HIGHWAY PROGRAM FY 2014-2015 SORTED BY PARISH FOR LEGISLATIVE REVIEW AND APPROVAL

Transcript of HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined...

Page 1: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

HIGHWAY PROGRAM

FY 2014-2015

SORTED BY PARISH

FOR LEGISLATIVE REVIEW AND APPROVAL

Page 2: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …
Page 3: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

INTRODUCTION

1. R.S. 48:229, 230 states that each year “the Department shall provide the Legislature a program of construction to be commenced in the ensuing fiscal year, which shall be based upon anticipated revenues to be appropriated by the Legislature…” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation”.

2. In compliance with this statute, the attached Highway Program identifies the

projects that are scheduled for construction letting in FY 2014-15. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.

3. There are many projects remaining to be let prior to the end of the current

fiscal year, FY 2013-14. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2014-15 construction program, and will be let as soon as practicable in that fiscal year.

4. The one year construction program and the list of other projects in various

stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.

5. At this point in time, future funding levels are uncertain. DOTD has based this

preliminary Highway Program on previous allocations of funding. If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.

6. In the event all of the projects listed for letting in FY 2014-15 cannot be let to

construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2014-15.

7. Construction estimates are for informational purposes only and are subject to

change.

Page 4: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …
Page 5: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

PRESERVATION NON-INTERSTATE (PAVEMENT) 7.5

NON-INTERSTATE (PAVEMENT) (non-federal aid) * 191.5

ROAD PREVENTIVE MAINTENANCE 7.5INTERSTATE (PAVEMENT) 74.0BRIDGE (ON SYSTEM) 67.0BRIDGE (OFF SYSTEM) 13.0

SUB-TOTAL 360.5

ITS (regular & earmarks) 11.0

OPERATIONS TRAFFIC CONTROL DEVICES 14.8ROADWAY FLOODING 3.7WEIGH STATIONS 1.9TRANSPORTATION SYSTEMS MANAGEMENT 7.4INTERSTATE LIGHTING 2.8REST AREAS 11.1ACCESS MANAGEMENT 8.1FERRIES/MAJOR REPAIRS 3.5MOVABLE BRIDGE PM 1.9

SUB-TOTAL 66.2

SAFETY HWY. PROGRAM 49.4RR CROSSING UPGRADES & SEPARATIONS 16.0

SUB-TOTAL 65.4

CAPACITY REGULAR PROGRAM 0.0

CORRIDOR UPGRADE 46.0SUB-TOTAL 46.0

INTERMODAL CONNECTOR 7.5

FED ENHANCEMENT PROJECTS 12.0

MISC.

URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT, DEMAND MANAGEMENT 84.0FED EARMARKS (DEMO,...) 3.7OTHER (BONDS, TOLLS, LOCAL ) 9.3ROAD TRANSFER 23.1

SUB-TOTAL 139.6

GRAND TOTAL 677.7

Subject to funding availability.* As approved by the Legislature, this Program includes NFA projects funded with $125 million in State Bonds.

TENTATIVE FY 14-15 BUDGET PARTITION

(COSTS IN MILLION DOLLARS)CONSTRUCTION

PROPOSEDCATEGORY SUB-CATEGORY

Page 6: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

FUNDING TYPES FEDERAL NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM FUNDING) STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,

LAYAFETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA, LAKE CHARLES, MONROE,

SLIDELL, MANDEVILLE-COVINGTON) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21) TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,

LAYAFETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA, LAKE CHARLES, MONROE,

SLIDELL, MANDEVILLE-COVINGTON) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS) HSIP, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER) RAIL HE. RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS) CM (CONGESTION MITIGATION – BATON ROUGE AND LAKE CHARLES) DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS) ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING) FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS) STATE / LOCAL NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES) NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES) STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION) TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT) STBONDS (GENERAL OBLIGATION BONDS) STGEN (STATE GENERAL FUNDS CASH) TOLLS LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT) OTHER (OTHER SOURCE NOT LISTED) NFI (NO FUNDING IDENTIFIED)

Page 7: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ACADIA

Project: H.003758 - I-10 ACCESS ROAD IN CROWLEY

Type Impv: CONSTRUCT NEW ACCESS ROAD

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: 700-01-0114;STAGE 0 COMPLETED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA I-10 450-04 DEMO 3,150 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009274 - LA 3076: W JCT US 90 - E JCT US 90

Type Impv: CONSTRUCT BASE & OVERLAY,BRIDGE REPLACEMENT,& PCCP PATC

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 3076 801-60 STPFLEX 775 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010844 - LA 1112: S. JCT LA 1111 - N. JCT LA 1111

Type Impv: BASE REHABILITATION AND ASPHALT OVERLAY

Project Manager: DOMINGUE, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 1112 801-31 NFA 2,500 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011016 - LA 13: S. JCT. LA 365 - ST LANDRY P/L

Type Impv: MICROSURFACING AND RELATED WORK

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 13 057-03 STPFLEX 1,150 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011070 - LA 370 & LA 3070: BASE REHABILITATION

Type Impv: STABILIZE BASE, OVERLAY, AND RELATED WORK.

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 3070 801-59 NFABOND 4,668 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

ACADIA LA 370 801-28 NFABOND 832 PRESERVATION

NON-INTERSTATE NFA

Project: H.010073 - BNSF (CROWLEY) SEVERAL CROSSINGS

Type Impv: R2 RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks: 714-01-0119

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA 000-01 RAIL PD 700 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010150 - S. AVENUE F & NAPP STREET BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA 000-01 FBROFF 732 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

ACADIA 000-01 FBROFF 262 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010962 - I-10: CABLE BARRIER (LAFAYETTE/ACADIA)

Type Impv: INSTALL MEDIAN CABLE BARRIER

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: PLEASE USE HSIPPEN FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA I-10 450-04 HSIPPEN 4,041 SAFETY 3-DESIGN/DEVELOPMENT

LAFAYETTE I-10 450-05 HSIPPEN 1,478 SAFETY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 1 of 211

Page 8: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ACADIA

Project: H.003756 - NEW INTERCHANGE LA 98 RAYNE

Type Impv: FED EARMARK FOR STUDY

Project Manager: GAUTREAU, COLLEEN

Remarks: 700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.002729 - GRAND PRAIRIE HWY INTR.&FRONTAGE RD

Type Impv: NEW BRIDGE. NEW CONCRETE PAVEMENT

Project Manager: YANG, LI

Remarks: 389-01-0011;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.009628 - LA 92: LA 13 - VERMILION P/L

Type Impv: ASPHALT CONCRETE OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 92 385-04 STPFLEX 2,213 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010209 - LA 35: LA 365 - LA 95

Type Impv: COLD PLANE AND OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 35 207-07 STPFLEX 1,054 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010220 - LA 97: BAYOU NEZPIQUE BR. - LA 100

Type Impv: STONE BASE WITH ASPHALT OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 97 201-02 STPFLEX 2,709 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010222 - LA 97: LA 98 - LA 368

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 97 201-03 STPFLEX 4,130 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010291 - I-10: TREE REMOVAL

Type Impv: TREE REMOVAL ON I-10 IN ACADIA PARISH

Project Manager: DOMINGUE, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA I-10 450-04 HSIP 1,096 SAFETY 1-PLANNING/ENVIRONMENTAL

LAFAYETTE I-10 450-05 HSIP 514 SAFETY

Project: H.010885 - LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE

Type Impv: REPLACEMENT OF PONTOON BRIDGE

Project Manager: HERATH, ANANDA

Remarks: CONSTRUCTION FUNDS WILL BE STATE BONDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ACADIA LA 91 801-09 0 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 2 of 211

Page 9: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ALLEN

Project: H.009298 - TOWN OF OBERLIN SRTS PROJECT

Type Impv: SIDEWALK IMPROVMENTS, MARKED CROSSINGS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ALLEN 000-02 SR2S 240 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011055 - LA1156 & LA3206: PATCH, WIDEN, CP, & OL

Type Impv: PATCH, WIDEN, COLD PLANE, OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ALLEN LA 1156 802-11 NFABOND 1,060 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

ALLEN LA 3206 802-14 NFABOND 742 PRESERVATION

NON-INTERSTATE NFA

Project: H.010054 - PARK ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ALLEN 000-02 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

ALLEN 000-02 FBROFF 308 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010055 - CHERRY WITCHIE & N. CARPENTER RD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ALLEN 000-02 FBROFF 2,510 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

ALLEN 000-02 FBROFF 1,426 PRESERVATION

BRIDGE (OFF SYSTEM)

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 3 of 211

Page 10: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION

Project: H.010533 - LA3251: LA75-LA30 & LA1003: LA1-STAR RD

Type Impv: STABILIZE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 3251 803-31 NFABOND 2,060 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

ASSUMPTION LA 1003 804-18 NFABOND 618 PRESERVATION

NON-INTERSTATE NFA

Project: H.010642 - LA 30: IBERVILLE PL TO 0.3M WEST OF I-10

Type Impv: COLD PLANE AND OVERLAY, SAFETY IMPROVEMENTS

Project Manager: DEVILLE, JACQUES

Remarks: USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 30 414-03 STP>200K 2,186 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

ASCENSION LA 30 414-03 HSIP 250 SAFETY

Project: H.011074 - LA 44, LA 42, LA 1248: CONCRETE PATCHING

Type Impv: PLACEMENT OF ADDITIONAL SURFACE MATERIAL OVER THE EXISTIN

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 44 265-01 NHPP 900 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

E BATON ROUGE LA 1248 258-33 NHPP 225 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

E BATON ROUGE LA 42 257-04 NHPP 256 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

Project: H.011173 - LA 3089: DONALDSONVILLE SIGNAL UPGRADES

Type Impv: SIGNALS TO BE UPGRADED TO CURRENT DOTD STANDARDS

Project Manager: LEBLANC, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 1 064-11 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED IN CURRENT FY 13-14

ASCENSION LA 308 407-09 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ASCENSION LA 3089 426-01 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ASCENSION LA 945 803-04 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.002370 - LA 42 (US 61 - LA 44)

Type Impv: WIDENING AND IMPROVEMENTS

Project Manager: LANDRY, COREY

Remarks: 260-01-0026; SEE NOTES FOR DETAILS. STGEN MATCH FOR UTIL

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 42 260-01 DEMO 0 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

ASCENSION LA 42 260-01 HSIP 0 SAFETY

ASCENSION LA 42 260-01 STBONDS 18,500 OTHER / MISCELLANEOUS

ASCENSION LA 42 260-01 TAPFLEX 1,500 ENHANCEMENTS

Project: H.007855 - LA 431 @ LA 934 INTERSECTION IMPROVEMENT

Type Impv: TURNLANES

Project Manager: DEVILLE, JACQUES

Remarks: 803-20-0006;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 431 267-02 CM 500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

ASCENSION LA 934 803-20 CM 250 URBAN SYSTEMS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 4 of 211

Page 11: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION

Project: H.009033 - LA 44: INTERSECTION IMPROVEMENT @ LA 934

Type Impv: TURN LANES AND SIGNAL UPGRADES

Project Manager: RICHARD, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 44 265-02 HSIP 800 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010019 - I-10:LA 73 INTCNG LIGHTING- PRAIRIEVILLE

Type Impv: INTERSTATE LIGHTING

Project Manager: ARMENTOR, MICHAEL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION I-10 450-11 NHPP 818 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010026 - LA 431: REALIGN CURVE, C/L RUMBLE STRIPS

Type Impv: REALIGN CURVE, CENTER LINE RUMBLE STRIP, RESTRIPE ROAD.

Project Manager: LAI, QUANG

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 431 267-02 HSIP 3,900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010532 - LA 22: LA 44 - LA 70

Type Impv: CTB & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 22 266-01 NFA 2,367 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010639 - LA 939 AND LA 940 REHAB

Type Impv: MILL AND OVERLAY

Project Manager: DEVILLE, JACQUES

Remarks: 10% MATCH FROM ENTITY AND 10% MATCH FROM TTF

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 939 803-23 STP>200K 770 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

ASCENSION LA 940 803-06 STP>200K 660 URBAN SYSTEMS

Project: H.010640 - LA 3038 (CORNERVIEW): REHAB & TURN LANE

Type Impv: MILL AND OVERLAY

Project Manager: DEVILLE, JACQUES

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

803-06 STP>200K 660 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010695 - US 61: FRONTAGE ROAD

Type Impv: CONSTRUCT FRONTAGE ROAD PARALLEL TO NB US 61

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION US 61 007-07 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.002423 - LA44: BLACK BAYOU BRIDGE REPLACEMENT

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 265-02-0016;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 44 265-02 STPFLEX 1,541 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009250 - I-10 HIGHLAND TO LA 73

Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION

Project Manager: REVIERE, RYAN

Remarks: LHIP USED FOR ENG

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION I-10 450-11 NFI 50,500 CORRIDOR 3-DESIGN/DEVELOPMENT

E BATON ROUGE I-10 450-10 NFI 16,000 CORRIDOR

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 5 of 211

Page 12: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION

Project: H.009266 - I-10: LA 73 TO LA 30

Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION

Project Manager: REVIERE, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 3-DESIGN/DEVELOPMENT

Project: H.009276 - I-10: LA 30 TO LA 22

Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION

Project Manager: REVIERE, RYAN

Remarks: LHIP USED FOR ENG

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 3-DESIGN/DEVELOPMENT

Project: H.009956 - LA 44: TURN LANES AND MEDIANS

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 44 265-02 HSIP 5,429 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.010074 - UP (DONALDSONVILLE) LA 3089 SERVICE RD.

Type Impv: ROAD WORK AROUND CROSSING TO MAKE SAFER

Project Manager: SHREWSBERRY,BILL

Remarks: 426-01-0026

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 3089 426-01 RAIL HE 20 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.010960 - LA 30 ROUNDABOUTS @ TANGER MALL & I-10

Type Impv: 3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPS

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 30 414-03 STPFLEX 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.006457 - ROUNDABOUT @ PR 929 & PARKER ROADS

Type Impv: ROUNDABOUT CONSTRUCTION

Project Manager: HOLM, RICK

Remarks: 737-03-0104;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION 000-03 SATRANS 500 SAFETY

LOCAL ROADS SAFETY

2-WAITING FOR FUNDING

Project: H.000337 - US 61:BAYOU MANCHAC & FRANCOIS BRS.

Type Impv: NEW BRIDGES

Project Manager: HERATH, ANANDA

Remarks: 007-07-0058;JT W/007-08-0040

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION US 61 007-07 STPFLEX 1,700 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE US 61 007-08 STPFLEX 10,300 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.002424 - SUNSHINE BRIDGE - I-10

Type Impv: WIDEN TO 4 LANES

Project Manager: NICKEL, TIM

Remarks: 426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS

ASCENSION LA 70 426-03 NFI 0 OTHER / MISCELLANEOUS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 6 of 211

Page 13: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION

Project: H.003790 - LA 930: CAUSEY RD TO LA 42

Type Impv: WIDEN LA 930 & ADD OPEN DITCHES

Project Manager: MUSA, ELNUR

Remarks: 803-14-0005;STATE BONDS BEING REQUESTED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 930 803-14 STBONDS 5,300 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009139 - US 61: ACCESS MGT. @ SWAMP RD (PHASE 2)

Type Impv: MEDIAN AND SIGNAL IMPROVEMENTS

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION US 61 007-07 STPFLEX 240 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

Project: H.010572 - LA 30 IMPROVEMENTS (I-10 TO LA 44)

Type Impv: FEASIBILITY STUDY TO WIDEN LA 30 FROM I-10 TO LA 44

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 30 414-03 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.010795 - ROUNDABOUT: LA 42 AT JOE SEVARIO ROAD

Type Impv: ROUNDABOUTS

Project Manager: FARR, ALEX

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 42 260-01 0 SAFETY 1-PLANNING/ENVIRONMENTAL

ASCENSION 000-03 0 SAFETY

Project: H.010909 - LA 44: LA 941 TO LA 22

Type Impv: FEASIBILITY STUDY

Project Manager: FARR, ALEX

Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 44 265-01 0 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.011160 - LA 73: LA 74 TO LA 621 CORRIDOR STUDY

Type Impv: CORRIDOR STUDY TO COLLECT DATA AND DEVELOP ALTERNATIVES

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASCENSION LA 73 077-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 7 of 211

Page 14: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASSUMPTION

Project: H.009635 - LA 308: LAFOURCHE P/L - LA 1011

Type Impv: COLD PLANE AND OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 308 407-06 STPFLEX 2,456 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011069 - LA643&LA403:PATCH, STABILIZE&OVERLAY

Type Impv: PATCH, STABILIZE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 403 804-10 NFABOND 2,120 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

ST JAMES LA 643 847-04 NFABOND 1,102 PRESERVATION

NON-INTERSTATE NFA

ST JAMES LA 643 847-04 NFABOND 1,018 PRESERVATION

NON-INTERSTATE NFA

Project: H.010443 - LA 308: CURVE REALIGN AND SHOULDERS

Type Impv: REALIGN CURVE AND ADD SHOULDERS

Project Manager: PICARD, TOBY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 308 407-07 HSIP 9,760 SAFETY 3-DESIGN/DEVELOPMENT

ASSUMPTION LA 308 407-08 HSIP 1,900 SAFETY

Project: H.009994 - LA 663: ROADWAY ELEVATION & MITIGATION

Type Impv: ELEVATION AND MITIGATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 663 804-25 FEMA 1,248 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009996 - LA 1015-2 RAISE HWY ELEV. & UPGRAD PIPES

Type Impv: ELEVATION AND UPGRADE PIPES

Project Manager: PAINE, PEGGY JO

Remarks: H.971633

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 1015-2 804-29 FEMA 678 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010007 - LA 70 PIERRE PART BAY BRIDGE CLN & PAINT

Type Impv: CLEANING & PAINTING

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 70 232-01 STPFLEX 400 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

Project: H.010571 - LA 70 BYPASS

Type Impv: STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 0-FEASIBILITY/SCOPING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 8 of 211

Page 15: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: AVOYELLES

Project: H.001913 - LA 29: N JCT LA 107 - JCT LA 114

Type Impv: CTB & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 146-01-0027;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 29 146-01 NFABOND 2,625 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006376 - US 71 @ EBONY ST.INTERSECTION IMP

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: MATHEWS, LARRY

Remarks: 714-05-0110;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES 000-05 RAIL HE 200 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009432 - VARIOUS ROADS: SIGNING (AVOYELLES)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES 000-05 SATRANS 45 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010540 - LA 452: JEFF LN- 1.2 MI E OF LOCK&DAM RD

Type Impv: PATCH & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 452 143-01 NFABOND 1,595 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

AVOYELLES LA 452 143-02 NFABOND 1,765 PRESERVATION

NON-INTERSTATE NFA

Project: H.010988 - LA 29: COLLEGE STREET TO TOONEY

Type Impv: CHIP SEALING OF LA 29

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 29 146-01 STPFLEX 477 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.001257 - INTERSECTION LA 114 @ LA 1

Type Impv: REPLACE BRIDGE W/ T-INTERSECTION

Project Manager: BROWN, JEFF

Remarks: 052-05-0050;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 114 052-05 FBROFF 765 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

AVOYELLES LA 114 052-05 HSIP 72 SAFETY

AVOYELLES LA 1 052-30 HSIP 255 SAFETY

AVOYELLES LA 1 052-30 STPFLEX 249 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.010323 - LA 454: LA 107 - RAPIDES P/L

Type Impv: ASPHALTIC SURFACE TREATMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 454 370-01 NFA 565 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011229 - LA 107: KCS RR XING (MANSURA)

Type Impv: REPLACE CROSSING SURFACE.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 107 052-06 RAIL HE 56 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

AVOYELLES LA 107 052-06 LOCAL 44 RAILROADS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 9 of 211

Page 16: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: AVOYELLES

Project: H.010364 - LA 114: LA 1188 - N JCT LA 115

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 114 145-01 STPFLEX 788 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010489 - I-49: LA 106 - LA 115 (RAMPS & SIDE RD)

Type Impv: PATCH, COLD PLANE, AND OVERLAY (RAMPS AND SIDE ROAD)

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES I-49 455-04 NHPP 487 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

AVOYELLES LA 106 204-04 STPFLEX 503 PRESERVATION

INTERSTATE

AVOYELLES LA 106 204-04 STPFLEX 600 PRESERVATION

NON-INTERSTATE

Project: H.009741 - MARKSVILLE SIDEWALK IMPROVEMENTS

Type Impv: SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGE

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES 000-05 STPENH 338 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009743 - BUNKIE SIDEWALK IMPROVEMENTS

Type Impv: SIDEWALKS AND RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES US 71 008-07 STPENH 96 ENHANCEMENTS 2-WAITING FOR FUNDING

AVOYELLES LA 115 805-18 STPENH 16 ENHANCEMENTS

AVOYELLES 000-05 STPENH 88 ENHANCEMENTS

Project: H.009805 - MOREAUVILLE SIDEWALKS

Type Impv: SIDEWALKS W/ SUBSURFACE DRAINAGE & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 114 052-05 STPENH 102 ENHANCEMENTS 2-WAITING FOR FUNDING

AVOYELLES 000-05 STPENH 102 ENHANCEMENTS

Project: H.007873 - BAYOU BOEUF & TURNER CANAL BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: HERATH, ANANDA

Remarks: 805-09-0007;2 BRIDGES; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 1176 805-09 FBROFF 2,375 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009493 - LA 107: LA 1179 - LA 1181

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 107 147-03 STPFLEX 2,322 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009497 - LA 106: BAYOU BOEUF BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 106 204-04 STPFLEX 2,600 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 10 of 211

Page 17: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: AVOYELLES

Project: H.010340 - LA 107: S JCT LA 1 - N JCT LA 1

Type Impv: WIDENING AND OVERLAY OF PCCP

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

AVOYELLES LA 107 052-06 STPFLEX 980 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 11 of 211

Page 18: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BEAUREGARD

Project: H.000432 - US190: RAGLEY OVERPASS-ALLEN PARISH LINE

Type Impv: CP 2", PATCH, OVERLAY 2" RD/SHLD

Project Manager: CHENEVERT, MARK

Remarks: 012-05-0036

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD US 190 012-05 STPFLEX 2,017 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006463 - BEAUREGARD PARISH PAVEMENT MARKINGS

Type Impv: PAVEMENT MARKING INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-06-0100;ENTITY REQUIRED TO MATCH FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD 000-06 HRRR 111 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006464 - CAMP EDGE RD SIGNING & PAVEMENT MARKINGS

Type Impv: SIGNS & PAVEMENT MARKING INSTALL

Project Manager: HOLM, RICK

Remarks: 737-06-0102;ENTITY REQUIRED TO MATCH FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD 000-06 SATRANS 30 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006468 - BEAUREGARD PARISH GUARDRAIL REPLACEMENT

Type Impv: GUARDRAIL REPLACEMENT

Project Manager: HOLM, RICK

Remarks: ENTITY REQUIRED TO MATCH FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD 000-06 0 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010088 - KCS (DERIDDER) SEVERAL RR X-ING DERIDDER

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD 000-06 RAIL PD 800 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010816 - OLD RIVER ROAD BRIDGE OVER CANEY CREEK

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-06-0124, USE PRIORITY 2 BOND AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD 000-06 FBROFF 530 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011171 - US 171: BEG BLVD - INT LA 27/US 190

Type Impv: CP 2", OL 2", CURB/SIDEWALK REPAIR, ADA REQUIRED UPGRADE

Project Manager: CORMIER, CLAYTON

Remarks: TIMED FUNDS ARE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD US 171 024-05 NHPP 700 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010915 - BEEHIVE LP & FIELDING WILLIAMS RD BRDGS

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD 000-06 FBROFF 600 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

BEAUREGARD 000-06 FBROFF 308 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.009482 - LA 113: JIM BURNEY BRANCH BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD LA 113 139-03 STPFLEX 950 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 12 of 211

Page 19: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BEAUREGARD

Project: H.009615 - LA 26: US 171 - ALLEN P/L

Type Impv: CP 2", OVERLAY 4", 2" SHLD

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD LA 26 028-04 STPFLEX 8,069 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010244 - LA 113: LA 26 - LA 112

Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD LA 113 139-04 STPFLEX 2,187 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010245 - LA 389: MONROE WHITMAN RD - US 190

Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD LA 389 187-04 STPFLEX 7,117 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010246 - LA 112: LA 399 - LA 113

Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BEAUREGARD LA 112 188-02 STPFLEX 2,163 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 13 of 211

Page 20: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BIENVILLE

Project: H.010097 - LA 783: RED RIVER PARISH LINE TO US 371

Type Impv: OVERLAY, STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 783 303-03 NFABOND 1,527 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010478 - I-20: WEBSTER P/L TO BLACK LAKE CREEK

Type Impv: COLD PLANE AND ASPHALTIC OVERLAY

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE I-20 451-04 NHPP 8,271 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010595 - LOUISIANA TRAIL - CASTOR TO JAMESTOWN

Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE 000-07 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009434 - VARIOUS ROADS:SIGNING (BIENVILLE)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE 000-07 SATRANS 9 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010513 - LA 507: LA 508 TO LINCOLN PARISH LINE

Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 507 308-02 NFABOND 2,266 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010519 - LA 794: LA 793 TO LA 154

Type Impv: STABILIZE BASE, ASPHALT OVERLAY, AND DRAINAGE PIPE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 794 807-02 NFABOND 2,163 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.001689 - TOPY CREEK BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: MUSA, ELNUR

Remarks: 088-02-0023;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 153 088-02 STPFLEX 1,831 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010561 - CASTOR CK RD/BEAR CK RD/DANIEL ST BRDGS

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE 000-07 FBROFF 370 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

BIENVILLE 000-07 FBROFF 454 PRESERVATION

BRIDGE (OFF SYSTEM)

BIENVILLE 000-07 FBROFF 293 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010977 - US 371: BI-DIRECTIONAL TURN LANE AT LA 4

Type Impv: ADDING LEFT TURN LANES AT LA 4 IN BOTH DIRECTIONS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE US 371 027-02 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 14 of 211

Page 21: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BIENVILLE

Project: H.001537 - LA 4: BEE BRANCH BRIDGE

Type Impv: NEW BRIDGE

Project Manager: YANG, LI

Remarks: 067-03-0014;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 4 067-03 STPFLEX 1,310 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001707 - SALINE BAYOU RELIEF BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 090-05-0030;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 507 090-05 FBROFF 1,178 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009962 - LA 516: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 516 294-04 FEMA 1,247 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010273 - LA 154: EAST JCT LA 4 TO JCT LA 792

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 154 090-04 STPFLEX 1,450 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010290 - LA 796: LA 508 TO LA 155

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks: AC WITH NFA

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BIENVILLE LA 796 090-05 STPFLEX 1,150 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 15 of 211

Page 22: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER

Project: H.006738 - KIDS ON THE MOVE PH. 2

Type Impv: SIDEWALK REPAIR,SIGNS AND PAVEMENT MARKINGS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 SR2S 200 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.007085 - SHED ROAD (BENTON - AIRLINE)

Type Impv: RECONSTRUCTION & WIDEN

Project Manager: DEVILLE, JACQUES

Remarks: 742-08-0001;CITY IS FUNDING ENGR.&ACQUIRING R/W

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 STP>200K 6,925 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

BOSSIER 000-08 STPFLEX 1,082 ROAD TRANSFER

Project: H.007896 - LA 3105 AT SHED ROAD TURN LANES

Type Impv: ADD 14' NB AND SB RT TURN LANE

Project Manager: STURDIVANT, PHILLIP

Remarks: 808-07-0054;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 3105 808-07 HSIP 540 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010298 - US 71: LOGGY BAYOU BRIDGE TO LA 154

Type Impv: COLD-PLANING, INLAY, CHIP SEAL SHOULDERS, PAVEMENT MARKIN

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER US 71 010-05 STPFLEX 2,813 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

BOSSIER US 71 010-06 STPFLEX 47 PRESERVATION

NON-INTERSTATE

Project: H.010310 - LA 154: US 71 TO BISTENEAU LAKE BRIDGE

Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 154 090-01 STPFLEX 398 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010311 - LA 157: E. COLLEGE ST TO CARTERVILLE RD

Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 157 084-01 STPFLEX 392 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010518 - LA 537: .15 MILES E LOG FERRY RD TO LA 3

Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 537 808-05 NFABOND 784 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.003244 - DIST 04 BRIDGE BRG REHAB & MISC REPAIRS

Type Impv: BRIDGE BEARING REPAIRS

Project Manager: TULLIER, DANNY

Remarks: 451-01-0135;BRPM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER I-220 451-31 NHPP 1,120 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 14-15

CADDO I-20 451-01 STPFLEX 980 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 16 of 211

Page 23: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER

Project: H.009945 - KORAN DOYLIN RD. BRIDGE / CLARKE BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 FBROFF 2,087 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010509 - LA 157: WEST LA 160 TO EAST LA 2

Type Impv: ULTRATHIN OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 157 286-01 NFABOND 1,648 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010662 - LA 511:JIMMIE DAVIS BRIDGE REHABILITATIO

Type Impv: CLEANING, PAINTING, STRUCTURAL REPAIRS AND DECK REPLACEME

Project Manager: REVIERE, RYAN

Remarks: FUNDING $10.5 MILLION CAPITOL OUTLAY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 511 102-03 STBONDS 9,200 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

BOSSIER LA 511 102-03 NHPP 10,000 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.010743 - LA 3: LEFT TURN LANE

Type Impv: INSTALL LEFT TURN LANE

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 3 044-02 HSIP 350 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010976 - LA 157: SB LEFT TURN LANE AT LA 154

Type Impv: ADD LEFT TURN LANE TO IMPROVE TRAFFIC FLOW

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 157 082-02 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.000118 - BAYOU FIFI BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: OLIVIER, NICHOLAS

Remarks: 001-03-0095;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER US 80 001-03 STPFLEX 1,019 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001795 - RED CHUTE AND OLD CHANNEL BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: BRAUNER, KURT

Remarks: 108-01-0019 AND 108-01-0017;USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 612 108-01 STPFLEX 4,300 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.003263 - I-20, WESTERFIELD - INDUSTRIAL

Type Impv: BRIDGES REHAB.;

Project Manager: KEMP, KELLY

Remarks: 451-02-0097;APP SLAB.BACK WALL.REVETMENT.BEARNG

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER I-20 451-02 STPFLEX 23,830 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

BOSSIER I-20 451-02 STPFLEX 10,101 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.007087 - HAMILTON ROAD IMPROVEMENTS PHASE I

Type Impv: ROAD IMPROVEMENTS

Project Manager: DEVILLE, JACQUES

Remarks: 742-08-0003; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 STP>200K 6,078 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 17 of 211

Page 24: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER

Project: H.007090 - HAMILTON RD IMPROVEMENTS PH I(C&G)

Type Impv: CLEARING AND GRUBBING

Project Manager: DEVILLE, JACQUES

Remarks: 742-08-0006; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 STP>200K 520 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.009508 - LA 2: CANEY CREEK BRIDGE TO WEBSTER P/L

Type Impv: ASHPALT OVERLAY, DRAINAGE, PAVEMENT STRIPING, & RELATED W

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 2 083-04 STPFLEX 3,114 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010250 - ROADWAY DRAINAGE IMPROVEMENTS - LA 154

Type Impv: ADDITION OF ASPHALT TO ROADWAY

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 154 090-01 STPFLEX 225 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.010299 - US 80: EASTRIDGE TO WEBSTER PARISH LINE

Type Impv: COLD-PLANING, INLAY, CHIP SEAL SHOULDERS, PAVEMENT MARKIN

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER US 80 001-03 STPFLEX 2,492 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.003854 - BOSSIER CONG RELIEF NORTH-SOUTH CORRIDOR

Type Impv: WIDENING STUDY

Project Manager: OLIVIER, NICHOLAS

Remarks: 700-08-0129;STAGE 0 COMPLETE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 NFI 24,161 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.003855 - BOSSIER PAR CONG RELIEF WINFIELD RD

Type Impv: ROADWAY EXT (WINFIELD RD) STUDY

Project Manager: OLIVIER, NICHOLAS

Remarks: 700-08-0130;STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.001779 - JIMMIE DAVIS BRIDGE (LA 511)

Type Impv: NEW BRIDGE

Project Manager: ONYEGBUNAM, EZEKIEL

Remarks: 102-03-0010;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 511 102-03 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.003857 - WAFER ROAD EXTENSION

Type Impv: ROAD EXTENSION (ENGINEERING) STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-08-0132;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.003859 - I-20 (LA 3 - I-220 E.)

Type Impv: STATE FUNDS FOR STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-08-0134;FEASIBILITY STUDY (STAGE 0)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 18 of 211

Page 25: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER

Project: H.005184 - HIGH PRIORITY CORRIDOR NO. 18

Type Impv: ENVIRONMENTAL IMPACT STATEMENT

Project Manager: SAVOIE, RICHARD

Remarks: 700-94-0003;NCPD FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.009522 - LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)

Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING

Project Manager: LACOMBE, JASON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER LA 3105 808-07 STPFLEX 9,100 RAILROADS

GRADE SEPARATION

1-PLANNING/ENVIRONMENTAL

BOSSIER I-20 451-02 NHPP 300 RAILROADS

GRADE SEPARATION

Project: H.009693 - US 71:J-TURN ROBERT E. LEE

Type Impv: INSTALL J-TURN LANE INTERSECTION

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

BOSSIER US 71 010-06 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 19 of 211

Page 26: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.001278 - INTERSECTION IMPR YOUREE DR AT KINGS HWY

Type Impv: INTERSECTION IMPROVEMENT

Project Manager: DEVILLE, JACQUES

Remarks: 053-09-0053; USE TTF AS MATCH PER AGREEMENT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 053-09 STP>200K 4,220 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

CADDO LA 1 053-09 STPFLEX 764 URBAN SYSTEMS

CADDO LA 3032 420-01 HSIP 865 SAFETY

CADDO LA 3032 420-01 STPFLEX 270 URBAN SYSTEMS

Project: H.003363 - I220 PHASE 1 SIGN UPGRADE- I20 TO LA 538

Type Impv: SIGNING

Project Manager: COURTIER, KAY

Remarks: 451-30-0036;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-220 451-30 NHPP 3,980 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006053 - MURPHY STREET BRIDGE OVER KCS RAILROAD

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-09-0023

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 FBROFF 4,557 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010247 - ROADWAY FLOODING IMPROVEMENTS - US 71

Type Impv: DRAINAGE IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO US 71 011-02 NHPP 1,590 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010294 - LA 169: LAKESHORE DRIVE TO LONGWOOD

Type Impv: SOIL CEMENT BASE COURSE, ASPHALTIC OVERLAY, PAVEMENT MA

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 169 048-02 STPFLEX 1,934 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010510 - LA 170: LA 2 (CAMP RD) TO US 71

Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 170 096-01 NFABOND 2,633 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010686 - LA 169: KCS RR XING (CADDO)

Type Impv: KCS SIGNAL WORK NEEDED TO TIE INTO LA 169 ACTIVE ADVANCE W

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 169 048-03 RAIL PD 13 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010949 - LA 1: TURN LANE EXTENSIONS AT LA 511

Type Impv: EXTENDING EXISTING LEFT TURN LANES TO IMPROVE TRAFFIC FLOW

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 053-09 NHPP 994 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 20 of 211

Page 27: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.010969 - LA 3132: GUARD RAIL UPGRADE

Type Impv: GUARD RAIL UPGRADE

Project Manager: BAUGH, SAM

Remarks: HSIP FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 3132 427-01 HSIP 670 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011111 - I-49 NORTH, SEGMENT K - PHASE 2

Type Impv: NEW I-49/I-220 INTERCHANGE WITH ROADWAYS TO TIE TO SEG. J

Project Manager: UMEOZULU, JOE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-49 455-09 STGEN 79,000 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

CADDO I-49 455-09 NHPP 36,000 DEMO / HIGH PRIORITY

CADDO I-220 451-30 STGEN 10,000 DEMO / HIGH PRIORITY

Project: H.011161 - I-49: MIRA-MYRTIS RD TO ARKANSAS S/L

Type Impv: DOWEL BAR RETROFIT

Project Manager: BAUGH, SAM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-49 455-09 STGEN 300 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.001623 - CREEK BRIDGE & IRISH BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: MOORE, DARRELL

Remarks: 079-01-0034;USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 3049 079-01 FBROFF 900 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.006472 - CITY OF SHREVEPORT TRAFFIC SIG BKUP

Type Impv: TRAFFIC SIGNAL POWER GENERATOR INST

Project Manager: HOLM, RICK

Remarks: 737-09-0104;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 SATRANS 216 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.006475 - CITY OF SHRVPRT TRAFFIC SIGNAL BKUP

Type Impv: TRAFFIC SIGNAL POWER GENERATOR

Project Manager: HOLM, RICK

Remarks: 737-09-0108;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 SATRANS 158 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009438 - VARIOUS ROADS:SIGNING (CADDO)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 SATRANS 113 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009475 - LA 538: ROUNDABOUT AT RAVENDALE

Type Impv: INSTALL SINGLE LANE ROUNDABOUT

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 538 078-02 HSIP 1,050 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009575 - I-20:TEXAS STATE LINE TO MONKHOUSE DR.

Type Impv: PCC PATHCING, UNDERDRAIN & PAVEMENT MARKINGS

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-20 451-01 NHPP 900 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 21 of 211

Page 28: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.010282 - I-220: WB CURVE IMPROVEMENT NEAR I-20

Type Impv: CURVE REALIGNMENT

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-220 451-30 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010307 - LA 538: LA 1 TO SOUTH JCT OF LA 530

Type Impv: ASPHALT OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 538 078-03 STPFLEX 880 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010512 - LA 3049: 3.4 MI N I-220 - 2 MI S LA 173

Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 3049 079-01 NFABOND 1,339 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010879 - AMERICAN ROSE CENTER TRAIL RESTORATION

Type Impv: RESTORATION AND CONSTRUCTION OF 2,200' OF PED-BIKE TRAIL

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 RTP 110 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

CADDO 000-09 LOCAL 15 RECREATIONAL TRAILS PROGRAM

Project: H.011028 - UP SEVERAL RR XINGS (CADDO)

Type Impv: INSTALL FLASHING LIGHTS, GATES, AND BELLS.

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 RAIL PD 1,200 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011105 - CUL-DE-SACS @ I-49N C-OF-A LINE

Type Impv: ROADWAY TURNAROUNDS AT INTERSTATE C/A LINE.

Project Manager: UMEOZULU, JOE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-49 455-09 STGEN 800 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011112 - LA 1: UP RR XING (CADDO)

Type Impv: UPGRADE RR WARNING DEVICES

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 053-08 RAIL PD 30 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.001661 - BLACK BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: YAP, KIAN

Remarks: 085-01-0022;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 530 085-01 FBROFF 2,356 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001770 - I-49 - LA 523

Type Impv: SIGNAL UPGRADE

Project Manager: STURDIVANT, PHILLIP

Remarks: 102-02-0032;(PRIORITY 9)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 511 102-02 HSIP 3,500 SAFETY 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 22 of 211

Page 29: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.009576 - I-49: DESOTO PARISH LINE TO LA 526

Type Impv: PCC PATCHING

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-49 455-08 NHPP 900 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010060 - BLANCHARD FURRH ROAD / CHOCTAW BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 FBROFF 1,047 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010202 - I-20: EXIT LANE EXTENSION (EXITS 3 & 5)

Type Impv: EXTEND EXIT LANES FOR DECELLERATION. PCC PAVEMENT

Project Manager: JESCLARD, TREY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-20 451-01 HSIP 900 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.010300 - US 80: JCT JEFFERSON PAIGE RD- HEARNE RD

Type Impv: COLD PLANING, ASPHALTIC OVERLAY, PAVEMENT MARKING,

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO US 80 001-02 STPFLEX 1,350 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010468 - I-20: WEST END HUDSON ST. BRIDGE TO I-49

Type Impv: REMOVE AND REPLACE PCC

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-20 451-01 NHPP 15,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010475 - I-20: MONKHOUSE TO W END OF HUDSON ST BR

Type Impv: REMOVE AND REPLACE PCC

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-20 451-01 NHPP 20,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.011094 - LA 3094: HEARNE AV BR REHAB

Type Impv: REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKM

Project Manager: D'ANDREA, ARTUR

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 3094 025-08 NHPP 2,700 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001618 - JCT LA 173 - MIDDLE SCHOOL

Type Impv: RECONST.W/GEOMETRIC IMP NEED STAGE0

Project Manager: GUEST, DEBRA

Remarks: 078-02-0019;NEED FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.001724 - SHREVEPORT-BLANCHARD HWY.

Type Impv: 4 LANING (CONTINGENT ON BOND FUNDS)

Project Manager: BORNE, FRED

Remarks: 094-01-0029;ORIGINATED BY DEPT OF ECON DEV.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 23 of 211

Page 30: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.001725 - JCT. LA 3094 - JCT. I-220

Type Impv: WIDENING

Project Manager: BORNE, FRED

Remarks: 094-01-0032;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 173 094-01 STPFLEX 10,000 CAPACITY 2-WAITING FOR FUNDING

Project: H.006447 - I-69: SIU 14 JCT I-20 TO US 82

Type Impv: DESIGN AND ACQUIRE R/W

Project Manager: REVIERE, RYAN

Remarks: 736-99-1032;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.009744 - OIL CITY MULTI-USE TRAIL, PHASE 2

Type Impv: MULTI-USE TRAIL AND RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 STPENH 438 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009913 - LA 1: 1.32 MI N JCT LA 2-TEXAS STA LINE

Type Impv: CHIP SEAL

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 045-03 STPFLEX 430 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

Project: H.000413 - CROSS BAYOU BRIDGE REPLACEMENT

Type Impv: BRIDGE REHAB

Project Manager: YAP, KIAN

Remarks: 011-01-0054;STAGE 0 - FUTURE REHAB PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO US 71 011-01 NHPP 2,800 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001164 - LA 169 - LA 538 (N. OF OIL CITY)

Type Impv: WIDEN TO 4 LANES

Project Manager: BURST, JEFFERY

Remarks: 045-01-0026;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 045-01 NFI 23,223 CAPACITY 1-PLANNING/ENVIRONMENTAL

CADDO LA 1 045-01 STPFLEX 4,000 CAPACITY

Project: H.001166 - CADDO LAKE BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: REVIERE, RYAN

Remarks: 045-01-0029;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 045-01 STPFLEX 21,398 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.003915 - I-49 INNER CITY CONNECTOR

Type Impv: STAGE 0 AND ENVIRONMENTAL

Project Manager: BROUSSARD, DAN

Remarks: USE STATE SURPLUS AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.009213 - LA 3132 (INNER LOOP) EXTENSION

Type Impv: STAGE 0 FEASIBILITY STUDY

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 3132 427-01 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 24 of 211

Page 31: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.010206 - LA 3132 AT LA 523: EXTEND C OF A

Type Impv: EXTEND CONTROL OF ACCESS LA 3132 AT LA 523

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.010271 - LA 1: SUNDOWN ROAD TO JCT LA 538

Type Impv: OVERLAY, SHOULDER STABILIZATION AND STRIPING

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 1 045-01 STPFLEX 1,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010278 - LA 173: JCT HEARNE AVE TO I-220

Type Impv: OVERLAY, SHOULDER STABLIZATION, STRIPING, RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 173 094-01 STPFLEX 1,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010279 - LA 173: LA 1 TO US 71

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 173 094-02 STPFLEX 900 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010286 - LA 538: JCT US 71 TO LA 1

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 538 078-04 STPFLEX 1,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010288 - LA 789: PRESTON ROAD TO LA 169

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO LA 789 809-07 STPFLEX 2,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010292 - US 79: TEXAS STATE LINE TO US 80

Type Impv: COLD PLANE, ASPHALTIC OVERLAY, PAVEMENT STRIPING

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO US 79 048-01 STPFLEX 1,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010428 - US 71: JCT US 80 TO HEARNE AVE

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO US 71 011-01 NHPP 470 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

CADDO US 71 053-09 NHPP 110 PRESERVATION

NON-INTERSTATE

Project: H.010549 - I20: MP RR (LM 6.5) TO PINES RD (LM 9.7)

Type Impv: WIDEN FROM 4 TO 6 LANES

Project Manager: ALLEN, JEFFREY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO I-20 451-01 NHPP 15,000 CORRIDOR 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 25 of 211

Page 32: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO

Project: H.011099 - DIST. 04 SIGNAL TIMING STUDIES PHASE 2

Type Impv: IMPROVE SIGNAL TIMING FOR DISTRICT 04 CORRIDORS

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CADDO US 171 025-08 NHPP 64 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

BOSSIER LA 72 010-30 STPFLEX 10 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

CADDO LA 1 053-09 NHPP 37 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

BOSSIER LA 3105 808-07 STPFLEX 42 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

CADDO LA 526 809-08 STPFLEX 37 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

BOSSIER LA 72 010-31 STPFLEX 10 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 26 of 211

Page 33: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.002713 - LA 3059: RED MARCEAUX RD -JEFF DAVIS P/L

Type Impv: PATCH, WIDEN, CP 2", OL 3.5"

Project Manager: CHENEVERT, MARK

Remarks: 383-01-0013

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 3059 383-01 NFABOND 1,383 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

CALCASIEU LA 3059 383-01 HSIPPEN 733 SAFETY

Project: H.006058 - MILLER AVENUE BRIDGE OVER GUM SLOUGH

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: USE PRIORITY 2 BOND AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 FBROFF 615 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006482 - CITY OF WESTLAKE SIGN REPLACEMENT

Type Impv: SIGN INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-10-0120;ENTITY REQUIRED TO MATCH FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 SATRANS 44 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006484 - CALCASIEU PH.LEGER RD.SIDEWALK SRTS

Type Impv: SIDEWALKS

Project Manager: GROS, SCOTT

Remarks: 737-10-0123;SR2S PROGRAM FUNDING

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 SR2S 275 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010156 - I-10: LA 383 INTCHNG LIGHTING (IOWA)

Type Impv: INTERSTATE LIGHTING

Project Manager: ARMENTOR, MICHAEL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 NHPP 697 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010440 - I-210: INTERSTATE LIGHTING

Type Impv: INTERSTATE LIGHTING

Project Manager: FOSTER, RICHARD

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-210 450-30 NHPP 1,716 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

4-SCHEDULED IN CURRENT FY 13-14

CALCASIEU I-10 450-91 NHPP 841 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

Project: H.010794 - LA 27, LA 10, & LA110: MICROSURFACING

Type Impv: MICROSURFACING

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 27 031-06 STPFLEX 808 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

ALLEN LA 10 066-04 STPFLEX 667 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

BEAUREGARD LA 110 190-01 STPFLEX 179 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

Project: H.000870 - YOU WINN RD./ GLORIA DRIVE @ US 171

Type Impv: INTERSECTION REALIGNMENT

Project Manager: HANKS, ANNA

Remarks: 742-10-0137;USE LOCAL AS MATCH FOR C.S. 000-10;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 STP<200K 817 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

CALCASIEU US 171 024-02 STP<200K 134 URBAN SYSTEMS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 27 of 211

Page 34: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.002059 - LA 384 @ LA 385

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: LAI, QUANG

Remarks: 195-04-0029;INTR IMP.WIDEN LA 384&385 @MCNEESE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 385 195-04 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.003729 - TOOMEY REST AREA

Type Impv: RECONSTRUCT REST AREA

Project Manager: GUINN, MICHAEL S

Remarks: 697-01-0002;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 NHPP 10,096 OPER EFFICIENCY/MOTORIST ASSISTANCE

REST AREAS

4-SCHEDULED FOR LETTING FY 14-15

CALCASIEU 000-10 OTHER 2,443 OPER EFFICIENCY/MOTORIST ASSISTANCE

REST AREAS

Project: H.003969 - EXISTING 3-LANE - CONTRABAND BAYOU

Type Impv: WIDENING AND DRAINAGE IMPROVEMENTS

Project Manager: BROADBENT, RONALD

Remarks: 810-06-0028;YS9 PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 1138-2 810-06 STGEN 900 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

CALCASIEU LA 1138-2 810-06 STPFLEX 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.007113 - J.BENNETT JOHNSTON AVENUE

Type Impv: OVERLAY

Project Manager: HANKS, ANNA

Remarks: 742-10-0125; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 STP<200K 580 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.007130 - JOHN STINE(MYRTLE SPRINGS-SAMPSON)

Type Impv: WIDENING

Project Manager: HANKS, ANNA

Remarks: 742-10-0146;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 STP<200K 5,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009118 - HWY 378 SPUR AT SUTHERLAND RD

Type Impv: ADDING TURN LANE

Project Manager: HANKS, ANNA

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 378-S 810-33 STP<200K 200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009440 - VARIOUS ROADS:SIGNING (CALCASIEU)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 SATRANS 11 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009621 - I-210: W JCT I-10 - E JCT I-10

Type Impv: OGFC

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-210 450-30 NHPP 3,500 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 28 of 211

Page 35: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.009790 - US 171: CONOCO ST - LA 110

Type Impv: MICROSURFACING

Project Manager: RAY, JARED

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU US 171 024-01 NHPP 1,135 TIME 4-SCHEDULED FOR LETTING FY 14-15

CALCASIEU US 171 024-02 NHPP 3,074 TIME

BEAUREGARD US 171 024-03 NHPP 3,222 TIME

Project: H.010192 - LAKE CHARLES ITS PHASE 2

Type Impv: ITS DEPLOYMENT AS PER REGIONAL ARCHITECTURE

Project Manager: DELANEY, ELIZABETH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 NHPP 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010865 - I-210: DISTRICT 07 CABLE BARRIER

Type Impv: INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.

Project Manager: CORMIER, CLAYTON

Remarks: USE HSIP FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-210 450-30 HSIP 939 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010868 - LAKE CHARLES FIRST AVENUE TRAIL

Type Impv: CONSTRUCTION OF 2100' PEDBIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010916 - PRIEN LAKE MAIN SPAN RE-DECKING

Type Impv: REHABILITATION

Project Manager: D'ANDREA, ARTUR

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-210 450-30 NHPP 12,600 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011053 - LA 3063: SHORT ST - S I-10 RAMP

Type Impv: PATCH, COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 3063 810-25 NFABOND 954 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.000186 - US 90 OVER I-10 RAMPS @ LOCKMOOR

Type Impv: BRIDGE REPLACEMENT

Project Manager: YANG, LI

Remarks: 003-04-0064;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU US 90 003-04 STPFLEX 12,248 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002070 - LA 14 BAYOU BRIDGE

Type Impv: NEW BRIDGE

Project Manager: LAI, QUANG

Remarks: 196-01-0023;MULTI PIPE OR CULVERT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 14 196-01 STPFLEX 393 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002075 - PAVEMENT WIDENING-MP42.7-I-10 FR RD

Type Impv: PAVEMENT WIDENING

Project Manager: RAY, JARED

Remarks: 197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 383 197-02 STPFLEX 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 29 of 211

Page 36: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.003184 - I-10: TEXAS STATE LINE-E. OF COONE GULLY

Type Impv: WIDEN TO 6 LANES

Project Manager: THOMAS, BEN

Remarks: 450-91-0078;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 NHPP 24,000 CORRIDOR 3-DESIGN/DEVELOPMENT

CALCASIEU I-10 450-91 NHPP 41,000 PRESERVATION

INTERSTATE

Project: H.007122 - MYRTLE SPRINGS ROAD

Type Impv: SURFACE WIDENING AND OVERLAY

Project Manager: HANKS, ANNA

Remarks: 742-10-0136;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.007923 - LA 378 RIGHT TURN LANE @ LA 379

Type Impv: RIGHT TURN LANE

Project Manager: RAY, JARED

Remarks: 810-12-0041;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 378 810-12 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.007939 - LA 378-S: INDIAN BAYOU BRIDGE & APPROACH

Type Impv: BRIDGE REPLACEMENT

Project Manager: MUSA, ELNUR

Remarks: 810-33-0002;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 378-S 810-33 STPFLEX 2,039 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009455 - I-210 BRIDGE CLEANING & PAINTING

Type Impv: CLEANING & PAINTING

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-210 450-30 NHPP 3,400 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

Project: H.009611 - US 90: EDGERLY - SULPHUR

Type Impv: CP 2", PATCH , OVERLAY 4"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU US 90 003-03 STPFLEX 3,825 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.009620 - I-10: W OF LA 108 - WESTLAKE (MP 25-27)

Type Impv: RUBBLIZE & OVERLAY, REPLACE AT UNDERPASS

Project Manager: RICHARD, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 NHPP 15,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010197 - US 171: J-TURN @ N. PERKINS FERRY RD.

Type Impv: INSTALL TURN LANES (RIGHT, LEFT AND J-TURN)

Project Manager: JESCLARD, TREY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU US 171 024-02 HSIP 750 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.010240 - LA 12: TEXAS STATE LN - LA 109

Type Impv: CP 2", OVERLAY 4", 2" SHLD

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 12 012-02 STPFLEX 2,308 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 30 of 211

Page 37: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.010563 - 5TH AVE (SOUTHBOUND) / FIFTH AVE DRAIN

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 FBROFF 439 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010564 - PEARL STREET / LATERAL L-3

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 FBROFF 295 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.011019 - LA 101: ELEVATE ROADWAY

Type Impv: ELEVATE THE ROADWAY

Project Manager: CORMIER, CLAYTON

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 101 209-01 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.011065 - NELSON INTERCHANGE IMPROVEMENTS

Type Impv: IMPROVEMENTS TO THE NELSON INTERCHANGE

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 1138-2 810-06 STBONDS 12,000 CAPACITY 3-DESIGN/DEVELOPMENT

CALCASIEU I-210 450-30 STBONDS 2,200 CAPACITY

Project: H.011088 - HOLLY HILL EXTENSION

Type Impv: NEW ALIGNMENT

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 3088 870-02 STBONDS 5,000 CAPACITY 3-DESIGN/DEVELOPMENT

CALCASIEU LA 3088 870-02 LOCAL 1,300 CAPACITY

CALCASIEU LA 1138-2 810-06 LOCAL 100 CAPACITY

CALCASIEU LA 1138-1 810-34 LOCAL 100 CAPACITY

Project: H.011100 - LA 3059: REALIGN @ PARISH LINE

Type Impv: REALIGN CURVE

Project Manager: CORMIER, CLAYTON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 3059 383-01 HSIP 1,475 SAFETY 3-DESIGN/DEVELOPMENT

JEFF DAVIS LA 3059 383-02 HSIP 1,025 SAFETY

Project: H.011196 - LAKE CHARLES SRTS PROJ. - BARBE ELEM.

Type Impv: SIDEWALKS, STRIPING AND SIGNING

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 SR2S 208 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.011232 - LAKE CHARLES SRTS PROJ. - BARBE ELEM. NI

Type Impv: EDUCATIONAL AND ENCOURAGEMENT ACTIVITIES

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 SR2S 50 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 31 of 211

Page 38: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.003200 - FRONTAGE ROAD CONST IN LAKE CHARLES

Type Impv: NEW FRONTAGE ROADS

Project Manager: PAINE, PEGGY JO

Remarks: 450-91-0171;STAGE 0 COMPLETE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.003740 - STARKS WEIGH STATION BUILDING

Type Impv: NEW WEIGH STATION BUILDING

Project Manager: MCCOY, JANET

Remarks: 697-13-0005;PRIORITY 1

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

WEIGH STATIONS

2-WAITING FOR FUNDING

Project: H.009750 - TOPSY ROAD SIDEWALK

Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks: ROW IS 80/20, CONSTRUCTION 95/5

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 STPENH 145 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009751 - BELL CITY SCHOOL SIDEWALK

Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE, WARNING LIGHTS &RELATED

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 14 196-01 STPENH 102 ENHANCEMENTS 2-WAITING FOR FUNDING

CALCASIEU 000-10 STPENH 13 ENHANCEMENTS

Project: H.000425 - LA 12 SABINE RIVER BRIDGE

Type Impv: NEW BRIDGE

Project Manager: OLIVIER, NICHOLAS

Remarks: 012-01-0004;JOINT PROJECT WITH TEXAS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 12 012-01 STPFLEX 4,346 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.000428 - LA 12 BRIDGES

Type Impv: NEW BRIDGES

Project Manager: BROWN, JEFF

Remarks: 012-02-0036;6 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 12 012-02 STPFLEX 29,903 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.003931 - CALCASIEU RIVER BRIDGE

Type Impv: FEASIBILITY & ENVIRON. STUDY

Project Manager: UMEOZULU, JOE

Remarks: 700-10-0115;INCL. UPRR GRADE SEPARATION

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 NFI 0 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.005967 - NELSON RD EXT & BRIDGE

Type Impv: NEW ROAD & BRIDGE

Project Manager: KENDRICK, BRIAN

Remarks: 706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL

CALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR

CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 32 of 211

Page 39: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.009305 - I-10 SPEED LIMITS

Type Impv: STUDY

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU I-10 450-91 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Project: H.009488 - LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)

Type Impv: STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 378 810-12 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.009521 - LA 397: NEW BR.@ I-10 & UPRR (CALCASIEU)

Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING

Project Manager: LACOMBE, JASON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 397 193-31 STPFLEX 10,200 RAILROADS

GRADE SEPARATION

1-PLANNING/ENVIRONMENTAL

Project: H.009612 - LA 12: LA 109 - BEAUREGARD P/L

Type Impv: CP 2", OVERLAY 4", 2" SHLD

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 12 012-02 STPFLEX 4,863 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009613 - LA 14: MC NEESE ST - E. PRIEN LAKE RD

Type Impv: PCCP RECONSTRUCTION

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 14 193-06 STPFLEX 4,926 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009614 - LA 14: LA 101 - JEFFERSON DAVIS P/L

Type Impv: CP 2", PATCH, OVERLAY 4"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 14 196-02 STPFLEX 1,181 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010000 - US171 CALCASIEU RVR BRIDGE CLEAN & PAINT

Type Impv: CLEANING & PAINTING & MISC. REPAIRS

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU US 171 024-01 NHPP 1,700 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

Project: H.010001 - LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT

Type Impv: CLEANING & PAINTING & MISC. REPAIRS

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 27 031-04 STPFLEX 1,800 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

Project: H.010234 - LA 14: 0.15 MI S LOGNION RD - LA 101

Type Impv: PATCH, CP 2", 4" OVERLAY RDWY, AGGREGATE SHLDR

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 14 196-01 STPFLEX 1,111 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 33 of 211

Page 40: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU

Project: H.010241 - LA 12: 0.63 MI NE AIRPORT DR - BUXTON CR

Type Impv: PATCH, CP2", 4" OVERLAY RDWY, 2" PAVED SHOULDER

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 12 012-04 STPFLEX 1,541 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010670 - LA 27&LA 1256:0.97 MI S LA1133- I-10 INT

Type Impv: PATCH, CP 2", OL 4"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALCASIEU LA 27 031-05 STPFLEX 2,315 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

CALCASIEU LA 27 031-05 STPFLEX 1,543 PRESERVATION

NON-INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 34 of 211

Page 41: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALDWELL

Project: H.007940 - BAYOU LAFOURCHE CUTOFF BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: HERATH, ANANDA

Remarks: 811-01-0009;USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL LA 847 811-01 FBR-ON/OFF 3,083 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009610 - LA 133: LA 4 - LA 561

Type Impv: ASPHALT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL LA 133 166-01 STPFLEX 2,858 PRESERVATION

NON-INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009979 - HESTER ROAD / PINEY CREEK

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL 000-11 FBROFF 308 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011130 - BOEUF WMA MORENGO SWAMP TRAIL - PHASE 1

Type Impv: RESTORATION OF 4.25 MILES OF MOTORIZED TRAILS IN WMA

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL 000-11 RTP 185 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011188 - RIVERTON CAMP RD: UP RR XING (CALDWELL)

Type Impv: THIS PROJECT PROPOSES TO INSTALL FLASHING LIGHTS AND GATE

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL 000-11 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.002650 - CASTOR,CASTOR RELIEF & DRAIN BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: TONEY, PATRICK

Remarks: 345-03-0029;3 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL LA 506 345-03 FBROFF 4,265 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009602 - LA 557: LA 4 - OUACHITA LINE

Type Impv: MICROSURFACING

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL LA 557 159-02 STPFLEX 1,276 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.001557 - 22' PAVEMENT - JCT. US 165

Type Impv: WIDENING & O'LAY W/CURVE REALIGN.

Project Manager: MASON, KEN

Remarks: 068-04-0030;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CALDWELL LA 4 068-04 HSIP 1,120 SAFETY 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 35 of 211

Page 42: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CAMERON

Project: H.010542 - LA 717: LA 14 - Vermilion P/L

Type Impv: PATCH, CP 2", OL 2"

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CAMERON LA 717 812-01 NFABOND 1,689 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010543 - LA 390: LA 27 - MAGGIE HEBERT RD

Type Impv: PATCH, CP 2", OL 2"

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CAMERON LA 390 812-03 NFABOND 1,437 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010544 - LA 384: LA 27 - GRANGERVILLE RD

Type Impv: PATCH, CP 2", OL 2"

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CAMERON LA 384 812-04 NFABOND 511 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010545 - LA 3056: JEFF DAVIS PL-.09 Mi N RIVER RD

Type Impv: PATCH, CP 2", OL 2"

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CAMERON LA 3056 812-08 NFABOND 654 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009470 - LA 82: SUPERIOR CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT - MOVEABLE BRIDGE

Project Manager: BUCCI, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CAMERON LA 82 194-02 STPFLEX 11,161 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009788 - LA 82: CREOLE - OAK GROVE

Type Impv: MICROSURFACING

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CAMERON LA 82 194-01 STPFLEX 492 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 36 of 211

Page 43: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CATAHOULA

Project: H.001129 - LA 8 REALIGNMENT AT OUACHITA RIVER

Type Impv: ROADWAY REALIGNMENT

Project Manager: RABALAIS, NICK

Remarks: 039-04-0061;SEE NOTES FOR FUNDING INFO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 8 039-04 STPFLEX 2,250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

CATAHOULA LA 8 039-04 STPFLEX 2,250 OTHER / MISCELLANEOUS

Project: H.006062 - AMYX ROAD BRIDGE OVER SALEM CREEK

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-13-0103

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA 000-13 FBROFF 407 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010529 - LA 921 & LA 567 OVERLAYS

Type Impv: PATCH & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 921 354-02 NFABOND 1,864 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

CATAHOULA LA 567 354-30 NFABOND 1,854 PRESERVATION

NON-INTERSTATE NFA

Project: H.010845 - LA 3037 & LA 3165 OVERLAYS

Type Impv: INPLACE STABILIZATION & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 3165 813-26 NFA 807 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14

CATAHOULA LA 3037 813-22 NFA 515 ROAD TRANSFER

Project: H.009607 - LA 124: ENTERPRISE - LA 559

Type Impv:

Project Manager: CHENEVERT, MARK

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 124 041-03 STPFLEX 935 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011174 - US 425: SICILY ISLAND - LA 913

Type Impv: CAPE SEAL

Project Manager: CHENEVERT, MARK

Remarks: TIMED FUNDS ARE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA US 425 026-05 NHPP 900 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.001140 - LA 124: HOOTER CREEK BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: RICHARD, RYAN

Remarks: 041-03-0025; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 124 041-03 FBROFF 1,504 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010941 - RATCLIFF ROAD / DUCK CREEK

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA 000-13 FBROFF 601 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 37 of 211

Page 44: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CATAHOULA

Project: H.000762 - JCT LA 28 - JCT LA 3037

Type Impv: WIDEN TO 4 LANES

Project Manager: MOORE, DARRELL

Remarks: 022-06-0038;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

CATAHOULA US 84 022-06 NFI 6,000 CAPACITY

Project: H.007946 - LA 3102: LA 124 - 4.8 MI NW OF LA 124

Type Impv: PATCH AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 813-24-0024;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

Project: H.009993 - PROTECTION OF INFRASTRUCTURE ON LA 124

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 124 041-03 FEMA 2,988 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010815 - LA 124 EXTENSION

Type Impv: CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTE

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 124 143-03 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

Project: H.011029 - LA 559: REPLACE DUTY FERRY WITH BRIDGE

Type Impv: FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGE

Project Manager: MUMPHREY, RAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CATAHOULA LA 559 813-29 STPFLEX 18,000 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING

CATAHOULA LA 559 346-01 STPFLEX 18,000 OTHER / MISCELLANEOUS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 38 of 211

Page 45: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CLAIBORNE

Project: H.010297 - LA 520:JCT US 79-1.624 MI S BELL HILL RD

Type Impv: ASPHALTIC OVERLAY, PAVEMENT MARKING, AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 520 101-01 STPFLEX 1,617 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010517 - LA 534 SPUR: LA 2 TO LA 534

Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 534-S 290-01 NFABOND 1,019 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009442 - VARIOUS ROADS:SIGNING (CLAIBORNE)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE 000-14 SATRANS 1 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010067 - LYONS HILL AND FLAT LICK ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE 000-14 FBROFF 994 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010293 - LA 146: .21 MI E OF US 79 - W JCT LA 518

Type Impv: THIN OVERLAY, PAVEMENT MARKING, AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 146 085-08 STPFLEX 2,500 PRESERVATION

NON-INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010308 - CLAIBORNE PARISH CHIP SEALS

Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 533 814-02 NFA 280 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010514 - LA 521: WEBSTER PARISH LINE TO LA 808

Type Impv: ULTRATHIN OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 521 291-02 NFA 1,273 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.001763 - LA 520: MIDDLE FORK BAYOU D'ARBONNE BRG.

Type Impv: BRIDGE REPLACEMENT

Project Manager: RICHARD, RYAN

Remarks: 101-01-0012;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 520 101-01 STPFLEX 898 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009505 - US 79: BILLY SHAW - N END OF PASSING LA

Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT MARKING & RELATED W

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE US 79 027-06 STPFLEX 1,940 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

CLAIBORNE LA 2 070-02 STPFLEX 3,200 PRESERVATION

NON-INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 39 of 211

Page 46: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CLAIBORNE

Project: H.009506 - LA 146: OWENS ST TO JCT. LA 518

Type Impv: ASPHALT OVERLAY, DRIANAGE, PAVEMENT STRIPING & RELATED W

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 146 085-08 STPFLEX 3,926 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010923 - US 79 BYPASS @ LA 9 ROUNDABOUT

Type Impv: DESIGN AND CONSTRUCTION OF ROUNDABOUT

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE US 79 027-05 STPFLEX 2,950 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.001674 - LA 146 BRIDGES NEAR HOMER

Type Impv: NEW BRIDGES

Project Manager: DELATTE, BRIAN

Remarks: 085-08-0032;4 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 146 085-08 STPFLEX 6,068 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009511 - LA 520: US 79-2.56 MI E BEAVER BRANCH BR

Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RELATED W

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 520 101-01 STPFLEX 2,690 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009963 - LA 518: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 518 109-03 FEMA 728 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009965 - LA 540: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 540 335-02 FEMA 12,466 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009971 - LA 3062: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 3062 085-30 FEMA 728 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010281 - LA 2: WEBSTER P/L TO LA 3062

Type Impv: COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT S

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CLAIBORNE LA 2 085-07 STPFLEX 3,350 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 40 of 211

Page 47: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CONCORDIA

Project: H.000780 - US 84 @ US 425 INTERSECTION IMPROVEMENTS

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: RABALAIS, NICK

Remarks: 022-07-0076 AND 026-02-0068;NEW PROJECT-BEING SCOPED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA US 84 022-07 STGEN 300 CAPACITY 4-SCHEDULED IN CURRENT FY 13-14

CONCORDIA US 84 022-07 NHPP 70 CAPACITY

CONCORDIA US 84 026-02 NHPP 30 CAPACITY

CONCORDIA US 425 026-03 NHPP 14 CAPACITY

CONCORDIA LA 568 075-01 STPFLEX 10 CAPACITY

Project: H.011056 - LA 566:4.7MI E DUNBARTON-2.88 MI S US425

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 566 355-03 NFABOND 1,879 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010871 - VIDALIA MULTI-USE TRAILS, SECTION 2

Type Impv: CONSTRUCTION OF A 2,900' PED-BIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA 000-15 RTP 127 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

CONCORDIA 000-15 LOCAL 12 RECREATIONAL TRAILS PROGRAM

Project: H.011041 - LA 569 OVERLAY & LA 555 AST

Type Impv: OVERLAY & AST

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 569 176-01 NFABOND 1,060 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

FRANKLIN LA 555 821-06 NFABOND 267 PRESERVATION

NON-INTERSTATE NFA

Project: H.011175 - DELAWARE ST. - ARKANSAS ST. IN FERRIDAY

Type Impv: COLD PLANE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: TIMED FUNDS ARE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA US 84 026-02 NHPP 750 TIME 4-SCHEDULED FOR LETTING FY 14-15

CONCORDIA US 425 026-03 NHPP 750 TIME

Project: H.010460 - LA 565: LA 129 - LA 600

Type Impv: PATCH AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 565 178-03 STPFLEX 1,305 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010462 - LA 15: LA 131 - US 84

Type Impv: STABILIZE AND OVERLAY, COLD PLANE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 15 177-05 STPFLEX 3,900 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 41 of 211

Page 48: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CONCORDIA

Project: H.000770 - JCT LA 565 - JCT LA 129

Type Impv: WIDEN TO 4 LANES

Project Manager: MOORE, DARRELL

Remarks: 022-07-0053;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.000771 - LA 129 - US 65 (FERRIDAY)

Type Impv: WIDEN TO 4 LANES

Project Manager: RABALAIS, NICK

Remarks: 022-07-0054;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.006187 - LA 15 @ DEER PARK (S OF US 65 - LEVEE)

Type Impv: LA 15 AT DEER PARK REALIGNMENT

Project Manager: MASON, KEN

Remarks: 177-04-0033

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 15 177-04 HSIP 1,657 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.009082 - VIDALIA PORT ACCESS ROAD

Type Impv: NEW ROUTE

Project Manager: MASON, KEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA 000-15 DEMO 2,636 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.009587 - US 84: MISS. RIVER BR. - LA 3180

Type Impv: M3 MICROSURFACING

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA US 84 026-02 NHPP 881 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009973 - LA 3196: GRADE IMPROVEMENT

Type Impv: GRADE IMPROVEMENT

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 3196 815-20 FEMA 2,781 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010461 - LA 15: LA 910 - LA 565

Type Impv: PATCH AND OVERLAY, AST

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA LA 15 177-04 STPFLEX 5,745 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010700 - US 425/US 84 SIGNAL TIMING STUDY

Type Impv: SIGNAL TIMING STUDY AND RETIMING OF SIGNALS

Project Manager: HOYT, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

CONCORDIA US 84 026-02 NHPP 22 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

CONCORDIA US 425 026-03 NHPP 1 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 42 of 211

Page 49: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DESOTO

Project: H.009510 - LA 481: SABINE P/L-BEULAH BAPTIST CHURCH

Type Impv: ULTRATHIN OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 299-02-0009; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 481 299-02 STPFLEX 1,986 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009574 - I-49: NATCHITOCHES P/L TO CADDO P/L

Type Impv: PCC PATCH & PAVEMENT MARKINGS

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO I-49 455-07 NHPP 2,052 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010312 - LA 191: LA 763 TO US 84

Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 191 099-03 STPFLEX 299 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.001749 - LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE

Type Impv: CURVE REALIGNMENT

Project Manager: BAUGH, SAM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 5 098-03 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009093 - LA 175: TURN LANES @ LA 5

Type Impv: ADD TURN LANES

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 175 035-04 HSIP 800 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009173 - LA 513: OXFORD TO US 84

Type Impv: ROADWAY PAVEMENT STRUCTURE REPAIRS AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 513 300-04 NFABOND 2,178 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009978 - US 84: PASSING LANES

Type Impv: COLD PLANING, SUPERPAVE ASPHALTIC CONCRETE, PAVEMENT STR

Project Manager: ALLEN, JEFFREY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO US 84 021-02 DEMO 1,900 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010212 - LA 175: IMPROVEMENT BTWN US 84 & LA 509

Type Impv: LENGTHEN TURN LANE, ADD TURN LANE AND MINOR WIDENING

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 175 035-04 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010975 - LA 175: NB LEFT TURN LANE AT LA 3015

Type Impv: ADDING LEFT TURN LANE TO IMPROVE TRAFFIC FLOW

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 175 035-04 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 43 of 211

Page 50: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DESOTO

Project: H.011009 - US 84: US 171 TO LA 175 SOUTH

Type Impv: MILL AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO US 84 021-03 NHPP 900 PRESERVATION

NON-INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011170 - US 171: SABINE PARISH LINE TO LA 5

Type Impv: EROSION CONTROL: REVETMENT, GRASS

Project Manager: BAUGH, SAM

Remarks: TIMED FUNDS WILL BE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO US 171 025-06 NHPP 462 TIME 4-SCHEDULED FOR LETTING FY 14-15

DESOTO US 171 025-05 NHPP 388 TIME

Project: H.010817 - ROGERS FIELD AND MOUNCE ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO 000-16 FBROFF 285 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

DESOTO 000-16 FBROFF 293 PRESERVATION

BRIDGE (OFF SYSTEM)

DESOTO 000-16 FBROFF 1,117 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010978 - US 84: LEFT TURN LANES AT LA 481

Type Impv: ADDING A LEFT TURN LANES IN BOTH DIRECTIONS AT LA 481

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO US 84 021-02 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.001223 - RESURFACING ON US 84 AND LA 5

Type Impv: MILL. OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 049-01-0017;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 5 049-01 STPFLEX 2,895 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

DESOTO US 84 021-02 STPFLEX 1,853 PRESERVATION

NON-INTERSTATE

Project: H.001790 - INT. PAPER PLANT - LA 1

Type Impv: RECON W/GEOMETRIC IMPROVEMENTS

Project Manager: BORNE, FRED

Remarks: 105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010285 - LA 512: US 171 TO LA 483

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DESOTO LA 512 301-02 STPFLEX 2,104 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 44 of 211

Page 51: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.002290 - LA 64: LA 19 TO MCHUGH RD

Type Impv: CENTER TURN LANE

Project Manager: MUSA, ELNUR

Remarks: SCOPE COMP; R/W & UTIL W STP>200K. DOTD MATCH. CITY/PARI

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 64 253-02 HSIP 3,526 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

E BATON ROUGE LA 64 253-02 STP>200K 0 URBAN SYSTEMS

Project: H.009290 - LSU LABORATORY SCHOOL SRTS PROJECT

Type Impv: BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIES

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 SR2S 208 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009638 - I-10: WASHINGTON ST. - KCS RR OPASS

Type Impv: COLD PLANE AND OVERLAY

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-10 450-10 NHPP 992 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010254 - 15TH ST PUMP STATION IMPROVEMENTS I-110

Type Impv: REPLACE/UPGRADE PUMP HOUSE COMPONENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 NHPP 480 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010534 - LA 427: ASCENSION P/L - LA 42

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 427 817-23 NFABOND 1,288 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

ASCENSION LA 427 803-25 NFA 10 PRESERVATION

NON-INTERSTATE NFA

Project: H.010554 - SAINT GABRIEL TRAIL AT THE LEVEE, PH 2

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON THE MISS. RIVER LEVEE.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RTP 183 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

E BATON ROUGE 000-17 LOCAL 5 RECREATIONAL TRAILS PROGRAM

Project: H.010585 - DOWNTOWN BATON ROUGE GREENWAY PH. 2

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

E BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM

Project: H.010967 - LA 73 AT US 61 SERVICE ROAD MODIFICATION

Type Impv: INSTALL MOUNTABLE CURBING ON LA 73 AND ON US 61 SERVICE RO

Project Manager: BEAUVAIS, HEWITT

Remarks: LETTER BID IN DISTRICT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 73 077-04 STCASH 22 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 45 of 211

Page 52: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.011211 - LA 64: MEDIAN IMPROVEMENTS

Type Impv: MEDIAN MODIFICATIONS TO PREVENT U TURNS FROM BEING DONE.

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 64 253-02 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.000698 - BAKER CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT & ASPHALT WIDENING

Project Manager: CAVALIER, STEPHANIE

Remarks: 019-02-0054;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61 019-02 NHPP 3,186 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE US 61 019-02 NHPP 800 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.002320 - SULLIVAN RD (WAX - HOOPER)

Type Impv: 4 LN DIVIDED CONC HWY RAISED MEDIAN

Project Manager: JESCLARD, TREY

Remarks: 255-30-0014;GREEN LIGHT PROJECT.LET BY CITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3034 255-30 LOCAL 19,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE LA 3034 255-30 STBONDS 3,000 PRESERVATION

NON-INTERSTATE

E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 PRESERVATION

NON-INTERSTATE

Project: H.002822 - NICHOLSON @ BRIGHTSIDE LANE

Type Impv: INTERSECTION IMPROVEMENT

Project Manager: DEVILLE, JACQUES

Remarks: 414-01-0036;SEE NOTES USE TTF AS MATCH FOR R/W ON LA 30

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 30 414-01 CM 3,816 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE 000-17 CM 2,763 URBAN SYSTEMS

Project: H.006499 - SAFE ROUTES TO WESTDALE MIDDLE SCHOOL

Type Impv: CONSTRUCTION OF BIKEPATH AND PURCHASE OF SPEED FEEDBACK

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 SR2S 210 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.007160 - EBR COMPUTERIZED TRAFFIC SIGNAL

Type Impv: TRAFFIC SIGNAL SYNCHRONIZATION

Project Manager: BROWN, JEFF

Remarks: 742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009144 - LA 42: CORRIDOR IMPROVEMENTS

Type Impv: CLEARING AND GRUBBING

Project Manager: ALLAIN, PETER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 42 257-04 STPFLEX 100 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010251 - CHIPPEWA ST PUMP STATION IMP US61/190-X

Type Impv: REPLACE/UPGRADE PUMP HOUSE COMPONENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61-X 817-20 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 46 of 211

Page 53: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.010253 - BLUEBONNET BLVD. PUMP STAT. IMP LA 1248

Type Impv: REPLACE PUMP STATION FLOAT SYSTEM

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 1248 258-33 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010262 - LA 42: DRAINAGE IMPROVEMENTS

Type Impv: REGRADE TRAVEL LANE AND ADJUST CATCH BASIN

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 42 257-04 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010439 - BOYD ST & 21ST ST PUMPING STA IMP I-110

Type Impv: REPLACE PUMP STATION FLOAT SYSTEM

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 NHPP 50 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE I-110 450-92 NHPP 50 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

Project: H.010560 - ESSEN LANE WIDEN: PERKINS RD TO I-10

Type Impv: WIDEN TO 6 LANES SECTION W/16'CURB & GUTTER MEDIAN

Project Manager: TSAI, LOONG SHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3064 258-32 STBONDS 5,900 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE LA 3064 258-32 STPFLEX 100 CAPACITY

Project: H.010565 - ACADIAN STREET PUMPING STATION

Type Impv: REPLACE/UPGRADE PUMPHOUSE COMPONENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 427 258-02 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010648 - ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY

Type Impv: PAVEMENT REHABILITATION

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STP>200K 2,900 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010649 - EBR PARISHWIDE SIGNAL MODIFICATIONS

Type Impv: SIGNAL MODIFICATIONS

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STP>200K 1,439 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010650 - OLOL MEDICAL COMPLEX AREA STREETS

Type Impv: REHABILITATE EXISTING ROADWAY

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STP>200K 1,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010723 - NORTH BOULEVARD PROMONADE

Type Impv: PED. AND BIKE PATH

Project Manager: JONES, MATTHEW

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 DEMO 1,500 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 47 of 211

Page 54: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.010792 - US 61 & LA 73: IMPROV'S AT PECUE LANE

Type Impv: INTERSECTION MODIFICATIONS

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61 007-08 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE LA 73 077-04 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.010866 - LA 37: TREE AND STUMP REMOVAL

Type Impv: LA 37: TREE AND STUMP REMOVAL

Project Manager: KELLEY, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 37 254-02 HSIPPEN 2,600 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010869 - WARDS CREEK TRAIL - BLUEBONNET EXTENSION

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RTP 256 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE 000-17 LOCAL 140 RECREATIONAL TRAILS PROGRAM

Project: H.010875 - WARDS CREEK TRAIL - SIEGEN EXTENSION

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RTP 222 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE 000-17 LOCAL 106 RECREATIONAL TRAILS PROGRAM

Project: H.011109 - US 61: IC RR XING (BATON ROUGE)

Type Impv: INSTALL NEW CROSSING SURFACE

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61 007-90 RAIL HE 400 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011115 - PENNINGTON TRAIL SEGMENT

Type Impv: CONST. OF 12' X 1480' PED-BIKE TRAIL

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE 000-17 LOCAL 397 RECREATIONAL TRAILS PROGRAM

Project: H.011120 - RIVERBEND CONNECTIVITY TRAIL

Type Impv: CONST. OF A 3700' PED-BIKE TRAIL THAT CONNECTS PUBLIC FCLTS.

Project Manager: RIGGS, LAURA

Remarks: MICHAED DOMINGUE IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE 000-17 LOCAL 94 RECREATIONAL TRAILS PROGRAM

Project: H.011135 - E. PERDUE: IC RR XING (BATON ROUGE)

Type Impv: INSTALLATION OF ACTIVE WARNING DEVICES.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 48 of 211

Page 55: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.011186 - DIST. 61 TRAFFIC CONTROL UPGRADE 3

Type Impv: SIGNALS TO BE UPGRADE TO CURRENT DOTD STANDARDS

Project Manager: LEBLANC, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61-X 019-01 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE US 61-X 013-04 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

E BATON ROUGE LA 67 060-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

E BATON ROUGE LA 67 060-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.011212 - LA 948: EXTEND WB RIGHT TURN LANE

Type Impv: EXTEND WESTBOUND RIGHT TURN LANE FOR ADDITIONAL CAPACITY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 948 258-01 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011213 - I 12: SOUND BARRIER WALL @ ESSEN LANE

Type Impv: CONSTRUCT SOUND BARRIER WALLS ALONG I-12 WESTBOUND AT E

Project Manager: ISEMANN, ROBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-12 454-01 NHPP 1,250 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011236 - I-10 OVER LA42 GIRDER REPLACEMENT

Type Impv: REPLACE IMPACT DAMAGED GIRDER

Project Manager: TSAI, CHING

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-10 450-10 REIMB 400 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE I-10 450-10 NHPP 100 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.002301 - NORTH SHERWOOD FOREST DRIVE IMPROVEMENTS

Type Impv: WIDEN FROM 2 TO 5 LANES

Project Manager: DEVILLE, JACQUES

Remarks: 742-17-0118;ENV DOC. BY CITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STP>200K 14,710 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.002337 - BAYOU FOUNTAIN

Type Impv: NEW BRIDGE

Project Manager: MOORE, DARRELL

Remarks: 257-03-0025;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 327-S 257-03 STPFLEX 1,666 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.007961 - BLACKWATER BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 817-05-0015;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 410 817-05 STPFLEX 2,379 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 49 of 211

Page 56: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.009649 - LA 67: US 61/190 - LA 3006

Type Impv: PCCP PATCHING

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 67 060-01 STPFLEX 2,167 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

E BATON ROUGE LA 67 060-01 STPFLEX 333 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

E BATON ROUGE LA 67 060-02 STPFLEX 1,733 PRESERVATION

NON-INTERSTATE

E BATON ROUGE LA 67 060-02 STPFLEX 267 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.009651 - US 61/190: US 61/190 BUS - MISS RIVER BR

Type Impv: COLD PLANE AND OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61 007-90 NHPP 8,438 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010020 - I-110 BRIDGE OVER LA 67 CLEAN & PAINT

Type Impv: CLEANING & PAINTING

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 NHPP 650 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

Project: H.010319 - I-110: NORTH ST. - PLANK RD.

Type Impv: RECONSTRUCT JCP @ GRADE

Project Manager: MOORE, DARRELL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 NHPP 27,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010652 - LA 73: US 61 (AIRLINE) - ESSEN LANE

Type Impv: PCCP PATCHING

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 73 077-05 NHPP 3,500 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010659 - RAFE-MEYER ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 FBROFF 732 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

E BATON ROUGE 000-17 FBROFF 593 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010660 - TUCKER RD/DYER RD/DENHAM RD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 FBROFF 732 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

E BATON ROUGE 000-17 FBROFF 593 PRESERVATION

BRIDGE (OFF SYSTEM)

E BATON ROUGE 000-17 FBROFF 739 PRESERVATION

BRIDGE (OFF SYSTEM)

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 50 of 211

Page 57: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.010661 - N. FLANNERY/FIREWOOD/CLOVERLAND BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 FBROFF 601 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

E BATON ROUGE 000-17 FBROFF 439 PRESERVATION

BRIDGE (OFF SYSTEM)

E BATON ROUGE 000-17 FBROFF 439 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010729 - TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)

Type Impv: TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATION

Project Manager: BROWN, JEFF

Remarks: EBR WILL PROVIDE 20% MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT

E BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION

E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION

E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION

Project: H.011098 - LA 30: CORRIDOR IMPROVEMENTS

Type Impv: ACCESS MANAGMENT LA 30 - NICHOLSON DR.

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 30 414-01 NHPP 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.002344 - PERKINS RD. (SIEGEN - PECUE)

Type Impv: WIDEN TO 5 LANES

Project Manager: PICARD, TOBY

Remarks: 258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 427 258-01 LOCAL 26,948 CAPACITY 2-WAITING FOR FUNDING

Project: H.002358 - ESSEN LANE INTERCHANGE

Type Impv: (PHASE 2)(REQ DEMO FUNDS)

Project Manager: PICARD, TOBY

Remarks: 454-01-0068;IM-D $250K FY03.REQ MORE DEMO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.002361 - ESSEN LANE AT I-10

Type Impv: CONCRETE NEW PAVEMENT

Project Manager: PICARD, TOBY

Remarks: 258-32-0022;GREEN LIGHT PROJ(G) LET BY CITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3064 258-32 LOCAL 6,805 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.007970 - OLD HAMMOND (BLVD DE PROV-MILL)

Type Impv: WIDEN TO 4 LANES

Project Manager: PICARD, TOBY

Remarks: 817-09-0035;INCLUDES I'SECT @ FLANNERY; GREEN LIGHT PROJ

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 426 817-09 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.007973 - OLD HAMMOND (BLVD DE PROV-MILL)

Type Impv: CLEARING AND GRUBBING

Project Manager: PICARD, TOBY

Remarks: 817-09-0040; GREEN LIGHT PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 426 817-09 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 51 of 211

Page 58: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.007974 - OLD HAMMOND HWY(MILLERVILLE-O'NEAL)

Type Impv: NEW CONC PAVEMENT

Project Manager: PICARD, TOBY

Remarks: 817-09-0042;LET BY CITY. GREEN LIGHT PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 426 817-09 LOCAL 12,062 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.009327 - I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE

Type Impv: EXPOXY BRIDGE DECK OVERLAY

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-10 450-10 NHPP 8,250 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

E BATON ROUGE I-110 450-92 NHPP 750 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

Project: H.009798 - CITY OF CENTRAL SIDEWALKS

Type Impv: SIDEWALK & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3034 255-30 STPENH 274 ENHANCEMENTS 2-WAITING FOR FUNDING

E BATON ROUGE 000-17 STPENH 168 ENHANCEMENTS

Project: H.009799 - EBR MISS E BANK MULTI-USE PATH, PHASE 3

Type Impv: MULTI-USE PATH & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STPENH 1,500 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.001606 - JEFFERSON HWY @ STUMBERG LN EXT

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: PICARD, TOBY

Remarks: 077-04-0025;GREEN LIGHT PROJECT (AA)LET BY CITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 73 077-04 LOCAL 11,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.002297 - MAGNOLIA BRIDGE RD - INDIAN MOUND

Type Impv: RECON W/GEOMETRIC IMPROVEMENTS

Project Manager: RICHARD, RYAN

Remarks: 254-02-0040;SAFETY TRANSFER FUNDS-4 MILLION MAX

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.002313 - HOOPER RD.(BLKWATER BAYOU - DEVALL)

Type Impv: WIDEN TO 5 LANES

Project Manager: PICARD, TOBY

Remarks: 255-02-0027;HOLD - SEWER & FUNDING PROBLEM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 408 255-02 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.002317 - LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)

Type Impv: NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIAN

Project Manager: PICARD, TOBY

Remarks: GREEN LIGHT PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 52 of 211

Page 59: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.003047 - PECUE LANE/I-10 INTERCHANGE

Type Impv: NEW INTERCHANGE

Project Manager: KENDRICK, BRIAN

Remarks: 450-10-0161;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-10 450-10 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

E BATON ROUGE I-10 450-10 STGEN 0 DEMO / HIGH PRIORITY

Project: H.005403 - LA408(HOOPER RD EXT)LA37-LA16

Type Impv: EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16

Project Manager: OLIVIER, NICHOLAS

Remarks: 700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.007963 - BLACKWATER BAYOU BRIDGE

Type Impv: NEW BRIDGE

Project Manager: GAUDRY, CARL

Remarks: 817-05-0017;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 410 817-05 STPFLEX 1,811 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.008415 - INFORMATION CENTER @ SOUTHERN UNIVERSITY

Type Impv: FEDERAL EARMARK

Project Manager: UMEOZULU, JOE

Remarks: DEMO$ & $ FROM SOUTHERN;AUTHORIZED;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

E BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS

Project: H.008732 - STUDY OF BATON ROUGE LOOP

Type Impv: EIS

Project Manager: NGUYEN, WAYNE

Remarks: EIS IS DEMO WITH MATCH FROM LOCALS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.009141 - LA 3246: ACCESS MGT. IMPROVEMENTS

Type Impv: MEDIAN AND SIGNAL IMPROVEMENTS

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3246 817-40 NHPP 426 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

Project: H.009489 - US 61: JEFFERSON HIGHWAY OVERPASS

Type Impv: BRIDGE REPLACEMENT

Project Manager: YAP, KIAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61 007-90 NHPP 6,854 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009725 - LA 3034: SULLIVAN RD @ WAX RD

Type Impv: PERMIT PROJECT WITH CEA

Project Manager: JESCLARD, TREY

Remarks: 255-30-0012

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 3034 255-30 LOCAL 4,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009745 - SCOTLANDVILLE PKWY MULTI-MODAL IMPRVMENT

Type Impv: MULTI-USE TRAIL & PED. BRIDGES

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 STPENH 234 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 53 of 211

Page 60: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE

Project: H.009783 - BR DOWNTOWN GREENWAY MULTI-USE PATH

Type Impv: MULTI-USE PATH W/LIGHTING, LANDSCAPING & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 STPENH 401 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

E BATON ROUGE I-10 450-10 STPENH 320 ENHANCEMENTS

E BATON ROUGE 000-17 STPENH 332 ENHANCEMENTS

Project: H.010051 - LSU HIGHLAND RD PED CORRIDOR, PHASE I

Type Impv: SIDEWALKS W/LIGHTING & LANDSCAPING

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STPENH 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Project: H.010211 - I-110 NB RAMP AT CAPITOL ACCESS ROAD

Type Impv: I-110 NB RAMP IMPROVEMENTS AT CAPITOL ACCESS ROAD

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE I-110 450-92 0 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.010320 - LA 42: JCT. HIGHLAND RD - LA 30

Type Impv: PCC PATCH

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 42 258-31 STPFLEX 2,400 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE LA 42 257-04 STPFLEX 4,100 PRESERVATION

NON-INTERSTATE

Project: H.010699 - LA 19 SIGNAL TIMING STUDY

Type Impv: SIGNAL TIMING STUDY AND RETIMING OF SIGNALS

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 19 250-01 STPFLEX 19 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Project: H.011226 - US190/US61: LA 415 TO I-12 STUDY

Type Impv: CORRIDOR STUDY ON US 190 / US 61

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

W BATON ROUGE US 190 008-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.009300 - HOOPER ROAD WIDENING (LA 3034 - LA 37)

Type Impv: FEASIBILITY STUDY TO WIDEN HOOPER ROAD

Project Manager: OLIVIER, NICHOLAS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE LA 408 255-02 0 CAPACITY 0-FEASIBILITY/SCOPING

Project: H.007137 - JONES CR. RD.(TIGER BEND - COURSEY)

Type Impv: WIDEN TO 5 LANES

Project Manager: DEVILLE, JACQUES

Remarks: 742-17-0131;NEED SCOPE FROM CITY(742-17-0155C&G

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E BATON ROUGE 000-17 STP>200K 14,552 URBAN SYSTEMS

E BATON ROUGE 000-17 LOCAL 646 URBAN SYSTEMS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 54 of 211

Page 61: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST CARROLL

Project: H.011035 - LA 580: JOES BAYOU - US 65

Type Impv: MAINTENANCE RESURFACING, 6" OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E CARROLL LA 580 818-01 STPFLEX 3,102 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.007992 - LA 883-1 - US 65

Type Impv: ASPHALT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 818-12-0004;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E CARROLL LA 883-2 818-12 STPFLEX 0 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.001961 - JOES BAYOU & CARRAWAY LAKE BRIDGES

Type Impv: NEW BRIDGES

Project Manager: HICKS, MELVIN

Remarks: 161-08-0022;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E CARROLL LA 134 161-08 STPFLEX 2,873 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010390 - US 65: PANOLA PLANT ROAD TO ARK. LINE

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E CARROLL US 65 020-09 NHPP 3,600 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 55 of 211

Page 62: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST FELICIANA

Project: H.009012 - WIDEN INTERSECTIONS AT LA 67 & LA 10

Type Impv: SAFETY - WIDEN INTERSECTION

Project Manager: LAI, QUANG

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E FELICIANA LA 67 060-03 HSIP 125 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

E FELICIANA LA 67 060-04 HSIP 125 SAFETY

E FELICIANA LA 10 061-05 HSIP 50 SAFETY

Project: H.011050 - LA 952: LA 10 - LA 68

Type Impv: STABILIZE AND OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E FELICIANA LA 952 819-05 NFABOND 5,830 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.002365 - LA 63 BRIDGES NEAR BLUFF CREEK

Type Impv: NEW BRIDGES

Project Manager: BRAUNER, KURT

Remarks: 259-01-0011;3 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E FELICIANA LA 63 259-01 STPFLEX 5,497 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010562 - BANK STREET & SINGLETARY STREET BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E FELICIANA 000-19 FBROFF 539 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

E FELICIANA 000-19 FBROFF 300 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.009633 - LA 67: LA 10 - MISSISSIPPI STATE LINE

Type Impv: STABILIZE AND OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

E FELICIANA LA 67 060-04 STPFLEX 8,813 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 56 of 211

Page 63: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EVANGELINE

Project: H.011032 - LA 374: LA 3277 - LA 13

Type Impv: STABILIZE BASE, OVERLAY, AND RELATED WORK.

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 374 820-01 NFABOND 6,219 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011048 - LA 95: ST. LANDRY PARISH LINE - LA 29

Type Impv: STABILIZE BASE, ASPHALT OVERLAY, AND RELATED WORK.

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 95 820-34 NFABOND 2,062 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011049 - LA 748: US 167 - LA 1169

Type Impv: STABILIZE BASE, ASPHALT OVERLAY, AND RELATED WORK.

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 748 380-01 NFABOND 1,197 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010208 - LA 104: CSLM 0.8 (END CURB & GUTR - 1161

Type Impv: COLD PLANE AND OVERLAY

Project Manager: RAY, JARED

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 104 202-01 STPFLEX 541 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.002101 - BAYOU DES CANNES BR NEAR VILLE PLATTE

Type Impv: BRIDGE REPLACEMENT

Project Manager: ISEMANN, ROBERT

Remarks: 202-01-0019;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 104 202-01 FBROFF 1,381 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010036 - FUSELIER ROAD & JEAN DUOS ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE 000-20 FBROFF 547 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010219 - LA 104: ALLEN P/L - LA 3277

Type Impv: STABLIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 104 200-02 STPFLEX 2,275 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.001524 - OAKDALE-LA 106

Type Impv: RECONSTRUCT

Project Manager: MOORE, DARRELL

Remarks: 066-05-0016;INCL204-01-0010 LM 0-0.38

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 10 066-06 NFI 14,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.010223 - LA 106: LA 10 - US 167

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

EVANGELINE LA 106 204-01 STPFLEX 6,426 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

EVANGELINE LA 106 204-02 STPFLEX 3,136 PRESERVATION

NON-INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 57 of 211

Page 64: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: FRANKLIN

Project: H.001093 - LA 4: DEER CREEK BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 036-04-0064;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN LA 4 036-04 STPFLEX 1,337 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006109 - PARISH LINE ROAD BRIDGE - EAST

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-21-0114

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN 000-21 FBROFF 267 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010530 - LA 555 & LA 572 OVERLAYS

Type Impv: PATCH, STABILIZE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN LA 555 821-22 NFABOND 4,781 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

FRANKLIN LA 572 821-23 NFABOND 3,799 PRESERVATION

NON-INTERSTATE NFA

Project: H.009582 - US 425: LA 562 - N JCT LA 3210

Type Impv: COLD PLANE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN US 425 026-06 NHPP 3,000 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010068 - BUSH ROAD AND LISHMAN ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN 000-21 FBROFF 662 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

FRANKLIN 000-21 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010873 - EIGHTH STREET BICYCLE TRAIL

Type Impv: CONSTRUCTION OF A 3,810 BICYCLE TRAIL

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN 000-21 RTP 163 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

FRANKLIN 000-21 LOCAL 47 RECREATIONAL TRAILS PROGRAM

Project: H.009583 - LA 4: LA 562 - LA 128

Type Impv: PATCHING & SINGLE LIFT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN LA 4 036-02 STPFLEX 452 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.009586 - LA 4: LA 578 - LA 128

Type Impv: ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATION

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN LA 4 036-04 STPFLEX 1,636 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 58 of 211

Page 65: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: FRANKLIN

Project: H.009605 - LA 4: LA 128 - LA 15

Type Impv: CHIP SEAL

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN LA 4 036-03 STPFLEX 1,716 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.009784 - WINNSBORO: ADAMS&COMMON ST STREETSCAPING

Type Impv: SIDEWALKS W/LIGHTING, & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

FRANKLIN 000-21 STPENH 229 ENHANCEMENTS 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 59 of 211

Page 66: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: GRANT

Project: H.010906 - LA 123: US 167-.52 MI E DRY PRONG CREEK

Type Impv: ONE LIFT OVERLAY OF EXISTING ASPHALTIC PAVEMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT LA 123 076-02 STPFLEX 700 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011061 - LA 1241: US 71 - US 167

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT LA 1241 822-05 NFABOND 2,544 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010368 - US 167: LA 472 - WINN P/L (NB)

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT US 167 023-03 NHPP 2,858 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010669 - UP RR XINGS (GRANT)

Type Impv: INSTALL F/L'S AND GATES

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT 000-22 RAIL PD 600 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010793 - ROADWAY DEPARTURE SAFETY IMPROVEMENTS

Type Impv: PURCHASE/INSTALL SIGNS & SOLAR BEACONS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT 000-22 SATRANS 33 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010861 - KATELAND GIN ROAD / DARROW BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT 000-22 FBROFF 1,617 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011119 - LA 158: KCS RR XING (GRANT)

Type Impv: REPLACE CROSSING SURFACE

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT LA 158 009-32 RAIL HE 158 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

GRANT LA 158 009-32 LOCAL 126 RAILROADS

Project: H.010592 - WILLET LOOP RD & ROCK HILL RD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT 000-22 FBROFF 585 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

GRANT 000-22 FBROFF 470 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.001842 - LA 471: DARTIGO CREEK & CREEK BRIDGES

Type Impv: NEW BRIDGE

Project Manager: PAINE, PEGGY JO

Remarks: USE NFA FUNDS TO PAY FOR MITIGATION UNTIL FEMA REIMBURS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT LA 471 123-01 FEMA 3,534 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 60 of 211

Page 67: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: GRANT

Project: H.010362 - LA 8: JCT US 167 - N JCT US 165

Type Impv: MICROSURFACING

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

GRANT LA 8 040-02 STPFLEX 270 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 61 of 211

Page 68: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA

Project: H.009177 - NEW IBERIA INTERSECTION SAFETY IMPROVE

Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 SATRANS 120 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009467 - LA671: JEANERETTE BR WEDGE SYSTEM REPAIR

Type Impv: MECHANICAL REPAIRS

Project Manager: LAMBERT, JARRETT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 671 241-01 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

MOVABLE BRIDGE REHABILITATION

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010521 - LA 344: 2.18 MI N LA 86 - LA 86

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 344 823-14 NFABOND 2,754 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010850 - SIGN SAFETY IMPROVEMENTS

Type Impv: PURCHASE AND INSTALL REGULATORY & WARNING SIGNS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 SATRANS 23 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.002753 - BAYOU PARC PERDU & CREEK BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 397-05-0016; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 89 397-05 FBROFF 1,800 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009843 - BNSF (NEW IBERIA) LA 14/CENTER ST.

Type Impv: INSTALLING NEW F/L'S AND GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 055-07-0077

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 14 055-07 RAIL PD 221 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009856 - BNSF (NEW IBERIA) JULIA ST.

Type Impv: INSTALL FLASHING LIGHTS & GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0100

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 221 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009857 - BNSF (NEW IBERIA) IBERIA ST.

Type Impv: INSTALL FLASHING LIGHTS & GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0101

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 222 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009860 - BNSF (NEW IBERIA) RR XINGS ALONG THE BNS

Type Impv: INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0102

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 222 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 62 of 211

Page 69: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA

Project: H.009868 - BNSF (NEW IBERIA) JEFF. TERRACE BLVD.

Type Impv: INSTALL FLASHING LIIGHTS & GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0117; BNSF TO PAY 20% MATCH OF DEMO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 DEMO 300 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

IBERIA 000-23 RAIL PD 0 RAILROADS

Project: H.009891 - BNSF (NEW IBERIA) WEEKS ST.

Type Impv: INSTALL F/L'S AND GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0099

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 222 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010100 - PESSON ELEM. SAFE ROUTES PHASE I

Type Impv: SIDEWALK CONSTRUCTION, MARKINGS,

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 SR2S 240 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010256 - LA 182:BRUNER ST - VINE ST DRAINAGE IMP.

Type Impv: INSTALL NEW DRAINAGE STRUCTURES, CONCRETE CURB AND GUTT

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 182 004-04 STPFLEX 653 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010614 - RT 207 (CENTRAL DR):BNSF RR XING(IBERIA)

Type Impv: UPGRADE BNSF RR SIGNALS AT IBERIA PARISH RT 207

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0114

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 60 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

IBERIA 000-23 LOCAL 15 RAILROADS

Project: H.010666 - DEARE STREET: BNSF RR XING (NEW IBERIA)

Type Impv: INSTALL F/L'S & GATES AT DEARE STREET

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011127 - LA 14: LDRR XING (NEW IBERIA)

Type Impv: REPLACE CROSSING SURFACE.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 14 055-07 RAIL HE 74 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

IBERIA LA 14 055-07 LOCAL 59 RAILROADS

Project: H.002762 - LA 86: LA 3242 - LA 347

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: RAY, JARED

Remarks: 400-01-0007; 400-01 NFA MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 86 400-01 STPFLEX 4,229 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 63 of 211

Page 70: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA

Project: H.002893 - US 90 BRIDGE OVER LA 14

Type Impv: BRIDGE REHABILIATION

Project Manager: KEMP, KELLY

Remarks: 424-04-0059;EAST AND WEST BOUND LANES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA US 90 424-04 NHPP 5,000 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002896 - US 90 DRAIN BR. NEAR JEANERETTE

Type Impv: NEW BRIDGE

Project Manager: TONEY, PATRICK

Remarks: 424-04-0064;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA US 90 424-04 NHPP 1,025 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009142 - LA 86 & LA 320: ROUNDABOUT

Type Impv: ROUNDABOUT

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 86 237-01 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

IBERIA LA 320 823-12 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.009861 - BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST

Type Impv: TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0105

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL HE 500 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.009892 - LDRR (NEW IBERIA) US 90 FR

Type Impv: NEW XING PER DISTRICT 03 & NEW IBERIA

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA US 90 424-04 STPFLEX 300 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.010155 - US 90 RAILROAD OVERPASS SE OF LA 85

Type Impv: BRIDGE OVERPASS

Project Manager: RABALAIS, NICK

Remarks: STBONDS AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA US 90 424-04 DEMO 15,000 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENT

Project: H.010922 - LA 88: REALIGN CURVES IN COTEAU

Type Impv: REALIGN 2 CURVES ON LA 88 IN COTEAU

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: USE HSIP FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 89 397-05 HSIP 4,030 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.011026 - LA 182 WB: LASALLE ST. - VINE ST.

Type Impv: DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY W

Project Manager: DOMINGUE, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 182 004-04 STPFLEX 342 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.009862 - BNSF (NEW IBERIA) CAROLINE ST.

Type Impv: INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-23-0108

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 RAIL PD 215 RAILROADS 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 64 of 211

Page 71: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA

Project: H.002765 - LA 86: LA 347 - LA 31

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: RAY, JARED

Remarks: 400-31-0013; 400-31 MATCH TTF

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 86 400-31 STPFLEX 1,008 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.006128 - VIDA SHAW BRIDGE OVER BAYOU TECHE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-23-0001;MOVEABLE BRIDGE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA 000-23 FBROFF 4,177 PRESERVATION

BRIDGE (OFF SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010004 - BAYOU TECHE MOVABLE BRIDGES REHAB

Type Impv: MOVABLE BRIDGE REHABILITATION

Project Manager: HINGLE, STEWART

Remarks: NFA AS MATCH TO C.S. 823-12; TTF AS MATCH TO C.S 400-30

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA LA 320 823-12 STPFLEX 3,642 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

ST MARTIN LA 350 400-30 STPFLEX 4,199 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.010267 - US 90: LEWIS ST. LEFT TURN LANE

Type Impv: CONSTRUCT LEFT TURN LANE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERIA US 90 424-04 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 65 of 211

Page 72: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERVILLE

Project: H.009171 - PLAQUEMINE INTERSECTION SAFETY IMPROVE

Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE 000-24 SATRANS 30 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010531 - LA1148&LA988:943' W OF DANIEL LN-WBR P/L

Type Impv: STABILIZE & OVERLAY.

Project Manager: RAY, JARED

Remarks: CS 827-07 FROM 1.11 TO 1.19 USES TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 1148 229-01 NFABOND 2,418 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

IBERVILLE LA 1148 824-26 NFA 634 PRESERVATION

NON-INTERSTATE NFA

IBERVILLE LA 988 824-07 STPFLEX 72 PRESERVATION

NON-INTERSTATE NFA

IBERVILLE LA 988 824-07 NFABOND 954 PRESERVATION

NON-INTERSTATE NFA

Project: H.010318 - I-10: RAMAH - WBR P/L

Type Impv: THIN ASPHALTIC CONCRETE(OGFC), REPLACEMENT OF APPROACH S

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE I-10 450-07 NHPP 5,310 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010602 - LA 1: LA 69 - LA 75

Type Impv: PATCH & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 1 050-06 STBONDS 10,000 PRESERVATION

NON-INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010945 - LA 30 & LA 74: INTERSECTION IMPROVS

Type Impv: TURN LANE ADDITIONS AND CLOSURE OF SELECTED CROSSOVERS

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 30 414-02 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

IBERVILLE LA 74 264-01 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.002333 - BAYOU PAUL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: ISEMANN, ROBERT

Remarks: 257-02-0014;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 327 257-02 FBROFF 1,397 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009485 - LA 404: BAYOU CHOCTAW BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BRAUNER, KURT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 404 405-01 STPFLEX 1,992 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010598 - DERRICK ROAD BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE 000-24 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 66 of 211

Page 73: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERVILLE

Project: H.010924 - LA 75 ROUNDABOUTS

Type Impv: DESIGN AND CONSTRUCTION OF 2 ROUNDABOUTS

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 75 824-02 STPFLEX 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.009762 - ENTERPRISE BLVD MULTI-USE PATH

Type Impv: SIDEWALKS & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE 000-24 STPENH 288 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009769 - ROSEDALE GATEWAY ENHANCEMENT

Type Impv: SIDEWALK & GATEWAYS W/LIGHTING,LANDSCAPE&SUBSURFACE D

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 77 219-03 STPENH 73 ENHANCEMENTS 2-WAITING FOR FUNDING

IBERVILLE LA 77 219-02 STPENH 24 ENHANCEMENTS

IBERVILLE LA 76 228-04 STPENH 73 ENHANCEMENTS

IBERVILLE LA 76 228-05 STPENH 24 ENHANCEMENTS

Project: H.009484 - LA 75: BAYOU BREAUX BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: HERATH, ANANDA

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 75 257-01 FBROFF 1,381 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009930 - LA 1 STAGE 0

Type Impv: TRAFFIC STUDY

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 1 050-06 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

W BATON ROUGE LA 1 050-07 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.009952 - LA 1: MEDIAN CLOSURES

Type Impv: MEDIAN CLOSURE WITH HSIP FUNDS

Project Manager: BEAUVAIS, HEWITT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 1 050-06 HSIP 250 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.010437 - LA 77: LA 386 - I-10

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

IBERVILLE LA 77 219-02 STPFLEX 6,200 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 67 of 211

Page 74: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JACKSON

Project: H.010423 - US 167 ROADWAY FLOODING 0.15 MI N LA 542

Type Impv: ADDITION OF TWO CB'S AND ONE DISCHARGE PIPE

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON US 167 023-06 NHPP 18 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006511 - GUARDRAIL & ROAD ALLIGNMENT CHANGES

Type Impv: SITE DISTANCE IMPROVEMENTS

Project Manager: HOLM, RICK

Remarks: 737-25-0002;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON 000-25 HRRR 402 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010420 - LA 505 ROADWAY FLOODING .9 MI N WINN P/L

Type Impv: REPLACE EXISTING CMP CROSS DRAIN WITH RCB CROSWS DRAIN

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON LA 505 321-03 NFA 192 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010471 - LA 542: LA 811 - LA 155

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON LA 542 319-01 STPFLEX 1,000 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010964 - US 167:TURN LANE IMPROVEMENT AT HODGE

Type Impv: TURN LANE IMPROVEMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON US 167 023-06 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010039 - BEAR KNOLL DRIVE & ZOAR ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON 000-25 FBROFF 578 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001553 - LA 146 BRIDGES NEAR KELLEYS

Type Impv: NEW BRIDGES

Project Manager: HICKS, MELVIN

Remarks: 068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON LA 146 068-02 STPFLEX 4,696 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

JACKSON LA 4 068-03 STPFLEX 2,954 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.010388 - LA 155: US 167 - LA 542

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON LA 155 319-30 STPFLEX 1,200 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010452 - LA 144: EROS (LA 34) - OUACHITA P/L

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JACKSON LA 144 318-01 STPFLEX 1,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

JACKSON LA 144 319-04 STPFLEX 500 PRESERVATION

NON-INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 68 of 211

Page 75: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.006138 - POPLAR STREET BRIDGE OVER BONNABEL CANAL

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-26-0106

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 FBROFF 602 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.007177 - AMES BOULEVARD IMPROVEMENTS

Type Impv: CONTINUOUS TURN LANE & DRAINAGE IMP

Project Manager: DEVILLE, JACQUES

Remarks: 742-26-0038;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 7,578 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.008046 - LA 3152 : CLEARVIEW OPERATIONAL IMPRV.

Type Impv: INTERSECTION IMPROVEMENTS, INCLUDING ADDITIONAL TURN LANES

Project Manager: FOSTER, AMANDA

Remarks: USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3152 826-03 STP>200K 846 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.008914 - US 90B:W.BANK EXPY DRAINAGE IMP @ STUMPF

Type Impv: DRAINAGE IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 90-Z 283-09 NHPP 598 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009187 - 23RD ST BRIDGE OVER CANAL NO 17(BUTLER)

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-26-0107

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 FBROFF 1,284 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009406 - LA 48 @ EVANS DR.

Type Impv: DRAINAGE STRUCTURE REPLACEMENTS AND ADDITIONS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 48 006-30 NHPP 451 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009441 - VETERANS BLVD OVLY AND BRIDGE MOD (PH 2)

Type Impv: RESURFACING AND MINOR BRIDGE WORK

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 1,473 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010327 - LA 45: TUSA DR. - OAK FOREST

Type Impv: DRAINAGE STRUCTURE ADDITIONS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 45 249-01 STPFLEX 379 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010505 - LA 303: LA 45 - END OF C.S. 826-07

Type Impv: ULTRATHIN OVERLAY

Project Manager: JOHNSON, ENNIS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 303 826-07 NFA 186 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 69 of 211

Page 76: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.010506 - LA 3150/LA 3151: THIN OVERLAY

Type Impv: ULTRATHIN OVERLAY

Project Manager: JOHNSON, ENNIS

Remarks: LETTER BID IN THE DISTRICT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3150 826-61 NFABOND 42 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

JEFFERSON LA 3151 826-62 NFABOND 164 PRESERVATION

NON-INTERSTATE NFA

Project: H.011023 - US 61: ST. CHARLES/JEFFERSON PARISH LINE

Type Impv: RAISING ROADWAY GRADE

Project Manager: GOLZ, SARAH

Remarks: $90K OF MATCH IS STBONDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 61 007-02 NHPP 443 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

ST CHARLES US 61 007-03 NHPP 443 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

Project: H.011182 - ITS DYNAMIC MESSAGE SIGNS (KENNER)

Type Impv: INSTALL 5 DYNAMIC MESSAGE SIGNS.

Project Manager: DELANEY, ELIZABETH

Remarks: ENTITY WILL PROVIDE MATCH FOR LOYOLA AND POWER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 49 283-30 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED IN CURRENT FY 13-14

JEFFERSON 000-26 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

JEFFERSON 000-26 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.002260 - GOOSE BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: TSAI, LOONG SHEN

Remarks: 249-90-0035;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 45 249-90 STPFLEX 3,836 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.006519 - SPEED CURVE ADVISORY

Type Impv: DYNAMIC MESSAGE SIGN&FLASHER INST.

Project Manager: HOLM, RICK

Remarks: 737-26-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 SATRANS 286 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009028 - AIRLINE PARK BLVD: W METAIRIE AV-0.4 M N

Type Impv: PANEL REPLACEMENT AND DRAINAGE

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 2,430 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010673 - US90Z:HARVEY CANAL TUNNEL REHABILITATION

Type Impv: CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILIT

Project Manager: REVIERE, RYAN

Remarks: SEE NOTES FOR FUNDING INFO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 90-Z 283-09 NHPP 12,700 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010882 - LA 18: 4TH STREET BRIDGE REHABILITATION

Type Impv: REPAIR AND REHABILITATION OF MECHANICAL, ELECTRICAL STRUCT

Project Manager: PENEGUY, MATT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 18 063-02 STPFLEX 5,000 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 70 of 211

Page 77: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.010985 - US 90: EXTEND ACCELERATION LANE @ US 90B

Type Impv: EXTEND ACCELERATION LANE AT THE INTERSECTION OF US 90B

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 90 005-10 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010986 - US 90B: INTERSECTION IMP. @ MANHATTAN

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 90-Z 283-09 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010990 - I-10: CLEARVIEW PKWY - CAUSEWAY BLVD.

Type Impv: JOINT REPAIR AND OVERLAY

Project Manager: THOMAS, BEN

Remarks: PRESERVATION INTERSTATE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON I-10 450-15 NHPP 4,000 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011158 - LA 3139: RAMP-A OVER LA 3152 REPAIR

Type Impv: REPLACE TWO PRESTRESSED CONCRETE GIRDERS AND ASSOCIATE

Project Manager: DELATTE, BRIAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3139 430-01 STPFLEX 375 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

JEFFERSON LA 3139 430-01 REIMB 375 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.011201 - KENNER SRTS PROJECT - CHATEAU ELEM

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 SR2S 28 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.001439 - LA 1 BRIDGES NEAR GRAND ISLE

Type Impv: NEW BRIDGE

Project Manager: BUCCI, MARK

Remarks: 064-01-0047;STRU.IN POOR COND. JT W/064-02-0030

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 1 064-01 STPFLEX 800 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

LAFOURCHE LA 1 064-02 NHPP 2,900 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.002262 - DRAIN CANAL BRIDGE ON LA 45

Type Impv: BRIDGE REPLACEMENT

Project Manager: MUSA, ELNUR

Remarks: 249-90-0037;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 45 249-90 STPFLEX 1,592 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.003074 - I 10: WILLIAMS BLVD - VETERANS BLVD

Type Impv: WIDENING

Project Manager: YANG, LI

Remarks: 450-15-0124

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON I-10 450-15 NFI 70,000 CORRIDOR 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 71 of 211

Page 78: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.007175 - LAPALCO (VICTORY - WESTWOOD)

Type Impv: WIDEN TO 4 LANES

Project Manager: DEVILLE, JACQUES

Remarks: 742-26-0033;FUND WITH DEMO FUNDS.PH.PUR.R/W

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 DEMO 3,600 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENT

JEFFERSON 000-26 STP>200K 8,578 URBAN SYSTEMS

Project: H.007181 - L&A ROAD IMPROVEMENTS

Type Impv: NEW ROADWAY AND ALIGNMENT

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.007208 - HARVEY BLVD EXT(PETERS RD-MANHATTAN

Type Impv: NEW ROADWAY EXTENSION

Project Manager: DEVILLE, JACQUES

Remarks: 742-26-0073;SEE NOTES.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3017 826-11 STP>200K 876 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

JEFFERSON 000-26 STP>200K 9,597 URBAN SYSTEMS

Project: H.007214 - EAST AMES BOULEVARD IMPROVEMENTS

Type Impv: WIDEN FROM 2 TO 3 LANES

Project Manager: DEVILLE, JACQUES

Remarks: 742-26-0080;OREGON DR.-BLANCHE DR.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 7,400 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.007223 - HARVEY BLVD (MANHATTAN - WALL)

Type Impv: WIDEN TO 4 LANE URBAD SECT W MEDIAN

Project Manager: DEVILLE, JACQUES

Remarks: 742-26-0090; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 7,100 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.008065 - HICKORY/DOCK ROUNDABOUT

Type Impv: ROUNDABOUT INSTALLATION

Project Manager: RAY, JARED

Remarks: 826-44-0032;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3154 826-44 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.009087 - I-10: LOYOLA DR. TO WILLIAMS BLVD.

Type Impv: MAJOR WIDENING - ADD TRAVEL LANES

Project Manager: YANG, LI

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 3-DESIGN/DEVELOPMENT

Project: H.010626 - SAUVE ROAD / SONIAT CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 FBROFF 1,033 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010973 - VETERANS BLVD LIGHTING(AIRPORT-LOYOLA)

Type Impv: ROADWAY LIGHTING

Project Manager: DEVILLE, JACQUES

Remarks: CITY OF KENNER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 660 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 72 of 211

Page 79: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.011007 - CHATEAU BLVD RESURFACING

Type Impv: RE-SURFACING

Project Manager: DEVILLE, JACQUES

Remarks: CITY OF KENNER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STP>200K 1,470 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.001413 - LA 18(4TH ST.EXT.-BURMASTER(GRETNA)

Type Impv: CONSTRUCT 2 LANES

Project Manager: DEVILLE, JACQUES

Remarks: 063-02-0048;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 18 063-02 STP>200K 9,500 URBAN SYSTEMS 2-WAITING FOR FUNDING

JEFFERSON LA 18 063-02 STGEN 1,000 OTHER / MISCELLANEOUS

JEFFERSON LA 18 063-02 TOLLS 2,000 CCC TOLL PROJECTS

Project: H.002955 - EARHART EXPRESSWAY

Type Impv: ACCESS IMPROVEMENTS

Project Manager: DEVILLE, JACQUES

Remarks: 430-01-0016

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3139 430-01 STP>200K 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING

Project: H.002956 - EARHART AT DAKIN

Type Impv: RAMP CONNECTOR (EB EARHART - DAKIN)

Project Manager: DEVILLE, JACQUES

Remarks: 430-01-0020; USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3139 430-01 STP>200K 2,375 URBAN SYSTEMS 2-WAITING FOR FUNDING

Project: H.004359 - HICKORY (LA 48 - MOUNES)

Type Impv: RELOCATION AND 4-LANING

Project Manager: YANG, LI

Remarks: 826-44-0027;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

JEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS

Project: H.004367 - LA3139:EARHART EXPRESSWAY EXT TO US 61

Type Impv: ENVIRONMENTAL. LINE & GRADE STUDY

Project Manager: YANG, LI

Remarks: 700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.009753 - JEAN LAFITTE: DOWNTOWN SIDEWALK, PHASE 2

Type Impv: SIDEWALK W/LIGHTING, LANDSCAPE & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STPENH 336 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.002258 - LA 45 (FLOOD GATE - LA 560-4)

Type Impv: COLD PLANE AND OVERLAY

Project Manager: RAY, JARED

Remarks: 249-01-0056;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 45 249-01 STPFLEX 1,551 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 73 of 211

Page 80: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.002264 - BAYOU BARATARIA BRIDGE@JEAN LAFITTE

Type Impv: BRIDGE REPL.(KERNER'S)

Project Manager: YANG, LI

Remarks: 249-90-0041;TEA-21 KERNER'S FERRY BRIDGE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 45 249-90 DEMO 4,146 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

JEFFERSON LA 45 249-90 FBR-ON/OFF 60,000 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.002861 - CAUSEWAY BLVD - EARHART EXPRESSWAY INTER

Type Impv: NEW INTERCHANGE

Project Manager: YANG, LI

Remarks: 430-01-0013;JEFF. PH CONSULTANT WORKING (E)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3139 430-01 NFI 60,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.005162 - MISS RIVER CORRIDOR INITIATIVE

Type Impv: INTERMODAL TRANSPORTATION STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-92-0015;STAGE 0 UNDERWAY BY UNO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.006442 - AIRPORT - CBD COMMUTER RAIL STUDY

Type Impv: STUDY

Project Manager: GAUTREAU, COLLEEN

Remarks: 736-92-0003;HP 1600 (SEE ALSO 700-26-0242)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.006513 - US 61 CORRIDOR PRESERVATION

Type Impv: ABANDONED RR R/W ACQ. (HP NO 1600)

Project Manager: GAUTREAU, COLLEEN

Remarks: 737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.006517 - NEW ORLEANS RAIL GATEWAY ANALYSIS

Type Impv: ENVR. GRADE X-ING. OPER IMPROVEMENT

Project Manager: GOODELL, DEAN

Remarks: 737-26-0006;MOVE MONIES FROM 737-26-0002 &

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 DEMO 6,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.007468 - OPPHEUM - HURON (JEFF. PH) BIKE PATH

Type Impv: LINEAR BIKE PATH

Project Manager: HORTON, VALERIE

Remarks: 744-26-0021;TEA-21 DEMO FUNDED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 DEMO 326 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Project: H.009307 - SMART GROWTH-LINKING EDUCATION & TRANS

Type Impv: DEVELOP A BICYCLE MASTER PLAN FOR JEFFERSON PARISH

Project Manager: NGUYEN, WAYNE

Remarks: MATCH BY THE RPC

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.009570 - US 61:TRANSCONTINENTAL DR - DAVID DR

Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 61 007-02 NHPP 1,469 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 74 of 211

Page 81: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.009571 - US 61:DAVID DR - WILLIAMS BLVD

Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 61 007-02 NHPP 1,998 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009794 - GRETNA BICYCLE ACCESS IMPROVEMENTS

Type Impv: SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STPENH 170 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

JEFFERSON US 90-Z 283-09 STPENH 75 ENHANCEMENTS

JEFFERSON LA 466 063-02 STPENH 50 ENHANCEMENTS

JEFFERSON LA 466 063-02 STPENH 25 ENHANCEMENTS

Project: H.009804 - KENNER: S WILLIAMS BLVD STREETSCAPING

Type Impv: SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON 000-26 STPENH 446 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Project: H.009959 - LA 301: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 301 826-06 FEMA 1,220 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009960 - LA 303: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 303 826-07 FEMA 1,597 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009974 - LA 3257: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 3257 826-48 FEMA 3,743 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010017 - US 90Z: WESTBANK EXPRESSWAY REHAB

Type Impv: MAJOR BRIDGE REHABILITATION

Project Manager: THOMAS, HOLLY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 90-Z 283-09 NHPP 12,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010402 - I-10: WILLIAMS BLVD - VETERANS BLVD

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON I-10 450-15 NHPP 4,000 PRESERVATION

INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 75 of 211

Page 82: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON

Project: H.010418 - LA 611-1 & LA 611-3:COLD PLANE & OVERLAY

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 611-1 826-14 STPFLEX 200 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

JEFFERSON LA 611-1 826-16 STPFLEX 500 PRESERVATION

NON-INTERSTATE

JEFFERSON LA 611-1 826-16 STPFLEX 100 PRESERVATION

NON-INTERSTATE

JEFFERSON LA 611-1 826-17 STPFLEX 325 PRESERVATION

NON-INTERSTATE

Project: H.010451 - BAYOU BARATARIA SWING BR REPAIRS- LA 302

Type Impv: BRIDGE INSPECTION AND REPAIR

Project Manager: GUIDRY, JOHN

Remarks: DIR LA-2012-1-051-003

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON LA 302 826-39 ER 137 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010479 - AIRLINE PUMP STA: MECH& ELECT REP; US 61

Type Impv: REPAIR OR REFURBISH PUMP MOTORS AND OTHER DAMAGED EQUIP

Project Manager: MILLER, DAVID

Remarks: DIR LA-2012-1-051-004

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFFERSON US 61 007-02 ER 328 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 76 of 211

Page 83: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON DAVIS

Project: H.008082 - LA 1126: LA 26 - US 90

Type Impv: MILL, STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 827-34-0001

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 1126 827-34 NFABOND 1,750 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.000517 - US 165 BRIDGES NEAR FENTON

Type Impv: BRIDGE REPLACEMENT

Project Manager: KEMP, KELLY

Remarks: 014-02-0025;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS US 165 014-02 NHPP 5,500 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.002076 - LA 383: LA 101 - ALLEN PARISH LINE

Type Impv: PATCH.COLD PLANE & 2 LIFT OLAY

Project Manager: RAY, JARED

Remarks: 197-03-0016; NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 383 197-03 STPFLEX 3,275 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.002714 - LA 3059: CALCASIEU P/L - LA 383

Type Impv: PATCH, WIDEN, COLD PLANE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 383-02-0004

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 3059 383-02 NFABOND 742 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.006528 - FENTON ELEMENTARY

Type Impv: SIDEWALK CONSTRUCTION AND CROSSWALKS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS 000-27 SR2S 250 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009420 - US 165: INSTALL J-TURN @ LA 101

Type Impv: INSTALL J-TURN ON US 165 @ LA 101

Project Manager: CORMIER, CLAYTON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS US 165 014-02 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010235 - LA 14: LA 99-POTTER RD

Type Impv: PATCH, CP 2", OL 3.5"

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 14 196-03 STPFLEX 769 PRESERVATION

NON-INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010269 - LA 1131: US 90 - ARDOIN COVE RD

Type Impv: ASHPALT SURFACE TREATMENT

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 1131 827-07 NFA 80 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011052 - LA 3086: LA 102/99 - ALLEN P/L

Type Impv: PATCH, COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 3086 198-04 NFABOND 2,968 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 77 of 211

Page 84: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON DAVIS

Project: H.002980 - I-10 OVERPASS OVER US 165 & MP R.R

Type Impv: NEW BRIDGES

Project Manager: DELATTE, BRIAN

Remarks: 450-03-0085;PARALLEL BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS I-10 450-03 NHPP 14,536 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010079 - MOUTON RE/W DIVISION ST/POWELL RD BRDGS

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS 000-27 FBROFF 1,317 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

JEFF DAVIS 000-27 FBROFF 732 PRESERVATION

BRIDGE (OFF SYSTEM)

JEFF DAVIS 000-27 FBROFF 439 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010864 - I-10: DISTRICT 07 CABLE BARRIER

Type Impv: INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.

Project Manager: CORMIER, CLAYTON

Remarks: USE HSIP FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS I-10 450-03 HSIP 3,219 SAFETY 3-DESIGN/DEVELOPMENT

CALCASIEU I-10 450-91 HSIP 2,541 SAFETY

Project: H.002091 - LA 97 OVERPASS (I-10)

Type Impv: BRIDGE REPLACEMENT

Project Manager: BROWN, JEFF

Remarks: 201-01-0008;PROJECT TO BE SCOPED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 97 201-01 STPFLEX 22,240 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.002094 - TURN LANES @ US 90 & SHERMAN ST.

Type Impv: CONSTRUCT TURN LANES

Project Manager: CORMIER, CLAYTON

Remarks: 201-01-0012;WAITING FOR STAGE 0 DOCUMENT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 97 201-01 HSIP 500 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.009486 - US 90: BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: CAVALIER, STEPHANIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS US 90 003-07 STPFLEX 1,370 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010238 - LA 26: US 90 - RACCA RD(JENNINGS)

Type Impv: PATCH, CP 2", OVERLAY 3", 3" SHLD

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 26 054-05 STPFLEX 1,156 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010243 - LA 26: HOSPITAL RD - JCT US 90

Type Impv: PATCH, CP 2", OVERLAY 3"

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

JEFF DAVIS LA 26 054-04 STPFLEX 576 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 78 of 211

Page 85: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE

Project: H.007229 - LAFAYETTE CON.GOV. SR2S PROJECT

Type Impv: SIDEWALKS. ETC.

Project Manager: GROS, SCOTT

Remarks: 742-28-0003;SR2S PROGRAM FUNDING

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 SR2S 218 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009630 - LA 719: LA 342 - US 90

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 719 828-08 NFABOND 5,194 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010350 - I-10: RAMP IMPROVEMENTS AT JCT LA 3184

Type Impv: CONSTRUCT TURN LANES

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-10 450-05 NHPP 660 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

LAFAYETTE LA 3184 828-45 NHPP 165 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.010575 - LAFAYETTE URBAN BICYCLE TRAILS

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL SYSTEM.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

LAFAYETTE 000-28 LOCAL 16 RECREATIONAL TRAILS PROGRAM

Project: H.011102 - I-49 CONNECTOR BLDG DEMOLITION (PHASE 1)

Type Impv: DEMOLITION OF EXISTING BUILDINGS

Project Manager: WEDGE, ED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 90 424-02 STGEN 165 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.003459 - ROUNDABOUT @ LA 726 AND I-49 FRONTAGE RD

Type Impv: CONSTRUCT ROUNDABOUT

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: 455-01-0054 AND 828-44-0015

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-49 455-01 HSIP 850 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE LA 726 828-44 HSIP 850 SAFETY

Project: H.005508 - VEROT SCHOOL RD (VINCENT - EX. 5-L)

Type Impv: RECONST. & ADD LANES

Project Manager: SMITH, DAVID

Remarks: 828-12-0014;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 339 828-12 STBONDS 24,500 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE LA 339 828-12 STPFLEX 2,110 CAPACITY

Project: H.006538 - LAFAYETTE SAFE ROUTES TO SCHOOL PROJECT

Type Impv: CONSTRUCTION OF SIDEWALKS AND CROSSWALKS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 SR2S 147 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE LA 92 213-05 SR2S 70 SAFETY

SAFE ROUTES TO SCHOOLS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 79 of 211

Page 86: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE

Project: H.007232 - LAFAYETTE MPO NON STATE PVT MARKING

Type Impv: PAVEMENT MARKINGS

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: 742-28-0006;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 STP<200K 1,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009494 - I-49 FRONTAGE ROADS:I-10 - ST.LANDRY P/L

Type Impv: PATCH, OVERLAY AND RELATED WORK

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-49 455-01 STPFLEX 3,500 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010351 - I-49: RAMP IMPROVEMENTS AT JCT. LA 726

Type Impv: CONSTRUCT TURN LANES ON RAMPS

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-49 455-01 NHPP 180 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE LA 726 828-44 STPFLEX 120 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.010442 - LA 3073: INTERSECT IMPROVE @ JCT LA 89

Type Impv: CONSTRUCT TURN LANES

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 3073 828-39 NHPP 900 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010713 - LA 89: ROUNDABOUT AT FORTUNE RD.

Type Impv: RECONSTRUCTION, ADDED CAPACITY

Project Manager: DOMINGUE, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 89 216-03 HSIP 1,175 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010826 - BEAU BASSIN RD OVERLAY

Type Impv: OVERLAY/PAVEMENT PRESERVATION

Project Manager: HANKS, ANNA

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 STP>200K 530 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010863 - I-10: INTERSTATE LIGHTING @ AMB CAFFERY

Type Impv: INTERSTATE LIGHTING

Project Manager: LEBOURGEOIS, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-10 450-05 NHPP 700 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010870 - ATAKAPA-ISHAK BREAUX BRIDGE TRAIL

Type Impv: CONSTRUCTION OF A 8.2 PED-BIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 RTP 128 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE 000-28 LOCAL 12 RECREATIONAL TRAILS PROGRAM

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 80 of 211

Page 87: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE

Project: H.010878 - ACADIANA HILLS TRAIL

Type Impv: CONSTRUCTION OF 900' OF PED-BIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 RTP 78 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE 000-28 LOCAL 14 RECREATIONAL TRAILS PROGRAM

Project: H.011018 - CHEMIN METAIRIE PARKWAY BIKE LANES

Type Impv: STRIPING, PAVEMENT MARKINGS AND SIGNING OF BIKE LANES.

Project Manager: HANKS, ANNA

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 STP>200K 116 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.002163 - ROUNDABOUT ON LA 342 AT LA 724

Type Impv: ROUNDABOUT

Project Manager: PICARD, TOBY

Remarks: 218-01-0019;PRIORITY 3

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 342 218-01 HSIP 1,100 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.003003 - I-10: E. JCT I-49 TO ST.MARTIN P/L

Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO

Project Manager: OLIVIER, NICHOLAS

Remarks: 450-05-0062;450-06-0068

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-10 450-05 NHPP 10,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

LAFAYETTE I-10 450-05 NHPP 9,000 PRESERVATION

INTERSTATE

LAFAYETTE I-10 450-05 NHPP 30,000 CORRIDOR

Project: H.007233 - LAFAYETTE MPO NON STATE PVT MARKING

Type Impv: PAVEMENT MARKINGS

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: 742-28-0007;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.009181 - US167(Johnston St)@LA3073(Amb Caff Pkwy)

Type Impv: INTERSECTION IMPROVEMENT

Project Manager: HANKS, ANNA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 167 080-02 STP<200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

LAFAYETTE LA 3073 828-39 STP<200K 500 URBAN SYSTEMS

Project: H.010557 - LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010995 - LA 724:[email protected](LAFAYETTE)

Type Impv: CONSTRUCT ROUNDABOUT

Project Manager: REVIERE, RYAN

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 724 828-28 CM 860 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 81 of 211

Page 88: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE

Project: H.011151 - US 90: BNSF RR FRONTAGE RD BRIDGES

Type Impv: NEW FRONTAGE ROADS AND RR BRIDGE FOR FUTURE I-49 SOUTH

Project Manager: PAINE, PEGGY JO

Remarks: STGEN IS UNCLAIMED PROPERTY FUNDS.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 90 424-02 STGEN 21,000 CAPACITY 3-DESIGN/DEVELOPMENT

LAFAYETTE US 90 424-02 DEMO 5,000 CAPACITY

Project: H.000201 - LA 182 AT BENDEL ROAD

Type Impv: GEOMETRIC IMPR. (INCL PINHOOK IMPR)

Project Manager: HANKS, ANNA

Remarks: 004-01-0039;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 182 004-01 LOCAL 4,252 URBAN SYSTEMS 2-WAITING FOR FUNDING

LAFAYETTE LA 182 004-01 HSIP 731 SAFETY

Project: H.006530 - ROUNDABOUT AT GEN. MOUTON/TAFT STREET

Type Impv: CONSTRUCTION OF A ROUNDABOUT

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 0 SAFETY

LOCAL ROADS SAFETY

2-WAITING FOR FUNDING

Project: H.009625 - LA 182: LA 89 - 0.36 MI. N. US 90 UPASS

Type Impv: COLD PLANE, PATCH & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 182 004-02 STPFLEX 2,159 PRESERVATION

NON-INTERSTATE

2-WAITING FOR FUNDING

Project: H.009629 - US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)

Type Impv: P.C.C.P. REHABILITATION

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 167 424-02 NHPP 8,813 PRESERVATION

NON-INTERSTATE

2-WAITING FOR FUNDING

Project: H.002151 - BAYOU PARC PEROU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BRAUNER, KURT

Remarks: 216-02-0016; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 734 216-02 FBROFF 1,025 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.002735 - BAYOU VERMILLION BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: LAI, QUANG

Remarks: 391-04-0018; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 1252 391-04 FBROFF 2,335 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.002868 - I-49 S:AMB CAFFERY/US90 INTERCHANGE

Type Impv: NEW INTERCHANGE

Project Manager: RABALAIS, NICK

Remarks: 424-02-0090;ENG DEMO. RW/UTL S9$? NFI FOR CONST

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 90 424-02 NFI 35,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.003454 - LAFAYETTE CONNNECTOR

Type Impv: IN LAFAYETTE NEW INTERSTATE

Project Manager: WEDGE, ED

Remarks: 455-01-0035;ENGR 700-24-0073. R/W 455-01-0034

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE I-49 455-01 DEMO 400,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 82 of 211

Page 89: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE

Project: H.004490 - STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS

Type Impv: STAGE 0 STUDY

Project Manager: BROUSSARD, DAN

Remarks: 700-28-0221; MATCH BY LAF MPO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.004492 - I-10 INTERCHANGE AT N AMBASSADOR CAFFERY

Type Impv: PLANNING STUDY

Project Manager: PORTER BETTS, CONNIE

Remarks: 700-28-0223;STUDY FED FY2013.ENGR FED FY2014

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.006531 - ROUNDABOUT AT HOSPITAL DRIVE AND GIRARD

Type Impv: CONSTRUCTION OF A ROUNDABOUT

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 0 SAFETY

LOCAL ROADS SAFETY

1-PLANNING/ENVIRONMENTAL

Project: H.009335 - LA 182: I-10 TO WEST PONT DES MOUTON RD

Type Impv: WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWA

Project Manager: BABIN, TEDDY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.009500 - 2035PLAN IMPLEMENTATION&I-49 ACTION PLAN

Type Impv: PLAN IMPLEMENTATION AND ACTION PLAN

Project Manager: BROUSSARD, DAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.009520 - LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)

Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING

Project Manager: LACOMBE, JASON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 3168 433-01 STPFLEX 24,700 RAILROADS

GRADE SEPARATION

1-PLANNING/ENVIRONMENTAL

Project: H.009639 - LA 343: LA 342 - 1.0 MI. N. LA 342

Type Impv: COLD PLANE, PATCH & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 343 393-03 STPFLEX 619 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009767 - PREJEAN RD: CARENCRO SIDEWALKS, PHASE 3

Type Impv: SIDEWALKS & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE 000-28 STPENH 106 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Project: H.009795 - LA 182: US 90-MLK DRIVE SIDEWALKS

Type Impv: SIDEWALKS & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 182 032-01 STPENH 571 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 83 of 211

Page 90: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE

Project: H.009997 - US 167 CORRIDOR STAGE 0 STUDY

Type Impv: ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURES

Project Manager: RENARD, APRIL

Remarks: STUDY FUNDED WITH SAFETY TRANSFER FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 167 080-02 0 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.010005 - VERMILLION RIVER MOVABLE BRIDGES REHAB

Type Impv: MOVABLE BRIDGE REHABILITATION

Project Manager: BRAUNER, KURT

Remarks: CONTROL SECTION 828-14 IS IN URBANIZED AREA, THE OTHER N

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 733 828-14 STPFLEX 4,568 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

VERMILION LA 82 194-07 STPFLEX 3,418 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.010207 - LA 94: LA 353 - ST. MARTIN PL

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 94 080-03 STPFLEX 127 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.011235 - I-49 SOUTH @ VEROT SCHOOL ROAD

Type Impv: CONSTRUCT NEW INTERSECTION - CONCRETE

Project Manager: LANDRY, COREY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE US 90 424-02 NFI 20,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.009214 - LA 339: WIDENING (LA 82 TO LA 3073)

Type Impv: STAGE 0 FEASIBILITY STUDY

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 339 828-11 0 CAPACITY 0-FEASIBILITY/SCOPING

LAFAYETTE LA 339 828-12 0 CAPACITY

Project: H.009215 - LA182:WIDENING(W PONT DES MOUTON RD-I49)

Type Impv: STAGE 0 FEASIBILITY STUDY

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFAYETTE LA 182 032-01 0 CAPACITY 0-FEASIBILITY/SCOPING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 84 of 211

Page 91: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE

Project: H.009346 - ACADIAN WEST TRAIL

Type Impv: CONSTRUCTION OF RAILS-TO-TRAILS BIKE TRAIL

Project Manager: RIGGS, LAURA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE 000-29 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

LAFOURCHE 000-29 LOCAL 33 RECREATIONAL TRAILS PROGRAM

Project: H.009561 - LA 652:LA 182-0.25 MILES E OF DADHILL RD

Type Impv: MILL AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 652 829-13 NFABOND 1,029 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010169 - KRAEMER LIFT BRIDGE MECHANICAL REPAIRS

Type Impv: MECHANICAL REPAIR

Project Manager: LAMBERT, JARRETT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 307 829-15 STPFLEX 650 OPER EFFICIENCY/MOTORIST ASSISTANCE

MOVABLE BRIDGE REHABILITATION

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010884 - LA 309: LA 20 - LA 1 OVERLAY

Type Impv: SINGLE LIFT THIN OVERLAY

Project Manager: RAY, JARED

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 309 413-04 STPFLEX 1,118 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

TERREBONNE LA 309 413-03 STPFLEX 125 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

LAFOURCHE LA 309 413-04 STPFLEX 68 PRESERVATION

NON-INTERSTATE

Project: H.001491 - LA 20 WIDENING: LA 308 - ST PATRICK ST

Type Impv: COLD PLANE AND OVERLAY

Project Manager: PAINE, PEGGY JO

Remarks: 065-06-0046;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 20 065-06 STBONDS 2,190 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

LAFOURCHE LA 20 065-06 HSIPPEN 4,878 SAFETY

- LOCAL 800 SAFETY

Project: H.002780 - LA 308 CURVE IMPROVEMENT

Type Impv: STRAIGHTEN CURVE IN ROADWAY

Project Manager: PICARD, TOBY

Remarks: 407-04-0043;407-04-0044

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 308 407-04 HSIP 2,073 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009479 - WEST LAROSE VERTICAL LIFT BRIDGE REHAB

Type Impv: BRIDGE REHABILITATION

Project Manager: HINGLE, STEWART

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-05 STPFLEX 13,594 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010109 - RACELAND SRTS PROJECT

Type Impv: SIDEWALK IMPROVMENTS, CROSSWALK, SPEED DETECTION DEVICES

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE 000-29 SR2S 254 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 85 of 211

Page 92: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE

Project: H.011214 - RWD SIGNING (ST. PATRICK ST.)

Type Impv: PURCHASE AND INSTALL REGULATORY AND WARNING SIGNS.

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE 000-29 SATRANS 5 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011239 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2E

Type Impv: CONSTRUCT LEEVILLE MAIN LINE INTERSECTION

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 829-32 STBONDS 8,584 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15

LAFOURCHE LA 1 829-32 LOCAL 1,416 OTHER / MISCELLANEOUS

Project: H.008118 - BAYOU DUMAR & DRAIN CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 829-12-0021;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 653 829-12 FBROFF 670 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009320 - ACADIAN ROAD ROUNDABOUT

Type Impv: 5 LEGGED ROUNDABOUT

Project Manager: HANKS, ANNA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 20 065-05 HSIP 1,570 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.010324 - LA 1: GOLDEN MEADOW - LEEVILLE

Type Impv: RAISING ROADWAY GRADE TO CONSISENT ELEVATION BY ADDING

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-90 NHPP 900 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.008145 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C

Type Impv: ROUTE LA 1 RELOCATION

Project Manager: NICKEL, TIM

Remarks: 829-32-0010;NEW BRIDGE.NEW ALLIGNMENT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 829-32 STBONDS 31,416 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

LAFOURCHE LA 1 829-32 LOCAL 5,184 OTHER / MISCELLANEOUS

Project: H.009742 - ACADIA RD: AUDUBON-CARDINAL PED PATHS

Type Impv: SIDEWALK WITH LIGHTING

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE 000-29 STPENH 204 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.010469 - EMERG CONT F/REPAIR TO ELMER'S ISLAND RD

Type Impv: FURNISH, PLACE, AND COMPACT AGGREGATE SURFACE COURSE MA

Project Manager: GISCLAIR, GARY

Remarks: LETTER BID 9/17/2012

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE 000-29 STCASH 300 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.002794 - VALENTINE CANAL BR. NEAR RACELAND

Type Impv: BRIDGE REPLACEMENT

Project Manager: ISEMANN, ROBERT

Remarks: 407-90-0018; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 308 407-90 FBROFF 1,421 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 86 of 211

Page 93: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE

Project: H.009658 - US 90: LA 182 - LA 1

Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE US 90 424-08 NHPP 3,938 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009662 - LA 308: GOLDEN MEADOW BR - GALLIANO BR

Type Impv: ASPHALTIC CONCRETE OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 308 407-01 STPFLEX 2,115 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009664 - LA 20: TERREBONNE P/L - JACKSON ST.

Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 20 065-05 STPFLEX 1,116 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009969 - LA 654: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 654 829-10 FEMA 2,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010006 - LA 182 & LA 58: MOVABLE BRIDGE REHAB

Type Impv: MOVABLE BRIDGE REHABILITATION

Project Manager: BRAUNER, KURT

Remarks: BOTH CONTROL SECTIONS IN HOUMA MPO AREA.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 182 005-07 STPFLEX 5,089 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

TERREBONNE LA 58 247-30 STPFLEX 4,253 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.010152 - CONSTRUCTION CANAL DREDGING

Type Impv: DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIO

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-90 NHPP 2,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.010403 - LA 182/LA1: US 90 - ST. MARY ST

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 182 005-06 STPFLEX 2,750 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010404 - US 90: 2.5 MI E LA 182 - ST CHARLES P/L

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE US 90 005-07 NHPP 4,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010408 - LA 1: VALENTINE BR - LA 655

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-05 STPFLEX 2,300 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 87 of 211

Page 94: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE

Project: H.010409 - LA 1: LA 655 - CHAMPAGNE-HARRELSON BR

Type Impv: COLD PLANE AND SUPERPAVE ASPHALTIC CONCRETE OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-06 STPFLEX 1,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010454 - EXTRUDED PANEL SIGN REPAIRS; LA 1

Type Impv: MATERIAL AND LABOR TO REINSTALL SIGNS DAMAGED DURING ISA

Project Manager: COURVILLE, CARL

Remarks: DIR LA-2012-1-057-001

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-90 ER 21 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010474 - LA 1 EMERG REPAIR: CAMINADA BR - LA 3090

Type Impv: ADD 4' SHOULDERS AND ARMOR EMBANKMENT SLOPES ON LA 1

Project Manager: BRANTON, JENNIFER

Remarks: DIR LA-2012-1-057-003

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 064-02 ER 2,017 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

JEFFERSON LA 1 064-01 ER 300 OTHER / MISCELLANEOUS

Project: H.010688 - LA 3235 FEASIBILITY STUDY

Type Impv: ACCESS MANAGEMENT

Project Manager: FARR, ALEX

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 3235 829-26 0 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.011207 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A

Type Impv: CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTURE

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 829-32 NFI 43,400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.011208 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B

Type Impv: ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEE

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.011209 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D

Type Impv: NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACH.

Project Manager: NICKEL, TIM

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.007234 - ACADIAN RD-WEST (CANAL TO LA 3185)

Type Impv: 4-LANE

Project Manager: HANKS, ANNA

Remarks: 742-29-0001;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LAFOURCHE 000-29 STP<200K 9,359 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 88 of 211

Page 95: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LASALLE

Project: H.009592 - LA 8: US 84 INTERSECTION

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 8 152-02 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009604 - LA 460: LA 127 - US 84

Type Impv: THIN OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 460 152-01 STPFLEX 2,878 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009982 - JEREMY ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE 000-30 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

LASALLE 000-30 FBROFF 300 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.009983 - WHITE SULPHUR SPRINGS ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE 000-30 FBROFF 470 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

LASALLE 000-30 FBROFF 323 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.011058 - LA 503: LA 127 - LA 126

Type Impv: PATCH & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 503 130-02 NFABOND 2,756 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.000754 - UNION PACIFIC R.R.OPASS NEAR TULLOS

Type Impv: BRIDGE REPLACEMENT

Project Manager: MUSA, ELNUR

Remarks: 022-04-0033;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE US 84 022-04 NHPP 3,500 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009589 - LA 28: RAPIDES LINE - DIVERSION CANAL

Type Impv: ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATION

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 28 074-03 NHPP 1,604 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.009765 - JENA: MULTI-MODAL CONNECTIVITY

Type Impv: MULTI-USE PATH W/LIGHTING, LANDSCAPE & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE 000-30 STPENH 787 ENHANCEMENTS 2-WAITING FOR FUNDING

LASALLE LA 8 830-08 STPENH 120 ENHANCEMENTS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 89 of 211

Page 96: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LASALLE

Project: H.000758 - LA 772 - HAIR CREEK(JENA)

Type Impv: WIDENING (STAGE 0 STUDY)

Project Manager: OLIVIER, NICHOLAS

Remarks: 022-05-0045;FEASIBILITY STUDY (STAGE 0)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE US 84 022-05 NHPP 12,500 CORRIDOR 1-PLANNING/ENVIRONMENTAL

Project: H.001133 - LA MIDLAND RR OVERPASS REPLACEMENT

Type Impv: REPLACE RR OVERPASS/BRIDGE REMOVAL

Project Manager: HICKS, MELVIN

Remarks: 040-04-0030;DOES NOT QUALIFY FOR BR FUNDS.WANT TO REMO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 772 040-04 STPFLEX 687 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009588 - LA 125: PENTECOSTAL CHURCH RD - US 165

Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 125 131-01 STPFLEX 1,448 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

CALDWELL LA 125 811-13 STPFLEX 47 PRESERVATION

NON-INTERSTATE

Project: H.009603 - LA 3259: LA 125 - US 165

Type Impv: ASPHALT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 3259 830-21 STPFLEX 294 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009644 - LA 125: US 165-PENTECOSTAL CHURCH ROAD

Type Impv: ASPHALT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LASALLE LA 125 131-01 STPFLEX 1,384 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 90 of 211

Page 97: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN

Project: H.006551 - MONDY RD&DICK'S RD SIGHT IMPROVE.

Type Impv: SITE DISTANCE IMPROVEMENTS

Project Manager: HOLM, RICK

Remarks: 737-31-0006;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 HRRR 188 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009277 - GRAMBLING SR2S PROJECT

Type Impv: SIDEWALK, CROSSWALKS, MARKINGS ETC.

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 SR2S 240 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

LINCOLN LA 149 831-16 SR2S 30 SAFETY

SAFE ROUTES TO SCHOOLS

Project: H.010270 - I-20: TREE REMOVAL IN LINCOLN PARISH

Type Impv: I-20: TREE REMOVAL IN LINCOLN PARISH

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN I-20 451-05 HSIPPEN 827 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.003708 - TREMONT EB REST AREA IMPROVEMENTS

Type Impv: RECONSTRUCT REST AREA

Project Manager: GUINN, MICHAEL S

Remarks: 695-01-0010;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 NHPP 11,229 OPER EFFICIENCY/MOTORIST ASSISTANCE

REST AREAS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.006548 - LINER & ROUGH EDGE ROAD IMPROVEMENT

Type Impv: SITE DISTANCE AND ALIGNMENT

Project Manager: HOLM, RICK

Remarks: 737-31-0003;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 HRRR 195 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009871 - KCS(SIMSBORO) WOODLAND DR.

Type Impv: INSTALL F/L'S AND GATES

Project Manager: SHREWSBERRY,BILL

Remarks: 714-31-0110

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010009 - LA 507 OVER I-20 BRIDGE REHABILITATION

Type Impv: REPLACEMENT OF SUPERSTRUCTURE

Project Manager: BUCCI, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 507 308-04 FBROFF 3,247 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010066 - I A LEWIS ELEM. SRTS SIDEWALK PROJECT

Type Impv: SIDEWALK IMPROVEMENT, TRAFFICE CALMING, SPEED REDUCTION IM

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 SR2S 250 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010239 - TREMONT WB REST AREA IMPROVEMENTS

Type Impv: ADD PAVILIONS, SIDEWALKS, SECURITY, LIGHTING, ADD. R/W.

Project Manager: GUINN, MICHAEL S

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 NHPP 5,550 OPER EFFICIENCY/MOTORIST ASSISTANCE

REST AREAS

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 91 of 211

Page 98: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN

Project: H.010424 - LA 823 ROADWAY FLOODING 1.8 MI E LA 151

Type Impv: RAISE THE ROADWAY ELEVATION

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 823 314-01 NFA 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010432 - US 167 & US 63: TURN LANE @ REYNOLDS DR

Type Impv: US 167 ADD RT TURN LANE AT REYNOLDS RD

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN US 63 023-10 NHPP 700 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010911 - I-20: MEDIAN CABLE (LINCOLN/OUACHITA)

Type Impv: INSTALL MEDIAN CABLE BARRIER

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN I-20 451-05 HSIPPEN 3,500 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

OUACHITA I-20 451-06 HSIPPEN 3,500 SAFETY

Project: H.011036 - LA 545: LA 146 - LISBON ROAD

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 545 308-07 NFABOND 2,389 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011037 - LA 563: LA 150 - LA 544

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 563 316-05 NFABOND 2,775 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011040 - LA 556: JACKSON PARISH LINE - LA 145

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 556 318-03 NFABOND 1,350 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011121 - TRAIL TO HIDEAWAY PARK

Type Impv: CONSTRUCTION OF 1275' WALKING TRAIL

Project Manager: RIGGS, LAURA

Remarks: MICHAEL DOMINGUE IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 RTP 93 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

LINCOLN 000-31 LOCAL 7 RECREATIONAL TRAILS PROGRAM

Project: H.010056 - EAVES ROAD & JEFFERSON AVENUE BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 FBROFF 693 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001550 - CHATHAM RD. (RUSTON)

Type Impv: WIDEN TO 5 LANES

Project Manager: JESCLARD, TREY

Remarks: 068-01-0009;$200 BONDS AVAIL. FOR PE (E?)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 92 of 211

Page 99: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN

Project: H.003298 - ROAD INTERCHANGE & I-20 FRONTAGE RD

Type Impv: NEW CONC PVMT TARBUTTON RD OVERPASS

Project Manager: REVIERE, RYAN

Remarks: 451-05-0115;STAGE 3

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN I-20 451-05 TCSP 4 PRESERVATION

INTERSTATE

2-WAITING FOR FUNDING

LINCOLN I-20 451-05 IM DISCR 927 PRESERVATION

INTERSTATE

LINCOLN I-20 451-05 DEMO 3,477 DEMO / HIGH PRIORITY

LINCOLN I-20 451-05 STGEN 250 PRESERVATION

INTERSTATE

LINCOLN I-20 451-05 NFI 9,641 PRESERVATION

INTERSTATE

Project: H.004608 - CHOUDRANT I-20 SERVICE ROAD

Type Impv: NEW SERVICE ROAD

Project Manager: PAINE, PEGGY JO

Remarks: 700-31-0121;STAGE 0 COMPLETED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN 000-31 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.000133 - US 80 OVERPASS @ KCS RR

Type Impv: BRIDGE REPLACEMENT

Project Manager: JONES, MATTHEW

Remarks: 001-07-0026;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN US 80 001-07 STPFLEX 22,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001679 - LA 146 BRIDGES NEAR VIENNA

Type Impv: NEW BRIDGES

Project Manager: UMEOZULU, JOE

Remarks: 085-09-0017;3 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 146 085-09 STPFLEX 3,569 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.008157 - JCT US 80 - JCT LA 150

Type Impv: RECON W/GEOMETRIC IMPROVEMENTS

Project Manager: BORNE, FRED

Remarks: 831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 150 831-07 SATRANS 4,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

831-12 NFI 5,000 OTHER / MISCELLANEOUS

Project: H.008159 - JCT US 80 - JCT LA 150

Type Impv: RECON W/GEOMETRIC IMPROVEMENTS

Project Manager: BORNE, FRED

Remarks: 831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 818 831-12 SATRANS 350 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

LINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS

Project: H.008161 - CALVIN CREEK BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BRAUNER, KURT

Remarks: 831-14-0005; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 3072 831-14 FBROFF 1,199 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 93 of 211

Page 100: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN

Project: H.009746 - RUSTON DOWNTOWN REVITALIZATION PHASE 6

Type Impv: SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 150 831-07 STPENH 895 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

LINCOLN LA 150 831-07 LOCAL 190 OTHER / MISCELLANEOUS

LINCOLN 000-31 STPENH 1,569 ENHANCEMENTS

LINCOLN 000-31 LOCAL 284 OTHER / MISCELLANEOUS

Project: H.010389 - LA 507: US 80 - S. END OVERPASS I-20

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 507 308-04 STPFLEX 735 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010453 - US 80: RIVER OAK DR - 0.92 E OF LA 818

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN US 80 001-07 STPFLEX 2,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010472 - US 80: 0.9 MILES E. OF LA 818 - US 167

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN US 80 001-07 STPFLEX 700 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010616 - I 20: LA 544 OVERPASS REPLACEMENT

Type Impv: OVERPASS REHABILITATION

Project Manager: BUCCI, MARK

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LINCOLN LA 544 296-03 FBROFF 4,807 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 94 of 211

Page 101: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON

Project: H.002373 - LA 16 @ LA 22 INSTALL ROUNDABOUT

Type Impv: INSTALL ROUNDABOUT

Project Manager: MUSA, ELNUR

Remarks: 260-02-0037;JT W 260-03-0014

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 260-02 HSIP 1,032 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

LIVINGSTON LA 22 260-03 HSIP 438 SAFETY

LIVINGSTON LA 22 266-03 HSIP 371 SAFETY

Project: H.006157 - WAX ROAD BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: USE PRIORITY 2 BOND AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 FBROFF 700 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.008166 - LA 1036: W JCT LA 442 - ST HELENA P/L

Type Impv: MILL, STABILIZE BASE, DRAINAGE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 832-01-0006;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1036 832-01 NFABOND 4,553 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010504 - LA 444: GUM SWAMP ROAD - LA 22

Type Impv: COLD PLANE, DRAINAGE, BASE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 444 832-19 NFABOND 3,287 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010638 - RIVER RD: GOVERNMENT ST - CENTERVILLE ST

Type Impv: MINOR WIDENING AND OVERLAY, SOME PAVEMENT PATCHING REQU

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 STP>200K 395 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010701 - LIVINGSTON PARISH RR SAFETY IMPROVEMENTS

Type Impv: INSTALL SIGNS & PAVEMENT MARKINGS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 HRRR 140 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010979 - LA 43: TURN LN @ LA 1040 & JAMES CH RD

Type Impv: DUAL LEFT TURN LANES OR CONTINUOUS 3 LANE SECTION

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 43 260-06 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.000466 - US 190: ROUNDABOUT AT EDEN CHURCH ROAD

Type Impv: CONSTRUCT 4-LEGGED SINGLE LANE ROUNDABOUT

Project Manager: PAINE, PEGGY JO

Remarks: 013-06-0054

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON US 190 013-06 HSIP 2,500 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.005693 - LA 447/I-12 INTERCHANGE

Type Impv:

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 447 268-01 STPFLEX 5,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 95 of 211

Page 102: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON

Project: H.008173 - US 190 & LA 1032

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: SMITH, DAVID

Remarks: 832-12-0014;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1032 832-12 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.008193 - LA 1034 - US 190

Type Impv: COLD PLANE. PATCH AND OLAY

Project Manager: RAY, JARED

Remarks: 832-32-0015

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 3002 832-32 HSIP 1,300 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

LIVINGSTON LA 3002 832-32 NHPP 774 PRESERVATION

NON-INTERSTATE

Project: H.009140 - LA 1026 AT LA 1030 ROUNDABOUT

Type Impv: ROUNDABOUT

Project Manager: LAI, QUANG

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1026 273-03 STPFLEX 3,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009179 - WAX ROAD

Type Impv: OVERLAY AND WIDENING

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL OF MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 STP>200K 1,150 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009180 - PLANTATION RD / ENTERPRISE RD

Type Impv: OVERLAY AND WIDENING

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 STP>200K 555 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009595 - I-12:LIVINGSTON PAR APPROACH SLAB REP P2

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON I-12 454-02 NHPP 7,200 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010124 - LA 16: ROUNDABOUT @ LA 447

Type Impv: ROUNDABOUT

Project Manager: RICHARD, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 262-01 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010558 - I-12 WDN: .5 M W SATSUMA-SATSUMA RAMPS

Type Impv: WIDEN I-12 TO 3 LANES

Project Manager: TSAI, LOONG SHEN

Remarks: CAN'T ADD TO TIP & STIP UNTIL COMPLETE NEW CONFORMITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON I-12 454-02 NHPP 12,000 CORRIDOR 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010781 - LA 1032: LA 16 - LA 3003

Type Impv: WIDEN CURVES, OVERLAY, RESTRIPE AND PAVEMENT MARKERS

Project Manager: BRANTON, JENNIFER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1032 832-12 HSIPPEN 3,437 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 96 of 211

Page 103: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON

Project: H.010842 - SIDNEY HUTCHINSON WALKING TRAIL

Type Impv: CONSTRUCTION OF A PEDESTRIAN TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

LIVINGSTON 000-32 LOCAL 33 RECREATIONAL TRAILS PROGRAM

Project: H.011129 - LA 1029: IC RR XING (WALKER)

Type Impv: REPLACE CROSSING SURFACE.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1029 832-25 RAIL HE 64 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

LIVINGSTON LA 1029 832-25 LOCAL 51 RAILROADS

Project: H.011210 - LA 22: DIVERSION CANAL - LA 16 OVERLAY

Type Impv: OVERLAY AND PATCHING

Project Manager: ISEMANN, ROBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 22 266-03 STBONDS 450 PRESERVATION

NON-INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.002381 - LA 43 CREEK BRIDGE NEAR ALBANY

Type Impv: NEW BRIDGE

Project Manager: ISEMANN, ROBERT

Remarks: 260-07-0025;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 43 260-07 STPFLEX 651 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.003425 - I-12: LA 63 - TANGIPAHOA PARISH LINE

Type Impv: C.P. AND OVERLAY

Project Manager: THOMAS, BEN

Remarks: 454-02-0077;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON I-12 454-02 NHPP 7,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.004634 - JUBAN RD WIDENING (I-12 - US 190)

Type Impv: WIDENING (CONC PAVEMENT)

Project Manager: PAINE, PEGGY JO

Remarks: 832-13-0019;700-32-0122 ENGINEERING ($800.000)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1026 832-13 STBONDS 5,980 CAPACITY 3-DESIGN/DEVELOPMENT

LIVINGSTON US 190 013-06 STBONDS 2,070 CAPACITY

LIVINGSTON US 190 013-06 HSIP 3,530 SAFETY

Project: H.008190 - LA 1025: CREEK BR. NEAR FRIENDSHIP

Type Impv: NEW BRIDGE

Project Manager: RICHARD, RYAN

Remarks: 832-29-0012;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1025 832-29 STPFLEX 571 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009548 - E. BATON ROUGE PARISH LINE - W JCT LA 16

Type Impv: MAINTENANCE RESTORATION & REHABILITATION

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON US 190 013-06 NHPP 1,211 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 97 of 211

Page 104: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON

Project: H.010625 - PEA RIDGE AND JOHN BARBER ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 FBROFF 370 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

LIVINGSTON 000-32 FBROFF 254 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010992 - I-12: I-12 INTERSTATE RAMP REPAIR

Type Impv: PATCHING AND STRIPING

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON I-12 454-02 NHPP 5,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.011014 - LA 3002: J-TURN

Type Impv: ADD SOUTH BOUND J-TURN FOR LEFT TURNING VEHICLES EXITING C

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 3002 832-32 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.011189 - LA 1026 @ DUNN & EDEN CHURCH ROUNDABOUTS

Type Impv: ROUNDABOUT INTERSECTION IMPROVEMENTS

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1026 273-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.011197 - DENHAM SPRINGS SRTS PROJ - NORTHSIDE

Type Impv: SIDEWALKS, STRIPING AND SIGNING

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON 000-32 SR2S 220 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.009749 - WALKER SIDEWALKS, PH 3

Type Impv: SIDEWALKS & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1027 273-03 STPENH 323 ENHANCEMENTS 2-WAITING FOR FUNDING

LIVINGSTON LA 447 268-02 STPENH 31 ENHANCEMENTS

LIVINGSTON 000-32 STPENH 223 ENHANCEMENTS

Project: H.000464 - US 190 & LA 1026 (ROUNDABOUT)

Type Impv: ROUNDABOUT

Project Manager: PAINE, PEGGY JO

Remarks: 013-06-0052;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON US 190 013-06 HSIP 1,200 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.002375 - AMITE R.BR. NEAR FRENCH SETTLEMENT

Type Impv: NEW BRIDGE

Project Manager: BROWN, JEFF

Remarks: 260-02-0040;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 260-02 STPFLEX 23,124 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 98 of 211

Page 105: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON

Project: H.002397 - PETE'S HWY(LA 16)INTERCHANGE @ I-12

Type Impv: INTERCHANGE IMPROVEMENTS - STAGE 0

Project Manager: BROADBENT, RONALD

Remarks: 262-01-0037;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.008170 - LA 1024 CREEK BRS. NEAR FRIENDSHIP

Type Impv: BRIDGE REPLACEMENT

Project Manager: ISEMANN, ROBERT

Remarks: 832-10-0019;2 BRIDGES; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 1024 832-10 FBROFF 1,302 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009549 - E. JCT. LA 16 - JCT. LA 447

Type Impv: MAINTENANCE RESTORATION & REHABILITATION

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON US 190 013-06 STPFLEX 2,322 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009552 - JCT. LA 1034 - JCT. US 190

Type Impv: MAINTENANCE RESTORATION & REHABILITATION

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 262-01 STPFLEX 1,405 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010030 - LA 16 TRAFFIC STUDY

Type Impv: STUDY TRAFFIC ALONG LA 16 IN DIST 62

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 262-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Project: H.010091 - LA 447 CORRIDOR STUDY PHASE II

Type Impv: TRAFFIC STUDY ON LA 447

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 447 268-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 447 268-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.010383 - LA 441: LA 442 - ST. HELENA PARISH LINE

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 441 270-03 STPFLEX 2,480 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010384 - LA 442: LA 63 - W. JCT. LA 441

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 442 269-01 STPFLEX 2,420 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010551 - LA 16: LA 64/LA 1026 - AMITE CHURCH RD.

Type Impv: ASPHALT SURFACE TREATMEENT

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 16 262-02 STPFLEX 199 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 99 of 211

Page 106: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON

Project: H.009837 - LA 64 MOBILITY IMP. (LA 1019 TO LA 16)

Type Impv: FEASIBILITY STUDY FOR MOBILITY IMPROVEMENTS OF LA 64

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

LIVINGSTON LA 64 273-03 0 CAPACITY 0-FEASIBILITY/SCOPING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 100 of 211

Page 107: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MADISON

Project: H.003332 - I-20: RICHLAND/MADISON PARISH RAMP REHAB

Type Impv: RAMP REHAB (RICHLAND PARISH AND MADISON PARISH)

Project Manager: THOMAS, BEN

Remarks: 451-07-0052;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-08 NHPP 7,078 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

RICHLAND I-20 451-07 NHPP 6,242 PRESERVATION

INTERSTATE

Project: H.010603 - I-20 MR BR MOD FOR TRAN REALIGN PIER E-2

Type Impv: PIER E2 TO MODIFICATION TO ACCOMODATE LATERAL MOVEMENT

Project Manager: D'ANDREA, ARTUR

Remarks: $4.25M RURAL TIGER GRANT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-09 DEMO 4,031 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010927 - SLOPE REP @ LETOURNEAU ON I-20 OVERPASS

Type Impv: EMBANKMENT AND ABUTMENT REPAIR

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-08 NHPP 1,500 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010930 - SLOPE REPAIR ON I-20 OVERPASSES

Type Impv: EMBANKMENT AND ABUTMENT REPAIR

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-08 NHPP 392 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

MADISON I-20 451-08 NHPP 392 PRESERVATION

INTERSTATE

MADISON I-20 451-08 NHPP 392 PRESERVATION

INTERSTATE

MADISON I-20 451-08 NHPP 392 PRESERVATION

INTERSTATE

RICHLAND I-20 451-07 NHPP 392 PRESERVATION

INTERSTATE

Project: H.011000 - I-20: MOUND TO DELTA SCALES

Type Impv: INSTALL SHOULDER UNDER-DRAIN W/SEL. COLD PLANING & OVERLA

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-08 NHPP 2,000 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010612 - I-20 MRB SOIL AND SCOUR STABILIZATION

Type Impv: IMP SLOPE & SOIL STABILITY AROUND PIERS E1 & E2 ADD RIP RAP

Project Manager: D'ANDREA, ARTUR

Remarks: OTHER IS $ FROM MDOT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-09 NHPP 13,973 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

MADISON 000-33 OTHER 13,973 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.011047 - LA 577: LA 860 - NEW BOYS ROAD

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: NFA WILL BE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON LA 577 164-02 STPFLEX 3,710 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011077 - I-20: MOUND TO DELTA SCALES

Type Impv: COLD PLANE AND OVERLAY

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-08 NHPP 6,000 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 101 of 211

Page 108: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MADISON

Project: H.003353 - I-20 DRAINAGE CANAL BRIDGE

Type Impv: BRIDGE REHAB

Project Manager: CAVALIER, STEPHANIE

Remarks: 451-08-0086;REHAB ABUTMENT WALLS. & APP. SLABS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-08 NHPP 2,724 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010038 - TENDAL NORTH RD / DRAIN TO TENSAS BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON 000-33 FBROFF 1,001 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010897 - I-20: MRB ISLAND ANCHORING PIER E1

Type Impv: REHABILITATION

Project Manager: D'ANDREA, ARTUR

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON I-20 451-09 NHPP 13,500 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

MADISON 000-33 OTHER 13,500 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.008200 - US 65 - FRONTAGE ROAD

Type Impv: ASPHALT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 833-06-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON LA 601 833-06 STPFLEX 0 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010455 - US 80: JCT LA 577 TO QUBEC

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MADISON US 80 002-04 STPFLEX 4,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 102 of 211

Page 109: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MOREHOUSE

Project: H.010422 - LA 830-3 ROADWAY FLOOD 1.3 MI W LA 830-4

Type Impv: EXISTING CROSS DRAIN WILL BE REPLACED WITH LARGER STRUCTU

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 830-3 834-15 STPFLEX 162 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010277 - LA 593: INTER. IMPRV. NAFF @ COLLINGSTON

Type Impv: INTERSECTION IMPROVEMENT

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 593 162-01 HSIP 800 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011031 - LA 834: BURLEIGH TRAIL-BAYOU BARTHOLOMEW

Type Impv: MILL & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 834 329-03 NFABOND 1,036 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011039 - LA 590: US 425 - ELVIN ROAD

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 590 834-03 NFABOND 848 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011124 - US 425: UP RR XING (MER ROUGE)

Type Impv: REPLACE CROSSING SURFACE AND ADJUST GRADE OF APPROACHE

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE US 425 037-01 RAIL HE 40 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

MOREHOUSE US 425 037-01 LOCAL 40 RAILROADS

Project: H.002631 - OVERFLOW CREEK BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 329-03-0014; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 834 329-03 FBROFF 1,555 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009535 - LA 599: S JCT US 165 TO N JCT US 165

Type Impv: COLD PLANE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 599 328-31 NFA 2,326 PRESERVATION

NON-INTERSTATE NFA

3-DESIGN/DEVELOPMENT

MOREHOUSE LA 599 328-02 NFA 3,255 PRESERVATION

NON-INTERSTATE NFA

Project: H.010040 - BUD ROAD & BONNE IDEE ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE 000-34 FBROFF 585 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

MOREHOUSE 000-34 FBROFF 416 PRESERVATION

BRIDGE (OFF SYSTEM)

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 103 of 211

Page 110: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MOREHOUSE

Project: H.000665 - UP R.R. OVERPASS NEAR BONITA

Type Impv: NEW BRIDGE

Project Manager: OLIVIER, NICHOLAS

Remarks: 016-05-0031;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE US 165 016-05 STPFLEX 8,926 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.008203 - LA 835 CREEK BRIDGES

Type Impv: NEW BRIDGES

Project Manager: BROWN, JEFF

Remarks: 834-07-0022;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 835 834-07 STPFLEX 2,892 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009538 - US 165: S LA 599 - N LA 599

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE US 165 016-05 STPFLEX 1,220 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010470 - LA 138: JCT LA 593 TO JCT LA 2

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

MOREHOUSE LA 138 330-01 STPFLEX 5,600 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 104 of 211

Page 111: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES

Project: H.010594 - LOUISIANA TRAIL: GOLDONNA TO CHESTNUT

Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010900 - LA 486: SOUTH JCT US 71-NORTH JCT US 71

Type Impv: CEMENTED BASE AND 2-LIFT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 486 835-01 NFA 1,600 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14

NATCHITOCHES LA 486 835-01 NFABOND 1,335 PRESERVATION

NON-INTERSTATE NFA

Project: H.011051 - LA 480: US 71 - CLEAR LAKE

Type Impv: STABLIZATION AND INSTALLATION OF TWO (20 LIFT OVERLAY OF L

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 480 835-09 NFABOND 3,710 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011057 - LA 490: EMMANUEL RD-0.12 SW SPURGEON RD

Type Impv: STABILIZE AND INSTALL TWO (2) LIFT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 490 835-08 NFABOND 1,749 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009721 - LA 1X: TURN LANES-46' N HANCOCK-LA 494

Type Impv: WIDEN ROADWAY FOR LEFT TURN LANE IMPROVEMENTS

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 1-X 053-04 HSIPPEN 3,850 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

NATCHITOCHES LA 1-X 053-04 TAP<200K 200 SAFETY

Project: H.010178 - LA 120: CURVE REALIGNMENT

Type Impv: REALIGNMENT OF LA 120 TO ELIMINATE SHARP REVERSE CURVE

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 120 042-05 HSIP 1,120 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010486 - I-49: RAPIDES P/L - 1.1 MI S LA 485

Type Impv: CRACK SEALING,PCCP PATCH&U-SEALING. SIDE ROADS -CP & OVER

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES I-49 455-06 NHPP 4,218 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

NATCHITOCHES LA 490 835-08 STPFLEX 417 PRESERVATION

INTERSTATE

NATCHITOCHES 000-35 STPFLEX 365 PRESERVATION

INTERSTATE

Project: H.010491 - I-49: 1.11 MI S LA 485- 0.57 MI N LA 174

Type Impv: PATCH, COLD PLANE, AND OVERLAY (ROADWAY, RAMPS, AND SIDE

Project Manager: THOMAS, BEN

Remarks: 455-06 TTF AS MATCH AND 115-02 NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES I-49 455-06 NHPP 4,955 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

NATCHITOCHES LA 485 115-02 STPFLEX 510 PRESERVATION

NON-INTERSTATE

NATCHITOCHES LA 485 115-02 STPFLEX 445 PRESERVATION

INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 105 of 211

Page 112: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES

Project: H.010830 - LOUISIANA TRAIL - GOLDONNA TO POND

Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

NATCHITOCHES 000-35 LOCAL 0 RECREATIONAL TRAILS PROGRAM

Project: H.010901 - LA 1265: FIVE FORKS ROAD REALIGNMENT

Type Impv: RECONSTRUCTION WITH GEOMETRIC IMPROVEMENTS

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 1265 835-23 NFA 1,900 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011063 - LA 1220: LA 119 - LITTLE RIVER BRIDGE

Type Impv: STABLIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 1220 361-01 NFABOND 1,537 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011071 - LA 493: LA 1 - LA 119

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 493 835-14 NFABOND 1,272 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011145 - LOUISIANA TRAILS RESTORATION PHASE 2

Type Impv: RESTORATION, NON-ROUTINE MAINT & CONS. OF 30 MILES OF TRAIL

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

Project: H.001145 - JCT. LA 487 - JCT. LA 6

Type Impv: CBT AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: AC WITH NFA FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 120 042-05 STPFLEX 3,500 PRESERVATION

NON-INTERSTATE NFA

3-DESIGN/DEVELOPMENT

Project: H.001146 - LA120: BRIDGES NEAR PROVENCAL

Type Impv: BRIDGE REPLACEMENT

Project Manager: YANG, LI

Remarks: 042-07-0022;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 120 042-07 FBROFF 2,000 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009559 - LA 156: MAMMY TRAIL - LA 479

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 156 092-01 STPFLEX 2,813 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 106 of 211

Page 113: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES

Project: H.010943 - CLARK/GOOD HOPE/ROBELINE-PROVENCAL BRDGS

Type Impv: BRIDGE REPLACEMENTS

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES 000-35 FBROFF 1,224 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

NATCHITOCHES 000-35 FBROFF 601 PRESERVATION

BRIDGE (OFF SYSTEM)

NATCHITOCHES 000-35 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.001809 - AJAX - I-49

Type Impv: CURVE REALIGNMENT

Project Manager: MOORE, DARRELL

Remarks: 112-06-0008;PROJECT TO BE RE-SCOPED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 174 112-06 STPFLEX 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.003741 - NATCHITOCHES REST AREA

Type Impv: REST AREA

Project Manager: DUPUY, ROY

Remarks: 698-08-0002;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES 000-35 NHPP 8,455 OPER EFFICIENCY/MOTORIST ASSISTANCE

REST AREAS

2-WAITING FOR FUNDING

Project: H.001061 - EL CAMINO EAST/WEST COR (EAST SEG )

Type Impv: MAJOR WIDENING LA 117 TO I 49

Project Manager: TSAI, LOONG SHEN

Remarks: 034-05-0035;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 6 034-05 DEMO 2,478 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

NATCHITOCHES LA 6 034-05 NFI 25,022 DEMO / HIGH PRIORITY

Project: H.001270 - NATCH. BY-PASS - KEYSER AVE

Type Impv: WIDEN TO 5 LANES

Project Manager: TONEY, PATRICK

Remarks: 053-04-0025;(NO FUNDING)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 1-X 053-04 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.001271 - CANE RIVER BRIDGE AT CHURCH STREET

Type Impv: BRIDGE REPLACEMENT

Project Manager: YAP, KIAN

Remarks: 053-04-0031;STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 1-X 053-04 STPFLEX 4,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001820 - LA 485 BRIDGES NEAR ALLEN

Type Impv: BRODGE REPLACEMENT

Project Manager: YANG, LI

Remarks: 115-01-0017;4 NEW BRIDGES.JT W/115-02-0011

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 485 115-01 FBROFF 7,326 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.007503 - NATCHITOCHES T&P RR DEPOT REHAB

Type Impv: MISCELLANEOUS

Project Manager: HORTON, VALERIE

Remarks: 000-35

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES 000-35 STPENH 597 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 107 of 211

Page 114: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES

Project: H.009992 - LA 120: ROADWAY ELEVATION PROJ./ROADWAY

Type Impv: ELEVATION AND MITIGATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 120 042-07 FEMA 4,508 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010342 - LA 155: RED RIVER P/L - S JCT LA 153

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 155 091-02 STPFLEX 1,939 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010343 - LA 174: DESOTO P/L - I-49 INTERCHANGE

Type Impv: PATCH. COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 174 112-06 STPFLEX 1,925 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010346 - LA 487: LA 120 - LA 174

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 487 113-03 STPFLEX 3,844 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010357 - LA 153: JCT LA 9 - FIVE FORKS ROAD

Type Impv: STALIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 153 088-01 STPFLEX 1,600 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010359 - LA 9: JCT US 71 - JCT LA 156

Type Impv: PATCH. COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 9 089-01 STPFLEX 1,509 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010365 - LA 117: BELLWOOD - LA 478

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

NATCHITOCHES LA 117 114-03 STPFLEX 1,288 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 108 of 211

Page 115: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.003181 - I-10 WB OVER JULIA STREET GIRDER REHABIL

Type Impv: REPLACE AND REPAIR DAMAGED STEEL AND CONNECTION PLATES

Project Manager: BUCCI, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 1,083 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.003182 - IHNC AND ALGIERS CUTOFF BRIDGE REHAB

Type Impv: FINGER JOINTS,ROCKER BEARINGS & DECK OVERLAY

Project Manager: KEMP, KELLY

Remarks: 450-90-0246;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 7,400 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

ORLEANS LA 407 836-08 NHPP 760 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

Project: H.004730 - US 61/90(TULANE) CLAIBORNE - CARROLLTON

Type Impv: SAFETY AND TRAFFIC OPERATIONAL IMPROVEMENTS

Project Manager: BAJEWSKI, CHRISTINA

Remarks: 700-36-0187;STAGE 0 AND STAGE 1 MATCH BY RPC

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 61 007-01 HSIP 1,000 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

ORLEANS US 61 007-01 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

ORLEANS US 90 006-03 HSIP 1,000 SAFETY

ORLEANS US 90 006-03 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.006566 - NEW ORLEANS SAFE ROUTES TO SCHOOL PROJ.

Type Impv: SIDEWALKS/SIGNS/ETC.

Project Manager: GROS, SCOTT

Remarks: 737-36-0015;SR2S PROGRAM FUNDING.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 477 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.007265 - ST CHARLES AVE (LA AVE-CALLIOPE ST)

Type Impv: OVERLAY

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0126; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 3,666 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009069 - TRI-CENTENNIAL PL PARKING, CITY PARK NO

Type Impv: PARKING LOT

Project Manager: FLETCHER, CURTIS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 TCSP 2,107 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

ORLEANS 000-36 LOCAL 190 DEMO / HIGH PRIORITY

Project: H.009354 - BROAD STREET CORRIDOR BIKEWAY

Type Impv: CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSING

Project Manager: RIGGS, LAURA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM

Project: H.009579 - I-10: I-610 SPLIT - US 90 SPLIT

Type Impv: COLD PLANE AND OVERLAY

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 6,365 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 109 of 211

Page 116: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.010113 - EINSTEIN CHARTER SCHOOL SRTS NON-INFRAST

Type Impv: BIKE/PED SAFETY TRAINING, PURCHASES, ENCOURAGEMENT ACTIVI

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 100 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010576 - JEFFERSON DAVIS TRAILS

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL SYSTEM.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

ORLEANS 000-36 LOCAL 14 RECREATIONAL TRAILS PROGRAM

Project: H.010712 - I-10 MEDIAN CABLE BARRIER:I510-TWIN SPAN

Type Impv: MEDIAN CABLE BARRIER

Project Manager: FOSTER, AMANDA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 HSIP 2,188 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010719 - US 90 RAMP IMPROVEMENTS

Type Impv: IMPROVE EB ONRAMP TO US 90Z FROM CLAIBORNE AVE.

Project Manager: NICKEL, TIM

Remarks: USE CCCD TOLL CREDITS AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90-Z 283-08 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

ORLEANS US 90-Z 283-08 NHPP 1,250 OTHER / MISCELLANEOUS

Project: H.010789 - I-10: IRISH BAYOU BRIDGE EMERGENCY REP

Type Impv: SCOUR REPAIR AND EROSION PROTECTION

Project Manager: JOHNSON, ENNIS

Remarks: DIR REPORT # LA-2012-1-071-005

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 ER 956 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010892 - US 90: IMPROVE U-TURN TO DANZIGER BR

Type Impv: IMPROVE U-TURN UNDER DANZIGER BRIDGE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90 006-90 NHPP 111 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010893 - US 90: LEFT TURN LANES & PAVED MEDIANS

Type Impv: ADD LEFT TURN LANE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90 006-90 STPFLEX 302 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011078 - NO RTMC BUILDING SECURITY

Type Impv: BUILDING SECURITY SYSTEM FOR THE NO RTMC

Project Manager: DELANEY, ELIZABETH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STPFLEX 120 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 110 of 211

Page 117: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.011090 - PATHS TO PROGRESS (GROUP 39)

Type Impv: OVERLAY, PATCHING, STRIPING, IMPROVING ADA RAMPS

Project Manager: BURST, JEFFERY

Remarks: 704-36-0044; DIR # 071-GALVEZ-01 & 071-DOWNMAN ROAD-01

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 ER 2,277 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

ORLEANS 000-36 ER 413 OTHER / MISCELLANEOUS

Project: H.011139 - NEW ORLEANS SRTS PROJECT - YLC (NI)

Type Impv: BICYCLE RACKS AND TRAINING.

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 150 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011140 - NEW ORLEANS SRTS PROJECT - KIDSWALK (NI)

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 150 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011198 - NEW ORLEANS SRTS PROJ. - EINSTEIN II

Type Impv: SIDEWALKS, STRIPING AND SIGNING

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 208 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011238 - I-910/US 90-Z: GENERAL DE GAULLE RAMPS

Type Impv: ASPHALT OVERLAY AND APPROACH SLAB LEVELING OF RAMPS

Project Manager: FOSTER, AMANDA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90-Z 283-08 NHPP 400 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006196 - WISNER BLVD BRIDGE REPLACEMENT

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-36-0108;ENHANCEMENTS PROVIDING $ 2,000,000

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 FBROFF 10,000 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

ORLEANS 000-36 STPENH 2,000 ENHANCEMENTS

Project: H.006567 - PEDESTRIAN CROSSWALK ENHANCEMENTS

Type Impv: SIGNS & PVMT.MARKINGS INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-36-0016;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SATRANS 276 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.007271 - CANAL BLVD (R.E. LEE - AMETHYST)

Type Impv: RECONSTRUCT EXISTING 4 LANE DIVIDED

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0135; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.007273 - MAGAZINE ST (BROADWAY - CALHOUN)

Type Impv: REHABILITATION

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0137; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 111 of 211

Page 118: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.007274 - MAGAZINE ST RECONSTRUCTION PHASE 2

Type Impv: REHABILITATION

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0139; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.007275 - ST CHARLES AVENUE OVERLAY (PHASE II

Type Impv: OVERLAY

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0140; USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 1,700 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.007277 - LAKE FOREST BOULEVARD

Type Impv: MINOR WIDENING

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0142;ADD ENGINEERING TO FY 10

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 370 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009308 - NEW ORLEANS DPW - EP HARNEY SCHOOL PROJ.

Type Impv: BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 25 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

ORLEANS US 90 006-03 SR2S 225 SAFETY

SAFE ROUTES TO SCHOOLS

Project: H.009419 - LA 3019: ROUNDABOUT @ I-10 RAMP

Type Impv: TWO-LANE ROUNDABOUT

Project Manager: PICARD, TOBY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS LA 3019 836-13 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009838 - SAFE ROUTES TO ARISE ACADEMY

Type Impv: NON-INFRASTRUCTURE SRTS PROJECT ONLY

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 50 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009949 - ESPERANZA SAFE ROUTES TO SCHOOL

Type Impv: NON-INFRASTRUCTURE SRTS PROJECT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 18 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010086 - E.P. HARNEY SCHOOL SRTS NON-INFRASTRUCT

Type Impv: SRTS NON-INFRASTRUCTURE

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 35 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010111 - AUDUBON CHARTER SCHOOL SRTS INFRASTRUCT

Type Impv: SIDEWALK IMPROVMENTS, TRAFFIC CALMING, STRIPING AND MARKIN

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 235 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 112 of 211

Page 119: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.010112 - AUDUBON CHARTER SCHOOL SRTS NON-INFRAST

Type Impv: BIKE AND PED SAFETY TRAINING,PURCHASES, ENFORCEMENT ACTIV

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 125 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010114 - EINSTEIN CHARTER SCHOOL INFRASTRUCTURE

Type Impv: SIDEWALK IMPROVEMENTS, TRAFIC CALMING, MARKINGS AND STRIP

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 458 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010189 - NEW ORLEANS HOSPITALITY ZONE

Type Impv: CONGESTION MANAGEMENT

Project Manager: BANKSTON, TANYA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90-Z 283-08 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010636 - US 90 OVER MISS RVR (GNO2)-CLEAN & PAINT

Type Impv: BRIDGE REPAIRS, CLEANING & PAINTING

Project Manager: REVIERE, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90-Z 283-08 NHPP 9,000 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010736 - ALGIERS AREA ROADWAYS #2

Type Impv: PCC REHAB INCLUDING PANEL PATCHING/REPLACEMENT, CLEANING

Project Manager: BURST, JEFFERY

Remarks: USE STBONDS AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 1,877 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

ORLEANS 000-36 STP>200K 709 URBAN SYSTEMS

Project: H.010872 - EARHART CORRIDOR BIKEWAY LINKAGE

Type Impv: CONSTRUCTION OF 2.3 MILES OF BIKE LANE.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 RTP 146 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ORLEANS 000-36 LOCAL 30 RECREATIONAL TRAILS PROGRAM

Project: H.011108 - NS SEVERAL RR XINGS (NEW ORLEANS)

Type Impv: RAIL/HIGHWAY CROSSING WARNING IMPROVEMENTS

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011146 - CITY PARK BICYCLE TRAIL

Type Impv: CONST. & IMPROVE. TO BICYCLE INFRAS. TO 1300 ACRES CITY PARK

Project Manager: RIGGS, LAURA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ORLEANS 000-36 LOCAL 10 RECREATIONAL TRAILS PROGRAM

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 113 of 211

Page 120: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.011150 - I-10 WB OVER CHEF MENTEUR BL BR REPAIR

Type Impv: REPLACE TWO STEEL GIRDER AND ASSOCIATED DECK.

Project Manager: D'ANDREA, ARTUR

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 850 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011167 - I-10: HOWARD AVENUE SERVICE ROAD

Type Impv: ROADWAY RESTORATION AND REHAB

Project Manager: FOSTER, AMANDA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 850 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011172 - US 90-Z: PAVEMENT MARKING REPLACEMENT I

Type Impv: PAVEMENT MARKING REPLACEMENT

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90-Z 283-08 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED FOR LETTING FY 14-15

JEFFERSON US 90-Z 283-09 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.011199 - NEW ORLEANS SRTS PROJ. - EINSTEIN II NI

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 50 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011219 - I-10: NO CBD1 I610-CARROLLTON

Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED FOR LETTING FY 14-15

Project: H.007259 - FLEUR DE LIS BLVD. PH 3

Type Impv: RECONSTRUCTION

Project Manager: DEVILLE, JACQUES

Remarks: 742-36-0118;(HARRISON - OLD HAMMOND HWY)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 6,100 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.010331 - US 90: FLOODWALL - CHEF PASS BRIDGE

Type Impv: RAISING ROADWAY GRADE TO CONSISENT ELEVATION BY ADDING

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90 006-90 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.011200 - NEW ORLEANS SRTS PROJ. - AUDUBON N.I.

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 SR2S 74 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.011220 - I-10: NO CBD2 CARROLLTON - POYDRAS

Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 114 of 211

Page 121: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.011221 - I-10: NO CBD3 POYDRAS - LOUISA

Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.011222 - I-10: NO CBD4 LOUISA - I-510

Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 5,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.007250 - ALMONASTER BRIDGE AND APPR.

Type Impv: BRIDGE REPLACEMENT

Project Manager: YANG, LI

Remarks: 742-36-0104;OTHER FUNDS - PORT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STPFLEX 20,000 INTERMODAL CONNECTOR 2-WAITING FOR FUNDING

ORLEANS 000-36 STPFLEX 20,000 PRESERVATION

BRIDGE (ON SYSTEM)

ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS

Project: H.007272 - HOWARD AVENUE EXTENSION

Type Impv: NEW 2-LANE ROADWAY

Project Manager: NICKEL, TIM

Remarks: 742-36-0136;CITY OWNS R/W

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.009938 - MAGNOLIA CONVERTED PED BRIDGE REHAB

Type Impv: REHAB OF EXISTING PED BRIDGE (CONVERTED VEHICLE) & REL. WOR

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STPENH 889 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.000263 - CHEF MENTEUR PASS BRIDGE & APPROACH

Type Impv: BRIDGE REPLACEMENT

Project Manager: RABALAIS, NICK

Remarks: 006-05-0067;STAGE 1 PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90 006-05 STPFLEX 85,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.000304 - I 10 - US 61 OVERPASS

Type Impv: BRIDGE REHABILITATION

Project Manager: D'ANDREA, ARTUR

Remarks: 007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 61 007-01 NHPP 4,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.004738 - I-610 - TWIN SPANS AND I-10 @ RR

Type Impv: STATE FUNDS FOR STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-36-0198;(STAGE 0.PHASE1)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.006561 - N.O. UNION PASSENGER TERMINAL M.P.

Type Impv: STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 737-36-0006;$360K H.P.DEMO. MATCH BY RPC $90K

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 DEMO 450 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 115 of 211

Page 122: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.008220 - LA406/WOODLAND HWY (LA23 - LA407)

Type Impv: WIDENING

Project Manager: DEVILLE, JACQUES

Remarks: 836-14-0002;JT W 838-06-0002

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS LA 406 836-14 STP>200K 1,500 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.009340 - PONO ALMONASTER BR GUSTAV REPAIRS

Type Impv: REIMBURSEMENT FOR EMERGENCY WORKED ALREADY COMPLETED

Project Manager: WINCHESTER, CHAD

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 ER 2,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009572 - LA 39:JUDGE SEEBER BR-ST BERNARD P/L

Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS LA 39 046-31 NHPP 1,406 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009661 - LA 406: DONNER CANAL BR - STANTON RD

Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS LA 406 409-02 STPFLEX 823 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009663 - LA 47: I-10 - BULLARD RD.

Type Impv: PCC REHAB AND ASPHALTIC CONCRETE OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS LA 47 148-03 STPFLEX 4,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009764 - NO CITY PARK: MARCONI MULTI-USE PATH

Type Impv: MULTI-USE PATH, LANDSCAPING & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STPENH 727 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Project: H.009939 - ST CHARLES AVE: STREETSCAPING IMP., PH 1

Type Impv: STREETSCAPING, DECORATIVE LIGHTING, & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STPENH 1,053 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Project: H.010016 - US 11: LAKE PONTCHARTRAIN BRIDGE REHAB

Type Impv: MAJOR BRIDGE REHABILITATION

Project Manager: BRAUNER, KURT

Remarks: PRIORITY BRIDGE PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 11 018-02 STPFLEX 25,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010018 - I-10: NO EAST DRAIN CANAL BRIDGE REPLACE

Type Impv: BRIDGE REPLACEMENT

Project Manager: YAP, KIAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS I-10 450-90 NHPP 11,758 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 116 of 211

Page 123: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS

Project: H.010405 - US 90: CAMELOT DR - FLOOD GATE

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90 006-90 STPFLEX 1,400 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010414 - LA 1253: DOWMAN RD - I-10 FRONTAGE RD

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS LA 1253 419-02 STPFLEX 250 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010634 - CCCD-US90BUS SIGN UPGRADE-EAST/WEST BANK

Type Impv: UPGRADING SIGNS ENTIRE LIMITS. UPGRADING STRUCTURES AS NEE

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS US 90-Z 283-08 NHPP 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

JEFFERSON US 90-Z 283-09 NHPP 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.005720 - FLORIDA AVENUE EXPRESSWAY FEASIBILITY ST

Type Impv: FLORIDA AVENUE EXPRESSWAY FEASIBILITY STUDY - RESCOPE

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 0 TIME 0-FEASIBILITY/SCOPING

Project: H.009920 - REMOVE TOLL BOOTHS/RECONFIG TRAVEL LANES

Type Impv: REMOVE TOLL BOOTHS/RECONFIGURATION OF TRAVEL LANES/SIGN

Project Manager: REVIERE, RYAN

Remarks: USE FEDERAL CCC TOLL CREDITS AS MATCH TO STP>200K

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

Project: H.009918 - REPLACE 2 CCCD FERRIES

Type Impv: REPLACE UP TO 2 CCCD FERRIES

Project Manager: REVIERE, RYAN

Remarks: USE TOLLS AS MATCH TO CMAQ AT 80/20 SPLIT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 CM 16,000 CCC TOLL PROJECTS STAGES 4, 3, 2, 1, 0

Project: H.009919 - REHABILITATION OF CCCD FERRY TERMINALS

Type Impv: REHABILITATION OF CCCD FERRY TERMINALS

Project Manager: REVIERE, RYAN

Remarks: USE TOLLS AS MATCH TO STPENH AT 80/20 SPLIT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ORLEANS 000-36 STPENH 3,000 CCC TOLL PROJECTS STAGES 4, 3, 2, 1, 0

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 117 of 211

Page 124: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA

Project: H.001943 - LA 15 (US 80 - LA 616)

Type Impv: SAFETY IMPROVEMENTS

Project Manager: COLQUETTE, PAUL

Remarks: 156-01-0024;LA 15 @ EXCALIBER (HILL CUT DOWN)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 15 156-01 HSIP 373 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

OUACHITA LA 15 156-01 STBONDS 225 SAFETY

Project: H.006205 - MOORE ROAD BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: USE PRIORITY 2 BOND AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 FBROFF 1,189 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009360 - RUSSELL SAGE WMA - HOG PEN & PUMP TRAIL

Type Impv: RESTORATION & NON-ROUTINE MAINTENANCE OF MOTORIZED TRAIL

Project Manager: RIGGS, LAURA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RTP 173 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

OUACHITA 000-37 LOCAL 1 RECREATIONAL TRAILS PROGRAM

Project: H.009842 - US 80: LA 617 - LA 34 SIDEWALKS

Type Impv: REPAIR AND RECONSTRUCTION OF SIDEWALKS

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 001-09 STPENH 1,673 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009999 - LA 594: TURN LN @ US 165 SERVICE RD.

Type Impv: WIDENING AND REALIGNING US 165 SERV RD ACROSS KCS & LA 594

Project Manager: HICKS, MELVIN

Remarks: 015-31-0053

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 594 326-01 HSIPPEN 1,059 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

OUACHITA US 165 015-31 RAIL HE 450 RAILROADS

OUACHITA US 165 015-31 HSIPPEN 995 SAFETY

Project: H.010419 - LA3033 ROADWAY FLOODING 1.5 MI S LA840-1

Type Impv: ADDITIONAL CROSS DRAIN & ADJACENT SIDE DRAIN WILL BE ADDED

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 3033 837-12 STPFLEX 57 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010582 - LOUISIANA DELTA COMMUNITY COLLEGE TRAIL

Type Impv: CONSTRUCTION OF A PED NATURE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RTP 18 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

OUACHITA 000-37 LOCAL 16 RECREATIONAL TRAILS PROGRAM

Project: H.010725 - ARKANSAS RD (CALDWELL RD-LA 143) CL&GRUB

Type Impv: CLEARING AND GRUBBING

Project Manager: BORNE, FRED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 616 324-02 STPFLEX 500 CAPACITY 4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 118 of 211

Page 125: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA

Project: H.010732 - LA 151: LA 546 TO US 80

Type Impv: THIN ASPHALTIC OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 151 317-01 STPFLEX 784 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010886 - LA 546: I-20 TO LA 34

Type Impv: OGFC

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 546 158-01 HSIPPEN 1,691 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.000169 - UNION PACIFIC RAILROAD BRIDGE AT SICARD

Type Impv: BRIDGE REPLACEMENT

Project Manager: RABALAIS, NICK

Remarks: 002-01-0047;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 002-01 STPFLEX 7,780 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.000640 - US 165: LA 841 TO RILLA

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 015-08-0051

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 165 015-08 NHPP 4,050 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.002622 - ARKANSAS ROAD: (CALDWELL ROAD - LA 143

Type Impv: WIDENING

Project Manager: BORNE, FRED

Remarks: 324-02-0008;CONVERTED FROM BOND TO FED AID-2001

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 616 324-02 STPFLEX 24,955 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15

OUACHITA LA 616 324-02 STGEN 45 CAPACITY

Project: H.003331 - ROUNDABOUT @ GARRETT RD INTERCHANGE

Type Impv: SAFETY AND TRAFFIC FLOW

Project Manager: COLQUETTE, PAUL

Remarks: 451-06-0161;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA I-20 451-06 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

OUACHITA I-20 451-06 LOCAL 300 OTHER / MISCELLANEOUS

Project: H.007288 - MONTGOMERY ST (LA 34 - I-20)

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: HANKS, ANNA

Remarks: 742-37-0015

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 STP<200K 4,295 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009297 - OUACHITA PAR. POLICE JURY SRTS PROJECT

Type Impv: SIDEWALKS/PED PATHS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 SR2S 240 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009531 - US 165: CALDWELL PARISH LINE TO LA 841

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 165 015-08 NHPP 3,780 TIME 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 119 of 211

Page 126: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA

Project: H.010092 - SRTS JACK HAYES ELEM., OUACHITA PARISH

Type Impv: CONSTRUCT SIDEWALKS AND CROSSWALKS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 SR2S 460 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010115 - JACK HAYES ELEM. SRTS NON-INFRASTRUCTURE

Type Impv: PURCHASES, INCENTIVES, BICYCLE RACKS, TRAINING.

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 SR2S 100 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010287 - LA 3249: ROUNDABOUT @ I-20/WELL RD.

Type Impv: ROUNDABOUT AT I-20/WELL RD.

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 3249 837-19 HSIP 1,400 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010396 - US 165: BAYOU DESIARD - STERLINGTON

Type Impv: ASPHALT USING CRACK & SEAT METHOD BECAUSE OF EXIST. BASE

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 165 016-01 NHPP 5,955 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010430 - LA 594: TURN LANE @ OUACHITA PAR HIGH

Type Impv: THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOL

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010698 - RIVERBARGE ST: UP RR XING (MONROE)

Type Impv: INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSING

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010827 - RUBY ROAD / YOUNGS BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: USE PRIORITY 2 BOND AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 FBROFF 1,224 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010874 - RIVERSIDE HIKING TRAIL

Type Impv: CONSTRUCTION OF 1.4 MILES OF PED-BIKE TRAIL

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RTP 150 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

OUACHITA 000-37 LOCAL 34 RECREATIONAL TRAILS PROGRAM

Project: H.011106 - SOUTH GRAND STREET TRAIL

Type Impv: CONST. OF 10' X 1,000' BOARDWALK ALONG THE RIVERFRONT

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

OUACHITA 000-37 LOCAL 14 RECREATIONAL TRAILS PROGRAM

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 120 of 211

Page 127: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA

Project: H.011144 - ALM SEVERAL RR XINGS (OUACH & MOREHOUSE)

Type Impv: INSTALL CROSSBUCK ASSEMBLIES AT ALM'S PASSIVE PUBLIC XING

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RAIL PD 50 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

MOREHOUSE 000-34 RAIL PD 50 RAILROADS

Project: H.011153 - OUACHITA WMA - SALINE AND SOUTH TRAILS

Type Impv: RESTOR. OF 3.2 MILES OF MOTORIZED TRAIL AND A .2 TRAILHEAD

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 RTP 145 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

Project: H.000163 - US 80 STEEP BAYOU BRIDGE

Type Impv: NEW BRIDGE

Project Manager: MOORE, DARRELL

Remarks: 001-09-0089;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 001-09 STPFLEX 1,537 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.006202 - BREARD STREET BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-37-0109;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 FBROFF 400 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.007300 - KANSAS LANE-GARRETT RD CONNECTOR

Type Impv: RD CONNECTOR & INTERCHANGE IMPRVMNT

Project Manager: BROADBENT, RONALD

Remarks: 742-37-0028;4TH FUND SOURCE US $300K STP<200K

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 STPFLEX 10,000 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENT

OUACHITA 000-37 DEMO 6,616 DEMO / HIGH PRIORITY

OUACHITA 000-37 NFI 7,431 OTHER / MISCELLANEOUS

Project: H.008226 - CHENIERE SPILLWAY & BRIDGE REPLACEMENT

Type Impv: BRIDGE REPLACEMENT

Project Manager: OLIVIER, NICHOLAS

Remarks: 837-12-0026;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 3033 837-12 STPFLEX 1,500 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009433 - OUACHITA SRTS PROJECT - JACK HAYES II

Type Impv: SIDEWALKS, SIGINING AND STRIPING

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 SR2S 181 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.010015 - LA 143: BAYOU D'ARBONNE BRIDGE REHAB

Type Impv: BRIDGE REHABILITATION

Project Manager: BRAUNER, KURT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 143 315-02 STPFLEX 626 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 121 of 211

Page 128: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA

Project: H.010352 - OUACHITA SRTS PROJECT - RISER

Type Impv: SIDEWALKS, SIGINING AND STRIPING

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 3033 837-12 SR2S 29 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

OUACHITA 000-37 SR2S 120 SAFETY

SAFE ROUTES TO SCHOOLS

Project: H.010989 - I-20: LINCOLN/OUACHITA P. RAMP REHAB

Type Impv: RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISH

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA I-20 451-06 NHPP 2,500 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

LINCOLN I-20 451-05 NHPP 1,500 PRESERVATION

INTERSTATE

Project: H.011192 - OUACHITA SRTS PROJECT JACK HAYES II N.I.

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 SR2S 50 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.011193 - OUACHITA SRTS PROJECT - RISER N.I.

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 SR2S 50 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.001952 - US 165 - MOREHOUSE PH. LINE

Type Impv: DOUBLE CHIP SEAL

Project Manager: CHENEVERT, MARK

Remarks: 160-01-0012;JTW/318-03-07.325-01-24.831-15-03

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 554 160-01 STCASH 106 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

Project: H.002624 - US 165 - W.JCT. LA 2

Type Impv: DOUBLE CHIP SEAL

Project Manager: CHENEVERT, MARK

Remarks: 325-01-0024;JTW/160-01-12

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 553 325-01 STCASH 461 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

Project: H.007284 - FINKS HIDEAWAY (HOLLAND-RAYMOND)PH2

Type Impv: WIDEN TO 5 LANES

Project Manager: HANKS, ANNA

Remarks: 742-37-0011;PH.TO OBTAIN UTILITY AGREE.& R/W

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 STP<200K 4,600 URBAN SYSTEMS 2-WAITING FOR FUNDING

Project: H.007289 - KANSAS LANE EXTENSION

Type Impv: ASPHALT NEW PAVEMENT

Project Manager: BROADBENT, RONALD

Remarks: 742-37-0016;US 80 - US 165. R/W & UTIL BY CITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 DEMO 4,531 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

OUACHITA 000-37 LOCAL 15,470 OTHER / MISCELLANEOUS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 122 of 211

Page 129: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA

Project: H.009752 - DESIARD ST: STREETSCAPING S GRAND-6TH ST

Type Impv: SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 STPENH 513 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009828 - US 80: LA 617 - LA 143 SIDEWALKS

Type Impv: SIDEWALKS & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 001-09 STPENH 540 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.004782 - LA 143 - US 165 CONNECTOR& OUACH

Type Impv: CONNECTOR & OUACHITA R. BR.(ENGR)

Project Manager: PAINE, PEGGY JO

Remarks: 700-37-0129;STAGE O

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.006578 - FAIRWAY DRIVE SIGN IMPROVEMENTS

Type Impv: SIGN & FLASHING BEACON INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-37-0013;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA 000-37 HRRR 16 SAFETY

LOCAL ROADS SAFETY

1-PLANNING/ENVIRONMENTAL

Project: H.008230 - LA 838 STEEP BAYOU BRIDGE

Type Impv: NEW BRIDGE

Project Manager: HICKS, MELVIN

Remarks: 837-14-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA LA 838 837-14 STPFLEX 1,055 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009932 - US 80 WIDENING: WELL ROAD - AVANT ROAD

Type Impv: WIDEN LANES 4-12' DIVIDED, CURB & GUTTER,SUBSURFACE DRAINA

Project Manager: FLETCHER, CURTIS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 001-09 NFI 4,800 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.010012 - I-20: US 80 OVERPASS BRIDGE REPLACEMENT

Type Impv: REPLACEMENT OF BRIDGE OVERPASS

Project Manager: CAVALIER, STEPHANIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 001-09 STPFLEX 3,414 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010391 - US 80: GILBERT ST TO JCT LA 139

Type Impv: MILL & OVERLAY; OFGC WITH SAFETY FUNDS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA US 80 002-01 NHPP 1,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010550 - I 20: LA 546 TO LA 594

Type Impv: WIDEN FROM 4 TO 6 LANES

Project Manager: WINCHESTER, CHAD

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

OUACHITA I-20 451-06 NHPP 200,000 CORRIDOR 0-FEASIBILITY/SCOPING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 123 of 211

Page 130: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: PLAQUEMINES

Project: H.010326 - LA 23: AVE. B - APRICOT ST.

Type Impv: MODIFICATION OF CB-06 AND CB-07 TOPS AS PER LADOTD STANDA

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES LA 23 062-02 NHPP 231 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010484 - EMERG DREDGE OSTRICA LOCK & CANAL

Type Impv: DREDGE CANAL TO THE DESIGN TEMPLATE TO ALLOW SAFE NAVIGA

Project Manager: ROONEY, BRITTANY

Remarks: SECRETARY EMERGENCY LETTER 9/5/2012

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES 000-38 STGEN 1,921 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010508 - LA 3137: LA 39 - FERRY LANDING ROAD

Type Impv: ULTRATHIN OVERLAY

Project Manager: JOHNSON, ENNIS

Remarks: LETTER BID IN THE DISTRICT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES LA 3137 838-05 NFABOND 489 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010935 - LA 23: ACCESS/OPERATION IMP BELLE CHASSE

Type Impv: ADD TURN LANES, CLOSE CROSSOVERS, AND IMPROVE CROSSOVE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES LA 23 062-02 NHPP 810 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.007712 - SOUTH PLAQUEMINES OFF ROAD PARK

Type Impv: CONSTRUCTION OF TEN MILES OF OFF ROAD TRAILS

Project Manager: RIGGS, LAURA

Remarks: 745-38-0005; MATCH BY PLAQUESMINES PARISH GOVERNMENT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES 000-38 RTP 100 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

PLAQUEMINES 000-38 LOCAL 150 RECREATIONAL TRAILS PROGRAM

Project: H.006441 - LA 23 (ENGINEERS RD. - WALL BLVD.)

Type Impv:

Project Manager: DEVILLE, JACQUES

Remarks: 736-38-0002;TRAFFIC STUDY FOR BELLE CHASE HWY.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES 000-38 STP>200K 6,245 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PLAQUEMINES 000-38 LOCAL 0 OTHER / MISCELLANEOUS

Project: H.001399 - HAPPY JACK - N.PORT SULPHUR

Type Impv: WIDEN TO 4 LANES

Project Manager: LAFLEUR, MIKE

Remarks: 062-04-0029;$1M GS9$ FOR STUDY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES LA 23 062-04 NFI 0 CORRIDOR 1-PLANNING/ENVIRONMENTAL

Project: H.004791 - REPL.BRIDGE AND TUNNEL BELLE CHASSE

Type Impv: STATE FUNDS FOR STUDY

Project Manager: REVIERE, RYAN

Remarks: 700-38-0108;FEASIBILITY STUDY STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES 000-38 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.010590 - EMERG ELEC REP&DEBR REM OSTRICA LK&CANAL

Type Impv: EMERGENCY ELECTRICAL REPAIR AND DEBRIS REMOVAL

Project Manager: MILLER, DAVID

Remarks: SECRETARY EMERGENCY LETTER 9/5/2012

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES 000-38 STGEN 400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 124 of 211

Page 131: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: PLAQUEMINES

Project: H.010912 - MISSIPPIPPI RIVER TRAIL-PLAQUEMINES PAR

Type Impv: STAGE 0 FEASIBILITY STUDY

Project Manager: NGUYEN, WAYNE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

PLAQUEMINES 000-38 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 125 of 211

Page 132: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: POINTE COUPEE

Project: H.009911 - LA 414(N): THIN ASPH CONC OVERLAY

Type Impv: THIN ASPHALTIC CONCRETE OVERLAY

Project Manager: RAY, JARED

Remarks: USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE LA 414 839-14 STPFLEX 498 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010435 - LA 411 & LA 413: PATCH,STABILIZE,OVERLAY

Type Impv: PATCH, STABILIZE, & OVERLAY

Project Manager: RAY, JARED

Remarks: 229-04 100% NFABOND; 227-03 USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE LA 411 229-04 NFABOND 2,760 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

W BATON ROUGE LA 413 227-01 STPFLEX 3,303 PRESERVATION

NON-INTERSTATE NFA

W BATON ROUGE LA 413 227-02 STPFLEX 2,018 PRESERVATION

NON-INTERSTATE NFA

POINTE COUPEE LA 413 227-03 STPFLEX 1,458 PRESERVATION

NON-INTERSTATE

Project: H.010263 - LA 1: DRAINAGE IMPROVEMENTS

Type Impv: CROSS DRAIN IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE LA 1 052-04 STPFLEX 88 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011116 - FALSE RIVER DRIVE PEDESTRIAN WALKWAY

Type Impv: CONST. OF 5' X 2700' TRAIL

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE 000-39 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

POINTE COUPEE 000-39 LOCAL 94 RECREATIONAL TRAILS PROGRAM

Project: H.011224 - US 190: GUARDRAIL REPL. (PHASE 1)

Type Impv: REPLACE GUARDRAIL.

Project Manager: RICHARD, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE US 190 008-03 HSIPPEN 3,300 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

POINTE COUPEE US 190 008-02 HSIPPEN 2,300 SAFETY

Project: H.010724 - PECAN ISLAND ROAD BRIDGE OVER THE CHENAL

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE 000-39 FBROFF 1,109 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002184 - BAYOU CHENAL & BAYOU DISCHARGE BRS.

Type Impv: NEW BRIDGES

Project Manager: MOORE, DARRELL

Remarks: 227-04-0019;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE LA 413 227-04 STPFLEX 4,395 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009991 - LA 81: ROADWAY ELEVATION & MITIGATION

Type Impv: ELEVATION AND MITIGATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE LA 81 839-08 FEMA 851 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 126 of 211

Page 133: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: POINTE COUPEE

Project: H.010434 - LA 15: LA 1 - W. FELICIANA P/L

Type Impv: STABILIZE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

POINTE COUPEE LA 15 177-01 STPFLEX 4,200 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 127 of 211

Page 134: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.006228 - BRIDGE OVER BAYOU BOEUF

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-40-0101

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 FBROFF 892 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.007005 - CENTRAL STATE HOSPITAL STREETS

Type Impv: REHABILITATE AND OVERLAY CERTAIN STREETS AND PARKING ARE

Project Manager: MATHEWS, LARRY

Remarks: MAX AMOUNT AVAILABLE W CE&I AND INCIDENTALS IS $908,123

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 FBR-ON/OFF 802 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.008259 - LA 1204: 0.369 MI E SPRINGHILL RD-US 165

Type Impv: AC OVERLAY/INPLACE BASE

Project Manager: HANKS, ANNA

Remarks: 840-31-0014; USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1204 840-31 STP<200K 764 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009516 - LA 1177: AVOYELLES PARISH - JCT. US 71

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1177 840-18 NFABOND 742 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009539 - I-49: NORTH OF LA 181 - NORTH OF LA 498

Type Impv: CRACK SEALING, PCCP PATCH & U-SEALING

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES I-49 455-05 NHPP 5,701 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

RAPIDES I-49 455-05 HSIP 2,807 SAFETY

RAPIDES I-49 455-05 HSIP 1,250 SAFETY

Project: H.010367 - LA 463: 221' S OF VERNON P/L - LA 121

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 463 139-07 STPFLEX 1,839 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

VERNON LA 463 139-06 STPFLEX 21 PRESERVATION

NON-INTERSTATE

Project: H.010425 - LA 28: TURN LANES @ CLOVERLEAF BLVD

Type Impv: CONSTRUCTION OF DOUBLE LEFT AND RIGHT TURN AT CLOVERLEF B

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 28 417-02 HSIP 605 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010490 - I-49: 0.66 MI S LA 1200 - 0.36 MI N LA 8

Type Impv: PATCH, COLD PLANE, & OVERLAY ROADWAY

Project Manager: THOMAS, BEN

Remarks: USE NFA AS MATCH FOR C.S. 134-04

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES I-49 455-05 NHPP 5,129 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

RAPIDES LA 8-S 134-04 STPFLEX 71 PRESERVATION

INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 128 of 211

Page 135: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.010492 - I-49: 0.36 MI N LA 8 - NATCHITOCHES P/L

Type Impv: CRACK SEALING,PCCP PATCH&U-SEALING

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES I-49 455-05 NHPP 852 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

RAPIDES I-49 455-05 HSIP 225 SAFETY

Project: H.011060 - LA 461: CALCASIEU - LA 121

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 461 371-04 NFABOND 2,650 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011062 - LA 1203:US 71-0.27 MI W HICKORY HILL RD

Type Impv: STABILIZE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: TTF AS MATCH FOR CS 369-02 FROM 0.0 TO 0.19

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1203 369-02 NFABOND 1,696 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

RAPIDES LA 1203 369-02 STPFLEX 76 PRESERVATION

NON-INTERSTATE

Project: H.011068 - LA 454: AVOYELLES P/L - LA 107

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 454 370-02 NFABOND 3,604 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.000577 - US 165-X: KCS RAILWAY OVERPASS

Type Impv: BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSING

Project Manager: RABALAIS, NICK

Remarks: 015-01-0049;SCOPE CHANGED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 165-X 015-01 STPFLEX 1,763 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.004823 - 3RD ST ENHANCEMENTS-ST JAMES TO BROADWAY

Type Impv: ENHANCEMENT

Project Manager: MATHEWS, LARRY

Remarks: 700-40-0143;STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 DEMO 2,590 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009299 - RAPIDES PARISH SCHOOL DIST. SRTS PROJECT

Type Impv: SIDEWALK CONSTRUCTION, MARKINGS, ADA IMPROVEMENTS

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 SR2S 285 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009555 - LA 1199: LA 112 - LA 121

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1199 840-27 STPFLEX 3,479 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010070 - RUGG ELEM. SAFE ROUTES TO SCHOOL PH. II

Type Impv: SIDEWALKS, STRIPING AND ARKINGS.

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 SR2S 210 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 129 of 211

Page 136: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.010171 - COA VERSAILLES BLVD ROADWAY LIGHTING

Type Impv: ROADWAY LIGHTING

Project Manager: HANKS, ANNA

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 STP<200K 605 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010193 - ALEXANDRIA ITS PHASE 1

Type Impv: ITS DEPLOYMENT AS PER REGIONAL ARCHITECTURE

Project Manager: BANKSTON, TANYA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010280 - US 167: LEFT TURN LANE SB FROM LA 28

Type Impv: INSTALLATION OF AN ADDITIONAL LEFT TURN LANE

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 167 023-01 HSIP 1,363 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010322 - LA 28: LA 3144 - LA 1205

Type Impv: MICROSURFACING

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 28 074-01 NHPP 922 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010349 - US 165: HORSESHOE DR - US 71

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 165 014-06 NHPP 1,079 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010777 - US 71: TURN LANES FOR LEE ST & RANDOM DR

Type Impv: CONSTRUCTION OF POSITIVE OFFSET LEFT TURN LANE ON US 71

Project Manager: MATHEWS, LARRY

Remarks: THIS IS A "B" PROJECT.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 71 008-09 HSIP 385 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

RAPIDES US 71 008-30 HSIP 125 SAFETY

Project: H.010821 - US 71:WIDENING OF SERVICE RD CONNECTIONS

Type Impv: WIDEN EXISTING SERVICE ROAD CONNECTIONS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 71 008-30 NHPP 270 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010894 - US 165: RIGHT TURN LANE AT LA 112

Type Impv: CONSTRUCT RIGHT TURN LANE ON US 165 TO THE INTERSECT LA 11

Project Manager: MATHEWS, LARRY

Remarks: THIS IS A "B" PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 165 014-05 HSIP 250 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

RAPIDES US 165 014-05 NHPP 65 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 130 of 211

Page 137: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.011154 - US 71 AND LA 3170 INTERSECTION IMPRS.

Type Impv: ADD TURN LANE AND INSTALL CONCRETE ISLAND

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 71 008-09 NHPP 225 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

RAPIDES LA 3170 840-35 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.011169 - US 165: ALLEN P/L- 0.312 S OF ASHMORE NB

Type Impv: PATCH, COLD PLANE, AND OVERLAY ROADWAY AND SHOULDERS

Project Manager: CHENEVERT, MARK

Remarks: TIMED FUNDS USED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 165 014-05 NHPP 2,431 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011204 - ALEXANDRIA SRTS PROJECT - MARTIN PARK NI

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 SR2S 15 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.001923 - FLAGON BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: DELATTE, BRIAN

Remarks: 149-02-0011;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 623 149-02 STPFLEX 1,916 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002672 - JACKSON(LA 1208-3) @ HORSESHOE

Type Impv: INTERSECTION IMPROVEMENT

Project Manager: HANKS, ANNA

Remarks: 368-03-0030

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1208-3 368-03 STP<200K 1,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.008278 - US 71:UP RR OVERPASS NEAR TIOGA

Type Impv: BRIDGE REPLACEMENT

Project Manager: RABALAIS, NICK

Remarks: 840-43-0016;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 71 840-43 NHPP 15,862 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009122 - LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES

Type Impv: NEW BRIDGES

Project Manager: YANG, LI

Remarks: 840-31-0015; 3 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1204 840-31 STPFLEX 3,000 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.009707 - LA 112: LA 113 - E DAVIS ROAD

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: APPLIED FOR STBONDS. DID NOT MAKE LIST.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 112 141-03 NFI 3,400 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010014 - LA 1 OVER I-49 BRIDGE REHABILITATION

Type Impv: BRIDGE OVERPASS REHABILITATION

Project Manager: YAP, KIAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1 053-01 STPFLEX 525 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 131 of 211

Page 138: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.010488 - I-49: 0.32 MI S LA 181-0.44 MI N US 167

Type Impv: PATCH,COLD PLANE, & OVERLAY(MAINLINE SHOULDERS & RAMPS)

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES I-49 455-05 NHPP 1,650 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.011194 - PINEVILLE SRTS PROJECT - PINEVILLE ELEM.

Type Impv: SIDEWALKS, SIGNING AND STRIPING

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 165-X 015-01 SR2S 200 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

RAPIDES 000-40 SR2S 27 SAFETY

SAFE ROUTES TO SCHOOLS

Project: H.011195 - ALEXANDRIA SRTS PROJECT - MARTIN PARK

Type Impv: SIDEWALKS, STRIPING AND SIGNAGE

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 SR2S 302 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.011203 - PINEVILLE SRTS PROJ - PINEVILLE ELEM NI

Type Impv: EDUCATION AND ENCOURAGEMENT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 SR2S 15 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.008251 - LA456:RDWY CLOSURE@UPRR CROSSING (MEEKER

Type Impv: RDWY CLOSURE@UPRR CROSSING

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 456 840-07 RAIL HE 34 RAILROADS 2-WAITING FOR FUNDING

Project: H.009720 - LA 1250: PINEVILLE URBAN STREETSCAPING

Type Impv: SIDEWALK WITH LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGE

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 1250 142-01 STPENH 227 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009723 - WOODWORTH SIDEWALK IMPROVEMENTS PH 3

Type Impv: SIDEWALKS AND REALTED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 STPENH 251 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009852 - MASONIC DRIVE CORRIDOR ENHANCEMENT, PH 3

Type Impv: SIDEWALK W/LIGHTING & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 STPENH 575 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.000582 - US 165 WIDENING @ PINEVILLE EXPRESSWAY

Type Impv: WIDENING

Project Manager: MATHEWS, LARRY

Remarks: 015-30-0013;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 165 015-30 NHPP 5,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 132 of 211

Page 139: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.000790 - US 167 BRIDGE MAINTENANCE

Type Impv: BRIDGE MAINTENANCE

Project Manager: MATHEWS, LARRY

Remarks: 023-01-0069;BRPM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 167 023-01 NHPP 3,000 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

Project: H.004825 - WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)

Type Impv: WIDEN FROM 3 TO 4 LANES

Project Manager: MUSA, ELNUR

Remarks: 700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.007311 - MASONIC DR. @ HORSESHOE DR.

Type Impv: INTERSECTION IMPROVEMENT

Project Manager: HANKS, ANNA

Remarks: 742-40-0007;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 STP<200K 540 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.008263 - LA 3144/SUSEK DRIVE ROUNDABOUT

Type Impv: ROUNDABOUT

Project Manager: MATHEWS, LARRY

Remarks: 840-34-0008;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.008265 - SUGARHOUSE RD. RECONSTRUCTION

Type Impv: RECONSTRUCT

Project Manager: HANKS, ANNA

Remarks: 840-37-0001;ON STATE SYSTEM (WAS 742-07-0040)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 3250 840-37 STP<200K 4,953 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.008271 - SUGARHOUSE RD EXTENSION

Type Impv: NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERS

Project Manager: HANKS, ANNA

Remarks: 840-37-0007;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

RAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS

Project: H.008277 - FT. BUHLOW BR (US 71/US 165)

Type Impv: RED RIVER BRIDDE

Project Manager: UMEOZULU, JOE

Remarks: 840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009498 - LA 121: CALCASIEU RIVER BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 029-05 USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 121 029-05 FBROFF 8,900 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009543 - LA 113: VERNON LINE - LA 112

Type Impv: BASE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 113 140-02 STPFLEX 3,449 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 133 of 211

Page 140: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES

Project: H.009556 - LA 107: LA 454 - 320' S OF ESTATE DRIVE

Type Impv: STABLIZE BASE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 107 142-04 STPFLEX 3,251 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010341 - LA 115: LA 1207 - LA 28

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 115 033-04 STPFLEX 1,928 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010355 - LA 113: LA 112 - CALCASIEU RIVER

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES LA 113 140-03 STPFLEX 1,679 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010482 - US167 FRONT: HICKORY HILL - KIWANIS CAMP

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 167 023-01 STPFLEX 526 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010824 - US 71 CORRIDOR STUDY

Type Impv: CONDUCT CORRIDOR STUDY ALONG US 71

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.011072 - CENTRAL LA BELTWAY FEASIBILITY STUDY

Type Impv: PLANNING STUDY

Project Manager: BROUSSARD, DAN

Remarks: RAPIDES AREA PLANNING COMMISSION

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RAPIDES 000-40 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 134 of 211

Page 141: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RED RIVER

Project: H.009515 - LA 786: US 371 TO LA 507

Type Impv: MILL AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 306-02-0010

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RED RIVER LA 786 306-02 NFABOND 2,427 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010095 - LA 515: LA 514 TO US 71

Type Impv: OVERLAY AND EMBANKMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RED RIVER LA 515 302-02 NFA 3,200 PRESERVATION

NON-INTERSTATE NFA

3-DESIGN/DEVELOPMENT

BOSSIER LA 515 302-03 NFA 780 PRESERVATION

NON-INTERSTATE NFA

Project: H.011087 - WESTDALE PLANTATION ROAD / BAYOU PIERRE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: DOTD PROVIDES THE MATCH FOR THE OFF-SYSTEM HWY BR PR

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RED RIVER 000-41 FBROFF 1,794 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001761 - LA 507 CREEK BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: YANG, LI

Remarks: 100-02-0013;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RED RIVER LA 507 100-02 FBROFF 2,133 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009402 - RDWY DRAINAGE IMP.-US 71 @ US 371 PH III

Type Impv: SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RED RIVER US 371 021-30 STPFLEX 535 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

1-PLANNING/ENVIRONMENTAL

Project: H.009961 - LA 507: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RED RIVER LA 507 100-02 FEMA 12,466 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 135 of 211

Page 142: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RICHLAND

Project: H.002646 - LA 576: LA 132 - LA 135

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 341-01-0007;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 576 341-01 NFABOND 4,377 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010733 - LA 183: US 80 TO LA 134

Type Impv: ASPHALT SURFACE TREATMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 134 185-01 STPFLEX 829 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.000174 - BAYOU LAFOURCHE BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: GAUDRY, CARL

Remarks: 002-02-0030;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND US 80 002-02 STPFLEX 6,723 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

OUACHITA US 80 002-01 STPFLEX 370 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.000974 - BOUEF RIVER BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: FLETCHER, CURTIS

Remarks: 026-09-0024;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 15 026-09 STPFLEX 7,000 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.008793 - LA 183: REALIGNMENT NEAR FRANKLIN FARMS.

Type Impv: ROADWAY REALIGNMENT AND OVERPASS

Project Manager: LANDRY, COREY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 183 185-01 STBONDS 14,000 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT

Project: H.010204 - US 425: ROUNDABOUT @ JULIA & LOUISA

Type Impv: INSTALL ROUNDABOUT

Project Manager: GUEST, DEBRA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND US 425 071-01 HSIP 1,200 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.011021 - LA 17: SHARON STREET TO TENNESSEE STREET

Type Impv: REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTU

Project Manager: HICKS, MELVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.001970 - BOEUF RIVER BRIDGE NEAR HEBERT

Type Impv: BRIDGE REPLACEMENT

Project Manager: HERATH, ANANDA

Remarks: 166-03-0015;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 561 166-03 FBROFF 7,011 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001972 - MUDDY BAYOU BRIDGE

Type Impv: NEW BRIDGE

Project Manager: BROWN, JEFF

Remarks: 167-02-0016;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 135 167-02 STPFLEX 1,128 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 136 of 211

Page 143: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RICHLAND

Project: H.008288 - BOEUF RIVER BRIDGE NEAR BUCKNER

Type Impv: BRIDE REPLACEMENT

Project Manager: HERATH, ANANDA

Remarks: 842-13-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND LA 132 842-13 FBROFF 3,672 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009530 - US 80: OUACHITA PL TO 1.32 MILES EAST

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND US 80 002-02 STPFLEX 6,204 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010395 - US 425: JCT I-20 TO JCT US 80

Type Impv: MILL & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND US 425 071-01 STPFLEX 750 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010457 - US 80: LA 133 TO US 425

Type Impv: MILL AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

RICHLAND US 80 002-02 STPFLEX 2,058 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

RICHLAND US 80 002-03 STPFLEX 1,442 PRESERVATION

NON-INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 137 of 211

Page 144: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: SABINE

Project: H.010538 - LA 474: YELLOW PINES RD - DESS ROAD

Type Impv: PATCH AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE LA 474 120-01 NFABOND 390 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010539 - LA 1217: LA 6 - 400' N OF PATTON RD

Type Impv: COLD PLANE, BASE, OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE LA 1217 113-01 NFABOND 2,380 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009451 - VARIOUS ROADS:SIGNING (SABINE)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE 000-43 SATRANS 23 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010696 - BROWN & GANDY: KCS RR XINGS (SABINE)

Type Impv: INSTALL F/L'S & GATES AT BROWN AND GANDY XINGS

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE 000-43 RAIL PD 500 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010032 - SHUTEYE ROAD & MARTHAVILLE ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE 000-43 FBROFF 393 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

SABINE 000-43 FBROFF 593 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010033 - PIONEER ROAD & LAKESIDE LOOP BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE 000-43 FBROFF 193 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

SABINE 000-43 FBROFF 585 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010344 - LA 174: LA 175 - DESOTO P/L

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE LA 174 112-04 STPFLEX 1,888 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010345 - LA 175: N JCT LA 120 - RAY CANTO RD

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE LA 175 035-02 STPFLEX 1,973 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010366 - LA 175: 300' S OF SHIRWILLIS DR - LA 120

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

SABINE LA 175 035-01 STPFLEX 2,456 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 138 of 211

Page 145: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST BERNARD

Project: H.007331 - PACKENHAM DR (LA46 - LA39)

Type Impv: RECONSTRUCT

Project Manager: DEVILLE, JACQUES

Remarks: 742-44-0006;WAS 742-07-0079

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD 000-44 STP>200K 3,141 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010586 - ST BERNARD P MISSISSIPPI RIVER TRAIL PH3

Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD 000-44 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

ST BERNARD 000-44 LOCAL 425 RECREATIONAL TRAILS PROGRAM

Project: H.010970 - LA 39: TURN LANE AT ST BERNARD HOSPITAL

Type Impv: ADD TURN LANE TO THE ST. BERNARD HOSPITAL

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 39 046-32 NHPP 160 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.002562 - BAYOU LALOUTRE BRIDGE REHABILITATION

Type Impv: STRUCTURAL/ELECTRICAL REPAIRS, CLEANING & PAINTING

Project Manager: KEMP, KELLY

Remarks: 284-02-0032;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 46 284-02 FBROFF 3,500 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

ST BERNARD LA 46 284-02 ER 800 OTHER / MISCELLANEOUS

Project: H.009418 - LA 39: ROUNDABOUT @ LA 46 & LA 300

Type Impv: INSTALL SINGLE-LANE ROUNDABOUT

Project Manager: PICARD, TOBY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 39 046-32 HSIP 550 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009834 - ST BERNARD PARISH STREET REHAB PROGRAM

Type Impv: OVERLAYS/PANEL REPAIR/PANEL REPLACEMENT

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD 000-44 STP>200K 4,668 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011103 - NS SEVERAL RR XINGS (PLAQUEM. & ST.BERN)

Type Impv: UPGRADE RAILROAD WARNING SIGNALS.

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 39 046-03 RAIL PD 60 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

PLAQUEMINES LA 39 046-04 RAIL PD 120 RAILROADS

Project: H.011118 - ST. BERNARD PARISH MRT TRAILHEADS

Type Impv: CONST. OF 1600' OF LEVEE ACCESS RAMPS ALONG MS RIVER TRAIL

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD 000-44 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ST BERNARD 000-44 LOCAL 44 RECREATIONAL TRAILS PROGRAM

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 139 of 211

Page 146: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST BERNARD

Project: H.010406 - LA 46: ORLEANS P/L - PARIS RD

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 46 046-03 NHPP 3,000 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010407 - LA 46: PARIS - 0.025 MI N WEBSTER ST

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 46 046-03 STPFLEX 1,500 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.002567 - REGGIO CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: OLIVIER, NICHOLAS

Remarks: 284-30-0023;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 300 284-30 FBROFF 1,834 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009573 - LA 39:LAKE BORGNE CANAL BR - LA 46

Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 39 046-32 STPFLEX 2,614 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009967 - LA 624: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 624 844-02 FEMA 3,869 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009968 - LA 625: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST BERNARD LA 625 844-03 FEMA 403 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 140 of 211

Page 147: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST CHARLES

Project: H.009359 - BONNET CARRE'S SPILLWAY ATV RIDING AREA

Type Impv: RESTORATION AND CONSTRUCTION OF A MOTORIZED TRAIL SYSTEM

Project Manager: RIGGS, LAURA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES 000-45 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010756 - US 90: LA 52- LA 3060

Type Impv: COLD PLANE, OVERLAY, STRIPING, CURB

Project Manager: ROONEY, BRITTANY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES US 90 005-09 STGEN 3,710 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010780 - US 90: LA 306 - EARLY ST

Type Impv: COLD PLANE, OVERLAY, STRIPING, CURB

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES US 90 005-08 STGEN 1,500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

ST CHARLES US 90 005-08 NHPP 225 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: H.010889 - LA 3127: ADD ACCELERATION LANES

Type Impv: ADD ACCELERATION LANES

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 3127 428-03 STPFLEX 1,197 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010891 - US 90: LEFT TURN LANE AT LA 635

Type Impv: ADD LEFT TURN LANE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES US 90 005-08 NHPP 78 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009176 - LULING INTERSECTION SAFETY IMPROVEMENTS

Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES 000-45 SATRANS 10 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009453 - VARIOUS ROADS:SIGNING (ST. CHARLES)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES 000-45 SATRANS 5 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010843 - ORMOND BLVD PAVEMENT REHAB

Type Impv: COLD PLANE, ASPHALT PATCHING, OVERLAY EXISTING ASPHALT, N

Project Manager: DEVILLE, JACQUES

Remarks: ST. CHARLES PARISH TO PROVIDE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES 000-45 STP>200K 4,284 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011010 - LA 628: ST. CHARLES PL - AIRLINE OVERLAY

Type Impv: THIN LIFT OVRLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 628 845-02 STPFLEX 900 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 141 of 211

Page 148: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST CHARLES

Project: H.011054 - LA 306: BARBER RD - W END BURCHELL CANAL

Type Impv: MILL & OVERLAY, PATCHING, GUARD RAIL, STRIPING

Project Manager: CHENEVERT, MARK

Remarks: NFA AS MATCH FOR CS 845-07 FROM 0.39 - 4.47

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 306 845-07 STPFLEX 2,226 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

ST CHARLES LA 306 845-07 NFABOND 2,497 PRESERVATION

NON-INTERSTATE NFA

Project: H.011132 - LA 50: KCS RR XING (ST. ROSE)

Type Impv: REPLACE CROSSING SURFACE.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 50 845-17 RAIL HE 61 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

ST CHARLES LA 50 845-17 LOCAL 49 RAILROADS

Project: H.011230 - LA 48: INTERSECTION IMP @ RIVER OAKS DR

Type Impv: INTERSECTION IMPROVEMENTS AT RIVER OAKS DRIVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 48 282-02 STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009326 - I-10/610 BRIDGE REPAIRS & PAINTING

Type Impv: BRIDGE DECK PATHCING

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES I-10 450-14 NHPP 3,600 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

ST JOHN I-10 450-13 NHPP 510 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

ORLEANS I-610 450-34 NHPP 2,100 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

Project: H.010498 - I-310: LULING BR DECK OVERLAY & REPAIR

Type Impv: REMOVE AND REPLACE BRIDGE DECK OVERLAY & STRUCTURAL REP

Project Manager: GUIDRY, CHRIS

Remarks: PRIORITY BRIDGE PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES I-310 450-37 NHPP 10,000 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

ST CHARLES I-310 450-37 NHPP 10,000 PRESERVATION

INTERSTATE

Project: H.011022 - US 61 @ EVANGELINE RD.

Type Impv: RAISING ROADWAY GRADE

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES US 61 007-03 STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.009763 - ST CHARLES EBANK LEVEE MU PATH, PHASE 6

Type Impv: MULTI-USE PATH & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES 000-45 STPENH 1,025 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.000320 - JEFFERSON PARISH LN. - LA 50

Type Impv: ULTRATHIN HMAC WEARING COURSE

Project Manager: RAY, JARED

Remarks: 007-03-0060;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES US 61 007-03 NHPP 1,688 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 142 of 211

Page 149: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST CHARLES

Project: H.004876 - LA 52: LA 18 - N OAK COURT

Type Impv: SAFETY AND TSM IMPROVEMENTS

Project Manager: DEVILLE, JACQUES

Remarks: DTSGE O COMPLETED UNDER DESIGN PHASE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES 000-45 STP>200K 1,850 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

ST CHARLES 000-45 OTHER 1,850 URBAN SYSTEMS

Project: H.010413 - LA 48: ORMOND PLANTATION - WESCO ST

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 48 282-02 STPFLEX 1,750 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010416 - LA 3127: ST. JOHN P/L - 3700' W I-310

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 3127 428-03 STPFLEX 5,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010417 - LA 306: LA 18 - LA 632

Type Impv: COLD PLANE, GEOGRID & 4" OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES LA 306 845-07 STPFLEX 3,600 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010753 - US 90/I-310 INTERCHANGE

Type Impv: RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMP

Project Manager: LANDRY, COREY

Remarks: MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

ST CHARLES US 90 005-08 NFI 0 CAPACITY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 143 of 211

Page 150: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST HELENA

Project: H.010623 - LA1042:LA37-LA43 & LA10S:LA43-CSLM 0.54

Type Impv: ASPHALTIC CONCRETE PAVEMENT OVERLAY AND STRIPING

Project Manager: BRANTON, JENNIFER

Remarks: LETTER BID IN DISTRICT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 10-S 846-12 NFA 225 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14

ST HELENA LA 1042 846-03 NFA 50 ROAD TRANSFER

Project: H.011015 - LA 441, LA 38, LA 10: CHIP SEALS

Type Impv: ASPHALT SURFACE TREATMENT

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 441 260-10 STPFLEX 271 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

WASHINGTON LA 38 263-06 STPFLEX 252 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

WASHINGTON LA 10 277-03 STPFLEX 222 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

TANGIPAHOA LA 10 277-01 STPFLEX 179 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

Project: H.011046 - LA 1044: JCT LA 432 - MISS. STATE LINE

Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 1044 846-11 NFABOND 3,935 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.002311 - LA 38 - MISSISSIPPI STATE LINE

Type Impv: COLD PLANE.BASE.DRAINAGE & OLAY

Project Manager: RAY, JARED

Remarks: 254-07-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 43 254-07 STPFLEX 3,790 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.002407 - PIGEON CREEK

Type Impv: NEW BRIDGE

Project Manager: YAP, KIAN

Remarks: 262-30-0008;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 63 262-30 STPFLEX 1,611 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.008312 - LA 1042 BRIDGES NEAR GREENSBURG

Type Impv: BRIDGE REPLACEMENT

Project Manager: UMEOZULU, JOE

Remarks: 846-03-0014;2 BRIDGES; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 1042 846-03 FBROFF 2,161 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010382 - LA 441: LA 16 - LA 10

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST HELENA LA 441 260-09 STPFLEX 3,972 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 144 of 211

Page 151: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JAMES

Project: H.010138 - SUNSHINE BRIDGE ITS

Type Impv: CCTV CAMERAS AND FIBER OPTIC COMMUNICATIONS

Project Manager: DELANEY, ELIZABETH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES LA 70 426-02 STPFLEX 52 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED IN CURRENT FY 13-14

ASCENSION LA 70 426-03 STPFLEX 753 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

ST JAMES LA 70 426-02 NFI 701 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.010082 - IC (LUTCHER/GRAMERCY) SEVERAL RR X-ING

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES 000-47 RAIL PD 600 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

ST JAMES LA 3274 256-32 RAIL PD 200 RAILROADS

ST JAMES LA 3193 847-07 RAIL PD 200 RAILROADS

ST JAMES LA 641 847-02 RAIL PD 200 RAILROADS

Project: H.011176 - INSTALL SE LA PERM CONTRAFLOW SIGNING

Type Impv: SE LA - PERMANENT SIGNING FOR CONTRAFLOW EVACUATION EVEN

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES I-10 450-12 NHPP 830 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED FOR LETTING FY 14-15

JEFFERSON I-10 450-15 NHPP 89 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ST JOHN I-10 450-13 NHPP 45 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ASCENSION I-10 450-11 NHPP 23 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ST JOHN US 61 007-04 NHPP 67 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ST JAMES US 61 007-05 NHPP 103 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ST CHARLES I-310 450-36 NHPP 11 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ST JOHN I-55 452-01 NHPP 45 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.009481 - LA 20 BAYOU CHEVREVIL BRIDGE

Type Impv: BRIDGE REHABILITATION

Project Manager: YAP, KIAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES LA 20 065-07 STPFLEX 821 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.011190 - LA3213: MISS RIVER BR REHAB (GRAMERCY)

Type Impv: REHABILITATE SUPERSTRUCTURE OF THE MAIN TRUSS

Project Manager: D'ANDREA, ARTUR

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES LA 3213 434-02 STPFLEX 1,500 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002426 - SUNSHINE BRIDGE - I-10

Type Impv: CLEARING AND GRUBBING

Project Manager: TONEY, PATRICK

Remarks: 426-02-0052;(CONST)426-02-42.426-03-04.NO FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

ASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 145 of 211

Page 152: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JAMES

Project: H.009483 - LA HIGHWAY 44 RE-ROUTE

Type Impv: ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44

Project Manager: WAGUESPACK, BRENT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

ST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS

Project: H.009724 - ST JAMES MISS EBANK MULTI-USE TRAIL PH 1

Type Impv: MULTI-USE PATH AND RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JAMES 000-47 STPENH 1,259 ENHANCEMENTS 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 146 of 211

Page 153: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JOHN

Project: H.008322 - LA 637: PORT OF S.LOUISIANA CONNECTOR

Type Impv: ASPH WIDEN AND OVERLAY

Project Manager: TSAI, LOONG SHEN

Remarks: 848-12-0016; $1M OF RR WORK IN PHASE 4

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 637 848-12 STPFLEX 6,418 INTERMODAL CONNECTOR 4-SCHEDULED IN CURRENT FY 13-14

ST JOHN LA 637 848-12 DEMO 500 DEMO / HIGH PRIORITY

Project: H.009282 - ST. JOHN THE BAPTIST PARISH PROJECT

Type Impv: SIDEWALKS,MARKINGS,SIGNALS,EDUCATION&ENCOURAGEMENT AC

Project Manager: GROS, SCOTT

Remarks: ST. JOHN THE BAPTIST PH.LAPLACE ELEMENTARY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN 000-48 SR2S 295 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010185 - GARYVILLE MILL POND &NORTHERN TRAIL PH 1

Type Impv: CONSTRUCTION OF 8' WIDE BY 2,800'LONG ASPHALT PED BIKE TRAIL

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN 000-48 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011128 - I-10 @ LA 3188 OVERPASS GIRDER REPAIR

Type Impv: REPAIR. TRUCK IMPACTED GIRDERS

Project Manager: TSAI, CHING

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 3188 848-15 REIMB 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.000326 - HEMLOCK ST.(LA 3224) @ US 61

Type Impv: SAFETY & CAPACITY MODIFICATIONS

Project Manager: DEVILLE, JACQUES

Remarks: 848-19-0007;STP>200K FUNDS, USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 3224 848-19 STP>200K 505 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009391 - LA 3188 DRAINAGE IMPROVEMENTS

Type Impv: DRAINAGE IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 3188 848-15 STP>200K 700 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010110 - EAST ST. JOHN ELEM SCHOOL SRTS PROJECT

Type Impv: SIDEWALK IMPROVMENTS, TRAFFIC CALMING, STRIPING AND MARKIN

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN 000-48 SR2S 260 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010257 - GRADE RAISING I-10 RAMPS @ LA 3188 INT.

Type Impv: RAISING THE EXISTING GRADE OF THE I-10 RAMPS AT LA 3188

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN I-10 450-13 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010693 - LA 54: IC RR XING (GARYVILLE)

Type Impv: UPGRADE THE EXISTING SIGNALS & GATES

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 54 256-31 RAIL PD 75 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 147 of 211

Page 154: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JOHN

Project: H.011043 - LA 643:ST JAMES P/L-LAC DES ALLEMANDS

Type Impv: PATCH & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 643 848-13 NFABOND 1,306 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009593 - I-10,I-12,I-55,I-59:DISTRICTWIDE SPOT RP

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN I-10 450-13 NHPP 1,500 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.009594 - I-10:RESERVE RELIEF CANAL - I-55 NB RAM

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN I-10 450-13 NHPP 10,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010076 - IC (RESERVE) W. 19TH ST.

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks: 714-48-0001

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN 000-48 RAIL PD 150 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.010077 - IC (RESERVE) SEVERAL RR X-ING GARYVILLE

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN 000-48 RAIL PD 400 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.009770 - ST JOHN MISS EASTBANK MU PATH, PH 3/3A

Type Impv: MULTI-USE PATH ON EB MISS. RIVER LEVEE

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN 000-48 STPENH 855 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.002960 - LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD

Type Impv: GRADE SEPARATE EXISTING AT GRADE CROSSING

Project Manager: LACOMBE, JASON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 3213 434-01 STPFLEX 20,000 RAILROADS

GRADE SEPARATION

1-PLANNING/ENVIRONMENTAL

Project: H.003378 - I-55 SERVICE ROAD

Type Impv: DRAINAGE IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks: 452-01-0056;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN I-55 452-01 NHPP 800 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

1-PLANNING/ENVIRONMENTAL

Project: H.008318 - JCT. LA 628 - JCT. LA 44

Type Impv: COLD PLANE, PATCH, AND OVERLAY

Project Manager: RAY, JARED

Remarks: 848-04-0010

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 636-3 848-04 STPFLEX 804 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 148 of 211

Page 155: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JOHN

Project: H.010385 - LA 3127: ST. JAMES P/L - ST. CHARLES P/L

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 3127 428-02 STPFLEX 3,115 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010902 - US 61 FEASIBILITY STUDY

Type Impv: FEASIBILITY STUDY

Project Manager: FARR, ALEX

Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN US 61 007-04 0 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.011136 - MRT EXTENSION ST. JOHN PARISH

Type Impv: STAGE 0 FEASIBILITY STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 20% NON-FEDERAL MATCH PROVIDED BY RPC

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 149 of 211

Page 156: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST LANDRY

Project: H.009468 - US 190 KROTZ SPGS ATCHAF BR CLEAN&PAINT

Type Impv: CLEANING AND PAINTING

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY US 190 008-04 NHPP 11,200 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009704 - MANUEL ST AT S EAST ST AND E DEAN ST

Type Impv: GUARD RAIL INSTALLATION

Project Manager: HOLM, RICK

Remarks: 000-49

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY 000-49 SATRANS 50 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010090 - UP (OPELOUSAS) SEVERAL RR X-ING

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY 000-49 RAIL PD 980 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14

- LOCAL 420 RAILROADS

Project: H.010523 - LA 361: LA 107 - AVOYELLES P/L

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 361 375-02 NFABOND 1,131 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010526 - LA 95: US 190 - EVANGELINE P/L

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 95 849-27 NFABOND 1,842 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010593 - BAYOU TECHE PADDLE TRAIL

Type Impv: CONSTRUCTION OF A PADDLE AND ATV TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY 000-49 RTP 104 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

ST LANDRY 000-49 LOCAL 13 RECREATIONAL TRAILS PROGRAM

Project: H.010910 - LA 13: CROSS DRAIN REPLACEMENT CSLM .541

Type Impv: CROSS DRAIN REPLACEMENT

Project Manager: DOMINGUE, CHRISTOPHER

Remarks: SECRETARY'S EMERGENCY LETTER DATED 5/12/2013

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 13 057-04 STGEN 260 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.008332 - ROGUE BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: KEMP, KELLY

Remarks: 849-11-0010; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 360 849-11 FBROFF 3,062 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.008335 - LA 91 DRAINAGE CANAL BRIDGE

Type Impv: NEW BRIDGE

Project Manager: HERATH, ANANDA

Remarks: 849-23-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 91 849-23 STPFLEX 1,032 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 150 of 211

Page 157: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST LANDRY

Project: H.010034 - JOE W ROAD & GALLOW ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY 000-49 FBROFF 570 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

ST LANDRY 000-49 FBROFF 246 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010035 - ANDREPONT RD & BAYOU GERMOND RD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY 000-49 FBROFF 293 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

ST LANDRY 000-49 FBROFF 601 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.000445 - MISSOURI PACIFIC R.R. OVERPASS

Type Impv: BRIDGE REHAB.REDECK & MAYBE WIDEN

Project Manager: GAUDRY, CARL

Remarks: 012-13-0101;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY US 190 012-13 NHPP 6,500 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.002176 - BAYOU HA HA & PALMETTO CO.CANAL BRS

Type Impv: NEW BRIDGES

Project Manager: BUCCI, MARK

Remarks: 219-07-0025;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 10 219-07 STPFLEX 4,950 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.009626 - US 190 (WB):MPRR OPASS-BAYOU COURTABLEAU

Type Impv: COLD PLANE, PATCH & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY US 190 012-13 NHPP 6,863 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010214 - US 71: LA 10 - AVOYELLES P/L

Type Impv: COLD PLANE, PATCH & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY US 71 008-06 STPFLEX 6,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010225 - LA 178: ACADIA P/L - LA 357

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST LANDRY LA 178 208-02 STPFLEX 700 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 151 of 211

Page 158: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARTIN

Project: H.010522 - LA 347: LA 86 - 0.46 MI. SW OF LA 96

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 347 400-03 STPFLEX 3,708 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

IBERIA LA 347 400-02 STPFLEX 629 PRESERVATION

NON-INTERSTATE NFA

Project: H.010546 - LA 96: 0.66 MILES W OF LA 352 - LA 352

Type Impv: ASPHALT OVERLAY

Project Manager: RAY, JARED

Remarks: FROM 11.41 TO 11.47 HAS TO BE STPFLEX WITH NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 96 238-03 NFABOND 196 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

ST MARTIN LA 96 238-03 STPFLEX 24 PRESERVATION

NON-INTERSTATE NFA

Project: H.008345 - BAYOU ALEXANDRE

Type Impv: BRIDGE REPLACEMENT

Project Manager: DELATTE, BRIAN

Remarks: 850-29-0005;USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 3083 850-29 FBROFF 1,219 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009143 - LA 31 & LA 92: ROUNDABOUT

Type Impv: ROUNDABOUT

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 31 056-02 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

ST MARTIN LA 92 213-08 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.009456 - LA 347: ROUNDABOUT @ MELANCON RD.

Type Impv: INSTALL ROUNDABOUT

Project Manager: PICARD, TOBY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 347 056-04 HSIP 1,700 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

ST MARTIN LA 347 400-30 HSIP 1,398 SAFETY

Project: H.009847 - BNSF (CADE) LA 92

Type Impv: UPGRADE CIRCUITRY AND SIGNALS

Project Manager: SHREWSBERRY,BILL

Remarks: 213-07-0013

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 92 213-07 RAIL PD 150 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010828 - PARC DES PONTS TRAILHEAD

Type Impv: CONSTRUCTION OF MULTI-USE TRAILHEAD.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN 000-50 RTP 200 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

Project: H.003014 - I-10: CSLM 5.50 TO ATCHAFALAYA FLDWY BR

Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO

Project Manager: OLIVIER, NICHOLAS

Remarks: 450-06-0068;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN I-10 450-06 NHPP 30,000 CORRIDOR 3-DESIGN/DEVELOPMENT

ST MARTIN I-10 450-06 NHPP 24,900 PRESERVATION

INTERSTATE

ST MARTIN I-10 450-06 NHPP 1,100 PRESERVATION

INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 152 of 211

Page 159: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARTIN

Project: H.009461 - I-10 ATCHAFALAYA FLDWY CLEAN & PAINT

Type Impv: CLEANING & PAINTING

Project Manager: TULLIER, DANNY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN I-10 450-06 NHPP 2,400 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

Project: H.010216 - LA 31: LA 351 - BEG. OF CURB & GUTTER

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 31 056-03 STPFLEX 1,771 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010559 - BAYOU MERCIER ROAD / BERARD CANAL BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN 000-50 FBROFF 1,178 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010601 - I-10: LAFAYETTE P/L TO CSLM 5.5

Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO

Project Manager: OLIVIER, NICHOLAS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN I-10 450-06 NHPP 30,000 CORRIDOR 3-DESIGN/DEVELOPMENT

ST MARTIN I-10 450-06 NHPP 25,420 PRESERVATION

INTERSTATE

ST MARTIN I-10 450-06 NHPP 13,000 PRESERVATION

INTERSTATE

LAFAYETTE I-10 450-05 NHPP 1,280 PRESERVATION

INTERSTATE

LAFAYETTE I-10 450-05 NHPP 300 PRESERVATION

INTERSTATE

Project: H.004924 - DEV.& CONST ST. MARTINVILLE BYPASS

Type Impv: FEDERAL EARMARK FOR STUDY

Project Manager: YANG, LI

Remarks: 700-50-0112;STAGE 0 COMPLETED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN 000-50 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.009747 - LA 31: PEDESTRIAN IMPROVEMENTS, PH 2

Type Impv: SIDEWALK W/ LANDSCAPING & RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARTIN LA 31 056-02 STPENH 467 ENHANCEMENTS 2-WAITING FOR FUNDING

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 153 of 211

Page 160: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARY

Project: H.010183 - PHARR ESTATES TRAIL (PHASE I)

Type Impv: CONSTRUCTION OF 850' OF BICYCLE TRAIL

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY 000-51 RTP 127 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

ST MARY 000-51 LOCAL 96 RECREATIONAL TRAILS PROGRAM

Project: H.002798 - BAYOU TECHE BRIDGE(OAKLAWN)

Type Impv: BRIDGE REPLACEMENT

Project Manager: BRAUNER, KURT

Remarks: 408-30-0008;CG PERMIT SURV ORDERED IN METRIC (M

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY LA 323 408-30 STPFLEX 9,342 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010003 - US 90: BAYOU RAMOS REHABILITATION PH. II

Type Impv: REHABILITATION PRESTRESS GIRDERS WITH CARBON FIBER WRAP

Project Manager: FENG, DANA

Remarks: USE HPB FUNDING. PROJECT REPAIR REMAINING DAMAGED GIRD

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY US 90 424-05 NHPP 4,500 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010268 - US 90: CURVE IMPROVEMENTS

Type Impv: INCREASE VERTICAL GRADE

Project Manager: DOMINGUE, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY US 90 424-05 HSIP 655 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010829 - ST. MARY PARISH BAYOU TECHE TRAILHEADS

Type Impv: CONSTRUCTION OF MULTI-USE TRAILHEADS.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM

Project: H.010877 - PHARR ESTATES TRAIL, PHASE 2

Type Impv: CONSTRUCTION OF 850' OF PED-BIKE TRAIL

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY 000-51 RTP 223 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ST MARY 000-51 LOCAL 107 RECREATIONAL TRAILS PROGRAM

Project: H.011034 - LA 87: LA 324 - 1.7 MI S LA 323

Type Impv: ASPHALT OVERLAY & RELATED WORK.

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY LA 87 408-01 NFABOND 6,303 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.004932 - INTERCHANGE US 90 @ LA 318

Type Impv: EA FOR NEW INTERCHANGE

Project Manager: NICKEL, TIM

Remarks: 700-51-0110; STGEN IS UNCLAIMED PROPERTY FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY US 90 424-05 STGEN 45,000 CAPACITY 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 154 of 211

Page 161: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARY

Project: H.010213 - LA 182: IBERIA P/L - LA 670

Type Impv: COLD PLANE, PATCH, & OVERLAY

Project Manager: RAY, JARED

Remarks: USE STATE BONDS FOR MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY LA 182 004-06 STPFLEX 2,880 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.004929 - IMP RALPH DARDEN PKWY B/W LA182 MLK

Type Impv: LA 182 & MLK IMPROVEMENTS

Project Manager: NGUYEN, WAYNE

Remarks: 700-51-0107;STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY 000-51 DEMO 315 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

Project: H.006392 - ELIMINATE HIGHWAY-RAIL CROSSINGS

Type Impv: RELOCATE BALDWIN TRACK

Project Manager: NGUYEN, WAYNE

Remarks: 714-51-0007;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY 000-51 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.009748 - BERWICK DOWNTOWN SIDEWALKS

Type Impv: SIDEWALKS AND RELATED WORK

Project Manager: HORTON, VALERIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST MARY 000-51 STPENH 73 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 155 of 211

Page 162: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.001340 - LA 21 WIDENING (BOOTLEGGER - 11TH)

Type Impv: WIDENING

Project Manager: FLETCHER, CURTIS

Remarks: 059-01-0028;DEMO & STP<200K.STATE MATCH(STAGE1)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 21 059-01 DEMO 0 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

ST TAMMANY LA 21 059-01 STP<200K 11,007 URBAN SYSTEMS

ST TAMMANY LA 21 059-01 STPFLEX 5,892 PRESERVATION

BRIDGE (ON SYSTEM)

Project: H.005972 - LAKE PONCHARTRAIN CAUSEWAY(9 MILE TURNAR

Type Impv: CROSSOVER WIDENING AND ELEC. MODS.

Project Manager: PICARD, TOBY

Remarks: DIR #K-051-LA-CAUSEWAY-01

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 ER 2,474 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.006298 - OAK STREET BRIDGE OVER GUM BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-52-0105

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 FBROFF 649 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006299 - GRANDE AVENUE BRIDGE OVER CYPRESS BAYOU

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks: 713-52-0106

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 FBROFF 399 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009185 - I-12: NORTHSHORE/AIRPORT RD. - US 11

Type Impv: MAJOR WIDENING - ADD TRAVEL LANE EB AND WB

Project Manager: REVIERE, RYAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 19,282 CORRIDOR 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009309 - SUMMIT BLVD (US 190 TO LA 433)

Type Impv: NEW 4 LANE DIVIDED ROADWAY

Project Manager: HANKS, ANNA

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 STP<200K 3,948 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.009600 - I-12: TANGI. PH. LINE - PONCHATOLAWA CR.

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 9,704 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009835 - US 190 COLLINS BLVD RIGHT TURN LANE @LEE

Type Impv: RIGHT TURN LANE

Project Manager: HANKS, ANNA

Remarks: USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 059-30 STP<200K 1,200 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011045 - LA 1077: LA 1078 - LA 25

Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1077 852-05 NFABOND 2,970 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 156 of 211

Page 163: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.000506 - LA 22 (DALWILL BLVD - US 190)

Type Impv: WIDENING AND DRAINAGE IMPROVEMENT

Project Manager: HANKS, ANNA

Remarks: 013-12-0060;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 22 261-06 STP<200K 2,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.000687 - I-12 @ US 11 INTERCHANGE LIGHTING

Type Impv: INTERSECTION LIGHTING IMPROVEMENTS

Project Manager: LEBOURGEOIS, CHRISTOPHER

Remarks: 018-04-0048;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.003107 - I-10: FRENCH BRANCH BR -W.PEARL RIVER BR

Type Impv: PAVEMENT REPLACEMENT

Project Manager: THOMAS, BEN

Remarks: 450-18-0108;INCL I-10/12/59 INTERCHANGE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 NHPP 22,800 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY I-59 453-01 NHPP 6,200 PRESERVATION

INTERSTATE

ST TAMMANY I-12 454-04 NHPP 5,000 PRESERVATION

INTERSTATE

Project: H.003452 - I-12 @ NORTHSHORE BLVD INTER. LIGHTING

Type Impv: ROADWAY LIGHTING

Project Manager: LEBOURGEOIS, CHRISTOPHER

Remarks: 454-04-0089;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009152 - CLEVELAND AVE: NS RR XING (SLIDELL)

Type Impv: NEW ROAD TO CLOSE CROSSING

Project Manager: SHREWSBERRY,BILL

Remarks: THIS IS A SPECIAL FRA GRANT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 RAIL HE 0 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY 000-52 HSR 1,100 DEMO / HIGH PRIORITY

Project: H.009325 - SOUTH CHANNEL FENDER REPAIR

Type Impv: REPAIR DAMAGE AND DETERIORATION TO FENDER

Project Manager: FLETCHER, CURTIS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 BDP 1,106 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009341 - LA 1085 & LA 1077: ROUNDABOUT

Type Impv: CONSTRUCT ROUNDABOUT

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1085 852-02 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY LA 1085 852-02 STP<200K 500 URBAN SYSTEMS

ST TAMMANY LA 1077 852-03 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: H.009460 - VARIOUS ROADS:SIGNING (ST. TAMMANY)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 SATRANS 14 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 157 of 211

Page 164: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.009596 - I-10&I-12:ST.TAMMAY PAR APR SLAB REPAIRS

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 NHPP 750 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY I-12 454-04 NHPP 750 PRESERVATION

INTERSTATE

Project: H.009706 - US 190 @ NORTHSHORE BLVD

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: HANKS, ANNA

Remarks: USE TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 013-12 STP<200K 2,300 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010184 - LA 59: CURVE REALIGN AND TUNNEL AT TRACE

Type Impv: REALIGN CURVE & PROVIDE A TUNNEL FOR TAMMANY TRACE CROS

Project Manager: JONES, MATTHEW

Remarks: ENG & R/W BY ST TAMMANY PARISH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 59 281-03 STPENH 1,900 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY LA 59 281-03 HSIP 750 SAFETY

Project: H.010728 - LA 1090: US 190 TO I-10 WIDENING

Type Impv: THREE LANE BY WIDENING.

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1090 852-26 STPFLEX 550 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010982 - LA 25 : JACKSON ST. - HAY HOLLOW RD.

Type Impv: WIDENING & RE-STRIPING FOR CENTER TURN LANE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 25 059-02 STPFLEX 550 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010984 - US 190: DUAL LT. TURN LA @ HARRISON AVE

Type Impv: DUAL LEFT TURN LANES ONTO HARRISON AVENUE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 013-11 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010987 - LA 433: BYU BONFOUCA - US 11 CENTER TURN

Type Impv: CENTER TURN LANE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 433 852-21 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011042 - LA 450: LA 25 - LA 16

Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY

Project Manager: RAY, JARED

Remarks: NFA WILL BE MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 450 852-07 STPFLEX 2,028 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

WASHINGTON LA 450 859-03 STPFLEX 2,940 PRESERVATION

NON-INTERSTATE NFA

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 158 of 211

Page 165: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.011114 - COVINGTON COMMUNITY TRAIL

Type Impv: CONST. OF 1380' MULTI-USE TRAIL

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 RTP 108 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY 000-52 LOCAL 20 RECREATIONAL TRAILS PROGRAM

Project: H.011117 - WEST HALL TRAIL

Type Impv: CONSTRUCTION OF 1,746' PED-BIKE TRAIL EXTENSION

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY 000-52 LOCAL 20 RECREATIONAL TRAILS PROGRAM

Project: H.011131 - CARROLL ROAD TRAIL

Type Impv: CONST. OF 10'X240' PED-BIKE TRAIL WITH CROSSWALK

Project Manager: RIGGS, LAURA

Remarks: CRT IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

ST TAMMANY 000-52 LOCAL 23 RECREATIONAL TRAILS PROGRAM

Project: H.011206 - REPLACE HIGH VOLTAGE CABLE SUPPORT TRAY

Type Impv: INSPECT AND REPLACE OR REPAIR MAINLINE CABLE TRAY

Project Manager: FLETCHER, CURTIS

Remarks: DIR NO. LA-2012-1-051-009

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 ER 1,256 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011216 - CITY OF SLIDELL PAVEMENT MARKINGS

Type Impv: PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROAD

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 SATRANS 95 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011217 - DEMOLISH NINE MILE TURNAROUND

Type Impv: PROVIDE FOR THE DEMOLITION OF THE NINE MILE TURNAROUND.

Project Manager: FLETCHER, CURTIS

Remarks: DIR NUMBER LA-2012-1-051-010

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 ER 213 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011231 - NORTH CONTROL PLAZA SCOUR PROTECTION

Type Impv: REPAIR AND REPLACE REVETMENT AS NEEDED AND REPAIR FENCE.

Project Manager: FLETCHER, CURTIS

Remarks: DIR NO. LA-2012-01-051-008

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 ER 154 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011237 - MIDDLE MIDDLE PEARL RIVER BRIDGE REPAIRS

Type Impv: STRUCTURAL TRUSS REPAIRS

Project Manager: FOSSIER, PAUL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 90 006-07 STPFLEX 500 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 159 of 211

Page 166: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.000497 - US190: BAYOU CASTINE-SE LA HOSPITAL

Type Impv: WIDEN TO 4 LANES

Project Manager: BORNE, FRED

Remarks: 013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 3-DESIGN/DEVELOPMENT

Project: H.000689 - SALT BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 018-30-0024;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 433 018-30 FBROFF 3,358 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002446 - TCHEFUNCTE RIVER BRIDGE

Type Impv: NEW BRIDGE

Project Manager: BUCCI, MARK

Remarks: 269-07-0012;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 40 269-07 STPFLEX 3,260 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.003451 - I-12: LA 434 INTCHG LIGHTING (LACOMBE)

Type Impv: INTERSTATE LIGHTING

Project Manager: FOSTER, RICHARD

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 850 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

3-DESIGN/DEVELOPMENT

Project: H.004113 - LA 435 TO LA 40/LA 41

Type Impv: NEW 4-LANE

Project Manager: BURST, JEFFERY

Remarks: 852-33-0001;BL DATE 10-08 404 RE-SUBMITTED 3-96

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 3241 852-33 NHPP 63,000 TIME 3-DESIGN/DEVELOPMENT

Project: H.004435 - LA 36 TO LA 435

Type Impv: NEW 4-LANE

Project Manager: BURST, JEFFERY

Remarks: 852-33-0003;BL DATE 7-08

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 3241 852-33 NHPP 92,000 TIME 3-DESIGN/DEVELOPMENT

Project: H.004957 - I-12/LA 434 INTERCHANGE TO LA 36

Type Impv: NEW 4-LANE

Project Manager: BURST, JEFFERY

Remarks: 852-33-0002;BL DATE 7-08

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 3241 852-33 NHPP 70,000 TIME 3-DESIGN/DEVELOPMENT

Project: H.009597 - I-10: W PEARL RIVER BR - PEARL RIVER BR

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 NHPP 3,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010668 - MIL DOLLAR/HOSMER MILL/HWY 41 SPUR BRDGS

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 FBROFF 3,389 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 160 of 211

Page 167: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.010720 - I-12: LA 1088 INTCHG LIGHTING

Type Impv: INTERSTATE LIGHTING

Project Manager: FOSTER, RICHARD

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 850 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

3-DESIGN/DEVELOPMENT

Project: H.010993 - I-10: TWIN SPANS - FRENCH BRANCH

Type Impv: MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGS

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 NHPP 10,993 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010994 - I-12: BAYOU LACOMBE - NORTHSHORE BLVD.

Type Impv: MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGS

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 5,830 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.011024 - I-10: OAK HARBOR RAMPS

Type Impv: RAISING EXISTING GRADE WITH EMBANKMENT IN EXISTING CROWN.

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.011030 - LA 59:ROUNDABOUT @ LONESOME RD.

Type Impv: CONSTRUCT ROUNDABOUT

Project Manager: JONES, MATTHEW

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 59 281-03 HSIP 1,709 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.011075 - LA 59:ROUNDABOUT @ SHARP RD.

Type Impv: CONSTRUCT ROUNDABOUT

Project Manager: JONES, MATTHEW

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 59 281-03 HSIP 1,914 SAFETY 3-DESIGN/DEVELOPMENT

Project: H.011137 - I-12: LA 21 TO US 190

Type Impv: ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEM

Project Manager: OLIVIER, NICHOLAS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 44,257 CAPACITY 3-DESIGN/DEVELOPMENT

ST TAMMANY I-12 454-04 NHPP 4,917 PRESERVATION

INTERSTATE

Project: H.011138 - COVINGTON SRTS PROJ. - PINE VIEW MIDDLE

Type Impv: SIDEWALKS, DRAINAGE, STRIPING AND SIGNAGE

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 SR2S 210 SAFETY

SAFE ROUTES TO SCHOOLS

3-DESIGN/DEVELOPMENT

Project: H.011152 - I-12: US 190 TO LA 59

Type Impv: ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEM

Project Manager: OLIVIER, NICHOLAS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-12 454-04 NHPP 39,557 CAPACITY 3-DESIGN/DEVELOPMENT

ST TAMMANY I-12 454-04 NHPP 4,395 PRESERVATION

INTERSTATE

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 161 of 211

Page 168: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.000494 - LA 433 - US 11

Type Impv: WIDEN TO 4 LANES

Project Manager: JESCLARD, TREY

Remarks: 013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING

Project: H.002391 - TCHEFUNCTE - CAUSEWAY APPROACH

Type Impv: WIDEN TO 4 LANES

Project Manager: BROADBENT, RONALD

Remarks: 261-06-0030;CITY/STATE AGREEMENT REQUIRED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDING

ST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS

Project: H.002394 - LA 22:TCHEFUNCTE RIVER BRIDGE-ADIN DRIVE

Type Impv: COLD PLANE.PATCH AND OLAY

Project Manager: HANKS, ANNA

Remarks: 261-06-0041;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 22 261-06 STPFLEX 494 PRESERVATION

NON-INTERSTATE

2-WAITING FOR FUNDING

ST TAMMANY LA 22 261-06 STP<200K 2,800 URBAN SYSTEMS

Project: H.009793 - SLIDELL: OLDE TOWN STREETSCAPING

Type Impv: SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 STPENH 954 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.010446 - EMERGENCY BR REPLACE: LA 1077-ST TAMMANY

Type Impv: CONT TO FURNISH ALL MATERIALS AND LABOR TO RECONSTRUCT B

Project Manager: SIBLEY, STEVEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1077 852-13 STCASH 200 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

Project: H.000284 - US 90: PEARL RIVER BRIDGES

Type Impv: NEW BRIDGES

Project Manager: OLIVIER, NICHOLAS

Remarks: 006-07-0048;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 90 006-07 STPFLEX 24,382 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.000286 - EAST PEARL RIVER BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: OLIVIER, NICHOLAS

Remarks: 006-08-0031;STAGE 0 PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 90 006-08 STPFLEX 15,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.000688 - US 11 NORFOLK SOUTHERN R.R.OVERPASS

Type Impv: BRIDGE REPLACEMENT

Project Manager: OLIVIER, NICHOLAS

Remarks: 018-04-0049;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 11 018-04 STPFLEX 21,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001006 - E. JCT. LA 40 - LA 16

Type Impv: RUBBLIZE AND OVERLAY

Project Manager: RAY, JARED

Remarks: 030-02-0029;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 21 030-02 NHPP 7,575 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 162 of 211

Page 169: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.001344 - JCT LA 25 - JCT US 190 BUS

Type Impv: WIDENING

Project Manager: JESCLARD, TREY

Remarks: 059-30-0008;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 059-30 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.004937 - US 11 - US 190

Type Impv: 2 LANE RECONSTRUCTION

Project Manager: JESCLARD, TREY

Remarks: 852-21-0030;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 433 852-21 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.004983 - US 11 (EDEN ISLES BLVD - SPARATAN DR)

Type Impv: WIDENING WITH BIKE PATH

Project Manager: OLIVIER, NICHOLAS

Remarks: 700-52-0196

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 DEMO 3,517 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

ST TAMMANY 000-52 NFI 15,829 DEMO / HIGH PRIORITY

Project: H.006599 - TAMMANY TRACE CAMP SALMEN CONNECTOR

Type Impv: CONSTRUCT PEDESTRIAN AND BIKE PATH

Project Manager: FLETCHER, CURTIS

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 DEMO 144 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

ST TAMMANY 000-52 STPENH 219 ENHANCEMENTS

Project: H.008358 - BLACK BAYOU BR. NEAR MADISONVILLE

Type Impv: BRIDGE REPLACEMENT

Project Manager: GAUDRY, CARL

Remarks: 852-13-0017; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1077 852-13 FBROFF 1,391 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.008369 - US 11 @ CLEO ROAD

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: HARROUCH, JOSHUA

Remarks: 852-26-0021;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 852-26 STPFLEX 950 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

Project: H.009934 - ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING

Type Impv: SIDEWALK LIGHTING & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY 000-52 STPENH 218 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

ST TAMMANY LA 435 281-04 STPENH 82 ENHANCEMENTS

Project: H.010116 - LA 1088 CORRIDOR STUDY

Type Impv: TRAFFIC STUDY ON LA 1088

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1088 852-11 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 163 of 211

Page 170: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.010274 - US 190: US 11 TO LA 433

Type Impv: STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENT

Project Manager: NGUYEN, WAYNE

Remarks: DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PR

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.010375 - LA 1077: LA 21 - U.S. 190

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1077 852-03 STPFLEX 2,484 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010377 - LA 36: LA 41 - IGC RAILROAD

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 36 280-03 STPFLEX 1,120 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010380 - LA 433: U-PASS I-10 - BEHRMAN STREET

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 433 018-30 STPFLEX 740 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010387 - U.S. 90: LA 433 - U.S. 190

Type Impv: RUBBILIZE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY US 90 006-07 STPFLEX 3,323 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010441 - GRADE RAISING ON LA 1077

Type Impv: DRAINAGE

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 1077 852-13 NFA 2,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

1-PLANNING/ENVIRONMENTAL

Project: H.010456 - BAYOU LIBERTY SWING BR; ELECT REP;LA 433

Type Impv: INSPECTION AND REPAIR

Project Manager: LUPER, CONRAD

Remarks: DIR LA-2012-1-103-007

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 433 852-21 ER 77 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010473 - ISAAC, I-10, FLOOD PROTECT ST. TAMMANY

Type Impv: PROVIDE TEMPORARY SAND BERM LEVEE FOR PROTECTION OF I-10

Project Manager: MURRAY, WILL

Remarks: SECRETARY EMERGENCY LETTER DATED 9/2/2012

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 STGEN 130 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010823 - LA 21: ROUNDABOUT @ US 190

Type Impv: ROUNDABOUT

Project Manager: FARR, ALEX

Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY LA 21 030-01 SATRANS 25 SAFETY 1-PLANNING/ENVIRONMENTAL

ST TAMMANY US 190-X 013-10 SATRANS 25 SAFETY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 164 of 211

Page 171: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY

Project: H.011223 - I-10: NO CBD5 I-510 - STATELINE

Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADE

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

ST TAMMANY I-10 450-18 NHPP 2,412 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

ORLEANS I-10 450-90 NHPP 1,578 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ORLEANS I-10 450-17 NHPP 1,010 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 165 of 211

Page 172: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA

Project: H.009599 - I-12:BAPTIST WEIGH STATION SPOT REPAIRS

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: BRANTON, JENNIFER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-12 454-03 NHPP 174 OPER EFFICIENCY/MOTORIST ASSISTANCE

WEIGH STATIONS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010210 - TANGIPAHOA PARISH RR SAFETY IMPROVEMENTS

Type Impv: TANGIPAHOA PARSH PUBLIC RR CROSSING

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 SATRANS 140 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010710 - I-55 GRADE RAISING

Type Impv: DRAINAGE

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-55 452-90 NHPP 430 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010790 - I-55 CN R/R & I-12 US 51 SLOPE FAILURE

Type Impv: EMBANKMENT AND ABUTMENT REPAIR

Project Manager: BROWN, JEFF

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-55 452-90 NHPP 1,500 PRESERVATION

INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

TANGIPAHOA I-12 454-03 NHPP 250 PRESERVATION

INTERSTATE

Project: H.010981 - US 51-X: RIGHT TURN LANE @ W. JCT. LA 22

Type Impv: RIGHT TURN LANE FROM LA 22 TO LA 51 (VETERANS BLVD)

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA US 51-X 853-36 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011002 - LA 440 & LA 40 OVERLAYS

Type Impv: CONTRACT MAINTENANCE OVERLAY

Project Manager: RAY, JARED

Remarks: USE NFA AS MATCH FOR C.S.276-03. TTF FOR OTHER C.S.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 40 415-02 STPFLEX 138 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

TANGIPAHOA LA 440 276-03 STPFLEX 477 PRESERVATION

NON-INTERSTATE

Project: H.000673 - US 51 BRIDGE REHABILITATION

Type Impv: TEMP. SUPPORT, REPAIR CONCRETE, INSTALL POST-TENSIONING

Project Manager: D'ANDREA, ARTUR

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA US 51 017-04 STPFLEX 380 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.003432 - I-12 & U.S.51 BUS INTERCHANGE IMP.

Type Impv: INTERCHANGE IMPROVEMENTS

Project Manager: OLIVIER, NICHOLAS

Remarks: 454-03-0067;$450K TOTAL IN SE FOR ENV & CONST MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA US 51-X 853-36 HSIP 4,400 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.008390 - LA 1053: US 51-MISSISSIPPI STATE LINE

Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 853-26-0010;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 1053 853-26 NFABOND 3,858 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 166 of 211

Page 173: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA

Project: H.009598 - I-55: END OF ELEVATED ROADWAY - US 51

Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-55 452-90 NHPP 5,000 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009900 - FRANKLINTON INTERSECTION SAFETY IMPROVE

Type Impv: PURCHASE/INSTALL SIGNS & SOLAR BEACONS

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 SATRANS 10 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010108 - INDEPENDENCE SRTS - PHASE II

Type Impv: SIDEWALK IMPROVMENTS, CROSSING AND STRIPING, NON-INFRASTR

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 SR2S 250 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010289 - LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.

Type Impv: CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELL

Project Manager: BRANTON, JENNIFER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 22 261-04 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010683 - I-12 & I-55: MEDIAN CABLE BARRIER

Type Impv: INSTALL MEDIAN CABLE BARRIER

Project Manager: BRANTON, JENNIFER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-55 452-90 HSIPPEN 5,936 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

LIVINGSTON I-12 454-02 HSIPPEN 3,836 SAFETY

Project: H.010702 - IC SEVERAL RR XINGS (HAMMOND)

Type Impv: INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMOND

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 RAIL PD 700 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010703 - IC SEVERAL RR SPUR XINGS (HAMMOND)

Type Impv: INSTALL F/L'S AT LA 443 & CBA'S AT SEVERAL OTHER SPUR XINGS

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 443 853-27 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

TANGIPAHOA 000-53 RAIL PD 50 RAILROADS

Project: H.010983 - I-55: RAMP WIDENING, NB OFF RAMP @ LA 16

Type Impv: RAMP WIDENING, ADDITIONAL TURN LANE ON EXIT RAMP

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-55 452-90 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011008 - LA 3026: LA 22 - END OF CONTROL

Type Impv: COLD PLANING, CEMENT TREATED BASE, ASPHALT OVERLAY

Project Manager: BRANTON, JENNIFER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 NFA 1,700 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 167 of 211

Page 174: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA

Project: H.011044 - LA 1058: JCT LA 10 - W JCT LA 1054

Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 1058 853-16 NFABOND 2,701 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.011113 - LA 1064: IC RR XING (TANGIPAHOA)

Type Impv: REPLACE THE SURFACING OF THE CROSSING.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 1064 853-09 RAIL HE 40 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

TANGIPAHOA LA 1064 853-09 LOCAL 40 RAILROADS

Project: H.009425 - LA 16 AMITE DRAINAGE IMPROVEMENTS

Type Impv: DRAINAGE IMPROVEMENTS

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 16 047-01 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Project: H.009547 - JCT US 190 - S. JCT LA 40

Type Impv: MAINTENANCE RESTORATION & REHABILITATION

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 445 278-02 STPFLEX 3,515 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.010061 - N. RIVER ROAD AND DURBIN ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 FBROFF 731 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010062 - WEINBERGER RD & JERUSALEM CH RD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 FBROFF 878 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010645 - IC(KENTWOOD) LA 38 RR X-ING IN KENTWOOD

Type Impv: RAILROAD SIGNALS AND SURFACE WORK

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 38 263-04 RAIL HE 300 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.010991 - I-12: LIVINGSTON PARISH LINE - I-55

Type Impv: MILL, OVERLAY AND PAVEMENT MARKINGS

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA I-12 454-03 NHPP 7,000 PRESERVATION

INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.011025 - LA 40: NATALBANY RIVER TO I-55

Type Impv: ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 40 415-02 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 168 of 211

Page 175: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA

Project: H.003672 - KENTWOOD WEIGH STATION REHAB.

Type Impv: DEMO..CONST. AND PIT SCALE REHAB

Project Manager: MCCOY, JANET

Remarks: 690-29-0008;PRIORITY 7

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA 000-53 NHPP 2,901 OPER EFFICIENCY/MOTORIST ASSISTANCE

WEIGH STATIONS

2-WAITING FOR FUNDING

Project: H.008399 - US 51 (LA 22 TO CLUB DELUXE RD)

Type Impv: WIDEN TO 5 LANES

Project Manager: OLIVIER, NICHOLAS

Remarks: 853-36-0031;PORTION OF PROJECT COMPLETED UNDER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA US 51-X 853-36 STPFLEX 13,100 CAPACITY 1-PLANNING/ENVIRONMENTAL

Project: H.010374 - LA 1064: U.S. 190 - LA 443

Type Impv: COLD PLANE , BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 1064 853-28 STPFLEX 1,932 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010378 - LA 38: U.S. 51 - WASHINGTON PARISH LINE

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 38 263-04 STPFLEX 6,487 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010379 - LA 40: N. JCT. LA 445 - ST. TAMMANY P/L

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 40 269-06 STPFLEX 1,782 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.008915 - LA3234 EXT FROM LA1065 - HAMMOND AIRPORT

Type Impv: FEASIBILITY STUDY FOR LA 3234 EXTENSION

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA LA 3234 853-40 0 INTERMODAL CONNECTOR 0-FEASIBILITY/SCOPING

Project: H.009321 - DISTRICT 62 TRAFFIC CONTROL

Type Impv: INTERSECTION IMPROVEMENTS - STUDY

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TANGIPAHOA US 51 017-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

0-FEASIBILITY/SCOPING

TANGIPAHOA LA 38 263-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

ST TAMMANY LA 437-S 059-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

WASHINGTON LA 1069 859-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

TANGIPAHOA LA 16 262-07 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

WASHINGTON LA 10 047-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

WASHINGTON LA 3124 030-32 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

WASHINGTON LA 60 279-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

WASHINGTON LA 16 058-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 169 of 211

Page 176: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TENSAS

Project: H.011059 - LA 606, LA 887 & LA 570 PATCH & OVERLAY

Type Impv: PATCH & OVERLAY/STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TENSAS LA 606 854-10 NFABOND 3,180 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

TENSAS LA 887 181-02 NFABOND 424 PRESERVATION

NON-INTERSTATE NFA

TENSAS LA 570 854-13 NFABOND 848 PRESERVATION

NON-INTERSTATE NFA

Project: H.011076 - LA 605/607 STABILIZE, PATCH, OVERLAY

Type Impv: STABILIZE & OVERLAY/PATCH & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 854-23/LA 605 USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TENSAS LA 605 854-23 STPFLEX 3,022 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

TENSAS LA 605 854-23 STPFLEX 102 PRESERVATION

NON-INTERSTATE

Project: H.009591 - LA 4: US 65 - LA 605

Type Impv: ASPHALT OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TENSAS LA 4 173-01 STPFLEX 541 PRESERVATION

NON-INTERSTATE

3-DESIGN/DEVELOPMENT

Project: H.009585 - LA 128: LA 573 - US 65

Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TENSAS LA 128 036-06 STPFLEX 1,772 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 170 of 211

Page 177: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE

Project: H.009564 - LA 24 & LA 3040: DRAINAGE & RT TURN LANE

Type Impv: INSTALL RIGHT TURN LANE

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 3040 065-30 STP<200K 107 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

TERREBONNE LA 24 065-04 STP<200K 195 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

Project: H.009567 - LA 311:INTERSECTION IMP @ SAVANNE RD

Type Impv: ADD THROUGH LANE @ TRAFFIC SIGNAL

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 311 413-01 STPFLEX 296 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010579 - WESTSIDE BIKE TRAIL ROUTE

Type Impv: CONSTRUCTION OF A BIKE TRAIL.

Project Manager: RIGGS, LAURA

Remarks: NATIONAL RECREATIONAL TRAILS PROJECT

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE 000-55 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

TERREBONNE 000-55 LOCAL 13 RECREATIONAL TRAILS PROGRAM

Project: H.007351 - COUNTRY DRIVE WIDENING PHASE A

Type Impv: WIDENING

Project Manager: HANKS, ANNA

Remarks: 742-55-0102;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE 000-55 STP<200K 4,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009408 - LA 24: RECREATION BRIDGE - ROD BRIDGE

Type Impv: RAISE THE ELEVATION OF THE ROADWAY TO PREVENT FLOODING

Project Manager: GOLZ, SARAH

Remarks: 065-04

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 24 065-04 STP<200K 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009462 - VARIOUS ROADS:SIGNING (TERREBONNE)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE 000-55 SATRANS 32 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010398 - LA 57:LA 3011-LA 56

Type Impv: SUPERPAVE ASPHALTIC CONCRETE OVERLAY

Project Manager: RAY, JARED

Remarks: AC WITH NFA AND USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 57 246-01 STPFLEX 1,299 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010997 - LA 3185: IMP @ MAIN PROJECT RD

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 3185 855-17 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.001498 - LA 24 & LA 316: COMPANY CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: PAINE, PEGGY JO

Remarks: 065-91-0017;STAGE 0 FEASIBILITY STUDY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 24 065-91 STPFLEX 16,700 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 171 of 211

Page 178: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE

Project: H.005043 - LA311: LA 664 (ST CHARLES ST)-SAVANNE RD

Type Impv: WIDEN TO 4 LANES

Project Manager: BROWN, JEFF

Remarks: 700-55-0122

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 3-DESIGN/DEVELOPMENT

Project: H.010890 - LA 182: ROUNDABOUT AT HOLLYWOOD RD

Type Impv: ADD ROUNDABOUT

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 182 005-05 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

Project: H.011159 - CAROLL STREET AND BUQUET STREET BRIDGES

Type Impv: BRIDGE REPLACEMENT - NO ADDED CAPACITY

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE 000-55 FBROFF 939 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

TERREBONNE 000-55 FBROFF 585 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.011187 - DISTRICT 02H: SIGNAL TIMING

Type Impv: SIGNAL TIMING

Project Manager: HARROUCH, JOSHUA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 24 065-04 STPFLEX 2 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

TERREBONNE LA 3040 065-30 STPFLEX 1 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

TERREBONNE LA 24 065-91 STPFLEX 1 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

LAFOURCHE LA 1 064-06 STPFLEX 2 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.008411 - BAYOU TERREBONNE BR (LA 660)

Type Impv: BRIDGE REPLACEMENT

Project Manager: PICARD, TOBY

Remarks: 855-07-0010;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 660 855-07 STPFLEX 507 PRESERVATION

BRIDGE (ON SYSTEM)

2-WAITING FOR FUNDING

Project: H.009766 - WPARK AVE: ROYCE ST-MARIETTA PL SIDEWALK

Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 24 065-04 STPENH 959 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.002238 - ROBINSON CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: CAVALIER, STEPHANIE

Remarks: 247-01-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 56 247-01 FBROFF 1,200 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.002244 - BOUDREAUX CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: KEMP, KELLY

Remarks: 247-02-0030;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 56 247-02 STPFLEX 30,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 172 of 211

Page 179: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE

Project: H.005039 - LA 3040 (REPLACE TUNNEL)

Type Impv: STATE FUND FOR STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-55-0118;FEASIBILITY STUDY STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE 000-55 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009568 - LA 660:US 90 - LA 316

Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 660 855-07 STPFLEX 1,125 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009569 - LA 182:MAIN ST - LA 308

Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 182 005-05 STPFLEX 2,025 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009659 - US 90: 1.5 MI E LA 20 - 0.3 MI W LA 309

Type Impv: COLD PLANE AND OVERLY OF EXISTING ASPHALTIC CONCRET PAVE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE US 90 424-07 NHPP 2,115 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009660 - LA 311/312: US 90 - LA 24

Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 312 413-30 STPFLEX 844 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009957 - LA 56: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 56 247-01 FEMA 1,251 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009958 - LA 57: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 57 246-01 FEMA 4,183 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009970 - LA 3011: ELEVATION AND STABILIZATION

Type Impv: ELEVATION AND STABILIZATION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 3011 855-13 FEMA 1,597 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010328 - LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE

Type Impv: CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEM

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 659 855-04 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 173 of 211

Page 180: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE

Project: H.010410 - LA 24: LA 20 - LA 664 (SB)

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 24 065-04 NHPP 4,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010411 - LA 24: LA 55 - PROSPECT STREET BRIDGE

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 24 065-91 STPFLEX 4,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010412 - LA 57: THOMPSON RD - CEDAR GROVE RD

Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

TERREBONNE LA 57 246-01 STPFLEX 1,750 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 174 of 211

Page 181: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: UNION

Project: H.009278 - BERNICE SR2S PROJECT

Type Impv: SIDEWALK, CROSSWALKS, HANDICAP RAMPS, ETC

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION 000-56 SR2S 225 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011033 - LA 826: LA 33 - HUTTIG ROAD

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION LA 826 856-06 NFABOND 1,580 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009412 - US 63: 0.16 MI N LA 2 ALT-0.8 MI N LA 15

Type Impv: COLD PLANE & ASPHALTIC CONCRETE OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION US 63 023-11 NHPP 2,344 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009415 - US 63: LA 15 - ARKANSAS STATE LINE

Type Impv: COLD PLANE & ASPHALTIC CONCRETE OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION US 63 023-11 NHPP 3,192 TIME 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011038 - LA 828: LA 33 - LA 2

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION LA 828 856-07 NFABOND 7,012 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009532 - LA 2: E END D'ARBONNE BRIDGE TO LA 15

Type Impv: COLD PLANE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION LA 2 070-04 STPFLEX 2,250 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010392 - LA 550: LA2 - LA 15

Type Impv: OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

UNION LA 550 311-01 STPFLEX 3,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 175 of 211

Page 182: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERMILION

Project: H.002132 - MAREE MICHEL AND CREEK BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: OLIVIER, NICHOLAS

Remarks: 212-01-0008;FY 2012 OVER PROGRAM PROJECT;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 91 212-01 FBROFF 2,248 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010524 - LA 696: 0.6 MI E LA 35 - US 167

Type Impv: ASPHALT OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 696 857-25 NFABOND 4,925 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010525 - LA 91: 2.95 MI N OF FLORENCE - LA 14

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 91 212-01 NFABOND 2,074 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010547 - LA 700: LA 699 - LAFAYETTE PARISH LINE

Type Impv: BASE REHABILITATION & ASPHALT OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 700 207-04 NFABOND 1,935 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010548 - LA 335:0.038 MI E LA 3093-1.51 MI W LA35

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: RAY, JARED

Remarks: NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 335 396-02 STPFLEX 2,555 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.002133 - BAYOU QUEUE DE TORTUE

Type Impv: BRIDGE REPLACEMENT

Project Manager: CAVALIER, STEPHANIE

Remarks: 213-02-0007; NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 705 213-02 FBROFF 1,763 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.008441 - CREEK BRIDGES NEAR BOSTON

Type Impv: BRIDGE REPLACEMENT

Project Manager: DELATTE, BRIAN

Remarks: 857-37-0011;USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 331 857-37 FBROFF 1,323 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009463 - VARIOUS ROADS:SIGNING (VERMILION)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION 000-57 SATRANS 170 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010353 - US 167: ACCESS MANAGEMENT (LFT TURN LNS)

Type Impv: ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNS

Project Manager: DOMINGUE, CHRISTOPHER

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION US 167 080-01 STPFLEX 248 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

LAFAYETTE US 167 080-02 NHPP 3,352 SAFETY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 176 of 211

Page 183: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERMILION

Project: H.002048 - LA 82 BRIDGES NEAR ESTHER

Type Impv: BRIDGE REPLACEMENT

Project Manager: LAI, QUANG

Remarks: 194-07-0056;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 82 194-07 STPFLEX 3,181 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.002747 - LA 335 BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: TONEY, PATRICK

Remarks: 396-02-0008;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 335 396-02 FBROFF 1,735 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010867 - JUDE & PLACIDE ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION 000-57 FBROFF 308 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

VERMILION 000-57 FBROFF 300 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.002148 - JCT LA 35 - JCT LA 700

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: RAY, JARED

Remarks: 214-01-0013;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 699 214-01 STPFLEX 4,220 PRESERVATION

NON-INTERSTATE

2-WAITING FOR FUNDING

Project: H.009761 - LA 14: DOWNTOWN ABBEVILLE STREETSCAPING

Type Impv: SIDEWALKS W/LIGHTING, LANDSCAPE & RELATED WORK

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 14 055-06 STPENH 500 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009792 - LA 35: KAPLAN SIDEWALKS, PHASE 1

Type Impv: SIDEWALKS W/ LANDSCAPING, SUBSURFACE DRAINAGE & RELATED

Project Manager: MEEK, STEPHEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 35 207-03 STPENH 324 ENHANCEMENTS 2-WAITING FOR FUNDING

Project: H.009627 - LA 35: LA 335 - LA 14

Type Impv: COLD PLANE, PATCH & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 35 207-02 STPFLEX 2,234 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.009972 - LA 3147: EMBANKMENT SLOPE REST & PROTECT

Type Impv: EMBANKMENT SLOPE RESTORATION AND PROTECTION

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 3147 857-66 FEMA 1,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

VERMILION LA 3147 857-66 FEMA 875 OTHER / MISCELLANEOUS

Project: H.010226 - LA 82: LA 35 - LA 333

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERMILION LA 82 215-01 STPFLEX 5,383 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 177 of 211

Page 184: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERNON

Project: H.010536 - LA 392: US 171 - PEASON RIDGE WILDLIFE

Type Impv: PATCH AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 392 135-02 NFABOND 1,130 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010541 - LA 8: 170' W LA 465 - 775' W RAPIDES P/L

Type Impv: THIN OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 8 134-02 STPFLEX 878 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006618 - SIDEWALK ON HIGH SCHOOL DRIVE

Type Impv: SIDEWALK INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-58-0001;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON 000-58 HRRR 96 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.006619 - SIDEWALK ON LOUISIANA AVENUE

Type Impv: SIDEWALK INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-58-0002;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON 000-58 HRRR 134 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010264 - US 171: NB @ LA 1213 CROSS DRAIN REPLACE

Type Impv: CROSS DRAIN REPLACEMENT

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON US 171 025-01 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010360 - US 171: 800' N BOONE ST - LA 8/LA 28

Type Impv: CRACK SEALING AND PCCP PATCHING

Project Manager: CHENEVERT, MARK

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON US 171 024-06 NHPP 886 TIME 4-SCHEDULED FOR LETTING FY 14-15

VERNON US 171 025-01 NHPP 414 TIME

Project: H.011067 - LA 399:LA 10 - FORT POLK MAINTAINED AREA

Type Impv: STABLIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 399 138-03 NFABOND 3,498 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010599 - WELCOME CEMETERY ROAD / MENACE CREEK

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON 000-58 FBROFF 316 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.011027 - LA 111 SOUTH OF EVANS - ADD CROSS DRAIN

Type Impv: REPLACE 4 EXISTING PIPE WITH 5 - 48" RCPAS AND ELEVATE ROAD

Project Manager: MATHEWS, LARRY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 111 132-02 STPFLEX 341 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 178 of 211

Page 185: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERNON

Project: H.001883 - LA 8 - LA 28

Type Impv: CHIP SEAL

Project Manager: CHENEVERT, MARK

Remarks: 137-02-0017;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 465 137-02 NFA 336 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

Project: H.000986 - SABINE RIVER BR (BURR FERRY)

Type Impv: BRIDGE REPLACEMENT

Project Manager: BROWN, JEFF

Remarks: 029-01-0004;ADMIN. BY TEXAS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 8 029-01 STPFLEX 12,700 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001881 - LA 392 BRIDGES NEAR HORNBECK

Type Impv: BRIDGE REPLACEMENT

Project Manager: GAUDRY, CARL

Remarks: 135-02-0009;2 BRIDGES; USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 392 135-02 FBROFF 3,560 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.005083 - VERNON PARISH TRANSPORTATION PLAN

Type Impv: INCLUDES US 171 IMPROVEMENT STUDY

Project Manager: BARTKIEWICZ, THOMAS

Remarks: 700-58-0140;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON 000-58 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009955 - LA 111: BEAUREGARD LINE - C DAVIS LOOP

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 111 132-02 STPFLEX 4,167 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010339 - LA 10: LOOK OUT RD - 850' E BAILEY RD

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 10 066-02 NHPP 1,226 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010348 - LA 8: LA 464 - US 171

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 8 029-02 STPFLEX 4,661 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010354 - LA 111: US 171 - LA 117

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 111 133-03 STPFLEX 1,898 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010358 - LA 3226: BEAUREGARD P/L - US 171

Type Impv: PATCH. COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

VERNON LA 3226 858-11 STPFLEX 2,329 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 179 of 211

Page 186: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WASHINGTON

Project: H.006621 - CITY OF BOGALUSA PAVEMENT MARKINGS

Type Impv: PAVEMENT MARKINGS INSTALLATION

Project Manager: HOLM, RICK

Remarks: 737-59-0005;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON 000-59 SATRANS 112 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009553 - LA 438: JCT. LA 38 - JCT. 438 SPUR

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON LA 438 275-01 STPFLEX 4,337 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

WASHINGTON LA 438 275-02 STPFLEX 2,432 PRESERVATION

NON-INTERSTATE NFA

Project: H.010106 - SUPERIOR AVE. ELEM. SCHOOL SRTS PROJECT

Type Impv: SIDEWALK IMPROVMENTS, STRIPING, ENCOURAGMENT AND EDUCAT

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON 000-59 SR2S 290 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010260 - LA 21 VARNADO DRAINAGE IMPROVEMENTS

Type Impv: ADDING A SUBSURFACE DRAINAGE SYSTEM

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON LA 21 030-04 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010980 - LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)

Type Impv: LANE CONFIGURATION MODIFICATION

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON LA 10 047-04 DEMO 150 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011122 - BOGALUSA TRAILS

Type Impv: CONSTRUCTION OF 4,000' AND RESTORATION OF 2,000' OF TRAIL

Project Manager: RIGGS, LAURA

Remarks: MICHAEL DOMINGUE IS THE PROJECT MANAGER

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON 000-59 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15

WASHINGTON 000-59 LOCAL 24 RECREATIONAL TRAILS PROGRAM

Project: H.011202 - FRANKLINTON SRTS PROJECT - FJHS

Type Impv: SIDEWALKS STRIPING AND SIGNAGE

Project Manager: GROS, SCOTT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON 000-59 SR2S 284 SAFETY

SAFE ROUTES TO SCHOOLS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010608 - PLEASANT HILL RD & LAWRENCE CK RD BRDGS

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON 000-59 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

WASHINGTON 000-59 FBROFF 655 PRESERVATION

BRIDGE (OFF SYSTEM)

WASHINGTON 000-59 FBROFF 739 PRESERVATION

BRIDGE (OFF SYSTEM)

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 180 of 211

Page 187: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WASHINGTON

Project: H.006622 - REHABILITATION-STREET ROUTES IN BOGALUSA

Type Impv: REHABILITATION OF CITY LIMITS ROAD IN BOGALUSA

Project Manager: WAGUESPACK, BRENT

Remarks: 737-59-0006

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON 000-59 NFA 356 ROAD TRANSFER 2-WAITING FOR FUNDING

Project: H.008449 - DRAIN BRIDGE NEAR STONEY POINT

Type Impv: BRIDGE REPLACEMENT

Project Manager: GAUDRY, CARL

Remarks: 859-04-0010;USE NFA AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON LA 450 859-04 FBROFF 1,093 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010376 - LA 25: ST. TAMMANY P/L - S JCT. LA 16

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON LA 25 059-03 STPFLEX 3,504 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010381 - LA 436: LA 62 - N. JCT. LA 21

Type Impv: COLD PLANE, BASE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WASHINGTON LA 436 859-08 STPFLEX 7,618 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 181 of 211

Page 188: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WEBSTER

Project: H.009504 - LA 2: BOSSIER PARISH LINE TO SYKES FERRY

Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RELATED W

Project Manager: CHENEVERT, MARK

Remarks: 083-06-0043; C.S. 083-06 IS STPFLEX WITH TTF AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 2 083-06 STPFLEX 2,856 PRESERVATION

NON-INTERSTATE

4-SCHEDULED IN CURRENT FY 13-14

WEBSTER LA 2-S 860-11 NFA 174 PRESERVATION

NON-INTERSTATE NFA

Project: H.010314 - LA 518: US 79 TO CLAIBORNE PARISH LINE

Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 518 292-01 STPFLEX 108 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010511 - LA 3008: FLAT LICK BAYOU TO LA 160

Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 3008 288-02 NFABOND 3,256 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010516 - LA 528: LA 157 TO US 371

Type Impv: ASPALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 528 107-02 NFABOND 2,016 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

BOSSIER LA 528 107-01 NFABOND 769 PRESERVATION

NON-INTERSTATE NFA

Project: H.010961 - I-20: E. B. EXIT RAMP AT DIXIE INN

Type Impv: ADDING LENGTH TO DECELERATION LANE AT EXIT

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER I-20 451-03 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010996 - LA 531: LA 792 TO LA 532

Type Impv: CHIP SEAL

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 531 111-01 STPFLEX 317 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009466 - VARIOUS ROADS:SIGNING (WEBSTER)

Type Impv: SIGNAGE

Project Manager: HOLM, RICK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER 000-60 SATRANS 19 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010024 - SMITHVILLE ROAD / BRALY CREEK

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER 000-60 FBROFF 354 PRESERVATION

BRIDGE (OFF SYSTEM)

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010203 - US 80: INTERS. IMPROVE @ ERWIN THOMPSON

Type Impv: IMP TURN RADIUS AT SW CORNER IN MINDEN.ACCESS TO INDUST PA

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER US 80 001-04 HSIP 100 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 182 of 211

Page 189: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WEBSTER

Project: H.010275 - LA 792: CURVE IMPROVEMENT

Type Impv: REALIGN CURVE

Project Manager: STURDIVANT, PHILLIP

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 792 293-03 HSIP 680 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

BIENVILLE LA 792 293-02 HSIP 100 SAFETY

Project: H.010480 - I-20: .9 MI E OF LA 7 OVP - BIENVILLE PL

Type Impv: COLD PLANE AND ASPHALTIC OVERLAY

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER I-20 451-03 NHPP 5,500 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010974 - US 79: NB LEFT TURN LANE AT MILLER ROAD

Type Impv: ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER US 79 027-04 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010008 - LA 532 OVER I-20 BRIDGE REPLACEMENT

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 532 860-07 FBROFF 3,517 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.001838 - BOSSIER PARISH LINE - LA 163

Type Impv: MILL. OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: 122-02-0009;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 164 122-02 STPFLEX 813 PRESERVATION

NON-INTERSTATE

2-WAITING FOR FUNDING

Project: H.001666 - DORCHEAT BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BRAUNER, KURT

Remarks: 085-05-0029;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 160 085-05 FBROFF 4,100 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001798 - PARMERS CREEK BRIDGE

Type Impv: NEW BRIDGE

Project Manager: BUCCI, MARK

Remarks: 111-01-0018;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 531 111-01 STPFLEX 1,843 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001799 - LA 531 OVERPASS

Type Impv: NEW INTERCHANGE

Project Manager: OLIVIER, NICHOLAS

Remarks: 451-03-0047;GEOM. STUDY UNDERWAY (E)

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 531 111-02 STPFLEX 20,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

WEBSTER I-20 451-03 NHPP 0 CAPACITY

Project: H.009513 - LA 164: JCT. LA 163 TO JCT. US 371

Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED W

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 164 122-03 STPFLEX 3,114 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 183 of 211

Page 190: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WEBSTER

Project: H.010276 - LA 164: JCT LA 163 TO US 371

Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WEBSTER LA 164 122-03 STPFLEX 2,650 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 184 of 211

Page 191: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W BATON ROUGE

Project: H.011215 - ER RPL RPMS -EBR,WBR,ST.MARTIN,IBR PAR

Type Impv: EMERGENCY RAISED PAVEMENT MARKER REPLACEMENT

Project Manager: FAUST, JEFF

Remarks: SECRETARY'S EMERGENCY LETTER DATED 1/30/2014

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE I-10 450-08 SATRANS 20 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

E BATON ROUGE I-10 450-09 SATRANS 10 SAFETY

E BATON ROUGE I-10 450-10 SATRANS 20 SAFETY

W BATON ROUGE LA 415 013-01 SATRANS 10 SAFETY

IBERVILLE I-10 450-07 SATRANS 120 SAFETY

ST MARTIN I-10 450-06 SATRANS 120 SAFETY

Project: H.010075 - UP (ADDIS) SEVERAL RR-X-INGS

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE 000-61 RAIL PD 1,000 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010653 - LA 986 SIDEWALKS

Type Impv: INSTALLATION OF SIDEWALKS

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 986 228-07 STP>200K 658 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010654 - LA 415:I-10 TO APPROXIMATELY 0.41M NORTH

Type Impv: PAVEMENT REHABILITATION

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 415 861-22 STP>200K 530 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.010656 - LA 1 @ LA 76 INTERSECTION IMPROVEMENTS

Type Impv: TURN LANES

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 STP>200K 214 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15

W BATON ROUGE LA 76 013-01 STP>200K 214 URBAN SYSTEMS

Project: H.010680 - I-10: CABLE BARRIER IN WBR & IBERVILLE

Type Impv: INSTALL MEDIAN CABLE BARRIER

Project Manager: KELLEY, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE I-10 450-08 HSIPPEN 929 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

IBERVILLE I-10 450-07 HSIPPEN 710 SAFETY

Project: H.010768 - MULTI-USE TRAILS, PHASE I-B (WBR)

Type Impv: 3 MILES OF LEVEE-TOP TRAIL IN WBR

Project Manager: FLETCHER, CURTIS

Remarks: USE WBR AS 20% MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE 000-61 CM 700 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 14-15

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 185 of 211

Page 192: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W BATON ROUGE

Project: H.011133 - LA 1: UP RR XING (WEST BATON ROUGE)

Type Impv: IMPROVE ROADWAY SURFACING.

Project Manager: LUKE, SHAWN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 RAIL HE 300 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15

Project: H.011218 - LA 1: TRAVEL TIMES TO NORTH BR

Type Impv: INSTALLATION OF BLUETOOTH EQUIP. AND VARIABLE MESSAGE SIG

Project Manager: BANKSTON, TANYA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 STCASH 50 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE US 190 007-10 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

E BATON ROUGE US 190 007-90 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

E BATON ROUGE US 190 007-90 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

E BATON ROUGE I-110 450-92 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

E BATON ROUGE I-10 450-09 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

W BATON ROUGE I-10 450-08 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.011228 - US 190: LA 415 - I-110 SIGN-STRIPE-TREE

Type Impv: SIGNING-STRIPING-TREE ON US 190 - OLD MISSISSIPPI RIVER BRDG

Project Manager: COURTIER, KAY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE US 190 008-01 NHPP 523 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED FOR LETTING FY 14-15

E BATON ROUGE US 61 007-90 NHPP 171 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

E BATON ROUGE US 61 007-90 NHPP 162 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

W BATON ROUGE LA 415-S 013-01 NHPP 77 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

W BATON ROUGE LA 415-S 013-01 NHPP 54 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

W BATON ROUGE LA 1 050-07 NHPP 70 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

W BATON ROUGE LA 415 225-01 NHPP 107 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

E BATON ROUGE US 61 019-01 NHPP 192 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

E BATON ROUGE I-110 450-92 NHPP 460 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

E BATON ROUGE US 190 007-10 NHPP 183 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: H.009288 - LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)

Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING

Project Manager: LACOMBE, JASON

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 NHPP 40,000 RAILROADS

GRADE SEPARATION

3-DESIGN/DEVELOPMENT

Project: H.010069 - UP (W. BATON ROUGE) WINTERVILLE RD.

Type Impv: RAILROAD SIGNALIZATION

Project Manager: SHREWSBERRY,BILL

Remarks: 714-61-0006

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE 000-61 RAIL PD 250 RAILROADS 3-DESIGN/DEVELOPMENT

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 186 of 211

Page 193: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W BATON ROUGE

Project: H.010655 - LA 1 LIGHTING RENOVATIONS

Type Impv: LIGHTING IMPROVEMENTS

Project Manager: DEVILLE, JACQUES

Remarks: USE LOCAL AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 STP>200K 485 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

Project: H.009421 - LA 1: J-TURNS @ SUGAR MILL PARKWAY

Type Impv: FULL J-TURN & J-TURN BETWEEN TWO U-TURNS

Project Manager: BEAUVAIS, HEWITT

Remarks: 050-07

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 SATRANS 900 SAFETY 2-WAITING FOR FUNDING

Project: H.000358 - US 190 @ LA 415: LOBDELL INTERCHANGE

Type Impv: NEW BRIDGE

Project Manager: PAINE, PEGGY JO

Remarks: 008-01-0051;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE US 190 008-01 NHPP 55,866 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.001234 - PORT ALLEN CANAL BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: DELATTE, BRIAN

Remarks: 050-07-0066;2 STRUCTURES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 1 050-07 NHPP 60,000 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.005121 - LA 1 - I-10 CONNECTOR STUDY

Type Impv: FEDERAL EARMARK FOR STUDY

Project Manager: KENDRICK, BRIAN

Remarks: 700-61-0113;STAGE 0 COMPLETED

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE 000-61 STGEN 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.009060 - ANALYSIS I-10 WB TRAFFIC EXISTIN TO LA 1

Type Impv:

Project Manager: COLVIN, JODY

Remarks: STUDY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE I-10 450-08 SATRANS 38 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Project: H.009905 - LA 415 CORRIDOR STUDY

Type Impv: EFFICIENCY AS DETOUR ROUTE

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W BATON ROUGE LA 415-S 013-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

W BATON ROUGE LA 415 225-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

W BATON ROUGE LA 415 861-22 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 187 of 211

Page 194: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W CARROLL

Project: H.011020 - LA 585: 0.45 MILES EAST OF LA 17

Type Impv: THREE 42" RCPA CROSS DRAIN STRUCTURES ADDED TO PREVENT FL

Project Manager: GOLZ, SARAH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W CARROLL LA 585 332-04 STPFLEX 151 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009981 - SKINNER LANE & ODIS WADE ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W CARROLL 000-62 FBROFF 447 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

W CARROLL 000-62 FBROFF 300 PRESERVATION

BRIDGE (OFF SYSTEM)

W CARROLL 000-62 FBROFF 231 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.008469 - LA 835: BOEUF RIVER BRIDGE NEAR CONCORD

Type Impv: NEW BRIDGE

Project Manager: RICHARD, RYAN

Remarks: 862-22-0006;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W CARROLL LA 835 862-22 STPFLEX 3,551 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010393 - LA 582: JCT LA 17 TO EAST CARROLL LINE

Type Impv: STABILIZED BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W CARROLL LA 582 333-02 STPFLEX 3,000 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010394 - LA 585: LA 879 - SANDERS ROAD

Type Impv: STABILIZE BASE & OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W CARROLL LA 585 332-02 STPFLEX 2,500 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 188 of 211

Page 195: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W FELICIANA

Project: H.010438 - US 61: E. FELICIANA P/L - MISS STATE LN

Type Impv: COLD PLANE & OVERLAY

Project Manager: RAY, JARED

Remarks: USE TIMED AS MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W FELICIANA US 61 019-05 NHPP 5,679 TIME 4-SCHEDULED FOR LETTING FY 14-15

W FELICIANA US 61 019-04 NHPP 2,321 TIME

Project: H.011064 - LA 964&LA 965:PATCH, STABILIZE & OVERLAY

Type Impv: PATCH, STABILIZE & OVERLAY

Project Manager: RAY, JARED

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W FELICIANA LA 964 863-09 NFABOND 2,035 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED FOR LETTING FY 14-15

W FELICIANA LA 965 863-08 NFABOND 1,357 PRESERVATION

NON-INTERSTATE NFA

Project: H.002281 - LA 66: BIG BAYOU SARA BRIDGE REHAB.

Type Impv: BRIDGE REHABILITATION

Project Manager: DELATTE, BRIAN

Remarks: 251-01-0018;STAGE 0 FEASIBILITY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W FELICIANA LA 66 251-01 STPFLEX 4,106 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010596 - PETERSON ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W FELICIANA 000-63 FBROFF 385 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

W FELICIANA 000-63 FBROFF 616 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: H.010597 - SLIGO ROAD BRIDGES

Type Impv: BRIDGE REPLACEMENT

Project Manager: PENTEK, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

W FELICIANA 000-63 FBROFF 3,388 PRESERVATION

BRIDGE (OFF SYSTEM)

3-DESIGN/DEVELOPMENT

W FELICIANA 000-63 FBROFF 747 PRESERVATION

BRIDGE (OFF SYSTEM)

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 189 of 211

Page 196: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WINN

Project: H.010537 - LA 471 AND LA 3136 OVERLAYS

Type Impv: STABILIZE BASE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks: NFA AS MATCH ON C.S. 123-03

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN LA 471 123-03 STPFLEX 3,275 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

WINN LA 3136 864-16 NFABOND 410 PRESERVATION

NON-INTERSTATE NFA

Project: H.011066 - LA 477: J E JONES RD - US 84

Type Impv: STABILIZE AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN LA 477 864-11 NFABOND 4,134 PRESERVATION

NON-INTERSTATE NFA

4-SCHEDULED IN CURRENT FY 13-14

Project: H.000382 - SALINE BAYOU BRIDGE

Type Impv: BRIDGE REPLACEMENT

Project Manager: BUCCI, MARK

Remarks: 009-04-0010;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN US 71 009-04 STPFLEX 3,441 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.010013 - US 84: LAS RAILROAD OVERPASS BR REHAB

Type Impv: REHABILITATION OF RAILROAD BRIDGE OVERPASS

Project Manager: HERATH, ANANDA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN US 84 022-02 NHPP 989 PRESERVATION

BRIDGE (ON SYSTEM)

3-DESIGN/DEVELOPMENT

Project: H.000750 - ROUNDABOUT US 84 AT LA 34 INTERSECTION

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: MATHEWS, LARRY

Remarks: 022-03-0046;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN US 84 022-03 HSIP 1,099 SAFETY 1-PLANNING/ENVIRONMENTAL

Project: H.001711 - SALINE BAYOU RELIEF & MILL CR. BRS.

Type Impv: NEW BRIDGES

Project Manager: YANG, LI

Remarks: 091-05-0014;2 BRIDGES

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN LA 126 091-05 STPFLEX 3,023 PRESERVATION

BRIDGE (ON SYSTEM)

1-PLANNING/ENVIRONMENTAL

Project: H.010081 - LA 156 IMPROVEMENTS (CALVIN TO US 167)

Type Impv: FEASIBILITY STUDY

Project Manager: PORTER BETTS, CONNIE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN LA 156 092-03 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

Project: H.010356 - LA 126: JCT LA 34 - NW JCT LA 499

Type Impv: CTB AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN LA 126 091-07 STPFLEX 2,733 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Project: H.010361 - US 84: LA 477 TO WOLF CREEK

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN US 84 022-02 NHPP 3,790 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 190 of 211

Page 197: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WINN

Project: H.010363 - LA 34: 1200' S OF LA 1236 TO LA 126

Type Impv: PATCH, COLD PLANE, AND OVERLAY

Project Manager: CHENEVERT, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

WINN LA 34 124-01 STPFLEX 979 PRESERVATION

NON-INTERSTATE

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 191 of 211

Page 198: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 02

Project: H.010744 - ALT FUEL VEHICLES & IDLE REDUCT (NO RPC)

Type Impv: PURCHASE OF ALT FUEL VEHICLES,CONV OF EXIST VEH,IDLE REDUC

Project Manager: REVIERE, RYAN

Remarks: RPC WILL PROVIDE 20% MATCH

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 CM 107 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 13-14

DISTRICTWIDE 02 000-92 CM 206 CONGESTION MITIGATION

DISTRICTWIDE 02 000-92 CM 412 CONGESTION MITIGATION

DISTRICTWIDE 02 000-92 CM 412 CONGESTION MITIGATION

Project: H.011233 - DISTRICT 02 LOW COST SAFETY IMPROVEMENTS

Type Impv: ENHANCED SIGNING AND STRIPING

Project Manager: RENARD, APRIL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 HSIPPEN 657 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009054 - DIST. 02 PAVEMENT MARKING REPLACEMENT II

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009186 - DIST. 02 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.005164 - SMART GROWTH STRATEGIES LAND USE

Type Impv: LAND USE STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-92-0017;STAGE O UNDER WAY

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.005167 - LONG-RANGE TRANSPORTATION STRATEGY

Type Impv: GROWTH MANAGEMENT STUDY

Project Manager: NGUYEN, WAYNE

Remarks: 700-92-0020;PRE STAGE 0

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.005168 - NEW ORLEANS RAIL GATEWAY EIS

Type Impv: EIS

Project Manager: GOODELL, DEAN

Remarks: STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

Project: H.009426 - DISTRICT 02 SIGNAL INVENTORY

Type Impv: INVENTORY SIGNALS IN DISTRICT 02

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 192 of 211

Page 199: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 02

Project: H.009731 - L/CNG FUEL FLEETS DISTRICT 02

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 02 000-92 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 193 of 211

Page 200: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 03

Project: H.009188 - DIST. 03 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 03 000-93 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010677 - DMS LADDER SYSTEM PHASE 3

Type Impv: INSTALLATION OF ACCESS LADDERS.

Project Manager: DELANEY, ELIZABETH

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 03 000-93 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED FOR LETTING FY 14-15

DISTRICTWIDE 07 000-97 NHPP 75 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.006713 - DIST 03 BRIDGE JT REPAIRS & OVERLAY

Type Impv: DECK JT REPAIRS & DECK OVERLAY

Project Manager: TULLIER, DANNY

Remarks: 737-93-0074;BRPM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 03 000-93 NHPP 548 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

Project: H.009732 - L/CNG FUEL FLEETS DISTRICT 03

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 03 000-93 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 194 of 211

Page 201: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 04

Project: H.010705 - DMS LADDER SYSTEM PHASE 4

Type Impv: INSTALL OF LADDERS AND SIGN REPACEMENTS.

Project Manager: BANKSTON, TANYA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 04 000-94 DEMO 1,646 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14

DISTRICTWIDE 04 000-94 STPFLEX 543 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.009189 - DIST. 04 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 04 000-94 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009733 - L/CNG FUEL FLEETS DISTRICT 04

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 04 000-94 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Project: H.010876 - I-20 & I-49 SPEED STUDY

Type Impv: CONDUCT SPEED STUDY ON INTERSTATE 20 AND INTERSTATE 49

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 04 000-94 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

DISTRICTWIDE 05 000-95 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

DISTRICTWIDE 08 000-98 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 195 of 211

Page 202: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 05

Project: H.009055 - DIST. 05 PAVEMENT MARKING REPLACEMENT:

Type Impv: PLASTICE PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 05 000-95 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED IN CURRENT FY 13-14

Project: H.009546 - I-20: DIST 05 CRACK & JOINT SEAL & PATCH

Type Impv: CRACK SEAL, JOINT SEAL & PATCHING

Project Manager: THOMAS, BEN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 05 000-95 NHPP 5,000 PRESERVATION

INTERSTATE

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009191 - DIST. 05 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 05 000-95 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009734 - L/CNG FUEL FLEETS DISTRICT 05

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 05 000-95 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 196 of 211

Page 203: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 07

Project: H.009056 - DIST 07. PAVEMENT MARKING REPLACEMENT II

Type Impv: PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 07 000-97 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009193 - DIST. 07 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 07 000-97 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009735 - L/CNG FUEL FLEETS DISTRICT 07

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 07 000-97 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 197 of 211

Page 204: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 08

Project: H.000792 - DIST 08 BRIDGE DK OVERLAYS & PAINTING

Type Impv: BRIDGE DECK EPOXY OVERLAY

Project Manager: TULLIER, DANNY

Remarks: 023-01-0073;BRPM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 08 000-98 STPFLEX 1,410 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

Project: H.009194 - DIST. 08 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 08 000-98 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009736 - L/CNG FUEL FLEETS DISTRICT 08

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 08 000-98 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 198 of 211

Page 205: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 58

Project: H.009052 - DIST. 58 PAVEMENT MARKING REPLACEMENT II

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 58 000-91 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009197 - DIST. 58 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009737 - L/CNG FUEL FLEETS DISTRICT 58

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 58 000-91 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 199 of 211

Page 206: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 61

Project: H.009833 - DISTRICT 61 TRAFFIC CONTROL UPGRADE

Type Impv: INTERSECTION IMPROVEMENTS

Project Manager: LEBLANC, GARY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 STPFLEX 1,670 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

4-SCHEDULED IN CURRENT FY 13-14

Project: H.006831 - BATON ROUGE ITS DEPLOYMENT (PHASE3)

Type Impv: BATON ROUGE ITS

Project Manager: BANKSTON, TANYA

Remarks: 737-99-0595;I-12 (AIRLINE - 2 MI PAST D.S.

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 CM 3,143 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

4-SCHEDULED FOR LETTING FY 14-15

DISTRICTWIDE 62 000-90 CM 857 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.011205 - DISTRICT 61: THERMOPLASTIC STRIPING

Type Impv: UPGRADE PAVEMENT & REPLACE STRIPING WITH THERMOPLASTIC

Project Manager: KELLEY, MARK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 SATRANS 250 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.000351 - DIST 61 BRIDGE DK JT & MISC REPAIRS

Type Impv: GROUT. REMOVE. REPLACE BEARINGS

Project Manager: TULLIER, DANNY

Remarks: 007-90-0029;BRPM

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 STPFLEX 2,184 PRESERVATION

BRIDGE PREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

Project: H.009199 - DIST. 61 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009738 - L/CNG FUEL FLEETS DISTRICT 61

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Project: H.009791 - LOW COST SAFETY COUNTERMEASURES

Type Impv: FEAS STUDY TO DETERMINE LOCATIONS COUNTERMEASURES NEEDE

Project Manager: RENARD, APRIL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 61 000-96 0 SAFETY 1-PLANNING/ENVIRONMENTAL

DISTRICTWIDE 62 000-90 0 SAFETY

DISTRICTWIDE 02 000-92 0 SAFETY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 200 of 211

Page 207: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 62

Project: H.011234 - DISTRICT 62 LOW-COST SAFETY IMPROVEMENTS

Type Impv: ENHANCED SIGNING AND STRIPING

Project Manager: RENARD, APRIL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 62 000-90 HSIPPEN 2,468 SAFETY 4-SCHEDULED FOR LETTING FY 14-15

Project: H.009200 - DIST. 62 PAVEMENT MARKING REPLACE III:

Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 62 000-90 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

3-DESIGN/DEVELOPMENT

Project: H.009739 - L/CNG FUEL FLEETS DISTRICT 62

Type Impv: FLEET CONVERSION TO CNG

Project Manager: AMBEAU, JAUBERT

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 62 000-90 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

Project: H.010031 - DISTRICT 62 TRAFFIC SIGNAL INVENTORY

Type Impv: INVENTORY TRAFFIC SIGNALS IN DIST 62

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

DISTRICTWIDE 62 000-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 201 of 211

Page 208: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: STATEWIDE

Project: H.009374 - DEWEY WILLS WMA-NOLAN-MUDDY BAYOU TRAILS

Type Impv: RESTORATION & NON-ROUTINE MAINTENANCE OF MOTORIZED TRAIL

Project Manager: RIGGS, LAURA

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 RTP 186 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010690 - M/V LEVY:DRY-DOCK -5 YEAR EXAM & REPOWER

Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWER

Project Manager: REED, KEVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 FB DISCR 1,350 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010694 - INSTALL AND MODIFY BARGES AND FERRIES

Type Impv: MODIFICATION, INSTALLATION LANDING BARGE,CONVERSION TO FE

Project Manager: REED, KEVIN

Remarks: FB DISCR FLEXED TO FTA THEREFORE NOT AUTH THROUGH FHW

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 FB DISCR 420 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 13-14

STATEWIDE 000-99 OTHER 330 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

Project: H.010788 - M/V ASCENSION: DRY-DOCK FOR 5 YEAR EXAM

Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM

Project Manager: REED, KEVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 STPFLEX 697 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010903 - LRSP TECH ASSISTANCE CRASH DATA ENGR

Type Impv: LRSP TECH ASSISTANCE CRASH DATA ENGR

Project Manager: CHAPMAN, JIM

Remarks: USE SATRANS FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.010904 - LRSP TECH ASSISTANCE ENGR

Type Impv: LRSP TECH ASSISTANCE ENGR

Project Manager: CHAPMAN, JIM

Remarks: USE SATRANS FUNDS

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 SAFETY

LOCAL ROADS SAFETY

4-SCHEDULED IN CURRENT FY 13-14

Project: H.011012 - BICYCLE GOALS MAP

Type Impv: BICYCLE GOALS MAP FOR DISTRICT'S USE.

Project Manager: PARSONS, BRIAN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011080 - DISTRICT 03: SIGNAL HEAD REPLACEMENT

Type Impv: INSTALL SIGNAL HEADS WITH BACKPLATES IN DISTRICT 03

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 SATRANS 700 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011155 - STATEWIDE HEAT STRAIGHTENING

Type Impv: HEAT STRAIGHTENING OF DAMAGED STEEL BRIDGE GIRDERS.

Project Manager: BROWN, HAYLYE

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 PRESERVATION

BRIDGE (ON SYSTEM)

4-SCHEDULED IN CURRENT FY 13-14

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 202 of 211

Page 209: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: STATEWIDE

Project: H.011168 - I9000 BREATH TESTING INSTRUMENTS

Type Impv: SHSP PROJECT FOR IMPAIRED DRIVING

Project Manager: RENARD, APRIL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 SATRANS 1,980 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.011178 - BREATH ALCOHOL TESTING MOBILE UNIT

Type Impv: SHSP IMPAIRED DRIVING EMPHASIS AREA STRATEGY

Project Manager: RENARD, APRIL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 SATRANS 390 SAFETY 4-SCHEDULED IN CURRENT FY 13-14

Project: H.010037 - NEW FERRY BOAT / CAMERON FERRY CROSSING

Type Impv: CONSTRUCT NEW FERRY BOAT

Project Manager: REED, KEVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 NFI 12,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010689 - CCC FERRY VESSEL: TERM/LAND TECH UPGRADE

Type Impv: TECHNOLOGY IMPROVEMENTS TO FERRY VESSELS AND TERMINAL L

Project Manager: REED, KEVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 FB DISCR 200 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.010691 - MV STUMPF: DRY-DOCK: 5 YR EXAM & REPOWER

Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWER

Project Manager: REED, KEVIN

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 FB DISCR 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

4-SCHEDULED FOR LETTING FY 14-15

Project: H.009884 - NOGC (STATEWIDE)

Type Impv: RELOCATING LED CROSSBUCK ASSEMBLIES

Project Manager: SHREWSBERRY,BILL

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 RAIL HE 200 RAILROADS 3-DESIGN/DEVELOPMENT

Project: H.007026 - ITS MAINTENANCE - STATEWIDE

Type Impv: ROUTINE & EMERGENCY REPAIR TO ITS STATEWIDE SYSTEM

Project Manager: SMITH, ERIK

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 STPFLEX 1,847 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

2-WAITING FOR FUNDING

STATEWIDE 000-99 STPFLEX 1,617 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

STATEWIDE 000-99 STPFLEX 1,617 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: H.005734 - LA 447 CORRIDOR STUDY

Type Impv: TRAFFIC ANALYSIS

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Project: H.005746 - SIGNAL STUDY ALONG LA 1208-3

Type Impv: SIGNAL STUDY ALONG 1208-3

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 203 of 211

Page 210: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: STATEWIDE

Project: H.006881 - WEIGH STATION SEWER TREATMENT EQU.

Type Impv: NEW SEWER TREATMENT EQU. STATEWIDE

Project Manager: MCCOY, JANET

Remarks: 737-99-0823;

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCE

WEIGH STATIONS

1-PLANNING/ENVIRONMENTAL

Project: H.009785 - ROADWAY MITIGATION

Type Impv: ENGINEERING SUPPORT AND ANALYSIS FOR HMGP PROGRAM

Project Manager: PAINE, PEGGY JO

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

1-PLANNING/ENVIRONMENTAL

Project: H.010052 - BR - NO INTERCITY RAIL

Type Impv: FEASIBILITY STUDY

Project Manager: BROUSSARD, DAN

Remarks: NEW ORLEANS MPO TO PROVIDE MATCH TO BTR STP>200K

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

Project: H.011225 - TRAFFIC SIGNAL CONTROLLER EVAL. STUDY

Type Impv: STATEWIDE TRAFFIC SIGNAL CONTROLLER STUDY

Project Manager: COLVIN, JODY

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

1-PLANNING/ENVIRONMENTAL

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 204 of 211

Page 211: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000001 - INTERMODAL CONNECTORS PROGRAM

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0

- NHPP 6,200 INTERMODAL CONNECTOR

Project: L.000002 - INTERSTATE PAVEMENT PREVENTIVE MAINT

Type Impv: SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENT

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 1,000 PRESERVATION

INTERSTATE

STAGES 4, 3, 2, 1, 0

Project: L.000003 - PREVENTIVE MAINTENANCE NON-INTERSTATE

Type Impv: PREVENTIVE MAINTENANCE/REHABILITATION

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 2,000 PRESERVATION

NON-INTERSTATE

STAGES 4, 3, 2, 1, 0

Project: L.000004 - PREVENTIVE MAINT NON-INTERSTATE (NFA)

Type Impv: PREVENTIVE MAINTENANCE/REHABILITATION

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NFA 2,500 PRESERVATION

NON-INTERSTATE NFA

STAGES 4, 3, 2, 1, 0

Project: L.000005 - ROAD PREVENTIVE MAINTENANCE

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 4,400 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

STAGES 4, 3, 2, 1, 0

- STCASH 6,000 PRESERVATION

ROAD PREVENTIVE MAINTENANCE

Project: L.000006 - MOTORIST ASSISTANCE PATROL

Type Impv: MAP

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

STAGES 4, 3, 2, 1, 0

- STCASH 1 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: L.000007 - TRANSPORTATION SYSTEMS MANAGEMENT

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

STAGES 4, 3, 2, 1, 0

- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRANSPORTATION SYSTEMS MANAGEMENT

Project: L.000008 - URBAN SYSTEM PROJECTS

Type Impv: SELECTED BY MPO'S

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

- STP<200K 1,000 URBAN SYSTEMS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 205 of 211

Page 212: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000009 - MISC BOND PROJECTS

Type Impv: AS APPROVED BY LEGISLATURE

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000010 - URGENT BRIDGE REPAIR/REPLACEMENT

Type Impv: REIMBURSABLE AND NON-REIMBURSABLE

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- REIMB 5,000 PRESERVATION

BRIDGE (ON SYSTEM)

STAGES 4, 3, 2, 1, 0

- NHPP 1,000 PRESERVATION

BRIDGE (ON SYSTEM)

- STPFLEX 1,000 PRESERVATION

BRIDGE (ON SYSTEM)

- STCASH 1,000 PRESERVATION

BRIDGE (ON SYSTEM)

Project: L.000011 - BRIDGE PREVENTIVE MAINTENANCE

Type Impv: MAINTENANCE

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 1,500 PRESERVATION

BRIDGE (ON SYSTEM)

STAGES 4, 3, 2, 1, 0

- STPFLEX 1,500 PRESERVATION

BRIDGE (ON SYSTEM)

- STCASH 1 PRESERVATION

BRIDGE (ON SYSTEM)

Project: L.000012 - BRIDGE PAINTING PROGRAM

Type Impv: MISC SITES

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 1,000 PRESERVATION

BRIDGE (ON SYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 1 PRESERVATION

BRIDGE (ON SYSTEM)

Project: L.000013 - MOVABLE BRIDGE PREVENTIVE MAINTENANCE

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

MOVABLE BRIDGE REHABILITATION

STAGES 4, 3, 2, 1, 0

Project: L.000014 - MISC ECONOMIC DEVELOPMENT INITIATIVES

Type Impv: IN CONJUNCTION WITH DED

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

- STBONDS 500 OTHER / MISCELLANEOUS

Project: L.000015 - MISC FERRY PROJECTS

Type Impv: REHABILITATION/REPAIR

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- OTHER 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

STAGES 4, 3, 2, 1, 0

- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

FERRY PROJECTS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 206 of 211

Page 213: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000016 - FEDERAL SAFETY PROGRAMS

Type Impv: MISC PROJECTS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0

- STPFLEX 200 SAFETY

- STCASH 100 SAFETY

Project: L.000017 - MISC ITS SYSTEMS

Type Impv: ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

STAGES 4, 3, 2, 1, 0

- DEMO 300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

- CM 400 OPER EFFICIENCY/MOTORIST ASSISTANCE

ITS

Project: L.000018 - INTERSTATE LIGHTING PROGRAM

Type Impv: IN ACCORDANCE WITH MAINTENANCE AGREEMENTS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

STAGES 4, 3, 2, 1, 0

- STCASH 100 OPER EFFICIENCY/MOTORIST ASSISTANCE

INTERSTATE LIGHTING

Project: L.000019 - STATE PARK ROADS

Type Impv: OVERLAY/REHABILITATION

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000020 - MISC DRAINAGE PROJECTS

Type Impv: TO ALLEVIATE FLOODING

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

STAGES 4, 3, 2, 1, 0

- STCASH 250 OPER EFFICIENCY/MOTORIST ASSISTANCE

ROADWAY FLOODING

Project: L.000021 - MISC FEDERAL PROJECTS/PROGRAMS

Type Impv: FEDERAL LANDS HIGHWAYS, ETC.

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000022 - RAILROAD CROSSING IMPROVEMENTS

Type Impv: FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAM

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0

- RAIL PD 3,000 RAILROADS

- STPFLEX 2,000 RAILROADS

- STCASH 200 RAILROADS

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 207 of 211

Page 214: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000025 - TOLL FUNDED PROJECTS

Type Impv: ORLEANS AND JEFFERSON PARISHES

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000026 - WETLAND MITIGATION BANK

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

- TIME 1,000 OTHER / MISCELLANEOUS

Project: L.000027 - EMERGENCY RELIEF PROVIDED BY CONGRESS

Type Impv: EMERGENCY RELIEF

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000028 - MAINTENANCE MATERIALS

Type Impv: HOT MIX, PIPE, BRIDGE MATERIAL, ETC

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STCASH 5,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000029 - FEDERAL ENHANCEMENT PROGRAM

Type Impv: MISC PROJECTS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0

Project: L.000030 - CRASH ATTENUATOR REPAIRS

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 200 SAFETY STAGES 4, 3, 2, 1, 0

- STCASH 100 SAFETY

Project: L.000031 - DEMO/HI-PRI/OTHER FEDERAL PROGRAMS

Type Impv: AS DEFINED BY FEDERAL GOVERNMENT

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0

Project: L.000032 - REST AREA REHABILITATION

Type Impv: FACILITY REHABILITATION

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

REST AREAS

STAGES 4, 3, 2, 1, 0

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 208 of 211

Page 215: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000033 - MISC SIGNS, STRIPING, SIGNALS

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

STAGES 4, 3, 2, 1, 0

- STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

Project: L.000034 - INSTALL RAISED PAVEMENT MARKERS

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STCASH 2,000 OPER EFFICIENCY/MOTORIST ASSISTANCE

TRAFFIC CONTROL DEVICES

STAGES 4, 3, 2, 1, 0

Project: L.000035 - MISC FEDERAL OFF-SYSTEM BRIDGES

Type Impv: BRIDGE REPLACEMENTS/INSPECTIONS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- FBROFF 1,000 PRESERVATION

BRIDGE (OFF SYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 200 PRESERVATION

BRIDGE (OFF SYSTEM)

Project: L.000036 - WEIGH STATION REHABILITATION/UPGRADE

Type Impv: MISC SITES STATEWIDE

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 1,900 OPER EFFICIENCY/MOTORIST ASSISTANCE

WEIGH STATIONS

STAGES 4, 3, 2, 1, 0

Project: L.000037 - HIGHWAY SAFETY IMPROVEMENTS

Type Impv: RUMBLE STRIPS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0

Project: L.000039 - ACCELERATED LOADING FACILITY

Type Impv: CONSTRUCT TEST SECTIONS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

Project: L.000040 - FEDERAL BRIDGE INSPECTION PROGRAMS

Type Impv: INSPECTIONS, RATINGS, LOAD FACTORS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 3,000 PRESERVATION

BRIDGE (ON SYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 600 PRESERVATION

BRIDGE (ON SYSTEM)

Project: L.000041 - CONGESTION MITIGATION PROJECTS

Type Impv: NON-ATTAINMENT AREAS

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 209 of 211

Page 216: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000042 - MISC CONGESTION MITIGATION PROJ - LKC

Type Impv: IN LAKE CHARLES AS APPROVED BY FHWA

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

Project: L.000043 - MISC CONGESTION MITIGATION PROJ - BTR

Type Impv: IN BATON ROUGE AS APPROVED BY FHWA

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

Project: L.000068 - ACCESS MANAGEMENT PROJECTS

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STPFLEX 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

STAGES 4, 3, 2, 1, 0

- STPFLEX 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

- STPFLEX 8,300 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

- STPFLEX 8,100 OPER EFFICIENCY/MOTORIST ASSISTANCE

ACCESS MANAGEMENT

Project: L.000069 - ROAD TRANSFER PROGRAM

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0

- STPFLEX 1,000 ROAD TRANSFER

Project: L.000093 - STATEWIDE CONGESTION MITIGATION

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0

Project: L.000094 - URBAN TRANSIT(INCL TRANSFER TO AGENCIES)

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

- STP<200K 100 URBAN SYSTEMS

- STPFLEX 100 URBAN SYSTEMS

Project: L.000024 - SOFT SIDE SAFETY

Type Impv: HANDLED THROUGH OPERATIONS BUDGET

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- HSIP 1,000 SAFETY STAGES 2, 1, 0

- STCASH 500 SAFETY

Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 210 of 211

Page 217: HIGHWAY PROGRAM FY 2014-2015 - Louisiana · HIGHWAY PROGRAM FY 2014-2015 ... stages are combined into this document which is called the Highway Priority Program or Highway …

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS

Project: L.000038 - PLANNING, TRAINING AND RESEARCH

Type Impv: HANDLED THROUGH OPERATING BUDGET

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0

- SPR OPT 7,000 OTHER / MISCELLANEOUS

Project: L.000023 - SCOPING AND ENVIRONMENTAL STUDIES

Type Impv:

Project Manager:

Remarks:

StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish

- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0

- STPFLEX 300 OTHER / MISCELLANEOUS

- STCASH 300 OTHER / MISCELLANEOUS