Post on 13-Oct-2020
7
Division 7AlamanceCaswellGuilfordOrangeRockingham
STATE TRANSPORTATION IMPROVEMENT PROGRAM
ORANGE
ALAMANCE
GUILFORD
CASWELL
ROCKINGHAM
158
29
421
158
15
70
70
220
220
29311
40
4040
74
85
85
73
150
119
62
770
87
68
62
700
68
49
8662
87
57
65
86
14
62
87
54
61
119
704
Kernersville
Eden
Reidsville
Greensboro
Mebane
ChapelHill
Graham
Carrboro
HighPoint
Burlington
P-5701
AV-5711
B-5346B-4953
B-5239
B-5349
B-5719
B-4956
B-5736
B-4958
B-5717
B-5344
B-4960
B-5730
B-5356
B-5354
B-4805
B-5715
B-4964
B-4803
B-5341
B-5721
B-5352
B-5716
B-5343
B-5722
EB-5712
U-5846
U-5774B
R-2612B
U-5849
U-5854
U-5304DU-5847
U-5550
U-5169
U-5326I-5711
R-5725
U-5752I-5712 U-5843
U-5850
P-5204
U-5848
U-5306B
R-5704
U-5842
U-5841
U-5304E
U-5812
U-5304B
EB-5721
U-5852
U-5754
EB-5714
EB-5716
EB-5717 U-5844
U-5855
U-2524BC
EB-5700
I-5853
I-5811
U-5851
U-2524D
I-5735
I-5854
I-5822
U-5853
I-5789
I-5790U-5845
I-5836I-5812
I-5110
U-3615B
I-5734
R-2413B
I-5852I-5762
U-2412A
I-5855
U-5304A
U-4758
U-2525B
R-2413A
I-5821
U-2525C
I-5736
I-3306A
DRAFT STIPFY 2015-2025STI ProjectsDIVISION 7
0 5 102.5Miles
BRIDGES FUNDED THROUGH STI
STATEWIDE AVIATION
REGIONAL AVIATION
DIVISION AVIATION
DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADUNDER CONSTRUCTIONMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES
* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not
let as of November 2014
COUNTY
FUTURE YEARS
F
NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School
FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)
STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds
NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)
SW - StatewideTRN -Transition Project
S - StructureU - Utilities
I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving
WAKE
NUMBERLENGTH (MILES)
DIVISION 00
R-0000
IDROUTE/CITY
US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY
Project termini and a general
SW
M1500
A
NHP
4000
FUNDING CATEGORY (1)
used for each project phase.
FUNDING SOURCE (2)
U
B3000R
FY 2017
C
(3) WORK TYPE (ACTIVITY)
A - Acquisition
with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
dollars.)
of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE
SW CBSW
One or two letter
HIGHWAY PROGRAM
UNFUNDED
NC 3 TO SR 1003SR 1003 TO NC 96
ASW
UNFUNDED
20000CRC 5000C 5000 BC B
WIDEN TO A FOUR-LANE FACILITY
A
NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.
B
FY 2025 FY 2018
700
FY 2019
DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020FY 2015 FY 2016
M
TOTAL PROJECT
COST (THOU)
NHPNHP
FUN
DS
A
PRIOR YEARS COST
(THOU)
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
U 5000NHP
C10000
FY 2021
C
FY 2023 FY 2024
FY 2022
5000
9000
APD - Appalachian Development
NHPNHP
LOCATION / DESCRIPTION NHP
NHP
I-40 TO NC 3
Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.
work description.
way, utility, mitigation and construction cost estimates
See Highway Funding Key
any project breaks.Category for the project andIdentifies the "STI" Funding
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
for an explanation of funding categories
Phases of implementation: ESTIMATED COST Preliminary engineering, right of
(1) FUNDING CATEGORY
PROJECT BREAKS
designation for project
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBER Assigned to each project at conception and remains with
BVarious - multiple routesNEW ROUTE or City
WORK TYPE (ACTIVITY) (3)
BOND (R) - Revenue Bond
HRRR - High Risk Rural Roads
L - LocalHSIP - Highway Safety Improvement Program
project until completion.
DIV - DivisionEX - Exempt
REG - RegionalHF - State Dollars (Non-STI)
F - Feasibility StudyCG - Construction (GARVEE)C - Construction
G - Grading and Structures
R - Right of Way
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
ER - Emergency Relief Funds
CMAQ - Congestion MitigationDP - Discretionary or Demonstration
FED - Federal Rail Funds
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS
I-5836 14540.2 MILE EAST OF NC 49 TO 0.2 MILE EAST OF NC 54 IN GRAHAM. PAVEMENT REHABILITATION.
2.7SW
NHPIM C 1454 ALAMANCE I-40 / I-85
PLANNING / DESIGN IN PROGRESS
I-5309 7225 650EAST OF GUILFORD COUNTY LINE TO EAST OF NC 49. PAVEMENT REHABILITATION.
5.8
SW
NHPIM C 6575 ALAMANCE I-40 /I-85
PROJECT COMPLETE - GARVEE BOND FUNDING $12.0 MILLION; PAYBACK FY 2007 - FY 2018
I-4918 19870 16014NC 54 (MILE POST 148) IN ALAMANCE COUNTY TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE.
8.3
TRN
NHP 964CG CG 964 CG 964 CG 964 ALAMANCEORANGE
I-40 / I-85
PROJECT COMPLETE - GARVEE BOND FUNDING $4.4 MILLION; PAYBACK FY 2007 - FY 2018
I-4714 11383 9511NC 49 (MILE POST 145) TO NC 54 (MILE POST 148). MILL AND RESURFACE.
2.8TRN
NHP 468CG CG 468 CG 468 CG 468 ALAMANCE I-40 / I-85
PLANNING / DESIGN IN PROGRESS
I-5711 1545 200SR 1007 (MEBANE-OAKS ROAD) IN MEBANE. INTERCHANGE IMPROVEMENTS.
SW
NHP R 160 NHP U 185 NHP C 1000
ALAMANCE I-40 / I-85
URBAN PROJECTSU-5752 930ST. MARKS CHURCH ROAD IN BURLINGTON.
INTERSECTION IMPROVEMENTS.
REG
T R 180 T C 750
ALAMANCE US 70(SOUTH CHURCH STREET)
U-5843 1163SR 1817 (GRAHAM-HOPEDALE ROAD) IN BURLINGTON. INTERSECTION IMPROVEMENTS.
0.5
DIV
T R 225 T C 938
ALAMANCE US 70(CHURCH STREET)
U-5844 7100SR 1430 (RAMADA ROAD) TO US 70 (CHURCH STREET) IN BURLINGTON. WIDEN TO MULTILANES.
1.1
DIV
T R 1900 T 5200C
ALAMANCE NC 62
UNDER CONSTRUCTION
U-5152 214 214ELMIRA STREET IN BURLINGTON. INSTALL METAL SIGN POST.
ALAMANCE NC 87(WEBB STREET)
PLANNING / DESIGN IN PROGRESS
U-3109 112589 46958NC 119 RELOCATION, I-85 TO SOUTH OF SR 1918 (MRS. WHITE ROAD) IN MEBANE. FOUR-TO-SIX-LANE FACILITY ON NEW LOCATION.
4.2 STP 10M A STP 47800C A STP 6600R B STP 813U B STP 8M B STP 10400C B
A NC 119 RELOCATION, I-40 / I-85 TO NORTH OF SR 1921 (MEBANE ROGERS ROAD). - RIGHT OF WAY IN PROGRESSB NC 119 RELOCATION, NORTH OF SR 1921 (MEBANE ROGERS ROAD) TO SOUTH OF SR 1918 (MRS. WHITE ROAD)
ALAMANCE NC 119
U-5853 24819SR 1228 (BOONE STATION DRIVE) IN BURLINGTON TO EAST LEBANON AVENUE IN ELON. WIDEN TO MULTILANES.
DIV
T 594U T 4949R T 19276C
ALAMANCE SR 1301(ST. MARKS CHURCHROAD / SOUTHWILLIAMSONAVENUE)
UNDER CONSTRUCTION
U-5538 1650 1650ACCESS ROAD FROM SR 1981 (TROLLINGWOOD-HAWFIELDS ROAD) TO INDUSTRIAL SITE. CONSTRUCT TWO-LANE ROAD ON NEW LOCATION.
1.5ALAMANCE NEW ROUTE
7-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
PART B, GARVEE BOND FUNDING $10.5 MILLION; PAYBACK FY 2011 - FY 2022
U-3110 30477 21293NEW ROUTE, US 70 TO NC 100 IN ELON. MULTI-LANES, PART ON NEW LOCATION.
2.1 STP 1148CG B CG 1148 B CG 1148 B CG 1148 B CG 1148 B CG 1148 B 1148CG B1148CG B
A US 70 TO NORTH OF SR 1309 (WESTBROOK AVENUE) - COMPLETEB IMPROVEMENTS ON SR 1311 (COOK ROAD), SR 1309 (WESTBROOK AVENUE) TO NC 100, PART ON NEW LOCATION - COMPLETETRN
ALAMANCE NEW ROUTE
FEDERAL BRIDGE PROJECTSB-5728 5635REPLACE BRIDGE NO. 112 OVER REEDY
FORK CREEK IN OSSIPEE.HF
HFB 515R HFB 5120C
ALAMANCE NC 87
PLANNING / DESIGN IN PROGRESS
B-5239 3065 200REPLACE BRIDGE NO. 126 OVER MILL RACE AND REPLACE BRIDGE NO. 119 OVER HAW RIVER.
REG
STPON 35R STPON 230U HFB C 2600
ALAMANCE NC 87
UNDER CONSTRUCTION
B-4400 1345 1345REPLACE BRIDGE NO. 160 OVER PRONG OF STINKING QUARTER CREEK.
DIV
ALAMANCE SR 1122(EULISS ROAD)
UNDER CONSTRUCTION
B-4401 1560 1560REPLACE BRIDGE NO. 161 OVER NORTH PRONG OF STINKING QUARTER CREEK.
DIV
ALAMANCE SR 1124(STAFFORD MILLROAD)
PLANNING / DESIGN IN PROGRESS
B-5342 1358 200REPLACE BRIDGE NO. 169 OVER GUM CREEK.
DIV
STPOFF 75R STPOFF 158U HFB C 925
ALAMANCE SR 1148(ANTHONY ROAD)
PLANNING / DESIGN IN PROGRESS
B-5349 1690 100REPLACE BRIDGE NO. 173 OVER LITTLE ALAMANCE CREEK IN BURLINGTON.
DIV
STPOFF R 180 STPOFF M 10 STPOFF C 1400
ALAMANCE SR 1149(HUFFMAN MILLROAD)
B-5727 2804REPLACE BRIDGE NO. 178 OVER LITTLE ALAMANCE CREEK IN BURLINGTON.
HF
HFB 250R HFB 4M HFB 2550C
ALAMANCE SR 1154 (TUCKERSTREET)
PLANNING / DESIGN IN PROGRESS
B-5347 675 100REPLACE BRIDGE NO. 170 OVER PRONG OF ALAMANCE CREEK IN ALAMANCE.
HF
HFB R 50 HFB C 525
ALAMANCE SR 1212(POND ROAD)
PLANNING / DESIGN IN PROGRESS
B-5346 947 100REPLACE BRIDGE NO. 3 OVER AN UNNAMED CREEK.
DIV
STPOFF R 77 STPOFF C 770
ALAMANCE SR 1529(DURHAM STREET)
PLANNING / DESIGN IN PROGRESS
B-5350 750 100REPLACE BRIDGE NO. 44 OVER JORDAN'S CREEK.
HF
HFB R 50 HFB C 600
ALAMANCE SR 1768(HUGHES MILLROAD)
RIGHT OF WAY IN PROGRESS
B-4953 860 285REPLACE BRIDGE NO. 64 OVER QUAKER CREEK.
DIV
STPOFF 575C ALAMANCE SR 1912(DICKEY MILL ROAD)
7-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
B-5735 1900REPLACE BRIDGE NO. 307 OVER BACK CREEK.
HF
HFB 175R HFB 1725C
ALAMANCE SR 1936 (STONE STREETEXTENSION)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
W-5011 468 468NC 119 INTERSECTION. INSTALL ALL-WAY STOP AND CHANNELIZATION, AND IMPROVE SIGHT DISTANCE.
0.3ALAMANCE NC 49
DIVISION PURCHASE ORDER CONTRACT (DPOC) - UNDER CONSTRUCTION
W-4705 400 400SR 2142 (MT. WILLEN ROAD-SALEM CHURCH ROAD) INTERSECTION. INSTALL TRAFFIC SIGNAL AND CONSTRUCT TURN LANES ON NC 54.
ALAMANCE NC 54
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
FEDERAL BRIDGE PROJECTSB-5734 3250REPLACE BRIDGE NO. 60 OVER MOON
CREEK.HF
HFB 300R HFB C 2950
CASWELL NC 86
7-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5162 2358 2358REPLACE BRIDGE NO. 35 OVER NORTH FORK RATTLESNAKE CREEK.
DIV
CASWELL SR 1523(BLANCH ROAD)
B-5719 683REPLACE BRIDGE NO. 53 OVER TRIBUTARY OF DAN RIVER.
DIV
STPOFF R 33 STPOFF C 650
CASWELL SR 1527 (RIVER BENDROAD)
UNDER CONSTRUCTION
B-4725 2361 2361REPLACE BRIDGE NO. 12 OVER COUNTRY LINE CREEK.
DIV
CASWELL SR 1554(YARBOROUGHSMILL ROAD)
B-5725 2800REPLACE BRIDGE NO. 7 OVER HYCO CREEK.
HF
HFB 250R HFB 2550C
CASWELL SR 1710 (GRIERSCHURCH ROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
W-5325 2154 2154NORTH OF SR 1111 (BYRDS SAWMILL ROAD) TO SOUTH OF SR 1759 (ROSCOE DAMERON ROAD). GEOMETRIC IMPROVEMENTS, PAVED SHOULDERS, AND RESURFACING.
1.1CASWELL NC 62
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EX
CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
7-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS
PROJECT COMPLETE - GARVEE BOND FUNDING $9.3 MILLION; PAYBACK FY 2007 - FY 2018
I-4715 17291 13947SR 4121 (HIGH POINT ROAD) TO I-85 BYPASS. MILL AND RESURFACE.
9.9TRN
NHP 836CG CG 836 CG 836 CG 836 GUILFORD I-40
I-5712 2175SR 1850 (SANDY RIDGE ROAD) IN GREENSBORO. INTERCHANGE IMPROVEMENTS.SW
NHP R 300 NHP C 1875
GUILFORD I-40 / US 421
I-5812 3341 MILE EAST OF SR 3029 (YOUNGS MILL ROAD) TO 0.2 MILE EAST OF SR 3045 (MOUNT HOPE CHURCH ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.
2SW
NHPIM C 334 GUILFORD I-40
I-5814 32260.4 MILE EAST OF SR 2632 (OLD SALEM ROAD) IN FORSYTH COUNTY TO 0.3 MILE WEST OF SR 1860 (MACY GROVE ROAD) IN GUILFORD COUNTY. PAVEMENT REHABILITATION.
2.4
SW
NHPIM C 3226 FORSYTHGUILFORD
I-40
I-5734 64021.3 MILES EAST OF SR 1850 (SANDY RIDGE ROAD) TO 1.1 MILES EAST OF SR 1556 (GALLIMORE DAIRY ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.
3SW
NHPIM C 6402 GUILFORD I-40
I-5762 3262FORSYTH COUNTY LINE TO 1.3 MILES EAST OF SR 1850 (SANDY RIDGE ROAD). PAVEMENT REHABILITATION.
4SW
NHPIM C 3262 GUILFORD I-40
I-5811 6130.2 MILE EAST OF SR 1541 (WENDOVER AVENUE) TO 0.6 MILE EAST OF SR 4239 (PATTERSON STREET) IN GREENSBORO. PAVEMENT REHABILITATION.
2SW
NHPIM C 613 GUILFORD I-40
I-5852 5174I-40 / US 421 TO SR 2085 (BRYAN BOULEVARD) IN GREENSBORO. PAVEMENT REHABILITATION.
3.4SW
NHPIM C 5174 GUILFORD I-73
I-5735 2620RANDOLPH COUNTY LINE TO 1.2 MILES NORTH OF NC 62. PAVEMENT REHABILITATION.
2SW
NHPIM C 2620 GUILFORD I-73
COORDINATE WITH I-5767
I-5736 829FORSYTH COUNTY LINE TO SR 1300 (GREEN ROAD) IN HIGH POINT. PAVEMENT REHABILITATION.
7.1SW
NHPIM C 829 GUILFORD I-74 / US 311
UNDER CONSTRUCTION
I-5511 180 180I-40 IN FORSYTH COUNTY TO EAST OF SR 1980 (OLD PLANK ROAD) IN GUILFORD COUNTY. INSTALL SIGNAGE TO REFLECT INTERSTATE DESIGNATION.
12
TRN
FORSYTHGUILFORD
I-74 / US 311
I-5790 41760.2 MILE NORTH OF SR 3039 (NELSON FARM ROAD) TO 1.3 MILES NORTH OF SR 3029 (YOUNGS MILL ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.
2.4SW
NHPIM C 4176 GUILFORD I-85
I-5789 3208SR 1113 (KIVETT DRIVE) TO 0.4 MILE NORTH OF I-85 BUSINESS IN HIGH POINT. PAVEMENT REHABILITATION.
2SW
NHPIM C 3208 GUILFORD I-85
I-5855 55310.8 MILE NORTH OF SR 3505 (PLEASANT GARDEN RD.) TO 0.2 MILE NORTH OF SR 3039 (NELSON FARM ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.
3.8SW
NHPIM C 5531 GUILFORD I-85
I-5854 33910.3 MILE NORTH OF BUSINESS 85 TO 0.2 MILE NORTH OF SR 1115 (REHOBETH CHURCH ROAD). PAVEMENT REHABILITATION.
1.9SW
NHPIM C 3391 GUILFORD I-85
I-5853 9300.4 MILE NORTH OF I-85 BUSINESS TO 0.3 MILE NORTH OF I-73 / US 421. PAVEMENT REHABILITATION.
2SW
NHPIM C 930 GUILFORD I-85 / US 29 / US 70
7-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS
I-5821 6692RANDOLPH COUNTY LINE TO 1 MILE EAST OF SR 1113 (KIVETT DRIVE). PAVEMENT REHABILITATION.
5.5SW
NHPIM C 6692 GUILFORD I-85
UNDER CONSTRUCTION
I-5329 1595 1595SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.
70GUILFORDMONTGOMERYRANDOLPHRICHMOND
US 220 / I-73 / I-74
COMBINED WITH R-2413A AND R-2413B FOR DESIGN-BUILD LET - UNDER CONSTRUCTION
I-5110 153391 85441NC 68 TO GREENSBORO WESTERN LOOP. SIX-LANE FREEWAY ON NEW LOCATION.
3
TRN
NHP 27150R NHP 2000U NHP 19400C C 19400
GUILFORD FUTURE I-73
RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-2577* 110870 2196MULTI-LANES NORTH OF US 421 / I-40 BUSINESS IN WINSTON-SALEM TO US 220 IN STOKESDALE. WIDEN TO MULTI-LANES.
18.8 NHP 3900R A R 3900 A NHP 1654U A U 1654 A T M 366 A NHP 12050C A C 12050 AT 6800R B T 36100C B T 4800R C T 25400C C
A MULTI-LANES NORTH OF US 421 / I-40 BUSINESS TO SR 1965 (BELEWS CREEK ROAD)REGB SR 1965 (BELEWS CREEK ROAD) IN FORSYTH COUNTY TO SR 2034 (ANTHONY ROAD) IN GUILFORD COUNTYC NORTH OF SR 2034 (ANTHONY ROAD) TO US 220
FORSYTHGUILFORD
US 158
R-2413* 268941 268941NC 68 AT SR 2011 (EDGEFIELD ROAD) IN GUILFORD COUNTY TO US 220-NC 68 INTERSECTION IN ROCKINGHAM COUNTY. FOUR-LANE FREEWAY, ON NEW LOCATION, NC 68 TO US 220 AND FOUR LANES ALONG US 220 TO NC 68 IN ROCKINGHAM COUNTY.
12.1
TRN A FOUR LANES AT SR 2011 (EDGEFIELD ROAD) TO SR 2127 (BROOK BANK ROAD) - COMBINED WITH I-5110 AND R-2413B FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONB SR 2127 (BROOK BANK ROAD) TO HAW RIVER - COMBINED WITH I-5110 AND R-2413A FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONC HAW RIVER TO NC 68-US 220 INTERSECTION - UNDER CONSTRUCTION
GUILFORDROCKINGHAM
US 220 /FUTURE I-73
R-2309 75385 75385SR 2182 (HORSEPEN CREEK ROAD) TO US 220-NC 68 CONNECTOR (R-2413) IN GREENSBORO AND SUMMERFIELD. WIDEN TO MULTI-LANES.
6.3
AA COTSWALD TERRACE NORTH OF GREENSBORO TO SR 2182 (HORSEPEN CREEK ROAD) - COMPLETEAB SR 2182 (HORSEPEN CREEK ROAD) TO NORTH OF SR 2313 (WINFREE ROAD) IN GREENSBORO - UNDER CONSTRUCTION
GUILFORD US 220
R-2612 37453 37453SR 3389 (WOODY MILL ROAD) AND SR 3418 (NEELLEY ROAD) SOUTH OF GREENSBORO. CONVERT AT-GRADE INTERSECTIONS TO INTERCHANGES.
EX A SR 3389 (WOODY MILL ROAD) INTERSECTION SOUTH OF GREENSBORO - COMPLETEB SR 3418 (NEELLEY ROAD) INTERSECTION SOUTH OF GREENSBORO - UNDER CONSTRUCTIONTRN
GUILFORD US 421
R-5725 698NC 150 INTERSECTION IN OAK RIDGE. INTERSECTION IMPROVEMENTS.
REG
NHP R 135 NHP C 563
GUILFORD NC 68
UNDER CONSTRUCTION
R-2611 31284 31284SR 2007 (BUNKER HILL ROAD) AT COLFAX TO NC 68 IN GREENSBORO. WIDEN TO MULTI-LANES.
3.6GUILFORD SR 1008(WEST MARKETSTREET)
7-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
GARVEE BOND FUNDING $105.9 M FOR SEGMENT C; PAYBACK FY 2013-2024 - GARVEE BOND FUNDING $25 M FOR SEGMENT D; PAYBACK FY 2017-2028
U-2524* 661865 450385GREENSBORO WESTERN LOOP, NORTH OF I-85 TO LAWNDALE DRIVE IN GREENSBORO. CONSTRUCT FREEWAY ON NEW LOCATION.
15 NHP 9900C BC NHP 10857CG C CG 10857 C CG 10857 C CG 10857 C CG 10857 C CG 10857 C 10857CG C10857CG C10857CG C CG 10857 C S(M) 8827C C C 8827 C NHP 5126CG DCG 2563 D CG 2563 D CG 2563 D CG 2563 D CG 2563 D 2563CG D2563CG D2563CG D CG 2563 D CG 2563 DS(M) C 29600 D NHP 15000C F
AA SOUTH OF SR 1541 (WENDOVER AVENUE) TO NORTH OF SR 1560 (SAPP ROAD) - COMPLETEAB GREENSBORO WESTERN LOOP, NORTH OF I-85 NEAR SR 1129 (GROOMETOWN ROAD) TO NORTH OF SR 4121 (HIGH POINT ROAD) - COMPLETEAC GREENSBORO WESTERN LOOP, NORTH OF SR 4121 (HIGH POINT ROAD) TO SOUTH OF I-40 - COMPLETEAE GREENSBORO WESTERN LOOP, INTERCHANGE AT PROPOSED HIGH POINT ROAD RELOCATION - UNDER CONSTRUCTIONBA GREENSBORO WESTERN LOOP, SOUTH OF I-40 TO NORTH OF SR 2147 (WEST FRIENDLY AVENUE) - COMPLETEBB GREENSBORO WESTERN LOOP, NORTH OF SR 2147 (WEST FRIENDLY AVENUE) TO NORTH OF SR 2176 (BRYAN BOULEVARD) - COMPLETEBC SR 2085 (BRYAN BOULEVARD) INTERCHANGE MODIFICATIONS, INCLUDING AUXILIARY LANES, ITS, AND INMAN ROAD BRIDGE REPLACEMENT.TRNC GREENSBORO WESTERN LOOP, NORTH OF SR 2176 (BRYAN BOULEVARD) TO US 220 (BATTLEGROUND AVENUE) - UNDER CONSTRUCTIONTRND GREENSBORO WESTERN LOOP, US 220 (BATTLEGROUND AVENUE) TO SR 2303 (LAWNDALE DRIVE) - RIGHT OF WAY IN PROGRESSSWE GREENSBORO WESTERN LOOP, ITS INSTALLATION - COMPLETEF GREENSBORO WESTERN LOOP, INTERCHANGE AT PROPOSED LEWISTON-FLEMING ROAD EXTENSION
GUILFORD I-73 / I-840 /FUTURE I-840 /US 421
PLANNING / DESIGN IN PROGRESS BY CITY OF HIGH POINT - NCDOT CENTRAL LET PROJECT
U-5169 17264 1175NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. RECONSTRUCT INTERCHANGE AND APPROACHES.
DIV
NHP R 1975 NHP M 14 NHP C 7050 C 7050
GUILFORD I-74 / US 311
PLANNING / DESIGN IN PROGRESS
U-2525* 380622 109238GREENSBORO EASTERN LOOP, LAWNDALE DRIVE TO NORTH OF I-40 / I-85 IN GREENSBORO. CONSTRUCT FREEWAY ON NEW LOCATION.
12.6 T 28775C B C 28775 B C 28775 B T R 14245 C T M 214 C T C 38900 C C 38900 C 38900C C38900C C T 15000C D
A GREENSBORO EASTERN LOOP, SOUTH OF SR 3041 (CLAPP FARMS ROAD) TO US 70 RELOCATION - COMPLETEB GREENSBORO EASTERN LOOP, US 70 RELOCATION TO US 29 NORTH OF GREENSBORO - UNDER CONSTRUCTIONTRNC GREENSBORO EASTERN LOOP, US 29 NORTH OF GREENSBORO TO SR 2303 (LAWNDALE DRIVE)SWD INTERCHANGE AT PROPOSED CONE BOULEVARD EXTENSION
GUILFORD I-785 / I-840;FUTURE I-785;FUTURE I-840
U-5754 17064I-40 / BUSINESS 85 TO SOUTH OF FLORIDA STREET IN GREENSBORO. ADD LANE ON I-40 / BUSINESS 85 EASTBOUND RAMP ONTO NORTHBOUND US 29 / US 70 / US 220 AND EXTEND US 29 / US 70 / US 220 SOUTHBOUND RAMP ONTO SR 3672 (MARTIN LUTHER KING, JR. DRIVE)
0.8
REG
NHP R 548 NHP U 66 NHP 16450C
GUILFORD US 29 / US 70 / US 220(O'HENRY BOULEVARD)
UNDER CONSTRUCTION
U-5201 1000 1000I-40 / I-85 BUSINESS TO PHILLIPS AVENUE IN GREENSBORO. UPGRADE ELECTRICAL WIRING SYSTEM AND REPLACE METAL BREAKWAY POLES.
GUILFORD US 29
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO
U-5306 6605 2075INTERSECTION AND SIDEWALK IMPROVEMENTS AT CONE BOULEVARD-BENJAMIN PARKWAY, WESTRIDGE ROAD, NEW GARDEN ROAD, AND BRASSFIELD ROAD INTERSECTIONS IN GREENSBORO.
NHP 430R B NHP 3100C B NHP 1000C C
A INTERSECTION WITH BENJAMIN PARKWAY / CONE BOULEVARD AND APPROACHES - RIGHT OF WAY IN PROGRESSTRNB INTERSECTION WITH WESTRIDGE ROAD AND APPROACHES - PLANNING / DESIGN IN PROGRESSREGC INTERSECTION WITH NEW GARDEN ROAD AND APPROACHES - PLANNING / DESIGN IN PROGRESSTRND INTERSECTION WITH BRASSFIELD ROAD AND APPROACHES - UNDER CONSTRUCTION
GUILFORD US 220(BATTLEGROUNDAVENUE)
U-5851 15771US 220 (WENDOVER AVENUE) TO EAST CONE BOULEVARD IN GREENSBORO. ADD LANES.
1.6
DIV
T R 3088 T U 371 T 12312C
GUILFORD SR 1001(CHURCH STREET)
7-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
U-5850 2158ELMSLEY DRIVE TO GLENDALE DRIVE IN GREENSBORO. WIDEN TO MULTLANES.
0.3
DIV
T R 467 T U 56 T 1635C
GUILFORD SR 1007(RANDLEMAN ROAD)
RIGHT OF WAY IN PROGRESS BY CITY OF GREENSBORO
U-5326 2560 700SR 1546 (COLLEGE ROAD) IN GREENSBORO. INTERSECTION IMPROVEMENTS.
DIV
T R 360 T C 1500
GUILFORD SR 1008(MARKET STREET)
U-5855 10052MONTLIEU AVENUE FROM NORTH COLLEGE DRIVE TO GREENSBORO ROAD AND GREENSBORO ROAD FROM MONTLIEU AVENUE TO I-74 / US 311 IN HIGH POINT. WIDEN ROADWAY.
DIV
T R 1737 T U 208 T 8107C
GUILFORD SR 1471(MONTLIEU AVENUE)SR 1486(GREENSBOROROAD)
U-2412 163768 106842PROPOSED US 311 BYPASS IN HIGH POINT TO SR 1424 (HILLTOP ROAD) IN GREENSBORO. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
7.8 NHP 36075C A C 12025 ASTP 8826C B
A US 311 BYPASS TO SR 4228 (VICKREY CHAPEL ROAD) - RIGHT OF WAY IN PROGRESSDIVB SR 4228 (VICKREY CHAPEL ROAD) TO SR 1424 (HILLTOP ROAD) - UNDER CONSTRUCTIONTRN
GUILFORD SR 1486(GREENSBORO ROAD) /SR 4121(HIGH POINT ROAD)
UNDER CONSTRUCTION BY CITY OF GREENSBORO
U-5322 700 700CLIFTON ROAD IN GREENSBORO. INTERSECTION IMPROVEMENTS.
GUILFORD SR 1541 / SR 2254(WENDOVER AVENUE)
U-3400 24207SR 1567 (ROBBINS COUNTRY ROAD) TO US 311 (MAIN STREET) IN ARCHDALE. WIDEN TO MULTI-LANES.
3.1
DIV
T R 8989 A T U 1691 A T M 7 T 10858C A T 1111R B T 209U B T 1342C B
A SR 1567 (ROBBINS COUNTRY ROAD) TO GUILFORD COUNTY LINE.DIVB RANDOLPH COUNTY LINE TO SR 1993 (MAIN STREET).
GUILFORDRANDOLPH
SR 1577 / SR 1004(ARCHDALE ROAD)
PLANNING / DESIGN IN PROGRESS
U-4758 25818 7518SR 1820 (SKEET CLUB ROAD) TO I-40 IN HIGH POINT. WIDEN TO MULTI-LANES.
4.4
DIV
T R 5000 T C 6650 6650C
GUILFORD SR 1818(JOHNSON STREET) /SR 1850(SANDY RIDGE ROAD)
U-3615 70399 17399US 311 TO NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. WIDEN TO MULTI-LANES.
5.7 T 5700R A T 15500C A T 10600C B C 10600 B C 10600 B
A US 311 TO EAST OF SR 1818 (JOHNSON STREET). WIDEN TO FIVE-LANE FACILITY FROM US 311 TO NORTH OF US 311 AND TO FOUR-LANE MEDIAN DIVIDED FACILITY FROM NORTH OF US 311 TO EAST OF SR1818 (JOHNSON STREET).
B EAST OF SR 1818 (JOHNSON STREET) TO WEST OF NC 68 (EASTCHESTER DRIVE). WIDEN TO FOUR-LANE MEDIAN DIVIDED FACILITY. - RIGHT OF WAY IN PROGRESSTRN
GUILFORD SR 1820(SKEET CLUB ROAD)
U-5852 13416NORTHAMPTON DRIVE TO HOLDEN ROAD IN GREENSBORO. ADD LANES.
1.2
DIV
T R 855 T U 103 T 12458C
GUILFORD SR 2085(BENJAMIN PARKWAY/ BRYAN BOULEVARD)
UNDER CONSTRUCTION BY CITY OF GREENSBORO
U-5505 3041 3041ISAACSON BOULEVARD IN GREENSBORO. REALIGN FLEMING ROAD AND CONSTRUCT NEW INTERSECTION.
GUILFORD SR 2136(FLEMING ROAD)
7-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
NON-STATE-SYSTEM - LOCAL MATCH BY CITY OF GREENSBORO
U-5812 930LAWNDALE DRIVE AND PISGAH CHURCH ROAD IN GREENSBORO. INTERSECTION IMPROVEMENTS AT LAWNDALE ROAD AND PISGAH CHURCH ROAD, AT LAWNDALE ROAD AND MARTINSVILLE ROAD, AND AT MARTINSVILLE ROAD AND PISGAH CHURCH ROAD
DIV
STP R 144 L R 36 STP C 600 L C 150
GUILFORD VARIOUS
U-5157 9945 9945RESURFACING AT SELECTED LOCATIONS.
A MONTLIEU AVENUE TO US 311 BUSINESS (MAIN AVENUE) - COMPLETEB RANDOLPH COUNTY LINE TO NORTH OF SR 3485 (HARMONT DRIVE) - COMPLETEC ELM STRET TO SUMMIT AVENUE (1.5 MILES), FRIENDLY AVENUE, RADIANCE DRIVE TO ELAM AVENUE (0.7 MILE) AND SMITH STREET, BATTLEGROUND AVENUE TO EUGENE STREET (0.6
MILE) - COMPLETED SECTIONS OF HOLDEN ROAD, FLORIDA STREET, BESSEMER AVENUE, MEADOWVIEW ROAD, CONE BOULEVARD AND YANCEYVILLE STREET - UNDER CONSTRUCTION BY CITY OF
GREENSBOROE PATTON AVENUE TO JJ DRIVE;
RANDLEMAN ROAD FROM FLORIDA STREET TO FREEMAN MILL ROAD; SPRING GARDEN STREET FROM HOLDEN STREET TO MARKET STREET; MEADOWVIEW ROAD FROM RANDLEMAN ROAD TO ELM-EUGENE STREET; CONE BOULEVARD FROM SUMMIT AVENUE TO 16TH STREET; BENJAMIN PARKWAY FROM BATTLEGROUND AVENUE TO WESTMORELAND STREET - UNDER CONSTRUCTION BY CITY
GUILFORD VARIOUS
U-5021 25311GREENSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION (GUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA C 1815 C 3916 3916C3916C3916C C 3916 C 3916GUILFORD VARIOUS
NON-STATE-SYSTEM - LOCAL MATCH BY CITY OF GREENSBORO
U-5849 1844SR 4240 (WEST LEET STREET) TO SPRING GARDEN STREET IN GREENSBORO. REPLACE RAILROAD OVERPASS AND WIDEN ROADWAY.
0.2
DIV
STP R 366 L R 91 STP U 44 L U 11 STP C 1066 L C 266
GUILFORD AYCOCK STREET
IN PROGRESS BY CITY OF GREENSBORO - OPEN TO TRAFFIC
U-4750 5016 5016CURRENT TERMINUS TO CHIMNEY ROCK ROAD IN GREENSBORO. EXTEND ROADWAY, INCLUDING A GRADE SEPARATION OVER THE GREENSBORO URBAN LOOP.
GUILFORD HORNADAY ROAD
IN PROGRESS BY CITY OF GREENSBORO - OPEN TO TRAFFIC
U-5162 3433 3433LAWNDALE DRIVE TO SR 2348 (BASS CHAPEL ROAD-ELM STREET) IN GREENSBORO. WIDENING, INTERSECTION IMPROVEMENTS AND SIDEWALKS.
1.38GUILFORD LAKE JEANETTEROAD
U-5841 233FRIENDLY AVENUE IN GREENSBORO. WIDEN LINDELL ROAD (SR 2254 [WENDOVER AVENUE] OFF-RAMP) TO ADD A SECOND LEFT TURN LANE.
DIV
T R 45 T C 188
GUILFORD LINDELL ROAD
NON-STATE-SYSTEM - LOCAL MATCH BY CITY OF GREENSBORO
U-5842 930NORTH ELM STREET IN GREENSBORO. INTERSECTION IMPROVEMENTS.
0.5
DIV
STP R 144 L R 36 STP C 600 L C 150
GUILFORD PISGAH CHURCHROAD
IN PROGRESS BY CITY OF GREENSBORO - OPEN TO TRAFFIC
U-5163 2521 2521J. J. DRIVE TO VANDALIA ROAD IN GREENSBORO. MEDIAN AND SIDEWALK CONSTRUCTION.
1.89GUILFORD SOUTH ELM-EUGENE STREET
7-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1507B WESTRIDGE AVENUE TO COTSWOLD DRIVE IN GREENSBORO. WIDEN TO 6 LANES WITH MEDIAN.
1.4GUILFORD US 220(BATTLEGROUNDAVENUE)
FEDERAL BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-5356 9120 100REPLACE BRIDGE NO. 299 OVER SOUTH BUFFALO CREEK IN GREENSBORO.
SW
NHPB R 820 NHPB C 8200
GUILFORD I-40 / BUSINESS 85 /US 29 / US 70 /US 220
RIGHT OF WAY IN PROGRESS
B-5119 7358 1458REPLACE BRIDGE NO. 291 AND BRIDGE NO. 349 OVER US 29 / US 70 / US 220 IN GREENSBORO.SW
NHPB 5900C GUILFORD I-40 / BUSINESS 85(WESTBOUND)
PLANNING / DESIGN IN PROGRESS
B-5353 7610 150REPLACE BRIDGE NO. 147 OVER SR 1993 (SOUTH MAIN STREET) IN HIGH POINT.
HF
HFB R 660 HFB C 6800
GUILFORD US 29 / US 70 /BUSINESS 85
COORDINATE WITH B-5351
B-5730 3092REPLACE BRIDGE NO. 237 OVER DEEP RIVER IN HIGH POINT.
REG
NHPB R 147 NHPB C 2945
GUILFORD US 29 / US 70 /BUSINESS 85 NB
COORDINATE WITH B-5730 - PLANNING / DESIGN IN PROGRESS
B-5351 4490 150REPLACE BRIDGE NO. 242 OVER DEEP RIVER IN HIGH POINT.
HF
HFB R 390 HFB C 3950
GUILFORD US 29 / US 70 /BUSINESS 85 SB
RIGHT OF WAY IN PROGRESS - DIVISION DESIGN / CENTRAL LET
B-5736 586 125REPLACE BRIDGE NO. 38 OVER BEAVER CREEK.REG
STPON 461C GUILFORD NC 61
B-5726 470REPLACE BRIDGE NO. 135 OVER AN UNNAMED BRANCH.
HF
HFB 45R HFB 425C
GUILFORD SR 1001 (NORTH CHURCHSTREET)
B-4956 1150REPLACE BRIDGE NO. 25 OVER POLE CAT CREEK.
DIV
STPOFF 100R STPOFF C 1050
GUILFORD SR 1105(EAST STEEPLECHASE ROAD)
B-5723 2663REPLACE BRIDGE NO. 54 OVER TWO MILE CREEK IN HIGH POINT.
HF
HFB 240R HFB 23M HFB 2400C
GUILFORD SR 1158 (JACKSONLAKE ROAD)
UNDER CONSTRUCTION
B-4957 2330 2330REPLACE BRIDGE NO. 56 OVER RICHLAND CREEK IN HIGH POINT.
DIV
GUILFORD SR 1193(BAKER ROAD)
B-5714 2108REPLACE BRIDGE NO. 67 OVER DEEP RIVER IN HIGH POINT.
HF
HFB R 190 HFB 1918C
GUILFORD SR 1523 (DEEP RIVERROAD)
B-5731 2038REPLACE BRIDGE NO. 112 OVER HAW RIVER IN OAK RIDGE AND STOKESDALE.
HF
HFB 180R HFB 33M HFB 1825C
GUILFORD SR 2109 (EVERFIELDROAD)
7-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4756 1720 1720REPLACE BRIDGE NO. 120 OVER REEDY FORK CREEK IN GREENSBORO.
DIV
GUILFORD SR 2128(BUNCH ROAD)
B-4958 1877REPLACE BRIDGE NO. 106 OVER REEDY FORK CREEK IN OAK RIDGE.
DIV
STPOFF 170R STPOFF 7M STPOFF C 1700
GUILFORD SR 2128(BUNCH ROAD)
PLANNING / DESIGN IN PROGRESS
B-5345 1447 200REPLACE BRIDGE NO. 456 OVER BRUSH CREEK IN GREENSBORO.
HF
HFB R 110 HFB M 12 HFB C 1125
GUILFORD SR 2136(FLEMING ROAD)
B-5732 2695REPLACE BRIDGE NO. 412 OVER NORTH BUFFALO CREEK IN GREENSBORO.
HF
HFB 245R HFB C 2450
GUILFORD SR 2526 (SUMMITAVENUE)
RIGHT OF WAY IN PROGRESS
B-4959 1400 350REPLACE BRIDGE NO. 193 OVER BUFFALO CREEK.
HF
HFB C 1050 GUILFORD SR 2719(HIGH ROCK ROAD)
PLANNING / DESIGN IN PROGRESS
B-5344 1020 100REPLACE BRIDGE NO. 161 OVER SOUTH BUFFALO CREEK.
DIV
STPOFF 120R STPOFF C 800
GUILFORD SR 2821(HARVEST ROAD)
UNDER CONSTRUCTION
B-4758 1135 1135REPLACE BRIDGE NO. 159 OVER NORTH BUFFALO CREEK.
DIV
GUILFORD SR 2824(CREEKVIEW ROAD)
PLANNING / DESIGN IN PROGRESS
B-4961 1150 100REPLACE BRIDGE NO. 208 OVER LITTLE ALAMANCE CREEK.
HF
HFB R 100 HFB C 950
GUILFORD SR 3051(KNOX ROAD)
RIGHT OF WAY IN PROGRESS
B-4960 1014 139REPLACE BRIDGE NO. 214 OVER LITTLE ALAMANCE CREEK.
DIV
STPOFF 875C GUILFORD SR 3058(JUDGE ADAMS ROAD)
B-5724 550REPLACE BRIDGE NO. 293 OVER LITTLE ALAMANCE CREEK.
HF
HFB 50R HFB 500C
GUILFORD SR 3314(WILEY LEWIS ROAD)
B-5717 3312REPLACE BRIDGE NO. 121 OVER SOUTH BUFFALO CREEK IN GREENSBORO.
DIV
NHPB R 157 NHPB M 22 NHPB 3133C
GUILFORD SR 4240(EAST LEE STREET -WESTBOUND)
COORDINATE WITH R-4707 - PLANNING / DESIGN IN PROGRESS
B-5354 4720 100REPLACE BRIDGE NO. 360 OVER US 29 IN GREENSBORO.
DIV
NHPB R 420 NHPB C 4200
GUILFORD SR 4771(REEDY FORKPARKWAY)
7-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
B-5718 4571REPLACE BRIDGE NO. 329 OVER I-40 / BUSINESS 85 / US 29 / US 70 / US 220 IN GREENSBORO.DIV
NHPB 218R NHPB C 4353
GUILFORD PATTON AVENUE
B-5713 3490REPLACE BRIDGE NO. 352 OVER I-40 / BUSINESS 85 IN GREENSBORO.
DIV
NHPB R 166 NHPB M 6 NHPB 3318C
GUILFORD WILLOW ROAD
MUNICIPAL BRIDGE PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO - MUNICIPAL BRIDGE PROJECT
B-5553 825REPLACE BRIDGE NO. 98 OVER A TRIBUTARY OF HORSEPEN CREEK IN GREENSBORO.
DIV
STPOFF R 60 L R 15 STPOFF C 600 L C 150
GUILFORD BALLINGER ROAD
PLANNING / DESIGN IN PROGRESS BY CITY OF HIGH POINT - MUNICIPAL BRIDGE
B-5358 1010 200REPLACE BRIDGE NO. 428 OVER BRANCH OF RICHLAND CREEK IN HIGH POINT.
DIV
STPOFF 111R L 28R STPOFF 37M L 9M STPOFF C 500 L C 125
GUILFORD MODEL FARM ROAD
MITIGATION PROJECTS
IN PROGRESS
EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
HAZARD ELIMINATION PROJECTS
RIGHT OF WAY IN PROGRESS
W-5305 735 245SR 1129 AT SR 4019 (GROOMETOWN ROAD); NC 62 AT SR 1129 (GROOMETOWN ROAD). REALIGN BOTH INTERSECTIONS AND REMOVE ACCESS BETWEEN SR 4019 AND NC 62.
REG
HSIP 490C GUILFORD NC 62;SR 1129(GROOMETOWNROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - UNDER CONSTRUCTION
SF-4907D 715 715NC 68 AND SR 2269 (ALCORN ROAD) IN OAK RIDGE. CONSTRUCT TURN LANES ON ALCORN ROAD APPROACHES AND UPGRADE SIGNAL.
GUILFORD NC 68;SR 2269(ALCORN ROAD)
7-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
W-5114 2923 2923SOUTH OF SR 2111 (EAST HARRELL ROAD) TO SR 4831 (BARTONSHIRE DRIVE) IN OAK RIDGE AND SUMMERFIELD. CONSTRUCT TURN LANES, CLOSE ACCESS TO SR 2029 (WEST HARRELL ROAD), AND RELOCATE SR 2111 INTERSECTION AND PORTION OF SR 2111.
0.52GUILFORD NC 68
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN IN PROGRESS
C-5558 10101 1552CITY OF HIGH POINT SIGNAL SYSTEM EXPANSION AND UPGRADE.
EX
CMAQ 242R L 7R CMAQ C 8051 L C 249
GUILFORD VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO
C-5555 4862 1406SIDEWALK PROJECTS AT SELECTED LOCATIONS IN GREENSBORO.
EX
CMAQ 2765C L 691C
GUILFORD VARIOUS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EX
CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
C-5609 2554PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE HIGH POINT MPO.
EX
CMAQ C 1277 C 1277 DAVIDSONFORSYTHGUILFORD
VARIOUS
C-5607 5210PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GREENSBORO URBAN AREA MPO.EX
CMAQ C 2605 C 2605 GUILFORD VARIOUS
C-5602 170PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE BURLINGTON-GRAHAM MPO.EX
CMAQ C 85 C 85 GUILFORDORANGE
VARIOUS
UNDER CONSTRUCTION BY CITY OF GREENSBORO
C-5511 378 378RANDOLPH STREET INTERSECTION IN GREENSBORO. CONSTRUCT LEFT TURN LANES.EX
GUILFORD FLORIDA STREET
IN ACQUISITION BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-5561 280 280PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION VANPOOL VEHICLE REPLACEMENT / EXPANSION.EX
GUILFORD REGIONWIDE
7-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)
E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
INTERSTATE PROJECTSI-3306 175164 87031I-85 IN ORANGE COUNTY TO NC 147
(DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM COUNTY. WIDEN TO SIX LANES AND INSTALL ITS.
20.7 NHP 40R A NHP 60R A NHP 33M A NHP 44000C A C 22000 A C 22000 A
A I-85 TO DURHAM COUNTY LINE - PLANNING / DESIGN IN PROGRESSREGB ORANGE COUNTY LINE TO NC 147 (DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM - COMPLETE
DURHAMORANGE
I-40
I-5822 17921.6 MILES EAST OF NC 86 TO.0.8 MILE EAST OF SR 1734 (ERWIN ROAD). PAVEMENT REHABILITATION.
2.2SW
NHPIM C 1792 ORANGE I-40
PROJECT COMPLETE - GARVEE BOND FUNDING $12.0 MILLION; PAYBACK FY 2007 - FY 2018
I-4918 19870 16014NC 54 (MILE POST 148) IN ALAMANCE COUNTY TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE.
8.3
TRN
NHP 964CG CG 964 CG 964 CG 964 ALAMANCEORANGE
I-40 / I-85
UNDER CONSTRUCTION
I-5312 2604 2604EAST OF I-40 TO DURHAM COUNTY LINE. PAVEMENT REHABILITATION.
7.6ORANGE I-85
URBAN PROJECTS
SCHEDULED FOR FEASIBILITY STUDY
U-5304 100717NC 86 (SOUTH COLUMBIA STREET) TO EASTOWNE DRIVE / LAKEVIEW DRIVE IN CHAPEL HILL. UPGRADE CORRIDOR.
6 T 18465R A R 18465 A R 18465 AT 2215U A U 2216 A U 2216 AT 33288C A T C 2052 B T 160R D T C 1000 D T 300R E T C 1875 E
A NC 86 (SOUTH COLUMBIA STREET) TO SR 1742 (EPHESUS CHURCH ROAD) IN CHAPEL HILL. CAPACITY IMPROVEMENTS AND POSSIBLE INTERCHANGE AT SR 1902 (MANNING DRIVE), WITH SIDEWALKS, WIDE OUTSIDE LANES AND TRANSIT ACCOMMODATIONS.
SW
B SAGE ROAD TO EAST LAKEVIEW DRIVE IN CHAPEL HILL. UPGRADE ROADWAY TO SUPERSTREET.SWC SR 1742 (EPHESUS CHURCH ROAD). INTERSECTION IMPROVEMENTS. - WORK TO BE COMPLETED UNDER U-5550.D NC 54 (RALEIGH ROAD). INTERCHANGE IMPROVEMENTS.SWE NC 54 / NC 86 INTERCHANGE. ADD LANE ON US 15 / US 501 NORTHBOUND RAMP ONTO EASTBOUND NC 54.REG
ORANGE US 15 / US 501(FORDHAMBOULEVARD)
FY 2018 PROGRAMMING REFLECTS REIMBURSEMENT TO TOWN OF CHAPEL HILL
U-5550 2170SR 1742 (EPHESUS CHURCH ROAD) IN CHAPEL HILL. INTERSECTION IMPROVEMENTS.SW
NHP C 2170 ORANGE US 15 / US 501(FORDHAM BOULEVARD)
7-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
PARTS A THROUGH F ON EXPANDED NHS
U-5774 228591US 15 / US 501 IN CHAPEL HILL TO NC 55 IN DURHAM. UPGRADE ROADWAY CORRIDOR.
9.2 NHP 6400R A NHP 17300C A NHP 4620R B NHP 554U B NHP C 13466 B C 13466 BNHP 500R C NHP C 4300 C C 4300 CNHP 3600R D NHP 9800C D NHP 450R E NHP C 1875 E NHP 160R F NHP C 1000 F T 1800R G T 800U G T 29400C G T 5900R H T 2500U H T C 6600 H C 6600 HT 2500R I T 10700U I T 33600C I T 3200R J T 12600U J T 30600C J
A US 15 / US 501. UPGRADE INTERCHANGEB US 15 / US 501 IN ORANGE COUNTY TO SR 1110 (BARBEE CHAPEL ROAD) IN DURHAM COUNTY, UPGRADE ROADWAY CORRIDOR AND CONVERT AT-GRADE INTERSECTION WITH SR 1110 TO
INTERCHANGE.REG
C SR1110 (BARBEE CHAPEL ROAD) TO I-40. UPGRADE ROADWAY CORRIDOR.REGD FALCONBBRIDGE ROAD. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.E SR 1110 (FARRINGTON ROAD). CONVERT AT-GRADE INTERSECTION TO GRADE SEPARATION.REGF I-40 / NC 54 INTERCHANGE IMPROVEMENTSSWG I-40 TO NC 751. UPGRADE ROADWAY CORRIDOR.H NC 751 TO SR 1118 (FAYETTEVILLE ROAD). UPGRADE ROADWAY CORRIDOR.DIVI SR 1118 (FAYETTEVILLE ROAD) TO SR 1106 (BARBEE ROAD). UPGRADE ROADWAY CORRIDOR.J SR 1106 (BARBEE ROAD) TO NC 55. UPGRADE ROADWAY CORRIDOR.
DURHAMORANGE
NC 54
UNDER CONSTRUCTION
U-0624 9357 9357PUREFOY ROAD TO SR 1902 (MANNING DRIVE) IN CHAPEL HILL. CORRIDOR UPGRADE TO INCLUDE BICYCLE LANES.
0.7ORANGE NC 86(SOUTH COLUMBIASTREET)
COORDINATE WITH U-5845
U-5848 5299EXISTING SR 1006 (ORANGE GROVE ROAD) TO US 70 BUSINESS) IN HILLSBOROUGH. EXTEND ORANGE GROVE ROAD ON NEW LOCATION WITH SIDEWALKS AND BICYCLE LANES.
0.4
DIV
T R 1067 T U 128 T 4104C
ORANGE SR 1006(ORANGE GROVE ROAD)
U-5854 775SR 1913 (BENNETT ROAD) IN CHAPEL HILL. CONSTRUCT ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS.
DIV
T R 150 T C 625
ORANGE SR 1008(MT. CARMELCHURCH ROAD)
COORDINATE WITH U-5848
U-5845 26240I-40 TO ENO RIVER IN HILLSBOROUGH. WIDEN TO MULTILANES.
2.6
DIV
T 1952R T 234U T 24054C
ORANGE SR 1009(SOUTH CHURTON STREET)
7-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
U-5847 775SR 1771 / SR 1927 (MERRITT MILL ROAD) / BREWER LANE INTERSECTION IN CHAPEL HILL AND CARRBORO. INTERSECTION IMPROVEMENTS.
DIV
T R 150 T C 625
ORANGE SR 1010(WEST FRANKLIN STREET /EAST MAIN STREET)
UNDER CONSTRUCTION
U-3306 19377 19377NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO SR 1734 (ERWIN ROAD) IN CHAPEL HILL. CORRIDOR UPGRADE, PART ON NEW LOCATION.
2.8ORANGE SR 1733(WEAVER DAIRYROAD)
U-5846 775SR 1780 (ESTES DRIVE) IN CARRBORO. CONSTRUCT ROUNDABOUT.
DIV
T R 150 T C 625
ORANGE SR 1772(GREENSBORO STREET)
UNDER CONSTRUCTION
U-2803 9061 9061ROCK HAVEN ROAD TO BRIDGE NO. 88 IN CARRBORO. WIDEN TO ADD BICYCLE LANES, SIDEWALKS, AND TURN LANES WITH A CENTER MEDIAN.
0.6ORANGE SR 1919(SMITH LEVEL ROAD)
DIVISION DESIGN / CENTRAL LET; STPDA PARTICIPATION FOR PART B NOT TO EXCEED $6.3 MILLION PENDING MPO APPROVAL
EB-4707 13010 2110US 15-501 IN ORANGE COUNTY TO SR 1116 (GARRETT ROAD) IN DURHAM COUNTY. BICYCLE, PEDESTRIAN, AND TRANSIT IMPROVEMENTS; AND CONSTRUCTION OF ROUNDABOUT.
2.7
TRN
L 2650R A L C 3100 A STPDA 3920C B L 980C B S 250C B
A US 15-501 IN ORANGE COUNTY TO SR 1113 (POPE ROAD) IN DURHAM COUNTYTRNB SR 1113 (POPE ROAD) TO SR 1116 (GARRETT ROAD) - RIGHT OF WAY IN PROGRESSTRN
DURHAMORANGE
SR 2220(OLD CHAPEL HILL ROAD)SR 1838(OLD DURHAM ROAD)
UNDER CONSTRUCTION BY TOWN OF CARRBORO
EL-5103 76 76CARRBORO, INSTALL BUS SHELTERS AT SELECTED LOCATIONS.
ORANGE VARIOUS
IN PROGRESS
U-4727 14716 12377DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.
DIV
STPDA 1871PE L 468PE
CHATHAMDURHAMORANGE
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF CHAPEL HILL - IN PROGRESS
U-5543 94 94VARIABLE MESSAGE SIGNS FOR TRAFFIC MANAGEMENT ON MAJOR CORRIDORS IN CHAPEL HILL.REG
DURHAMORANGE
VARIOUS
U-5023 21748DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA 4365C4365C4288C C 4365 C 4365CHATHAMDURHAMORANGE
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF HILLSBOROUGH
U-5549 156DOWNTOWN ACCESS IMPROVEMENTS IN HILLSBOROUGH. CONSTRUCT CURB RELOCATIONS AND ADA-COMPLIANT INTERSECTION IMPROVEMENTS, AND REMOVE ON-STREET PARKING.
DIV
STPDA C 125 L C 31
ORANGE VARIOUS
FEASIBILITY STUDIES
FEASIBILITY STUDY IN PROGRESS
FS-1205A NC 86 IN ORANGE COUNTY TO SR 1728 (WADE AVENUE) IN WAKE COUNTY. CONSTRUCT MANAGED LANES.
23DURHAMORANGEWAKE
I-40
7-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-4962 6800 200REPLACE BRIDGE NO. 46 OVER ENO RIVER.
HF
HFB R 600 HFB C 6000
ORANGE US 70 BYPASS
PLANNING / DESIGN IN PROGRESS
B-5348 1145 100REPLACE BRIDGE NO. 85 OVER PHIL'S CREEK.
HF
HFB R 95 HFB C 950
ORANGE SR 1005(OLD GREENSBOROROAD)
B-5733 1955REPLACE BRIDGE NO. 39 OVER BOOKER CREEK IN CHAPEL HILL.
HF
HFB 180R HFB C 1775
ORANGE SR 1010 (EASTFRANKLIN STREET)
B-5720 1265REPLACE BRIDGE NO. 11 OVER ENO RIVER.
HF
HFB 115R HFB 1150C
ORANGE SR 1336 (HALLS MILLROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
HAZARD ELIMINATION PROJECTS
RIGHT OF WAY IN PROGRESS
W-5143 455 130NORTH OF INTERSECTION WITH SR 1332 (HIGHLAND FARM ROAD). IMPROVE HORIZONTAL ALIGNMENT OF CURVE TO PROVIDE A MINIMUM OF 60 MPH DESIGN SPEED.
TRN
HSIP 325C ORANGE SR 1004 (EFLAND-CEDAR GROVE ROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF CHAPEL HILL - IN PROGRESS
C-5179 2558 220NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO CASWELL DRIVE IN CHAPEL HILL. CONSTRUCT FIVE FOOT SIDEWALKS AND FIVE FOOT BIKE LANES.NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO ELLIOTT ROAD IN CHAPEL HILL. CONSTRUCT TEN FOOT MULTIUSE PATH.
EX
CMAQ R 240 L R 60 CMAQ C 1630 L C 408
ORANGE SR 1750(NORTH ESTESDRIVE)
C-5618 450PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE TRIANGLE AREA RPO.
EX
CMAQ C 225 C 225 CHATHAMORANGE
VARIOUS
7-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS
C-5602 170PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE BURLINGTON-GRAHAM MPO.EX
CMAQ C 85 C 85 GUILFORDORANGE
VARIOUS
C-5605 5030PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE DURHAM / CHAPEL HILL / CARRBORO MPO.
EX
CMAQ C 2515 C 2515 CHATHAMDURHAMORANGE
VARIOUS
C-5565 4422TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
EX
CMAQ 482I A I 572 A I 620 A I 640 A L 430I A I 496 A I 579 A I 603 A
A DEVELOP FLEXIBLE WORK SCHEDULES IN CAMPO AREA.EXB DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC AREA.
CHATHAMDURHAMFRANKLINGRANVILLEJOHNSTONORANGEWAKE
VARIOUS
IN PROGRESS
C-5111 250 250INSTALL TWO STATE MAINTAINED E-85 FUELING SITES IN CHARLOTTE AND HILLSBOROUGH.EX
MECKLENBURGORANGE
CHARLOTTEHILLSBOROUGH
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF CARRBORO
C-5181 320CONSTRUCT A 100 FOOT BRIDGE AND 650 FOOT PAVED TRAIL IN CARRBORO TO FILL GAP BETWEEN THE UPPER BOLIN TRAIL AND TWIN CREEKS GREENWAY AND IMPLEMENT PROGRAM TO SUPPORT NON-VEHICLE TRIPS TO MORRIS GROVE ELEMENTRY SCHOOL.
EX
CMAQ C 247 L C 61 CMAQ I 10 L I 2
ORANGE JONES CREEK GREENWAY
UNDER CONSTRUCTION BY ORANGE COUNTY
C-4932A 20 20PARK AND RIDE FACILITY IN TOWN OF HILLSBOROUGH, INSTALL BUS SHELTERS AND BIKE RACKS.
EX
ORANGE ORANGE COUNTYPARK-AND-RIDELOT
IN PROGRESS BY ORANGE COUNTY
C-4932B 436 436PARK AND RIDE FACILITY IN TOWN OF HILLSBOROUGH. PROVIDE OPERATING ASSISTANCE FOR THREE YEARS.
EX
ORANGE ORANGE COUNTYPARK-AND-RIDELOT
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF HILLSBOROUGH - IN PROGRESS
C-5184 610 60RIVERWALK TRAIL, PHASE III IN HILLSBOROUGH. CONSTRUCT A PAVED OFF-ROAD TAIL ALONG ENO RIVER CONNECTING RIVER PARK, GOLD PARK AND THE OCCONEECHEE MOUNTAIN STATE NATURAL AREA, AND CONSTRUCT SIDEWALK TO PROVIDE PEDESTRIAN AND BICYCLE CONNECTIONS TO THE GREENWAY.
EX
CMAQ 80R L 20R CMAQ C 360 L C 90
ORANGE RIVERWALK TRAIL
IN PROGRESS BY TRIANGLE J COUNCIL OF GOVERNMENTS
C-4924 3697 3697TRIANGLE J COUNCIL OF GOVERNMENTS (COG). DEVELOP A FLEXIBLE WORK SCHEDULE FOR EMPLOYEES AND ORGANIZATIONS IN TRIANGLE OZONE NON-ATTAINMENT AREA FOR THREE YEARS.EX A DEVELOP FLEXIBLE WORK SCHEDULES FOR EMPLOYEES IN CAPITAL AREA MPO (CAMPO) - IN PROGRESSEX
B DEVELOP FLEXIBLE WORK SCHEDULES FOR EMPLOYEES IN DURHAM-CHAPEL HILL-CARRBORO (DCHC) - IN PROGRESSEX
DURHAMORANGEWAKE
TRIANGLE JCOUNCIL OFGOVERNMENTS
7-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (LOCAL PROJECTS)
PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY TOWN OF CHAPEL HILL - IN PROGRESS
EL-4601 1141 1141EASTERN SECTION, US 15-501 AT SR 1994 (CULBRETH ROAD TO SR 1919 (SMITH LEVEL ROAD) IN CHAPEL HILL. TEN FOOT MULTI-USE ASPHALT PATH INCLUDING ACCESS TO MERRITT PASTURE.
ORANGE MORGAN CREEKGREENWAY
RURAL PROJECTSR-2413* 268941 268941NC 68 AT SR 2011 (EDGEFIELD ROAD) IN
GUILFORD COUNTY TO US 220-NC 68 INTERSECTION IN ROCKINGHAM COUNTY. FOUR-LANE FREEWAY, ON NEW LOCATION, NC 68 TO US 220 AND FOUR LANES ALONG US 220 TO NC 68 IN ROCKINGHAM COUNTY.
12.1
TRN A FOUR LANES AT SR 2011 (EDGEFIELD ROAD) TO SR 2127 (BROOK BANK ROAD) - COMBINED WITH I-5110 AND R-2413B FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONB SR 2127 (BROOK BANK ROAD) TO HAW RIVER - COMBINED WITH I-5110 AND R-2413A FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONC HAW RIVER TO NC 68-US 220 INTERSECTION - UNDER CONSTRUCTION
GUILFORDROCKINGHAM
US 220 /FUTURE I-73
R-5704 775SR 1998 (WENTWORTH STREET) / SR 1001 (SANDY CROSS ROAD). CONSTRUCT ROUNDABOUT AND REMOVE TRAFFIC SIGNAL.
REG
T R 150 T C 625
ROCKINGHAM NC 87
URBAN PROJECTSU-3326* 94001 94001SOUTH SCALES STREET TO NC 14 IN
REIDSVILLE. WIDEN TO MULTI-LANES.5.6
A SOUTH SCALES STREET TO SR 2686 (RICHARDSON DRIVE) - UNDER CONSTRUCTIONB SR 2686 (RICHARDSON DRIVE) TO NC 14 - UNDER CONSTRUCTION
ROCKINGHAM US 29 BUSINESS / US158 (FREEWAY DRIVE)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1507A SR 2066 (KINGS HIGHWAY) IN EDEN. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.
ROCKINGHAM NC 14(VAN BUREN ROAD)
FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4621 9858 9858REPLACE BRIDGE NO. 150 OVER US 220 BUSINESS.
SW
ROCKINGHAM US 220(NORTHBOUND)
PLANNING / DESIGN IN PROGRESS
B-5352 2790 200REPLACE BRIDGE NO. 131 OVER NORFOLK SOUTHERN RAILROAD.
SW
NHPB R 240 NHPB C 2350
ROCKINGHAM US 220(NORTHBOUND)
PLANNING / DESIGN IN PROGRESS
B-5343 1218 200REPLACE BRIDGE NO. 169 OVER CASCADE CREEK.
REG
STPON 93R HFB C 925
ROCKINGHAM US 311 / NC 770
B-5729 8470REPLACE BRIDGE NO. 134 OVER DAN RIVER IN EDEN.
HF
HFB 770R HFB C 7700
ROCKINGHAM NC 700
B-5737 5280REPLACE BRIDGE NO. 108 OVER NC 14 / NC 87 / NC 770 IN EDEN.
HF
HFB 480R HFB C 4800
ROCKINGHAM NC 700
PLANNING / DESIGN IN PROGRESS
B-4802 1355 100REPLACE BRIDGE NO. 18 OVER HAW RIVER.
HF
HFB R 110 HFB M 20 HFB C 1125
ROCKINGHAM SR 1002(SCALESVILLE ROAD)
UNDER CONSTRUCTION
B-4623 1715 1715REPLACE BRIDGE NO. 47 OVER HOGAN'S CREEK.
DIV
ROCKINGHAM SR 1128(SARDIS CHURCHROAD)
7-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
B-5716 5351REPLACE BRIDGE NO. 140 OVER DAN RIVER IN MADISON.
DIV
STPOFF R 255 STPOFF 2548C2548C
ROCKINGHAM SR 1138 (LINDSEYBRIDGE ROAD)
B-5722 1790REPLACE BRIDGE NO. 277 OVER BEAVER CREEK.
DIV
STPOFF R 85 STPOFF C 1705
ROCKINGHAM SR 1169 (ISLANDDRIVE)
PLANNING / DESIGN IN PROGRESS
B-5341 1655 100REPLACE BRIDGE NO. 110 OVER WOLF ISLAND CREEK.
DIV
STPOFF 35U STPOFF 70R STPOFF C 1450
ROCKINGHAM SR 1767(MAYFIELD ROAD)
B-5355 2945REPLACE BRIDGE NO. 106 OVER WOLF ISLAND CREEK.
HF
HFB R 270 HFB C 2675
ROCKINGHAM SR 1902(DIBRELL ROAD)
RIGHT OF WAY IN PROGRESS
B-4803 2182 482REPLACE BRIDGE NO. 97 OVER WOLF ISLAND CREEK.
DIV
STPOFF 1700C ROCKINGHAM SR 1925(WORSHAM MILLROAD)
PLANNING / DESIGN IN PROGRESS
B-4624 1323 127REPLACE BRIDGE NO. 80 OVER WOLF ISLAND CREEK.
HF
HFB R 220 HFB M 1 HFB C 975
ROCKINGHAM SR 1929(ESTES ROAD)
B-5721 3310REPLACE BRIDGE NO. 124 OVER MAYO RIVER IN MADISON.
DIV
STPOFF 158R STPOFF 3152C
ROCKINGHAM SR 2177 (DAN VALLEYROAD)
B-5715 1461REPLACE BRIDGE NO. 17 OVER HAW RIVER.
DIV
STPOFF 69R STPOFF 19M STPOFF 1373C
ROCKINGHAM SR 2351(WITTY ROAD)
PLANNING / DESIGN IN PROGRESS
B-4805 850 100REPLACE BRIDGE NO. 9 OVER PRONG OF TROUBLESOME CREEK.
DIV
STPOFF R 75 STPOFF C 675
ROCKINGHAM SR 2406(IRON WORKS ROAD)
PLANNING / DESIGN IN PROGRESS
B-4807 1861 100REPLACE BRIDGE NO. 6 OVER HAW RIVER.
HF
HFB R 140 HFB M 21 HFB C 1600
ROCKINGHAM SR 2426(CUNNINGHAM MILLROAD)
PLANNING / DESIGN IN PROGRESS
B-4964 1342 100REPLACE BRIDGE NO. 85 OVER SOUTHERN RAILROAD.
DIV
STPOFF 47U STPOFF 95R STPOFF C 1100
ROCKINGHAM SR 2600(MIZPAH CHURCHROAD)
B-5357 660REPLACE BRIDGE NO. 78 OVER AN UNNAMED CREEK.
HF
HFB R 60 HFB C 600
ROCKINGHAM SR 2715(HAMPTON ROAD)
7-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5003 311 311SR 2422 (MONROETON ROAD) / SR 2426 (CUNNINGHAM MILL ROAD). WIDEN FOR LEFT TURN LANES AND INSTALL TRAFFIC SIGNAL.
ROCKINGHAM US 158
DIVISION PURCHASE ORDER CONTRACT (POC) - PLANNING / DESIGN IN PROGRESS
W-5142 645 100SR 1110 (ELLISBORO ROAD) SOUTH OF MADISON. FIRST MEDIAN OPENING SOUTH OF INTERSECTION, PROVIDE A LIMITED MOVEMENT CROSSOVER, CONSTRUCT A BULB-OUT AND UPGRADE TWO LEFT-TURN LANES.
TRN
HSIP 20R HSIP 525C
ROCKINGHAM US 220
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
ALAMANCECASWELLGUILFORDORANGEROCKINGHAM
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EX
CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
7-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
COUNTY ID
FUTURE YEARS
F
RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants
HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)
(1) FUNDING CATEGORY
DURHAM AREA
SR - Secondary Road
TRANSIT PARTNERROUTE / CITY /
NUMBER
TA-4738
LOCATION / DESCRIPTION
PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY
DIV
SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
CP
BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET
ESTIMATED COST Preliminary engineering, right of
C10000
dollars.)
of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.
way, utility, mitigation and construction cost estimates
(2) FUNDING SOURCES KEY
O - OtherL - Local
initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
work description. CPProject termini and a general
conception and remains with
9000
PROJECT BREAKS
CP
Various - multiple routes
A
5000
FY 2022
C
CP 3000CP
BCP 5000 B
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2023 FY 2024FY 2021
STATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020
TOTAL PROJECT
COST (THOU)
FUZFUZ
FUN
DS
A
PRIOR YEARS COST
(THOU)
ACP 700
FY 2015 FY 2016
4000CP
FY 2025
5000
BB
CP CP 5000B
UNFUNDED
NON HIGHWAY PROGRAM
ADIV
FY 2017 FY 2018
BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
WORK TYPE (ACTIVITY) (3)Phases of implementation:
DIV C
20000
COMMITMENTSFUTURE
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
Preliminary engineering, Right of Way, UNFUNDED
BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
with proposed work type or activity beginning in the
break.
One or two letter
CP
A
for an explanation of funding categories
FUNDING CATEGORY (1)
DIV
DIVISION 00
DEVELOPMENTAL PROGRAM
DURHAM
FY 2019
TRANSIT PARTNERROUTE / CITY /
NEW ROUTE or CityTRANSIT PARTNER
IDENTIFICATION NUMBER Assigned to each project at
US or NC RoutesI - Interstate
project until completion.
C - City
FEPD - Elderly and Persons with Disablity (5310)
FMOD - Fixed Guideway Modifications
designation for project
any project breaks.Category for the project and
LOCATION / DESCRIPTION
used for each project phase.
FUNDING SOURCE (2)
Identifies the "STI" Funding
See Highway Funding Key
FSPR - State Planning and Research
FNF - New Freedom ProgramFNS - New Starts - Capital (5309)
FMPL - Metropolitan Planning (5303)
FED - Federal Rail Funds
FLAP - Federal Lands Access Program
FUZ - Urbanized Area Formula Program (5307)
CMAQ - Congestion Mitigation
FF - Federal Ferry
FNU - Non Urbanized Area Formula Program (5311)
(3) WORK TYPE (ACTIVITY)
C - ConstructionAD - Administrative
CP - Capital
A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide
DIV - Division
DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS
AV-5737 1200OBTAIN NAVIGATION EASEMENTS AND CLEAR OBSTRUCTIONS IN THE RUNWAY 24 APPROACH.
DIV
T R 1080 L R 120
ALAMANCE BURLINGTON-ALAMANCEREGIONAL AIRPORT(BUY)
AV-5768 6500ACQUIRE RUNWAY PROTECTION ZONE, DEMOLISH STRUCTURES AND CLEAR APPROACHES.DIV
T 5850R L 650R
ALAMANCE BURLINGTON-ALAMANCEREGIONAL AIRPORT (BUY)
PUBLIC TRANSPORTATION PROJECTSTM-6147 122OPERATING
HF
JARC 61O L 61O
ALAMANCE ALAMANACE COUNTYTRANSPORTATION
TQ-6788 228OPERATING
HF
FEPD 114O L 114O
ALAMANCE ALAMANACE COUNTYTRANSPORTATION
TO-5136 11817 3647OPERATING ASSISTANCE
HF
SMAP 1634O O 817 O 817 O 817 O 817 O 817 817O817O817O ALAMANCEGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TO-5134 2634 600OPERATING ASSISTANCE
HF
FUZ 434O O 200 O 200 O 200 O 200 O 200 200O200O200O ALAMANCEGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TS-5115 39 19SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 4CP CP 2 CP 2 CP 2 CP 2 CP 2 2CP2CP2CP ALAMANCEFORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
added per FY 2011 allocations
TP-5117 312 52PLANNING ASSISTANCE - BURLINGTON-GRAHAM
HF
FMPL 52CP CP 26 CP 26 CP 26 CP 26 CP 26 26CP26CP26CP ALAMANCE PIEDMONT AUTHORITYFORREGIONAL TRANSPORTATION
TM-5134 2400 400OPERATING ASSISTANCE
HF
JARC 400O O 200 O 200 O 200 O 200 O 200 200O200O200O ALAMANCE PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TA-6116 1875 233CAPITAL
HF
FNU 1642CP STCP
ALAMANCE ALAMANACE COUNTYTRANSPORTATION
TK-6103 4978 1428ADMINISTRATION
HF
FNU 702O O 356 O 356 O 356 O 356 O 356 356O356O356O FNU
ALAMANCE ALAMANACE COUNTYTRANSPORTATION
PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRN
STHSR 64PE STHSR 712R R 474 STHSR 3000C C 3000 C 941 O 881C C 880
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
7-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS
ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS
P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX
CMAQ 3750O O 3750
A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
UNDER CONSTRUCTION
P-5205 11605 11605GRAHAM TO HAW RIVER. SIDING AND CURVE REALIGNMENT.TRN
ALAMANCE PIEDMONT CORRIDOR
PUBLIC TRANSPORTATION PROJECTSTA-9003 16CAPITAL - PURCHASE OF SERVICE
HF
FEPD 12CP L 2CP S 2CP
CASWELL CASWELL COUNTY
TA-6175 199 28CAPITALHF
FNU 171CP CASWELL CASWELL COUNTY
TK-6116 1568 448ADMINISTRATION
HF
FNU 224O O 112 O 112 O 112 O 112 O 112 112O112O112O FNU
CASWELL CASWELL COUNTY
AVIATION PROJECTSAV-5701 20000RUNWAY 5R-23L EXTENSION PROGRAM
SW
O C 19500 T C 500
GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)
AV-5708 15500CONSTRUCT TAXIWAY OVER FUTURE I-73 EAST OF SR 2085 (BRYAN BOULEVARD).
SW
O 15000C T 500C
GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)
AV-5707 15900CONSTRUCT TAXIWAY G.
SW
O C 15400 T C 500
GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)
AV-5715 10000RUNWAY 5R-23L GROUP VI UPGRADE.
SW
O C 9500 T C 500
GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)
7-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS
AV-5718 3000HIGH SPEED TAXIWAY TO RUNWAY 5R-23L.
SW
O C 2500 T C 500
GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)
AV-5711 8000SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM (SMGCS) UPDATE.
SW
O C 7500 T C 500
GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF JAMESTOWN - IN PROGRESS
EB-5519 850EXISTING SIDEWALK NEAR JAMESTOWN MUNICIPAL BUILDING TO YORKLEIGH LANE NEAR GUILFORD TECHNICAL COMMUNITY COLLEGE JAMESTOWN CAMPUS/RAGSDALE HIGH SCHOOL COMPLEX IN JAMESTOWN. CONSTRUCT SIDEWALK.
TRN
STPEB 850C GUILFORD SR 4121 (EAST MAINSTREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF JAMESTOWN
EB-5517 1200EXISTING SIDEWALK TO PIEDMONT ENVIRONMENTAL CENTER ENTRANCE IN HIGH POINT AND JAMESTOWN. CONSTRUCT PEDESTRIAN BRIDGE OVER EAST FORK OF DEEP RIVER.
TRN
STPEB 1200C GUILFORD NEW PEDESTRIAN BRIDGEAND APPROACHES
PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY OTHERS - IN PROGRESS
EL-5101 23442 12489PEDESTRIAN AND BICYCLE PROJECTS IN THE GREENSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION (GUAMPO).
DIV
STPDA 268R L 67R STPDA 3949C C 1027 C 3518 L 987C C 257 C 880
GUILFORD VARIOUS
TAP FUNDING INCLUDES UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-5532 10273 35GREENSBORO URBAN AREA MPO: BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) – ELIGIBLE PROJECTS
DIV
TAP 64R R 20 R 10 R 10 L 16R R 6 R 3 R 3 STPDA 359C C 1203 C 356 C 3169 TAP 540C C 608 C 305 C 305 L 225C C 453 C 165 C 868 TAP C 155 C 155 C 155 C 155 C 155 155C155C155C C 155 C 155
GUILFORD VARIOUS
EB-5700 500PHASES B, C, AND D - CONSTRUCT GREENWAY ALONG MURROW BOULEVARD AND FISHER AVENUE IN GREENSBORO, FROM SR 4240 (EAST LEE STREET) TO NORTH ELM STREET ON EAST SIDE, AND FROM NORTH ELM STREET TO GREENE STREET ON SOUTH SIDE.
1.3
DIV
STPEB C 400 L C 100
GUILFORD DOWNTOWN GREENWAY
EB-5717 170MURROW BOULEVARD TO BESSEMER AVENUE IN GREENSBORO. CONSTRUCT SIDEWALK ON NORTH SIDE.
1
DIV
SRTS C 170 GUILFORD EAST LINDSAYSTREET
EB-5716 204SOUTH OF MEADOWVIEW ROAD TO SPRING GARDEN ROAD IN GREENSBORO. CONSTRUCT SIDEWALK ON WEST SIDE.
0.8DIV
SRTS C 204 GUILFORD HOLDEN ROAD
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO - IN PROGRESS
EB-5518 460 110BATTLEGROUND AVENUE TO MENDENHALL STREET IN GREENSBORO. REMOVE THROUGH LANE ON HILL STREET AND CONSTRUCT MULTI-USE PATH.
0.7
TRN
STPEB 350C GUILFORD LATHAM PARKGREENWAY
EB-5714 144SR 2751 (CHURCH STREET) TO SR 2523 (YANCEYVILLE STREET) IN GREENSBORO. CONSTRUCT SIDEWALK ON BOTH SIDES WHERE NONE EXISTS.
0.9DIV
SRTS C 144 GUILFORD LEES CHAPEL ROAD
7-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS
EB-5712 286SR 1398 (FREEMAN MILL ROAD) TO FLORIDA STREET IN GREENSBORO. CONSTRUCT SIDEWALKS ON WEST SIDE AND ON EAST SIDE FROM EXISTING SIDEWALK TO FLORIDA STREET.
0.6DIV
SRTS C 286 GUILFORD LOVETT STREET
PUBLIC TRANSPORTATION PROJECTSTA-5132 4775 1410EXPANSION BUSES
HF
FUZ 1346CP CP 673 CP 673 CP 673 GUILFORD GREENSBORO TRANSITAUTHORITY
TA-5124 1630 460EXPANSION BUS
HF
FNF 234CP CP 117 CP 117 CP 117 CP 117 CP 117 117CP117CP117CP GUILFORD GREENSBORO TRANSITAUTHORITY
see amendment #1 of 2012-2018 STIP
TG-5105 1815 1185ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FUZ 130CP CP 65 CP 65 CP 65 CP 61 CP 61 61CP61CP61CP GUILFORD GREENSBORO TRANSITAUTHORITY
see amendment #1 to 2012-2018 STIP
TG-4957 8610 2538OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ 1210Oc Oc 594 Oc 594 Oc 594 Oc 616 Oc 616 616Oc616Oc616Oc GUILFORD GREENSBORO TRANSITAUTHORITY
see amendment #1 to 2012-2018 STIP
TG-4759 58487 20482PREVENTIVE MAINTENANCE
DIV
FUZ 7002Oc Oc 3501 Oc 3501 Oc 3501 Oc 3750 Oc 3750 3750Oc3750Oc3750Oc L 350OC STPDA 1400OC
GUILFORD GREENSBORO TRANSITAUTHORITY
TG-5101A 6631 2256OPERATING ASSISTANCE
HF
FUZ 1575O O 875 O 875 O 875 FUZ 175CP
GUILFORD GREENSBORO TRANSITAUTHORITY
TG-5105B 136 50ROUTINE CAPITAL - BUS SHELTERS
EX
CMAQ 86CP GUILFORD GREENSBORO TRANSITAUTHORITY
TM-4705 4188 1188OPERATING ASSISTANCE
HF
JARC 600O O 300 O 300 O 300 O 300 O 300 300O300O300O GUILFORD GREENSBORO TRANSITAUTHORITY
TM-5308 305TRANSIT ENHANCEMENTS
HF
FUZ 98CP CP 49 CP 49 CP 49 L 24CP CP 12 CP 12 CP 12
GUILFORD GREENSBORO TRANSITAUTHORITY
TM-5312 1285316 OPERATING - GTA SUPPLEMENTAL SERVICE TO GTCC JAMESTOWN CAMPUS
HF
JARC 64O L 64O
GUILFORD GREENSBORO TRANSITAUTHORITY
TI-6103 12802 3566INTERCITY BUS - GREENSBORO TO BOONE
HF
FNU 2196O O 880 O 880 O 880 O 880 O 880 880O880O880O FORSYTHGUILFORDWATAUGAWILKESYADKIN
COACH AMERICA
TA-4767 4617 1817REPLACEMENT - PARATRANSIT VEHICLE
EX
CMAQ 666CP FBUS 553CP CP 553 CP 553 L 124CP CP 62 CP 62 S 117CP CP 55 CP 55 STPDA
GUILFORD GREENSBORO TRANSITAUTHORITY
7-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TA-4771 12807 1986HYBRID REPLACEMENT BUSES
EX
CMAQ 3708CP CP 2544 CP 567 FBUS 1108CP CP 664 CP 554 L 479CP CP 286 CP 64 CP 58 S 426CP CP 254 CP 57 CP 52
GUILFORD GREENSBORO TRANSITAUTHORITY
TO-4971 79471 12111OPERATING ASSISTANCE - FIXED ROUTE
HF
FUZ 5612O O 2956 O 2656 O 2956 O 1335 O 1335 1335O1335O1335O O 1335 L 2956O O 1328 O 1628 O 1328 O 3150 O 3150 3150O3150O3150O O 3150 SMAP 3256O O 1628 O 1628 O 1628 O 1815 O 1815 1815O1815O1815O O 1815
GUILFORD GREENSBORO TRANSITAUTHORITY
TO-5125 4885 2443OPERATING ASSISTANCE - PRIORITY SERVICE
EX
CMAQ 2442Oc GUILFORD GREENSBORO TRANSITAUTHORITY
TO-6139 1868 426ELDERLY AND DISABLED OPERATING
HF
FEPD 215O O 97 O 97 O 97 O 215 L 215O O 97 O 97 O 97 O 215
GUILFORD GREENSBORO TRANSITAUTHORITY
TO-6140 168 24ADMINISTRATIVE OVERSIGHT OF 5310 FUNDS
HF
FEPD 48O O 24 O 24 O 24 O 24 GUILFORD GREENSBORO TRANSITAUTHORITY
TO-5101B 1128 376OPERATING ASSISTANCE - ADDED SUNDAY
EX
CMAQ 752Oc GUILFORD GREENSBORO TRANSITAUTHORITY
TO-5101C 1854 618OPERATING ASSISTANCE - ROUTE #12 MODIFIED
EX
CMAQ 1236Oc GUILFORD GREENSBORO TRANSITAUTHORITY
TO-5101D 684 228OPERATING ASSISTANCE - ROUTE #15
EX
CMAQ 456Oc GUILFORD GREENSBORO TRANSITAUTHORITY
TP-5101 2005 518PLANNING ASSISTANCE - 5303
HF
FMPL 278CP CP 139 CP 139 CP 139 CP 139 CP 139 236CP139CP139CP GUILFORD GREENSBORO TRANSITAUTHORITY
TP-4712 2502 126PLANNING ASSISTANCE
HF
FUZ 376CP CP 250 CP 250 CP 250 CP 250 CP 250 250CP250CP250CP GUILFORD GREENSBORO TRANSITAUTHORITY
TQ-6783 8835310 CAPITAL PROJECTS
HF
FEPD 354CP CP 118 CP 118 CP 118 L 88CP CP 29 CP 29 CP 29
GUILFORD GREENSBORO TRANSITAUTHORITY
TQ-7000 132 24ADMINISTRATIVE OVERSIGHT OF 5310
HF
FEPD 66AD AD 21 AD 21 GUILFORD GREENSBORO TRANSIT AUTHORITY
see amendment #1 for 2012-2018 STIP
TS-4758 843 233SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 122CP CP 61 CP 61 CP 61 CP 61 CP 61 61CP61CP61CP GUILFORD GREENSBORO TRANSITAUTHORITY
TA-6551 53CAPITAL - EXPANSION VEHICLE
HF
FEPD 43CP L 5CP S 5CP
GUILFORD SENIOR RESOURCES OFGUILFORD
TQ-6793 202OPERATING
HF
FEPD 101O L 101O
GUILFORD GUILFORD COUNTYTRANSPORTATION
TO-4790 47708 12938OPERATING ASSISTANCE
HF
FUZ 7250O O 3640 O 3650 O 3660 O 2404 O 2404 2404O2404O2404O SMAP 870O O 435 O 435 O 435 O 475 O 475 475O475O475O
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSITSYSTEM
7-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TP-5104 616 176PLANNING ASSISTANCE - 5303
HF
FMPL 88CP CP 44 CP 44 CP 44 CP 44 CP 44 44CP44CP44CP GUILFORD HIGH POINT TRANSITSYSTEM / HI-TRAN
TS-5113 220 60SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 32CP CP 16 CP 16 CP 16 CP 16 CP 16 16CP16CP16CP DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSITSYSTEM / HI-TRAN
TM-6139 634OPERATING ASSISTANCE
HF
JARC 317O L 317O
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TO-5134 2634 600OPERATING ASSISTANCE
HF
FUZ 434O O 200 O 200 O 200 O 200 O 200 200O200O200O ALAMANCEGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TO-5136 11817 3647OPERATING ASSISTANCE
HF
SMAP 1634O O 817 O 817 O 817 O 817 O 817 817O817O817O ALAMANCEGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TO-5134B 1800OPERATING ASSISTANCE
HF
FUZ 900O L 900O
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TO-5134C 700OPERATING Assistance
HF
FUZ 700O FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TS-5115 39 19SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 4CP CP 2 CP 2 CP 2 CP 2 CP 2 2CP2CP2CP ALAMANCEFORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TA-6522 750 375PURCHASE VANS
REG
L 75CP STPDA 300CP
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TG-6173 375ROUTINE CAPITAL
HF
FUZ 300CP L 75CP
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TG-5226 1312 500PREVENTIVE MAINTENANCE
REG
STPDA 812CP FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TG-6173B 188ROUTINE CAPITAL
HF
FUZ 150CP L 38CP
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TM-5313 10006316 OPERATING - PART: CAREER EXPRESS DEVIATED FIXED ROUTE SERVICE
HF
JARC 250O O 250 L 250O O 250
GUILFORD PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
TG-4814 3206 916ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC ($40K CAPITAL COST OF CONTRACTING)HF
FUZ 458CP CP 229 CP 229 CP 229 CP 229 CP 229 229CP229CP229CP DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSITSYSTEM / HI TRAN
TA-6263 439 290CAPITAL
HF
FNU 149CP GUILFORD GUILFORD COUNTYTRANSPORTATION
TK-6132 3174 906ADMINISTRATION
HF
FNU 452O O 227 O 227 O 227 O 227 O 227 227O227O227O FNU
GUILFORD GUILFORD COUNTYTRANSPORTATION
7-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FREIGHT RAIL PROJECTS
"OTHER" FUNDS REFLECT NORFOLK SOUTHERN CORPORATION PARTICIPATION
P-5700 1700NORFOLK SOUTHERN "ROUNDHOUSE" PROPERTY. CONSTRUCT PARKING LOT WITH SPACE FOR INTERNATIONAL CONTAINERS, INCLUDING SECURITY FENCE, POLE-MOUNTED LIGHTING, AND PAVED ENTRANCE.
DIV
T C 850 O C 850
GUILFORD NORFOLK SOUTHERNMAINLINE
PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRN
STHSR 64PE STHSR 712R R 474 STHSR 3000C C 3000 C 941 O 881C C 880
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
UNDER CONSTRUCTION
P-5204 9212 9212GRADE SEPARATION AND ROAD REALIGNMENT, CARMON ROAD CROSSING CLOSURE AND MCLEANSVILLE ROAD CROSSING CLOSURE.
TRN
GUILFORD PIEDMONT CORRIDORSR 2819(MCLEANSVILLEROAD)
ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS
P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX
CMAQ 3750O O 3750
A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-4726 12233 6047DURHAM-CHAPEL HILL-CARRBORO (DCHC) MPO. BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) – ELIGIBLE PROJECTS.
DIV
STPDA 304PE L 76PE STPDA 2076C C 353 L 519C C 88 TAP C 277 C 277 C 277 C 277 C 277 277C277C277C C 277 C 277
CHATHAMDURHAMORANGE
VARIOUS
7-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS
PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY TOWN OF CARRBORO - IN PROGRESS
EL-4828 2068 784WESTERN SECTION, SR 1919 (SMITH LEVEL ROAD) TO UNIVERSITY LAKE IN CARRBORO. CONSTRUCT GREENWAY AND CONNECTIONS.
TRN
STPDA 298C A L 74C A TAP 730C B L 182C B
A PHASE 1TRNB PHASE 2TRN
ORANGE MORGAN CREEKGREENWAY
EB-5721 558CLELAND DRIVE TO WILLOW DRIVE IN CHAPEL HILL. UPGRADE EXISTING OFF-ROAD PATH AND CONSTRUCT NEW SECTION OF PATH.
0.7
DIV
SRTS 89PE SRTS 469C
ORANGE ORANGE COUNTYBICYCLE ROUTE 1
PUBLIC TRANSPORTATION PROJECTSTA-5148 224VANPOOL VANS - REPLACEMENT (8)
HF
FBUS 178CP L 46CP
DURHAMORANGEWAKE
TRIANGLE TRANSITAUTHORITY
TA-5154 269REPLACEMENT PARATRANSIT VEHICLES
DIV
L 54CP STPDA 215CP
DURHAMORANGE
TRIANGLE TRANSITAUTHORITY
TA-5123B 19546 11710EXPANSION BUS
HF
FUZ 1352CP CP 1621 CP 1621 CP 1621 1621CP DURHAMORANGE
TRIANGLE TRANSITAUTHORITY
TG-5251 277ROUTINE CAPITAL
HF
FBUS 222CP L 55CP
DURHAMORANGEWAKE
TRIANGLE TRANSITAUTHORITY
see March 2012 handout 2012-2018 STIP
TG-4821B 24490 5373ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC INCLUDES ADA, PM AND SERVICE VEHICLES
HF
FUZ 3548CP CP 1849 CP 1909 CP 1966 CP 1969 CP 1969 1969CP1969CP1969CP DURHAMORANGE
TRIANGLE TRANSITAUTHORITY
TM-5311 470SUNDAY ROUTES (400, 700, & 800)
HF
JARC 235O L 235O
DURHAMORANGEWAKE
TRIANGLE TRANSITAUTHORITY
TA-4748 4421 1820REPLACEMENT - PARATRANSIT VEHICLEHF
FUZ 1025CP CP 197 CP 197 CP 197 CP 197 CP 197 197CP197CP197CP ORANGE CHAPEL HILL TRANSIT
TA-4979 4061 1685REPLACEMENT VANHF
FUZ CP 792 CP 792 792CP ORANGE CHAPEL HILL TRANSIT
TA-4726 51141 29334REPLACEMENT BUS - ARTICULATED
HF
FBUS FUZ 2423CP CP 2423 CP 2423 CP 2423 CP 2423 CP 2423 2423CP2423CP2423CP
ORANGE CHAPEL HILL TRANSIT
TA-5143 200PURCHASE SUPPORT AND PARATRANSIT VEHICLES
HF
FBUS 160CP L 20CP S 20CP
ORANGE CHAPEL HILL TRANSIT
TA-4726A 22353 REPLACEMENT BUSES.
DIV
STPDA 973A A 720 L 362A A 180
ORANGE CHAPEL HILL TRANSIT
TD-5271 50RENOVATE BUS RELATED FACILITIESHF
FBUS 50CP ORANGE CHAPEL HILL TRANSIT
7-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TD-4710B 878 878FACILITY - PARK & RIDEHF
FUZ ORANGE CHAPEL HILL TRANSIT
TG-5249 70ROUTINE CAPITAL - RESURFACE PARK & RIDE LOTS
HF
FUZ 56CP L 14CP
ORANGE CHAPEL HILL TRANSIT
TG-5248 100ROUTINE CAPITAL-RESURFACE PARK & RIDE LOTS
HF
FBUS 80CP L 20CP
ORANGE CHAPEL HILL TRANSIT
TG-5247 71ROUTINE CAPITAL - RESURFACE PARK & RIDE LOTS
HF
FUZ 57CP L 7CP S 7CP
ORANGE CHAPEL HILL TRANSIT
TG-5227 329ROUTINE CAPITAL - PURCHASE BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SUPPORT VEHICLES, REPLACE/REPAIR LIFTS
HF
FBUS 263CP L 66CP
ORANGE CHAPEL HILL TRANSIT
TG-4732A 3920 1220ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ 540CP CP 540 CP 540 CP 540 540CP ORANGE CHAPEL HILL TRANSIT
TG-4732B 888 300ROUTINE CAPITAL - SERVICE VEHICLEHF
FUZ 196CP CP 196 196CP ORANGE CHAPEL HILL TRANSIT
TG-4731B 28557 4849PREVENTIVE MAINTENANCEHF
FUZ 5112Oc Oc 2931 Oc 3181 Oc 3431 Oc 3681 Oc 1343 1343Oc1343Oc1343Oc ORANGE CHAPEL HILL TRANSIT
TM-5132 414 216OPERATING ASSISTANCE
HF
JARC 99O L 99O
ORANGE CHAPEL HILL TRANSIT
TM-5305 136OPERATING - NIGHT SERVICE
HF
JARC 68O L 68O
ORANGE CHAPEL HILL TRANSIT
TM-5306 144OPERATING ASSISTANCE - CONTINUATION OF SERVICE HOUR EXTENSIONA
HF
JARC 72O L 72O
ORANGE CHAPEL HILL TRANSIT
TO-5133 50081 14381OPERATING ASSISTANCEHF
SMAP 7140O O 3570 O 3570 O 3570 O 3570 O 3570 3570O3570O3570O ORANGE CHAPEL HILL TRANSIT
TQ-5104 216EZ RIDER SENIOR SHUTLEHF
FEPD 216O ORANGE CHAPEL HILL TRANSIT
TS-5106 506 239SAFETY & SECURITY - MIN. 1% SET ASIDEHF
FUZ 55CP CP 35 CP 35 CP 35 CP 35 CP 18 18CP18CP18CP ORANGE CHAPEL HILL TRANSIT
TT-6107 80PURCHASE MOBILE DATA TERMINALS
DIV
L 16CP STPDA 64CP
ORANGE CHAPEL HILL TRANSIT
TA-6526 5CAPITAL
HF
FEPD 3CP L 1CP S 1CP
ORANGE ORANGE COUNTYDEPARTMENT OF AGING
TN-5102 1764 504OPERATING ASSISTANCE - NEW FREEDOM - URBAN
HF
FNF 252O O 126 O 126 O 126 O 126 O 126 126O126O126O DURHAMORANGE
DURHAM AREA TRANSITAUTHORITY
7-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TE-5205 977986UNC HOSPITALS IN CHAPEL HILL TO NC 55 (ALSTON AVENUE) IN DURHAM. CONSTRUCT LIGHT RAIL SYSTEM.
17.1
REG
FBUS R 6613 A R 6612 A T R 3306 A R 3306 A L R 3306 A R 3306 A FBUS C 24812 A 24811C A24811C A24811C A T C 12405 A 12404C A12405C A12405C A L C 12405 A 12404C A12405C A12405C A FBUS R 14759 B R 14758 B R 14758 B T R 7379 B R 7379 B R 7379 B L R 7379 B R 7379 B R 7379 B FBUS 221503C B C 110752 BT 110750C B C 55375 BL 110750C B C 55375 B
A UNC HOSPITALS IN CHAPEL HILL TO DURHAM COUNTY LINEREGB ORANGE COUNTY LINE TO NC 55 (ALSTON AVENUE) IN DURHAM.REG
DURHAMORANGE
DURHAM-ORANGELIGHT RAIL LINE
TQ-6165 150MOBILITY MANAGEMENT
HF
FEPD 120CP L 15CP S 15CP
ORANGE ORANGE COUNTYDEPARTMENT OF AGING
TQ-3002 163SENIOR TRANSPORTATION EXPANSION, ASSESSMENT AND MOBILITY MANAGER INCLUDING PURCHASE OF SERVICEHF
FEPD 163CP ORANGE ORANGE COUNTYDEPARTMENT OF AGING
TA-6554 482CAPITALHF
FNU 482CP ORANGE ORANGE PUBLIC TRANSIT
TD-5155 771 REPLACEMENT LTV (25') AND RADIO, VEHICLE LETTERING AND LOGOS, AND ON-BOARD CAMERA.DIV
STPDA A 62 L A 15
ORANGE ORANGE PUBLIC TRANSIT
TK-6151 2600 742ADMINISTRATION
HF
FNU 370O O 186 O 186 O 186 O 186 O 186 186O186O186O FNU
ORANGE ORANGE PUBLIC TRANSIT
TA-4818B 6491 3605REPLACEMENT BUS
HF
FUZ 962CP CP 962 962CP DURHAMORANGE
TRIANGLE TRANSITAUTHORITY
added unfunded $1.5B to match 2040 estimates
TE-4903A 1502000 2000FIXED GUIDEWAY - LIGHT RAIL SERVICE- CARY/RALEIGH
HF
FED CP 500000 500000CP500000CP DURHAMORANGEWAKE
TRIANGLE TRANSITAUTHORITY
see March 2012 handout 2012-2018 STIP
TP-4732A 8429 1256PLANNING ASSISTANCE
HF
FUZ 1332PL PL 696 PL 717 PL 738 PL 738 PL 738 738PL738PL738PL DURHAMORANGE
TRIANGLE TRANSITAUTHORITY
TS-5119 353 215SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 34CP CP 22 CP 19 CP 19 CP 19 CP 19 2CP2CP2CP DURHAMORANGE
TRIANGLE TRANSITAUTHORITY
7-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRN
STHSR 64PE STHSR 712R R 474 STHSR 3000C C 3000 C 941 O 881C C 880
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
"OTHER" FUNDING REFLECTS PARTICIPATION BY TRIANGLE TRANSIT
P-5701 7200MILEPOST 41.7 IN HILLSBOROUGH. CONSTRUCT PLATFORM, PASSENGER RAIL STATION BUILDING, SITE ACCESS, UTILITIES AND PARKING.DIV
T C 3315 C 3315 O C 285 C 285
ORANGE NORFOLK SOUTHERNH LINE
ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS
P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX
CMAQ 3750O O 3750
A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
PUBLIC TRANSPORTATION PROJECTSTA-6525 190CAPITAL
HF
FEPD 152CP L 19CP S 19CP
ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
TA-6548 128CAPITAL - EXPANSION VEHICLES
HF
FEPD 102CP L 13CP S 13CP
ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
TA-9000 108CAPITAL - PURCHASE OF SERVICE
HF
FEPD 86CP L 11CP S 11CP
ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
TA-6135 907 369CAPITAL
HF
FNU 538CP ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
TK-6159 2474 706ADMINISTRATION
HF
FNU 352O O 177 O 177 O 177 O 177 O 177 177O177O177O FNU
ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
7-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 7
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TQ-6164 492OPERATING ASSISTANCE
HF
FEPD 246O L 246O
ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
TQ-6785 250OPERATING
HF
FEPD 125O L 125O
ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.
7-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE