The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

7
The Buff President’s Weekly Letter Project

Transcript of The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

Page 1: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

The BuffPresident’s Weekly Letter Project

Page 2: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

The Buffs

Vilachith PhommasackSystem analyst

Watchara SriswasdiTechnical Manager

Patra Thamavithya

Project Manager

Chaklam Silpasuwanchai

Software architect

Tin Tin AyeJunior Programmer

Page 3: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

Agenda1. Recent iteration and job done

2. What we are doing now

Page 4: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

I1 I2 E1 C1 C2

Current situation

Inception Elaboration Construction

Page 5: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

Job done on the Construction iteration 1 Request real test data from Ms.Izel

Ms. Izel provided us with DOC files the President’s Weekly Letter – March issues for testing.

Held a system demonstration with Ms. Izel We get a lot of constructive feedbacks Tradeoffs: She is requesting even more functionality! And we are suffering!

Installing the application on a test server http://web4.cs.ait.ac.th/pwlp/

Implementing another 2 use cases(prototype, design, code, test) “Maintain task” and “Maintain PWL”

Refine/Start a bunch of documents

Page 6: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

Construction iteration 2 Gantt Chart

Page 7: The B uff. The Buffs Agenda 1. Recent iteration and job done 2. What we are doing now.

What are we doing now?(C2) Take user feedbacks into consideration

Fixing things according to Ms. Izel’s feedback

Finishing up rest of the use cases Currently, it’s almost done.

Another complete system demonstration with Ms.Izel Around this coming Friday

Running full optioned system test Test according to a test scenario check list (Vilachith, Patra, Aye Aye) automated test by chaky

Reports, Reports, Reports Why not agile?