Agenda1. Recent iteration and job done
2. What we are doing now
I1 I2 E1 C1 C2
Current situation
Inception Elaboration Construction
Job done on the Construction iteration 1 Request real test data from Ms.Izel
Ms. Izel provided us with DOC files the President’s Weekly Letter – March issues for testing.
Held a system demonstration with Ms. Izel We get a lot of constructive feedbacks Tradeoffs: She is requesting even more functionality! And we are suffering!
Installing the application on a test server http://web4.cs.ait.ac.th/pwlp/
Implementing another 2 use cases(prototype, design, code, test) “Maintain task” and “Maintain PWL”
Refine/Start a bunch of documents
Construction iteration 2 Gantt Chart
What are we doing now?(C2) Take user feedbacks into consideration
Fixing things according to Ms. Izel’s feedback
Finishing up rest of the use cases Currently, it’s almost done.
Another complete system demonstration with Ms.Izel Around this coming Friday
Running full optioned system test Test according to a test scenario check list (Vilachith, Patra, Aye Aye) automated test by chaky
Reports, Reports, Reports Why not agile?