HIGHWAY PROGRAM
FY 2014-2015
SORTED BY PARISH
FOR LEGISLATIVE REVIEW AND APPROVAL
INTRODUCTION
1. R.S. 48:229, 230 states that each year “the Department shall provide the Legislature a program of construction to be commenced in the ensuing fiscal year, which shall be based upon anticipated revenues to be appropriated by the Legislature…” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation”.
2. In compliance with this statute, the attached Highway Program identifies the
projects that are scheduled for construction letting in FY 2014-15. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.
3. There are many projects remaining to be let prior to the end of the current
fiscal year, FY 2013-14. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2014-15 construction program, and will be let as soon as practicable in that fiscal year.
4. The one year construction program and the list of other projects in various
stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.
5. At this point in time, future funding levels are uncertain. DOTD has based this
preliminary Highway Program on previous allocations of funding. If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.
6. In the event all of the projects listed for letting in FY 2014-15 cannot be let to
construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2014-15.
7. Construction estimates are for informational purposes only and are subject to
change.
PRESERVATION NON-INTERSTATE (PAVEMENT) 7.5
NON-INTERSTATE (PAVEMENT) (non-federal aid) * 191.5
ROAD PREVENTIVE MAINTENANCE 7.5INTERSTATE (PAVEMENT) 74.0BRIDGE (ON SYSTEM) 67.0BRIDGE (OFF SYSTEM) 13.0
SUB-TOTAL 360.5
ITS (regular & earmarks) 11.0
OPERATIONS TRAFFIC CONTROL DEVICES 14.8ROADWAY FLOODING 3.7WEIGH STATIONS 1.9TRANSPORTATION SYSTEMS MANAGEMENT 7.4INTERSTATE LIGHTING 2.8REST AREAS 11.1ACCESS MANAGEMENT 8.1FERRIES/MAJOR REPAIRS 3.5MOVABLE BRIDGE PM 1.9
SUB-TOTAL 66.2
SAFETY HWY. PROGRAM 49.4RR CROSSING UPGRADES & SEPARATIONS 16.0
SUB-TOTAL 65.4
CAPACITY REGULAR PROGRAM 0.0
CORRIDOR UPGRADE 46.0SUB-TOTAL 46.0
INTERMODAL CONNECTOR 7.5
FED ENHANCEMENT PROJECTS 12.0
MISC.
URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT, DEMAND MANAGEMENT 84.0FED EARMARKS (DEMO,...) 3.7OTHER (BONDS, TOLLS, LOCAL ) 9.3ROAD TRANSFER 23.1
SUB-TOTAL 139.6
GRAND TOTAL 677.7
Subject to funding availability.* As approved by the Legislature, this Program includes NFA projects funded with $125 million in State Bonds.
TENTATIVE FY 14-15 BUDGET PARTITION
(COSTS IN MILLION DOLLARS)CONSTRUCTION
PROPOSEDCATEGORY SUB-CATEGORY
FUNDING TYPES FEDERAL NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM FUNDING) STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAYAFETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA, LAKE CHARLES, MONROE,
SLIDELL, MANDEVILLE-COVINGTON) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21) TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAYAFETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA, LAKE CHARLES, MONROE,
SLIDELL, MANDEVILLE-COVINGTON) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS) HSIP, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER) RAIL HE. RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS) CM (CONGESTION MITIGATION – BATON ROUGE AND LAKE CHARLES) DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS) ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING) FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS) STATE / LOCAL NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES) NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES) STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION) TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT) STBONDS (GENERAL OBLIGATION BONDS) STGEN (STATE GENERAL FUNDS CASH) TOLLS LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT) OTHER (OTHER SOURCE NOT LISTED) NFI (NO FUNDING IDENTIFIED)
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ACADIA
Project: H.003758 - I-10 ACCESS ROAD IN CROWLEY
Type Impv: CONSTRUCT NEW ACCESS ROAD
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 700-01-0114;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA I-10 450-04 DEMO 3,150 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009274 - LA 3076: W JCT US 90 - E JCT US 90
Type Impv: CONSTRUCT BASE & OVERLAY,BRIDGE REPLACEMENT,& PCCP PATC
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 3076 801-60 STPFLEX 775 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010844 - LA 1112: S. JCT LA 1111 - N. JCT LA 1111
Type Impv: BASE REHABILITATION AND ASPHALT OVERLAY
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 1112 801-31 NFA 2,500 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011016 - LA 13: S. JCT. LA 365 - ST LANDRY P/L
Type Impv: MICROSURFACING AND RELATED WORK
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 13 057-03 STPFLEX 1,150 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011070 - LA 370 & LA 3070: BASE REHABILITATION
Type Impv: STABILIZE BASE, OVERLAY, AND RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 3070 801-59 NFABOND 4,668 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
ACADIA LA 370 801-28 NFABOND 832 PRESERVATION
NON-INTERSTATE NFA
Project: H.010073 - BNSF (CROWLEY) SEVERAL CROSSINGS
Type Impv: R2 RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks: 714-01-0119
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 RAIL PD 700 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010150 - S. AVENUE F & NAPP STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 FBROFF 732 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
ACADIA 000-01 FBROFF 262 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010962 - I-10: CABLE BARRIER (LAFAYETTE/ACADIA)
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: PLEASE USE HSIPPEN FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA I-10 450-04 HSIPPEN 4,041 SAFETY 3-DESIGN/DEVELOPMENT
LAFAYETTE I-10 450-05 HSIPPEN 1,478 SAFETY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 1 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ACADIA
Project: H.003756 - NEW INTERCHANGE LA 98 RAYNE
Type Impv: FED EARMARK FOR STUDY
Project Manager: GAUTREAU, COLLEEN
Remarks: 700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.002729 - GRAND PRAIRIE HWY INTR.&FRONTAGE RD
Type Impv: NEW BRIDGE. NEW CONCRETE PAVEMENT
Project Manager: YANG, LI
Remarks: 389-01-0011;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009628 - LA 92: LA 13 - VERMILION P/L
Type Impv: ASPHALT CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 92 385-04 STPFLEX 2,213 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010209 - LA 35: LA 365 - LA 95
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 35 207-07 STPFLEX 1,054 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010220 - LA 97: BAYOU NEZPIQUE BR. - LA 100
Type Impv: STONE BASE WITH ASPHALT OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 97 201-02 STPFLEX 2,709 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010222 - LA 97: LA 98 - LA 368
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 97 201-03 STPFLEX 4,130 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010291 - I-10: TREE REMOVAL
Type Impv: TREE REMOVAL ON I-10 IN ACADIA PARISH
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA I-10 450-04 HSIP 1,096 SAFETY 1-PLANNING/ENVIRONMENTAL
LAFAYETTE I-10 450-05 HSIP 514 SAFETY
Project: H.010885 - LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE
Type Impv: REPLACEMENT OF PONTOON BRIDGE
Project Manager: HERATH, ANANDA
Remarks: CONSTRUCTION FUNDS WILL BE STATE BONDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 91 801-09 0 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 2 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ALLEN
Project: H.009298 - TOWN OF OBERLIN SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, MARKED CROSSINGS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN 000-02 SR2S 240 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011055 - LA1156 & LA3206: PATCH, WIDEN, CP, & OL
Type Impv: PATCH, WIDEN, COLD PLANE, OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN LA 1156 802-11 NFABOND 1,060 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
ALLEN LA 3206 802-14 NFABOND 742 PRESERVATION
NON-INTERSTATE NFA
Project: H.010054 - PARK ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN 000-02 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
ALLEN 000-02 FBROFF 308 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010055 - CHERRY WITCHIE & N. CARPENTER RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN 000-02 FBROFF 2,510 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
ALLEN 000-02 FBROFF 1,426 PRESERVATION
BRIDGE (OFF SYSTEM)
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 3 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION
Project: H.010533 - LA3251: LA75-LA30 & LA1003: LA1-STAR RD
Type Impv: STABILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 3251 803-31 NFABOND 2,060 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
ASSUMPTION LA 1003 804-18 NFABOND 618 PRESERVATION
NON-INTERSTATE NFA
Project: H.010642 - LA 30: IBERVILLE PL TO 0.3M WEST OF I-10
Type Impv: COLD PLANE AND OVERLAY, SAFETY IMPROVEMENTS
Project Manager: DEVILLE, JACQUES
Remarks: USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 30 414-03 STP>200K 2,186 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
ASCENSION LA 30 414-03 HSIP 250 SAFETY
Project: H.011074 - LA 44, LA 42, LA 1248: CONCRETE PATCHING
Type Impv: PLACEMENT OF ADDITIONAL SURFACE MATERIAL OVER THE EXISTIN
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-01 NHPP 900 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
E BATON ROUGE LA 1248 258-33 NHPP 225 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
E BATON ROUGE LA 42 257-04 NHPP 256 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
Project: H.011173 - LA 3089: DONALDSONVILLE SIGNAL UPGRADES
Type Impv: SIGNALS TO BE UPGRADED TO CURRENT DOTD STANDARDS
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 1 064-11 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 13-14
ASCENSION LA 308 407-09 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ASCENSION LA 3089 426-01 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ASCENSION LA 945 803-04 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.002370 - LA 42 (US 61 - LA 44)
Type Impv: WIDENING AND IMPROVEMENTS
Project Manager: LANDRY, COREY
Remarks: 260-01-0026; SEE NOTES FOR DETAILS. STGEN MATCH FOR UTIL
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 42 260-01 DEMO 0 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
ASCENSION LA 42 260-01 HSIP 0 SAFETY
ASCENSION LA 42 260-01 STBONDS 18,500 OTHER / MISCELLANEOUS
ASCENSION LA 42 260-01 TAPFLEX 1,500 ENHANCEMENTS
Project: H.007855 - LA 431 @ LA 934 INTERSECTION IMPROVEMENT
Type Impv: TURNLANES
Project Manager: DEVILLE, JACQUES
Remarks: 803-20-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 431 267-02 CM 500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
ASCENSION LA 934 803-20 CM 250 URBAN SYSTEMS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 4 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION
Project: H.009033 - LA 44: INTERSECTION IMPROVEMENT @ LA 934
Type Impv: TURN LANES AND SIGNAL UPGRADES
Project Manager: RICHARD, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-02 HSIP 800 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010019 - I-10:LA 73 INTCNG LIGHTING- PRAIRIEVILLE
Type Impv: INTERSTATE LIGHTING
Project Manager: ARMENTOR, MICHAEL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NHPP 818 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010026 - LA 431: REALIGN CURVE, C/L RUMBLE STRIPS
Type Impv: REALIGN CURVE, CENTER LINE RUMBLE STRIP, RESTRIPE ROAD.
Project Manager: LAI, QUANG
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 431 267-02 HSIP 3,900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010532 - LA 22: LA 44 - LA 70
Type Impv: CTB & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 22 266-01 NFA 2,367 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010639 - LA 939 AND LA 940 REHAB
Type Impv: MILL AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 10% MATCH FROM ENTITY AND 10% MATCH FROM TTF
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 939 803-23 STP>200K 770 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
ASCENSION LA 940 803-06 STP>200K 660 URBAN SYSTEMS
Project: H.010640 - LA 3038 (CORNERVIEW): REHAB & TURN LANE
Type Impv: MILL AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
803-06 STP>200K 660 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010695 - US 61: FRONTAGE ROAD
Type Impv: CONSTRUCT FRONTAGE ROAD PARALLEL TO NB US 61
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION US 61 007-07 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.002423 - LA44: BLACK BAYOU BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 265-02-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-02 STPFLEX 1,541 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009250 - I-10 HIGHLAND TO LA 73
Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION
Project Manager: REVIERE, RYAN
Remarks: LHIP USED FOR ENG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NFI 50,500 CORRIDOR 3-DESIGN/DEVELOPMENT
E BATON ROUGE I-10 450-10 NFI 16,000 CORRIDOR
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 5 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION
Project: H.009266 - I-10: LA 73 TO LA 30
Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION
Project Manager: REVIERE, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.009276 - I-10: LA 30 TO LA 22
Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION
Project Manager: REVIERE, RYAN
Remarks: LHIP USED FOR ENG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.009956 - LA 44: TURN LANES AND MEDIANS
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-02 HSIP 5,429 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.010074 - UP (DONALDSONVILLE) LA 3089 SERVICE RD.
Type Impv: ROAD WORK AROUND CROSSING TO MAKE SAFER
Project Manager: SHREWSBERRY,BILL
Remarks: 426-01-0026
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 3089 426-01 RAIL HE 20 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010960 - LA 30 ROUNDABOUTS @ TANGER MALL & I-10
Type Impv: 3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPS
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 30 414-03 STPFLEX 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.006457 - ROUNDABOUT @ PR 929 & PARKER ROADS
Type Impv: ROUNDABOUT CONSTRUCTION
Project Manager: HOLM, RICK
Remarks: 737-03-0104;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION 000-03 SATRANS 500 SAFETY
LOCAL ROADS SAFETY
2-WAITING FOR FUNDING
Project: H.000337 - US 61:BAYOU MANCHAC & FRANCOIS BRS.
Type Impv: NEW BRIDGES
Project Manager: HERATH, ANANDA
Remarks: 007-07-0058;JT W/007-08-0040
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION US 61 007-07 STPFLEX 1,700 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE US 61 007-08 STPFLEX 10,300 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.002424 - SUNSHINE BRIDGE - I-10
Type Impv: WIDEN TO 4 LANES
Project Manager: NICKEL, TIM
Remarks: 426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS
ASCENSION LA 70 426-03 NFI 0 OTHER / MISCELLANEOUS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 6 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASCENSION
Project: H.003790 - LA 930: CAUSEY RD TO LA 42
Type Impv: WIDEN LA 930 & ADD OPEN DITCHES
Project Manager: MUSA, ELNUR
Remarks: 803-14-0005;STATE BONDS BEING REQUESTED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 930 803-14 STBONDS 5,300 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009139 - US 61: ACCESS MGT. @ SWAMP RD (PHASE 2)
Type Impv: MEDIAN AND SIGNAL IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION US 61 007-07 STPFLEX 240 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.010572 - LA 30 IMPROVEMENTS (I-10 TO LA 44)
Type Impv: FEASIBILITY STUDY TO WIDEN LA 30 FROM I-10 TO LA 44
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 30 414-03 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010795 - ROUNDABOUT: LA 42 AT JOE SEVARIO ROAD
Type Impv: ROUNDABOUTS
Project Manager: FARR, ALEX
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 42 260-01 0 SAFETY 1-PLANNING/ENVIRONMENTAL
ASCENSION 000-03 0 SAFETY
Project: H.010909 - LA 44: LA 941 TO LA 22
Type Impv: FEASIBILITY STUDY
Project Manager: FARR, ALEX
Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-01 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011160 - LA 73: LA 74 TO LA 621 CORRIDOR STUDY
Type Impv: CORRIDOR STUDY TO COLLECT DATA AND DEVELOP ALTERNATIVES
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 73 077-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 7 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ASSUMPTION
Project: H.009635 - LA 308: LAFOURCHE P/L - LA 1011
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 308 407-06 STPFLEX 2,456 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011069 - LA643&LA403:PATCH, STABILIZE&OVERLAY
Type Impv: PATCH, STABILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 403 804-10 NFABOND 2,120 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
ST JAMES LA 643 847-04 NFABOND 1,102 PRESERVATION
NON-INTERSTATE NFA
ST JAMES LA 643 847-04 NFABOND 1,018 PRESERVATION
NON-INTERSTATE NFA
Project: H.010443 - LA 308: CURVE REALIGN AND SHOULDERS
Type Impv: REALIGN CURVE AND ADD SHOULDERS
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 308 407-07 HSIP 9,760 SAFETY 3-DESIGN/DEVELOPMENT
ASSUMPTION LA 308 407-08 HSIP 1,900 SAFETY
Project: H.009994 - LA 663: ROADWAY ELEVATION & MITIGATION
Type Impv: ELEVATION AND MITIGATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 663 804-25 FEMA 1,248 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009996 - LA 1015-2 RAISE HWY ELEV. & UPGRAD PIPES
Type Impv: ELEVATION AND UPGRADE PIPES
Project Manager: PAINE, PEGGY JO
Remarks: H.971633
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 1015-2 804-29 FEMA 678 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010007 - LA 70 PIERRE PART BAY BRIDGE CLN & PAINT
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 70 232-01 STPFLEX 400 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.010571 - LA 70 BYPASS
Type Impv: STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 0-FEASIBILITY/SCOPING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 8 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: AVOYELLES
Project: H.001913 - LA 29: N JCT LA 107 - JCT LA 114
Type Impv: CTB & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 146-01-0027;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 29 146-01 NFABOND 2,625 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006376 - US 71 @ EBONY ST.INTERSECTION IMP
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: MATHEWS, LARRY
Remarks: 714-05-0110;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 RAIL HE 200 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009432 - VARIOUS ROADS: SIGNING (AVOYELLES)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 SATRANS 45 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010540 - LA 452: JEFF LN- 1.2 MI E OF LOCK&DAM RD
Type Impv: PATCH & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 452 143-01 NFABOND 1,595 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
AVOYELLES LA 452 143-02 NFABOND 1,765 PRESERVATION
NON-INTERSTATE NFA
Project: H.010988 - LA 29: COLLEGE STREET TO TOONEY
Type Impv: CHIP SEALING OF LA 29
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 29 146-01 STPFLEX 477 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.001257 - INTERSECTION LA 114 @ LA 1
Type Impv: REPLACE BRIDGE W/ T-INTERSECTION
Project Manager: BROWN, JEFF
Remarks: 052-05-0050;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 114 052-05 FBROFF 765 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
AVOYELLES LA 114 052-05 HSIP 72 SAFETY
AVOYELLES LA 1 052-30 HSIP 255 SAFETY
AVOYELLES LA 1 052-30 STPFLEX 249 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.010323 - LA 454: LA 107 - RAPIDES P/L
Type Impv: ASPHALTIC SURFACE TREATMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 454 370-01 NFA 565 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011229 - LA 107: KCS RR XING (MANSURA)
Type Impv: REPLACE CROSSING SURFACE.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 107 052-06 RAIL HE 56 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
AVOYELLES LA 107 052-06 LOCAL 44 RAILROADS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 9 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: AVOYELLES
Project: H.010364 - LA 114: LA 1188 - N JCT LA 115
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 114 145-01 STPFLEX 788 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010489 - I-49: LA 106 - LA 115 (RAMPS & SIDE RD)
Type Impv: PATCH, COLD PLANE, AND OVERLAY (RAMPS AND SIDE ROAD)
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES I-49 455-04 NHPP 487 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
AVOYELLES LA 106 204-04 STPFLEX 503 PRESERVATION
INTERSTATE
AVOYELLES LA 106 204-04 STPFLEX 600 PRESERVATION
NON-INTERSTATE
Project: H.009741 - MARKSVILLE SIDEWALK IMPROVEMENTS
Type Impv: SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGE
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 STPENH 338 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009743 - BUNKIE SIDEWALK IMPROVEMENTS
Type Impv: SIDEWALKS AND RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES US 71 008-07 STPENH 96 ENHANCEMENTS 2-WAITING FOR FUNDING
AVOYELLES LA 115 805-18 STPENH 16 ENHANCEMENTS
AVOYELLES 000-05 STPENH 88 ENHANCEMENTS
Project: H.009805 - MOREAUVILLE SIDEWALKS
Type Impv: SIDEWALKS W/ SUBSURFACE DRAINAGE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 114 052-05 STPENH 102 ENHANCEMENTS 2-WAITING FOR FUNDING
AVOYELLES 000-05 STPENH 102 ENHANCEMENTS
Project: H.007873 - BAYOU BOEUF & TURNER CANAL BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 805-09-0007;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 1176 805-09 FBROFF 2,375 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009493 - LA 107: LA 1179 - LA 1181
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 107 147-03 STPFLEX 2,322 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009497 - LA 106: BAYOU BOEUF BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 106 204-04 STPFLEX 2,600 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 10 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: AVOYELLES
Project: H.010340 - LA 107: S JCT LA 1 - N JCT LA 1
Type Impv: WIDENING AND OVERLAY OF PCCP
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 107 052-06 STPFLEX 980 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 11 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BEAUREGARD
Project: H.000432 - US190: RAGLEY OVERPASS-ALLEN PARISH LINE
Type Impv: CP 2", PATCH, OVERLAY 2" RD/SHLD
Project Manager: CHENEVERT, MARK
Remarks: 012-05-0036
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD US 190 012-05 STPFLEX 2,017 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006463 - BEAUREGARD PARISH PAVEMENT MARKINGS
Type Impv: PAVEMENT MARKING INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-06-0100;ENTITY REQUIRED TO MATCH FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 HRRR 111 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006464 - CAMP EDGE RD SIGNING & PAVEMENT MARKINGS
Type Impv: SIGNS & PAVEMENT MARKING INSTALL
Project Manager: HOLM, RICK
Remarks: 737-06-0102;ENTITY REQUIRED TO MATCH FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 SATRANS 30 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006468 - BEAUREGARD PARISH GUARDRAIL REPLACEMENT
Type Impv: GUARDRAIL REPLACEMENT
Project Manager: HOLM, RICK
Remarks: ENTITY REQUIRED TO MATCH FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 0 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010088 - KCS (DERIDDER) SEVERAL RR X-ING DERIDDER
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 RAIL PD 800 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010816 - OLD RIVER ROAD BRIDGE OVER CANEY CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-06-0124, USE PRIORITY 2 BOND AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 FBROFF 530 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011171 - US 171: BEG BLVD - INT LA 27/US 190
Type Impv: CP 2", OL 2", CURB/SIDEWALK REPAIR, ADA REQUIRED UPGRADE
Project Manager: CORMIER, CLAYTON
Remarks: TIMED FUNDS ARE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD US 171 024-05 NHPP 700 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010915 - BEEHIVE LP & FIELDING WILLIAMS RD BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 FBROFF 600 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
BEAUREGARD 000-06 FBROFF 308 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.009482 - LA 113: JIM BURNEY BRANCH BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 113 139-03 STPFLEX 950 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 12 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BEAUREGARD
Project: H.009615 - LA 26: US 171 - ALLEN P/L
Type Impv: CP 2", OVERLAY 4", 2" SHLD
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 26 028-04 STPFLEX 8,069 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010244 - LA 113: LA 26 - LA 112
Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 113 139-04 STPFLEX 2,187 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010245 - LA 389: MONROE WHITMAN RD - US 190
Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 389 187-04 STPFLEX 7,117 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010246 - LA 112: LA 399 - LA 113
Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 112 188-02 STPFLEX 2,163 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 13 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BIENVILLE
Project: H.010097 - LA 783: RED RIVER PARISH LINE TO US 371
Type Impv: OVERLAY, STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 783 303-03 NFABOND 1,527 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010478 - I-20: WEBSTER P/L TO BLACK LAKE CREEK
Type Impv: COLD PLANE AND ASPHALTIC OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE I-20 451-04 NHPP 8,271 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010595 - LOUISIANA TRAIL - CASTOR TO JAMESTOWN
Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE 000-07 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009434 - VARIOUS ROADS:SIGNING (BIENVILLE)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE 000-07 SATRANS 9 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010513 - LA 507: LA 508 TO LINCOLN PARISH LINE
Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 507 308-02 NFABOND 2,266 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010519 - LA 794: LA 793 TO LA 154
Type Impv: STABILIZE BASE, ASPHALT OVERLAY, AND DRAINAGE PIPE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 794 807-02 NFABOND 2,163 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.001689 - TOPY CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 088-02-0023;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 153 088-02 STPFLEX 1,831 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010561 - CASTOR CK RD/BEAR CK RD/DANIEL ST BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE 000-07 FBROFF 370 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
BIENVILLE 000-07 FBROFF 454 PRESERVATION
BRIDGE (OFF SYSTEM)
BIENVILLE 000-07 FBROFF 293 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010977 - US 371: BI-DIRECTIONAL TURN LANE AT LA 4
Type Impv: ADDING LEFT TURN LANES AT LA 4 IN BOTH DIRECTIONS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE US 371 027-02 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 14 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BIENVILLE
Project: H.001537 - LA 4: BEE BRANCH BRIDGE
Type Impv: NEW BRIDGE
Project Manager: YANG, LI
Remarks: 067-03-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 4 067-03 STPFLEX 1,310 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001707 - SALINE BAYOU RELIEF BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 090-05-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 507 090-05 FBROFF 1,178 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009962 - LA 516: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 516 294-04 FEMA 1,247 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010273 - LA 154: EAST JCT LA 4 TO JCT LA 792
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 154 090-04 STPFLEX 1,450 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010290 - LA 796: LA 508 TO LA 155
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks: AC WITH NFA
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 796 090-05 STPFLEX 1,150 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 15 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER
Project: H.006738 - KIDS ON THE MOVE PH. 2
Type Impv: SIDEWALK REPAIR,SIGNS AND PAVEMENT MARKINGS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 SR2S 200 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.007085 - SHED ROAD (BENTON - AIRLINE)
Type Impv: RECONSTRUCTION & WIDEN
Project Manager: DEVILLE, JACQUES
Remarks: 742-08-0001;CITY IS FUNDING ENGR.&ACQUIRING R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 6,925 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
BOSSIER 000-08 STPFLEX 1,082 ROAD TRANSFER
Project: H.007896 - LA 3105 AT SHED ROAD TURN LANES
Type Impv: ADD 14' NB AND SB RT TURN LANE
Project Manager: STURDIVANT, PHILLIP
Remarks: 808-07-0054;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3105 808-07 HSIP 540 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010298 - US 71: LOGGY BAYOU BRIDGE TO LA 154
Type Impv: COLD-PLANING, INLAY, CHIP SEAL SHOULDERS, PAVEMENT MARKIN
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 71 010-05 STPFLEX 2,813 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
BOSSIER US 71 010-06 STPFLEX 47 PRESERVATION
NON-INTERSTATE
Project: H.010310 - LA 154: US 71 TO BISTENEAU LAKE BRIDGE
Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 154 090-01 STPFLEX 398 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010311 - LA 157: E. COLLEGE ST TO CARTERVILLE RD
Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 157 084-01 STPFLEX 392 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010518 - LA 537: .15 MILES E LOG FERRY RD TO LA 3
Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 537 808-05 NFABOND 784 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.003244 - DIST 04 BRIDGE BRG REHAB & MISC REPAIRS
Type Impv: BRIDGE BEARING REPAIRS
Project Manager: TULLIER, DANNY
Remarks: 451-01-0135;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-220 451-31 NHPP 1,120 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 14-15
CADDO I-20 451-01 STPFLEX 980 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 16 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER
Project: H.009945 - KORAN DOYLIN RD. BRIDGE / CLARKE BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 FBROFF 2,087 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010509 - LA 157: WEST LA 160 TO EAST LA 2
Type Impv: ULTRATHIN OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 157 286-01 NFABOND 1,648 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010662 - LA 511:JIMMIE DAVIS BRIDGE REHABILITATIO
Type Impv: CLEANING, PAINTING, STRUCTURAL REPAIRS AND DECK REPLACEME
Project Manager: REVIERE, RYAN
Remarks: FUNDING $10.5 MILLION CAPITOL OUTLAY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 511 102-03 STBONDS 9,200 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
BOSSIER LA 511 102-03 NHPP 10,000 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.010743 - LA 3: LEFT TURN LANE
Type Impv: INSTALL LEFT TURN LANE
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3 044-02 HSIP 350 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010976 - LA 157: SB LEFT TURN LANE AT LA 154
Type Impv: ADD LEFT TURN LANE TO IMPROVE TRAFFIC FLOW
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 157 082-02 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.000118 - BAYOU FIFI BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 001-03-0095;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 80 001-03 STPFLEX 1,019 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001795 - RED CHUTE AND OLD CHANNEL BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 108-01-0019 AND 108-01-0017;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 612 108-01 STPFLEX 4,300 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003263 - I-20, WESTERFIELD - INDUSTRIAL
Type Impv: BRIDGES REHAB.;
Project Manager: KEMP, KELLY
Remarks: 451-02-0097;APP SLAB.BACK WALL.REVETMENT.BEARNG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-20 451-02 STPFLEX 23,830 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
BOSSIER I-20 451-02 STPFLEX 10,101 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.007087 - HAMILTON ROAD IMPROVEMENTS PHASE I
Type Impv: ROAD IMPROVEMENTS
Project Manager: DEVILLE, JACQUES
Remarks: 742-08-0003; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 6,078 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 17 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER
Project: H.007090 - HAMILTON RD IMPROVEMENTS PH I(C&G)
Type Impv: CLEARING AND GRUBBING
Project Manager: DEVILLE, JACQUES
Remarks: 742-08-0006; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 520 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.009508 - LA 2: CANEY CREEK BRIDGE TO WEBSTER P/L
Type Impv: ASHPALT OVERLAY, DRAINAGE, PAVEMENT STRIPING, & RELATED W
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 2 083-04 STPFLEX 3,114 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010250 - ROADWAY DRAINAGE IMPROVEMENTS - LA 154
Type Impv: ADDITION OF ASPHALT TO ROADWAY
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 154 090-01 STPFLEX 225 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.010299 - US 80: EASTRIDGE TO WEBSTER PARISH LINE
Type Impv: COLD-PLANING, INLAY, CHIP SEAL SHOULDERS, PAVEMENT MARKIN
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 80 001-03 STPFLEX 2,492 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.003854 - BOSSIER CONG RELIEF NORTH-SOUTH CORRIDOR
Type Impv: WIDENING STUDY
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-08-0129;STAGE 0 COMPLETE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 NFI 24,161 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.003855 - BOSSIER PAR CONG RELIEF WINFIELD RD
Type Impv: ROADWAY EXT (WINFIELD RD) STUDY
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-08-0130;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.001779 - JIMMIE DAVIS BRIDGE (LA 511)
Type Impv: NEW BRIDGE
Project Manager: ONYEGBUNAM, EZEKIEL
Remarks: 102-03-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 511 102-03 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.003857 - WAFER ROAD EXTENSION
Type Impv: ROAD EXTENSION (ENGINEERING) STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-08-0132;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.003859 - I-20 (LA 3 - I-220 E.)
Type Impv: STATE FUNDS FOR STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-08-0134;FEASIBILITY STUDY (STAGE 0)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 18 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: BOSSIER
Project: H.005184 - HIGH PRIORITY CORRIDOR NO. 18
Type Impv: ENVIRONMENTAL IMPACT STATEMENT
Project Manager: SAVOIE, RICHARD
Remarks: 700-94-0003;NCPD FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009522 - LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3105 808-07 STPFLEX 9,100 RAILROADS
GRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
BOSSIER I-20 451-02 NHPP 300 RAILROADS
GRADE SEPARATION
Project: H.009693 - US 71:J-TURN ROBERT E. LEE
Type Impv: INSTALL J-TURN LANE INTERSECTION
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 71 010-06 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 19 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.001278 - INTERSECTION IMPR YOUREE DR AT KINGS HWY
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: DEVILLE, JACQUES
Remarks: 053-09-0053; USE TTF AS MATCH PER AGREEMENT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 053-09 STP>200K 4,220 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
CADDO LA 1 053-09 STPFLEX 764 URBAN SYSTEMS
CADDO LA 3032 420-01 HSIP 865 SAFETY
CADDO LA 3032 420-01 STPFLEX 270 URBAN SYSTEMS
Project: H.003363 - I220 PHASE 1 SIGN UPGRADE- I20 TO LA 538
Type Impv: SIGNING
Project Manager: COURTIER, KAY
Remarks: 451-30-0036;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-220 451-30 NHPP 3,980 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006053 - MURPHY STREET BRIDGE OVER KCS RAILROAD
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-09-0023
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 FBROFF 4,557 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010247 - ROADWAY FLOODING IMPROVEMENTS - US 71
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 71 011-02 NHPP 1,590 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010294 - LA 169: LAKESHORE DRIVE TO LONGWOOD
Type Impv: SOIL CEMENT BASE COURSE, ASPHALTIC OVERLAY, PAVEMENT MA
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 169 048-02 STPFLEX 1,934 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010510 - LA 170: LA 2 (CAMP RD) TO US 71
Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 170 096-01 NFABOND 2,633 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010686 - LA 169: KCS RR XING (CADDO)
Type Impv: KCS SIGNAL WORK NEEDED TO TIE INTO LA 169 ACTIVE ADVANCE W
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 169 048-03 RAIL PD 13 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010949 - LA 1: TURN LANE EXTENSIONS AT LA 511
Type Impv: EXTENDING EXISTING LEFT TURN LANES TO IMPROVE TRAFFIC FLOW
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 053-09 NHPP 994 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 20 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.010969 - LA 3132: GUARD RAIL UPGRADE
Type Impv: GUARD RAIL UPGRADE
Project Manager: BAUGH, SAM
Remarks: HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3132 427-01 HSIP 670 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011111 - I-49 NORTH, SEGMENT K - PHASE 2
Type Impv: NEW I-49/I-220 INTERCHANGE WITH ROADWAYS TO TIE TO SEG. J
Project Manager: UMEOZULU, JOE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-49 455-09 STGEN 79,000 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
CADDO I-49 455-09 NHPP 36,000 DEMO / HIGH PRIORITY
CADDO I-220 451-30 STGEN 10,000 DEMO / HIGH PRIORITY
Project: H.011161 - I-49: MIRA-MYRTIS RD TO ARKANSAS S/L
Type Impv: DOWEL BAR RETROFIT
Project Manager: BAUGH, SAM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-49 455-09 STGEN 300 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.001623 - CREEK BRIDGE & IRISH BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: MOORE, DARRELL
Remarks: 079-01-0034;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3049 079-01 FBROFF 900 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.006472 - CITY OF SHREVEPORT TRAFFIC SIG BKUP
Type Impv: TRAFFIC SIGNAL POWER GENERATOR INST
Project Manager: HOLM, RICK
Remarks: 737-09-0104;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 SATRANS 216 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.006475 - CITY OF SHRVPRT TRAFFIC SIGNAL BKUP
Type Impv: TRAFFIC SIGNAL POWER GENERATOR
Project Manager: HOLM, RICK
Remarks: 737-09-0108;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 SATRANS 158 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009438 - VARIOUS ROADS:SIGNING (CADDO)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 SATRANS 113 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009475 - LA 538: ROUNDABOUT AT RAVENDALE
Type Impv: INSTALL SINGLE LANE ROUNDABOUT
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-02 HSIP 1,050 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009575 - I-20:TEXAS STATE LINE TO MONKHOUSE DR.
Type Impv: PCC PATHCING, UNDERDRAIN & PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 900 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 21 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.010282 - I-220: WB CURVE IMPROVEMENT NEAR I-20
Type Impv: CURVE REALIGNMENT
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-220 451-30 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010307 - LA 538: LA 1 TO SOUTH JCT OF LA 530
Type Impv: ASPHALT OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-03 STPFLEX 880 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010512 - LA 3049: 3.4 MI N I-220 - 2 MI S LA 173
Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3049 079-01 NFABOND 1,339 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010879 - AMERICAN ROSE CENTER TRAIL RESTORATION
Type Impv: RESTORATION AND CONSTRUCTION OF 2,200' OF PED-BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 RTP 110 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
CADDO 000-09 LOCAL 15 RECREATIONAL TRAILS PROGRAM
Project: H.011028 - UP SEVERAL RR XINGS (CADDO)
Type Impv: INSTALL FLASHING LIGHTS, GATES, AND BELLS.
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 RAIL PD 1,200 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011105 - CUL-DE-SACS @ I-49N C-OF-A LINE
Type Impv: ROADWAY TURNAROUNDS AT INTERSTATE C/A LINE.
Project Manager: UMEOZULU, JOE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-49 455-09 STGEN 800 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011112 - LA 1: UP RR XING (CADDO)
Type Impv: UPGRADE RR WARNING DEVICES
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 053-08 RAIL PD 30 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.001661 - BLACK BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks: 085-01-0022;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 530 085-01 FBROFF 2,356 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001770 - I-49 - LA 523
Type Impv: SIGNAL UPGRADE
Project Manager: STURDIVANT, PHILLIP
Remarks: 102-02-0032;(PRIORITY 9)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 511 102-02 HSIP 3,500 SAFETY 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 22 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.009576 - I-49: DESOTO PARISH LINE TO LA 526
Type Impv: PCC PATCHING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-49 455-08 NHPP 900 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010060 - BLANCHARD FURRH ROAD / CHOCTAW BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 FBROFF 1,047 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010202 - I-20: EXIT LANE EXTENSION (EXITS 3 & 5)
Type Impv: EXTEND EXIT LANES FOR DECELLERATION. PCC PAVEMENT
Project Manager: JESCLARD, TREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 HSIP 900 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.010300 - US 80: JCT JEFFERSON PAIGE RD- HEARNE RD
Type Impv: COLD PLANING, ASPHALTIC OVERLAY, PAVEMENT MARKING,
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 80 001-02 STPFLEX 1,350 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010468 - I-20: WEST END HUDSON ST. BRIDGE TO I-49
Type Impv: REMOVE AND REPLACE PCC
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 15,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010475 - I-20: MONKHOUSE TO W END OF HUDSON ST BR
Type Impv: REMOVE AND REPLACE PCC
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 20,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011094 - LA 3094: HEARNE AV BR REHAB
Type Impv: REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKM
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3094 025-08 NHPP 2,700 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001618 - JCT LA 173 - MIDDLE SCHOOL
Type Impv: RECONST.W/GEOMETRIC IMP NEED STAGE0
Project Manager: GUEST, DEBRA
Remarks: 078-02-0019;NEED FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.001724 - SHREVEPORT-BLANCHARD HWY.
Type Impv: 4 LANING (CONTINGENT ON BOND FUNDS)
Project Manager: BORNE, FRED
Remarks: 094-01-0029;ORIGINATED BY DEPT OF ECON DEV.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 23 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.001725 - JCT. LA 3094 - JCT. I-220
Type Impv: WIDENING
Project Manager: BORNE, FRED
Remarks: 094-01-0032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-01 STPFLEX 10,000 CAPACITY 2-WAITING FOR FUNDING
Project: H.006447 - I-69: SIU 14 JCT I-20 TO US 82
Type Impv: DESIGN AND ACQUIRE R/W
Project Manager: REVIERE, RYAN
Remarks: 736-99-1032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.009744 - OIL CITY MULTI-USE TRAIL, PHASE 2
Type Impv: MULTI-USE TRAIL AND RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 STPENH 438 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009913 - LA 1: 1.32 MI N JCT LA 2-TEXAS STA LINE
Type Impv: CHIP SEAL
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-03 STPFLEX 430 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.000413 - CROSS BAYOU BRIDGE REPLACEMENT
Type Impv: BRIDGE REHAB
Project Manager: YAP, KIAN
Remarks: 011-01-0054;STAGE 0 - FUTURE REHAB PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 71 011-01 NHPP 2,800 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001164 - LA 169 - LA 538 (N. OF OIL CITY)
Type Impv: WIDEN TO 4 LANES
Project Manager: BURST, JEFFERY
Remarks: 045-01-0026;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-01 NFI 23,223 CAPACITY 1-PLANNING/ENVIRONMENTAL
CADDO LA 1 045-01 STPFLEX 4,000 CAPACITY
Project: H.001166 - CADDO LAKE BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: REVIERE, RYAN
Remarks: 045-01-0029;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-01 STPFLEX 21,398 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.003915 - I-49 INNER CITY CONNECTOR
Type Impv: STAGE 0 AND ENVIRONMENTAL
Project Manager: BROUSSARD, DAN
Remarks: USE STATE SURPLUS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009213 - LA 3132 (INNER LOOP) EXTENSION
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3132 427-01 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 24 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.010206 - LA 3132 AT LA 523: EXTEND C OF A
Type Impv: EXTEND CONTROL OF ACCESS LA 3132 AT LA 523
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.010271 - LA 1: SUNDOWN ROAD TO JCT LA 538
Type Impv: OVERLAY, SHOULDER STABILIZATION AND STRIPING
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-01 STPFLEX 1,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010278 - LA 173: JCT HEARNE AVE TO I-220
Type Impv: OVERLAY, SHOULDER STABLIZATION, STRIPING, RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-01 STPFLEX 1,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010279 - LA 173: LA 1 TO US 71
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-02 STPFLEX 900 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010286 - LA 538: JCT US 71 TO LA 1
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-04 STPFLEX 1,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010288 - LA 789: PRESTON ROAD TO LA 169
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 789 809-07 STPFLEX 2,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010292 - US 79: TEXAS STATE LINE TO US 80
Type Impv: COLD PLANE, ASPHALTIC OVERLAY, PAVEMENT STRIPING
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 79 048-01 STPFLEX 1,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010428 - US 71: JCT US 80 TO HEARNE AVE
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 71 011-01 NHPP 470 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
CADDO US 71 053-09 NHPP 110 PRESERVATION
NON-INTERSTATE
Project: H.010549 - I20: MP RR (LM 6.5) TO PINES RD (LM 9.7)
Type Impv: WIDEN FROM 4 TO 6 LANES
Project Manager: ALLEN, JEFFREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 15,000 CORRIDOR 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 25 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CADDO
Project: H.011099 - DIST. 04 SIGNAL TIMING STUDIES PHASE 2
Type Impv: IMPROVE SIGNAL TIMING FOR DISTRICT 04 CORRIDORS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 171 025-08 NHPP 64 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 72 010-30 STPFLEX 10 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
CADDO LA 1 053-09 NHPP 37 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
BOSSIER LA 3105 808-07 STPFLEX 42 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
CADDO LA 526 809-08 STPFLEX 37 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
BOSSIER LA 72 010-31 STPFLEX 10 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 26 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.002713 - LA 3059: RED MARCEAUX RD -JEFF DAVIS P/L
Type Impv: PATCH, WIDEN, CP 2", OL 3.5"
Project Manager: CHENEVERT, MARK
Remarks: 383-01-0013
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3059 383-01 NFABOND 1,383 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
CALCASIEU LA 3059 383-01 HSIPPEN 733 SAFETY
Project: H.006058 - MILLER AVENUE BRIDGE OVER GUM SLOUGH
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: USE PRIORITY 2 BOND AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 FBROFF 615 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006482 - CITY OF WESTLAKE SIGN REPLACEMENT
Type Impv: SIGN INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-10-0120;ENTITY REQUIRED TO MATCH FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SATRANS 44 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006484 - CALCASIEU PH.LEGER RD.SIDEWALK SRTS
Type Impv: SIDEWALKS
Project Manager: GROS, SCOTT
Remarks: 737-10-0123;SR2S PROGRAM FUNDING
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SR2S 275 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010156 - I-10: LA 383 INTCHNG LIGHTING (IOWA)
Type Impv: INTERSTATE LIGHTING
Project Manager: ARMENTOR, MICHAEL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 697 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010440 - I-210: INTERSTATE LIGHTING
Type Impv: INTERSTATE LIGHTING
Project Manager: FOSTER, RICHARD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 1,716 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
4-SCHEDULED IN CURRENT FY 13-14
CALCASIEU I-10 450-91 NHPP 841 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
Project: H.010794 - LA 27, LA 10, & LA110: MICROSURFACING
Type Impv: MICROSURFACING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 27 031-06 STPFLEX 808 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
ALLEN LA 10 066-04 STPFLEX 667 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
BEAUREGARD LA 110 190-01 STPFLEX 179 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
Project: H.000870 - YOU WINN RD./ GLORIA DRIVE @ US 171
Type Impv: INTERSECTION REALIGNMENT
Project Manager: HANKS, ANNA
Remarks: 742-10-0137;USE LOCAL AS MATCH FOR C.S. 000-10;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 817 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
CALCASIEU US 171 024-02 STP<200K 134 URBAN SYSTEMS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 27 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.002059 - LA 384 @ LA 385
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: LAI, QUANG
Remarks: 195-04-0029;INTR IMP.WIDEN LA 384&385 @MCNEESE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 385 195-04 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.003729 - TOOMEY REST AREA
Type Impv: RECONSTRUCT REST AREA
Project Manager: GUINN, MICHAEL S
Remarks: 697-01-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 NHPP 10,096 OPER EFFICIENCY/MOTORIST ASSISTANCE
REST AREAS
4-SCHEDULED FOR LETTING FY 14-15
CALCASIEU 000-10 OTHER 2,443 OPER EFFICIENCY/MOTORIST ASSISTANCE
REST AREAS
Project: H.003969 - EXISTING 3-LANE - CONTRABAND BAYOU
Type Impv: WIDENING AND DRAINAGE IMPROVEMENTS
Project Manager: BROADBENT, RONALD
Remarks: 810-06-0028;YS9 PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 1138-2 810-06 STGEN 900 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
CALCASIEU LA 1138-2 810-06 STPFLEX 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.007113 - J.BENNETT JOHNSTON AVENUE
Type Impv: OVERLAY
Project Manager: HANKS, ANNA
Remarks: 742-10-0125; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 580 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.007130 - JOHN STINE(MYRTLE SPRINGS-SAMPSON)
Type Impv: WIDENING
Project Manager: HANKS, ANNA
Remarks: 742-10-0146;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 5,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009118 - HWY 378 SPUR AT SUTHERLAND RD
Type Impv: ADDING TURN LANE
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 378-S 810-33 STP<200K 200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009440 - VARIOUS ROADS:SIGNING (CALCASIEU)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SATRANS 11 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009621 - I-210: W JCT I-10 - E JCT I-10
Type Impv: OGFC
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 3,500 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 28 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.009790 - US 171: CONOCO ST - LA 110
Type Impv: MICROSURFACING
Project Manager: RAY, JARED
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 171 024-01 NHPP 1,135 TIME 4-SCHEDULED FOR LETTING FY 14-15
CALCASIEU US 171 024-02 NHPP 3,074 TIME
BEAUREGARD US 171 024-03 NHPP 3,222 TIME
Project: H.010192 - LAKE CHARLES ITS PHASE 2
Type Impv: ITS DEPLOYMENT AS PER REGIONAL ARCHITECTURE
Project Manager: DELANEY, ELIZABETH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010865 - I-210: DISTRICT 07 CABLE BARRIER
Type Impv: INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.
Project Manager: CORMIER, CLAYTON
Remarks: USE HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 HSIP 939 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010868 - LAKE CHARLES FIRST AVENUE TRAIL
Type Impv: CONSTRUCTION OF 2100' PEDBIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010916 - PRIEN LAKE MAIN SPAN RE-DECKING
Type Impv: REHABILITATION
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 12,600 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011053 - LA 3063: SHORT ST - S I-10 RAMP
Type Impv: PATCH, COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3063 810-25 NFABOND 954 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.000186 - US 90 OVER I-10 RAMPS @ LOCKMOOR
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 003-04-0064;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 90 003-04 STPFLEX 12,248 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002070 - LA 14 BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: LAI, QUANG
Remarks: 196-01-0023;MULTI PIPE OR CULVERT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-01 STPFLEX 393 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002075 - PAVEMENT WIDENING-MP42.7-I-10 FR RD
Type Impv: PAVEMENT WIDENING
Project Manager: RAY, JARED
Remarks: 197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 383 197-02 STPFLEX 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 29 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.003184 - I-10: TEXAS STATE LINE-E. OF COONE GULLY
Type Impv: WIDEN TO 6 LANES
Project Manager: THOMAS, BEN
Remarks: 450-91-0078;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 24,000 CORRIDOR 3-DESIGN/DEVELOPMENT
CALCASIEU I-10 450-91 NHPP 41,000 PRESERVATION
INTERSTATE
Project: H.007122 - MYRTLE SPRINGS ROAD
Type Impv: SURFACE WIDENING AND OVERLAY
Project Manager: HANKS, ANNA
Remarks: 742-10-0136;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007923 - LA 378 RIGHT TURN LANE @ LA 379
Type Impv: RIGHT TURN LANE
Project Manager: RAY, JARED
Remarks: 810-12-0041;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 378 810-12 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.007939 - LA 378-S: INDIAN BAYOU BRIDGE & APPROACH
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 810-33-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 378-S 810-33 STPFLEX 2,039 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009455 - I-210 BRIDGE CLEANING & PAINTING
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 3,400 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.009611 - US 90: EDGERLY - SULPHUR
Type Impv: CP 2", PATCH , OVERLAY 4"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 90 003-03 STPFLEX 3,825 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009620 - I-10: W OF LA 108 - WESTLAKE (MP 25-27)
Type Impv: RUBBLIZE & OVERLAY, REPLACE AT UNDERPASS
Project Manager: RICHARD, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 15,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010197 - US 171: J-TURN @ N. PERKINS FERRY RD.
Type Impv: INSTALL TURN LANES (RIGHT, LEFT AND J-TURN)
Project Manager: JESCLARD, TREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 171 024-02 HSIP 750 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.010240 - LA 12: TEXAS STATE LN - LA 109
Type Impv: CP 2", OVERLAY 4", 2" SHLD
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-02 STPFLEX 2,308 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 30 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.010563 - 5TH AVE (SOUTHBOUND) / FIFTH AVE DRAIN
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 FBROFF 439 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010564 - PEARL STREET / LATERAL L-3
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 FBROFF 295 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011019 - LA 101: ELEVATE ROADWAY
Type Impv: ELEVATE THE ROADWAY
Project Manager: CORMIER, CLAYTON
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 101 209-01 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011065 - NELSON INTERCHANGE IMPROVEMENTS
Type Impv: IMPROVEMENTS TO THE NELSON INTERCHANGE
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 1138-2 810-06 STBONDS 12,000 CAPACITY 3-DESIGN/DEVELOPMENT
CALCASIEU I-210 450-30 STBONDS 2,200 CAPACITY
Project: H.011088 - HOLLY HILL EXTENSION
Type Impv: NEW ALIGNMENT
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3088 870-02 STBONDS 5,000 CAPACITY 3-DESIGN/DEVELOPMENT
CALCASIEU LA 3088 870-02 LOCAL 1,300 CAPACITY
CALCASIEU LA 1138-2 810-06 LOCAL 100 CAPACITY
CALCASIEU LA 1138-1 810-34 LOCAL 100 CAPACITY
Project: H.011100 - LA 3059: REALIGN @ PARISH LINE
Type Impv: REALIGN CURVE
Project Manager: CORMIER, CLAYTON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3059 383-01 HSIP 1,475 SAFETY 3-DESIGN/DEVELOPMENT
JEFF DAVIS LA 3059 383-02 HSIP 1,025 SAFETY
Project: H.011196 - LAKE CHARLES SRTS PROJ. - BARBE ELEM.
Type Impv: SIDEWALKS, STRIPING AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SR2S 208 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.011232 - LAKE CHARLES SRTS PROJ. - BARBE ELEM. NI
Type Impv: EDUCATIONAL AND ENCOURAGEMENT ACTIVITIES
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SR2S 50 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 31 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.003200 - FRONTAGE ROAD CONST IN LAKE CHARLES
Type Impv: NEW FRONTAGE ROADS
Project Manager: PAINE, PEGGY JO
Remarks: 450-91-0171;STAGE 0 COMPLETE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.003740 - STARKS WEIGH STATION BUILDING
Type Impv: NEW WEIGH STATION BUILDING
Project Manager: MCCOY, JANET
Remarks: 697-13-0005;PRIORITY 1
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
WEIGH STATIONS
2-WAITING FOR FUNDING
Project: H.009750 - TOPSY ROAD SIDEWALK
Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks: ROW IS 80/20, CONSTRUCTION 95/5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STPENH 145 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009751 - BELL CITY SCHOOL SIDEWALK
Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE, WARNING LIGHTS &RELATED
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-01 STPENH 102 ENHANCEMENTS 2-WAITING FOR FUNDING
CALCASIEU 000-10 STPENH 13 ENHANCEMENTS
Project: H.000425 - LA 12 SABINE RIVER BRIDGE
Type Impv: NEW BRIDGE
Project Manager: OLIVIER, NICHOLAS
Remarks: 012-01-0004;JOINT PROJECT WITH TEXAS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-01 STPFLEX 4,346 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.000428 - LA 12 BRIDGES
Type Impv: NEW BRIDGES
Project Manager: BROWN, JEFF
Remarks: 012-02-0036;6 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-02 STPFLEX 29,903 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.003931 - CALCASIEU RIVER BRIDGE
Type Impv: FEASIBILITY & ENVIRON. STUDY
Project Manager: UMEOZULU, JOE
Remarks: 700-10-0115;INCL. UPRR GRADE SEPARATION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NFI 0 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.005967 - NELSON RD EXT & BRIDGE
Type Impv: NEW ROAD & BRIDGE
Project Manager: KENDRICK, BRIAN
Remarks: 706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL
CALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR
CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 32 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.009305 - I-10 SPEED LIMITS
Type Impv: STUDY
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.009488 - LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)
Type Impv: STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 378 810-12 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.009521 - LA 397: NEW BR.@ I-10 & UPRR (CALCASIEU)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 397 193-31 STPFLEX 10,200 RAILROADS
GRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
Project: H.009612 - LA 12: LA 109 - BEAUREGARD P/L
Type Impv: CP 2", OVERLAY 4", 2" SHLD
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-02 STPFLEX 4,863 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009613 - LA 14: MC NEESE ST - E. PRIEN LAKE RD
Type Impv: PCCP RECONSTRUCTION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 193-06 STPFLEX 4,926 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009614 - LA 14: LA 101 - JEFFERSON DAVIS P/L
Type Impv: CP 2", PATCH, OVERLAY 4"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-02 STPFLEX 1,181 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010000 - US171 CALCASIEU RVR BRIDGE CLEAN & PAINT
Type Impv: CLEANING & PAINTING & MISC. REPAIRS
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 171 024-01 NHPP 1,700 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.010001 - LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT
Type Impv: CLEANING & PAINTING & MISC. REPAIRS
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 27 031-04 STPFLEX 1,800 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.010234 - LA 14: 0.15 MI S LOGNION RD - LA 101
Type Impv: PATCH, CP 2", 4" OVERLAY RDWY, AGGREGATE SHLDR
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-01 STPFLEX 1,111 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 33 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALCASIEU
Project: H.010241 - LA 12: 0.63 MI NE AIRPORT DR - BUXTON CR
Type Impv: PATCH, CP2", 4" OVERLAY RDWY, 2" PAVED SHOULDER
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-04 STPFLEX 1,541 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010670 - LA 27&LA 1256:0.97 MI S LA1133- I-10 INT
Type Impv: PATCH, CP 2", OL 4"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 27 031-05 STPFLEX 2,315 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
CALCASIEU LA 27 031-05 STPFLEX 1,543 PRESERVATION
NON-INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 34 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CALDWELL
Project: H.007940 - BAYOU LAFOURCHE CUTOFF BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 811-01-0009;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 847 811-01 FBR-ON/OFF 3,083 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009610 - LA 133: LA 4 - LA 561
Type Impv: ASPHALT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 133 166-01 STPFLEX 2,858 PRESERVATION
NON-INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009979 - HESTER ROAD / PINEY CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL 000-11 FBROFF 308 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011130 - BOEUF WMA MORENGO SWAMP TRAIL - PHASE 1
Type Impv: RESTORATION OF 4.25 MILES OF MOTORIZED TRAILS IN WMA
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL 000-11 RTP 185 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011188 - RIVERTON CAMP RD: UP RR XING (CALDWELL)
Type Impv: THIS PROJECT PROPOSES TO INSTALL FLASHING LIGHTS AND GATE
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL 000-11 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.002650 - CASTOR,CASTOR RELIEF & DRAIN BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: TONEY, PATRICK
Remarks: 345-03-0029;3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 506 345-03 FBROFF 4,265 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009602 - LA 557: LA 4 - OUACHITA LINE
Type Impv: MICROSURFACING
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 557 159-02 STPFLEX 1,276 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.001557 - 22' PAVEMENT - JCT. US 165
Type Impv: WIDENING & O'LAY W/CURVE REALIGN.
Project Manager: MASON, KEN
Remarks: 068-04-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 4 068-04 HSIP 1,120 SAFETY 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 35 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CAMERON
Project: H.010542 - LA 717: LA 14 - Vermilion P/L
Type Impv: PATCH, CP 2", OL 2"
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 717 812-01 NFABOND 1,689 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010543 - LA 390: LA 27 - MAGGIE HEBERT RD
Type Impv: PATCH, CP 2", OL 2"
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 390 812-03 NFABOND 1,437 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010544 - LA 384: LA 27 - GRANGERVILLE RD
Type Impv: PATCH, CP 2", OL 2"
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 384 812-04 NFABOND 511 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010545 - LA 3056: JEFF DAVIS PL-.09 Mi N RIVER RD
Type Impv: PATCH, CP 2", OL 2"
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 3056 812-08 NFABOND 654 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009470 - LA 82: SUPERIOR CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT - MOVEABLE BRIDGE
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 82 194-02 STPFLEX 11,161 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009788 - LA 82: CREOLE - OAK GROVE
Type Impv: MICROSURFACING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 82 194-01 STPFLEX 492 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 36 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CATAHOULA
Project: H.001129 - LA 8 REALIGNMENT AT OUACHITA RIVER
Type Impv: ROADWAY REALIGNMENT
Project Manager: RABALAIS, NICK
Remarks: 039-04-0061;SEE NOTES FOR FUNDING INFO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 8 039-04 STPFLEX 2,250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
CATAHOULA LA 8 039-04 STPFLEX 2,250 OTHER / MISCELLANEOUS
Project: H.006062 - AMYX ROAD BRIDGE OVER SALEM CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-13-0103
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA 000-13 FBROFF 407 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010529 - LA 921 & LA 567 OVERLAYS
Type Impv: PATCH & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 921 354-02 NFABOND 1,864 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
CATAHOULA LA 567 354-30 NFABOND 1,854 PRESERVATION
NON-INTERSTATE NFA
Project: H.010845 - LA 3037 & LA 3165 OVERLAYS
Type Impv: INPLACE STABILIZATION & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 3165 813-26 NFA 807 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14
CATAHOULA LA 3037 813-22 NFA 515 ROAD TRANSFER
Project: H.009607 - LA 124: ENTERPRISE - LA 559
Type Impv:
Project Manager: CHENEVERT, MARK
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 041-03 STPFLEX 935 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011174 - US 425: SICILY ISLAND - LA 913
Type Impv: CAPE SEAL
Project Manager: CHENEVERT, MARK
Remarks: TIMED FUNDS ARE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA US 425 026-05 NHPP 900 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.001140 - LA 124: HOOTER CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: RICHARD, RYAN
Remarks: 041-03-0025; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 041-03 FBROFF 1,504 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010941 - RATCLIFF ROAD / DUCK CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA 000-13 FBROFF 601 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 37 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CATAHOULA
Project: H.000762 - JCT LA 28 - JCT LA 3037
Type Impv: WIDEN TO 4 LANES
Project Manager: MOORE, DARRELL
Remarks: 022-06-0038;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CATAHOULA US 84 022-06 NFI 6,000 CAPACITY
Project: H.007946 - LA 3102: LA 124 - 4.8 MI NW OF LA 124
Type Impv: PATCH AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 813-24-0024;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Project: H.009993 - PROTECTION OF INFRASTRUCTURE ON LA 124
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 041-03 FEMA 2,988 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010815 - LA 124 EXTENSION
Type Impv: CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTE
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 143-03 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Project: H.011029 - LA 559: REPLACE DUTY FERRY WITH BRIDGE
Type Impv: FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGE
Project Manager: MUMPHREY, RAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 559 813-29 STPFLEX 18,000 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING
CATAHOULA LA 559 346-01 STPFLEX 18,000 OTHER / MISCELLANEOUS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 38 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CLAIBORNE
Project: H.010297 - LA 520:JCT US 79-1.624 MI S BELL HILL RD
Type Impv: ASPHALTIC OVERLAY, PAVEMENT MARKING, AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 520 101-01 STPFLEX 1,617 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010517 - LA 534 SPUR: LA 2 TO LA 534
Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 534-S 290-01 NFABOND 1,019 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009442 - VARIOUS ROADS:SIGNING (CLAIBORNE)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE 000-14 SATRANS 1 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010067 - LYONS HILL AND FLAT LICK ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE 000-14 FBROFF 994 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010293 - LA 146: .21 MI E OF US 79 - W JCT LA 518
Type Impv: THIN OVERLAY, PAVEMENT MARKING, AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 146 085-08 STPFLEX 2,500 PRESERVATION
NON-INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010308 - CLAIBORNE PARISH CHIP SEALS
Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 533 814-02 NFA 280 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010514 - LA 521: WEBSTER PARISH LINE TO LA 808
Type Impv: ULTRATHIN OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 521 291-02 NFA 1,273 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.001763 - LA 520: MIDDLE FORK BAYOU D'ARBONNE BRG.
Type Impv: BRIDGE REPLACEMENT
Project Manager: RICHARD, RYAN
Remarks: 101-01-0012;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 520 101-01 STPFLEX 898 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009505 - US 79: BILLY SHAW - N END OF PASSING LA
Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT MARKING & RELATED W
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE US 79 027-06 STPFLEX 1,940 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 2 070-02 STPFLEX 3,200 PRESERVATION
NON-INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 39 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CLAIBORNE
Project: H.009506 - LA 146: OWENS ST TO JCT. LA 518
Type Impv: ASPHALT OVERLAY, DRIANAGE, PAVEMENT STRIPING & RELATED W
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 146 085-08 STPFLEX 3,926 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010923 - US 79 BYPASS @ LA 9 ROUNDABOUT
Type Impv: DESIGN AND CONSTRUCTION OF ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE US 79 027-05 STPFLEX 2,950 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.001674 - LA 146 BRIDGES NEAR HOMER
Type Impv: NEW BRIDGES
Project Manager: DELATTE, BRIAN
Remarks: 085-08-0032;4 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 146 085-08 STPFLEX 6,068 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009511 - LA 520: US 79-2.56 MI E BEAVER BRANCH BR
Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RELATED W
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 520 101-01 STPFLEX 2,690 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009963 - LA 518: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 518 109-03 FEMA 728 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009965 - LA 540: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 540 335-02 FEMA 12,466 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009971 - LA 3062: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 3062 085-30 FEMA 728 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010281 - LA 2: WEBSTER P/L TO LA 3062
Type Impv: COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT S
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 2 085-07 STPFLEX 3,350 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 40 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CONCORDIA
Project: H.000780 - US 84 @ US 425 INTERSECTION IMPROVEMENTS
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: RABALAIS, NICK
Remarks: 022-07-0076 AND 026-02-0068;NEW PROJECT-BEING SCOPED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 022-07 STGEN 300 CAPACITY 4-SCHEDULED IN CURRENT FY 13-14
CONCORDIA US 84 022-07 NHPP 70 CAPACITY
CONCORDIA US 84 026-02 NHPP 30 CAPACITY
CONCORDIA US 425 026-03 NHPP 14 CAPACITY
CONCORDIA LA 568 075-01 STPFLEX 10 CAPACITY
Project: H.011056 - LA 566:4.7MI E DUNBARTON-2.88 MI S US425
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 566 355-03 NFABOND 1,879 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010871 - VIDALIA MULTI-USE TRAILS, SECTION 2
Type Impv: CONSTRUCTION OF A 2,900' PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA 000-15 RTP 127 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
CONCORDIA 000-15 LOCAL 12 RECREATIONAL TRAILS PROGRAM
Project: H.011041 - LA 569 OVERLAY & LA 555 AST
Type Impv: OVERLAY & AST
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 569 176-01 NFABOND 1,060 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
FRANKLIN LA 555 821-06 NFABOND 267 PRESERVATION
NON-INTERSTATE NFA
Project: H.011175 - DELAWARE ST. - ARKANSAS ST. IN FERRIDAY
Type Impv: COLD PLANE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: TIMED FUNDS ARE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 026-02 NHPP 750 TIME 4-SCHEDULED FOR LETTING FY 14-15
CONCORDIA US 425 026-03 NHPP 750 TIME
Project: H.010460 - LA 565: LA 129 - LA 600
Type Impv: PATCH AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 565 178-03 STPFLEX 1,305 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010462 - LA 15: LA 131 - US 84
Type Impv: STABILIZE AND OVERLAY, COLD PLANE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 15 177-05 STPFLEX 3,900 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 41 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: CONCORDIA
Project: H.000770 - JCT LA 565 - JCT LA 129
Type Impv: WIDEN TO 4 LANES
Project Manager: MOORE, DARRELL
Remarks: 022-07-0053;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.000771 - LA 129 - US 65 (FERRIDAY)
Type Impv: WIDEN TO 4 LANES
Project Manager: RABALAIS, NICK
Remarks: 022-07-0054;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.006187 - LA 15 @ DEER PARK (S OF US 65 - LEVEE)
Type Impv: LA 15 AT DEER PARK REALIGNMENT
Project Manager: MASON, KEN
Remarks: 177-04-0033
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 15 177-04 HSIP 1,657 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.009082 - VIDALIA PORT ACCESS ROAD
Type Impv: NEW ROUTE
Project Manager: MASON, KEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA 000-15 DEMO 2,636 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009587 - US 84: MISS. RIVER BR. - LA 3180
Type Impv: M3 MICROSURFACING
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 026-02 NHPP 881 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009973 - LA 3196: GRADE IMPROVEMENT
Type Impv: GRADE IMPROVEMENT
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 3196 815-20 FEMA 2,781 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010461 - LA 15: LA 910 - LA 565
Type Impv: PATCH AND OVERLAY, AST
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 15 177-04 STPFLEX 5,745 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010700 - US 425/US 84 SIGNAL TIMING STUDY
Type Impv: SIGNAL TIMING STUDY AND RETIMING OF SIGNALS
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 026-02 NHPP 22 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
CONCORDIA US 425 026-03 NHPP 1 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 42 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DESOTO
Project: H.009510 - LA 481: SABINE P/L-BEULAH BAPTIST CHURCH
Type Impv: ULTRATHIN OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 299-02-0009; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 481 299-02 STPFLEX 1,986 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009574 - I-49: NATCHITOCHES P/L TO CADDO P/L
Type Impv: PCC PATCH & PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO I-49 455-07 NHPP 2,052 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010312 - LA 191: LA 763 TO US 84
Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 191 099-03 STPFLEX 299 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.001749 - LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE
Type Impv: CURVE REALIGNMENT
Project Manager: BAUGH, SAM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 5 098-03 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009093 - LA 175: TURN LANES @ LA 5
Type Impv: ADD TURN LANES
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 175 035-04 HSIP 800 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009173 - LA 513: OXFORD TO US 84
Type Impv: ROADWAY PAVEMENT STRUCTURE REPAIRS AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 513 300-04 NFABOND 2,178 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009978 - US 84: PASSING LANES
Type Impv: COLD PLANING, SUPERPAVE ASPHALTIC CONCRETE, PAVEMENT STR
Project Manager: ALLEN, JEFFREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 84 021-02 DEMO 1,900 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010212 - LA 175: IMPROVEMENT BTWN US 84 & LA 509
Type Impv: LENGTHEN TURN LANE, ADD TURN LANE AND MINOR WIDENING
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 175 035-04 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010975 - LA 175: NB LEFT TURN LANE AT LA 3015
Type Impv: ADDING LEFT TURN LANE TO IMPROVE TRAFFIC FLOW
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 175 035-04 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 43 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DESOTO
Project: H.011009 - US 84: US 171 TO LA 175 SOUTH
Type Impv: MILL AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 84 021-03 NHPP 900 PRESERVATION
NON-INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011170 - US 171: SABINE PARISH LINE TO LA 5
Type Impv: EROSION CONTROL: REVETMENT, GRASS
Project Manager: BAUGH, SAM
Remarks: TIMED FUNDS WILL BE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 171 025-06 NHPP 462 TIME 4-SCHEDULED FOR LETTING FY 14-15
DESOTO US 171 025-05 NHPP 388 TIME
Project: H.010817 - ROGERS FIELD AND MOUNCE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO 000-16 FBROFF 285 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
DESOTO 000-16 FBROFF 293 PRESERVATION
BRIDGE (OFF SYSTEM)
DESOTO 000-16 FBROFF 1,117 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010978 - US 84: LEFT TURN LANES AT LA 481
Type Impv: ADDING A LEFT TURN LANES IN BOTH DIRECTIONS AT LA 481
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 84 021-02 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.001223 - RESURFACING ON US 84 AND LA 5
Type Impv: MILL. OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 049-01-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 5 049-01 STPFLEX 2,895 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
DESOTO US 84 021-02 STPFLEX 1,853 PRESERVATION
NON-INTERSTATE
Project: H.001790 - INT. PAPER PLANT - LA 1
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: BORNE, FRED
Remarks: 105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010285 - LA 512: US 171 TO LA 483
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 512 301-02 STPFLEX 2,104 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 44 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.002290 - LA 64: LA 19 TO MCHUGH RD
Type Impv: CENTER TURN LANE
Project Manager: MUSA, ELNUR
Remarks: SCOPE COMP; R/W & UTIL W STP>200K. DOTD MATCH. CITY/PARI
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 64 253-02 HSIP 3,526 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
E BATON ROUGE LA 64 253-02 STP>200K 0 URBAN SYSTEMS
Project: H.009290 - LSU LABORATORY SCHOOL SRTS PROJECT
Type Impv: BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIES
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 SR2S 208 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009638 - I-10: WASHINGTON ST. - KCS RR OPASS
Type Impv: COLD PLANE AND OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 NHPP 992 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010254 - 15TH ST PUMP STATION IMPROVEMENTS I-110
Type Impv: REPLACE/UPGRADE PUMP HOUSE COMPONENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 480 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010534 - LA 427: ASCENSION P/L - LA 42
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 427 817-23 NFABOND 1,288 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
ASCENSION LA 427 803-25 NFA 10 PRESERVATION
NON-INTERSTATE NFA
Project: H.010554 - SAINT GABRIEL TRAIL AT THE LEVEE, PH 2
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON THE MISS. RIVER LEVEE.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 183 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
E BATON ROUGE 000-17 LOCAL 5 RECREATIONAL TRAILS PROGRAM
Project: H.010585 - DOWNTOWN BATON ROUGE GREENWAY PH. 2
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
E BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM
Project: H.010967 - LA 73 AT US 61 SERVICE ROAD MODIFICATION
Type Impv: INSTALL MOUNTABLE CURBING ON LA 73 AND ON US 61 SERVICE RO
Project Manager: BEAUVAIS, HEWITT
Remarks: LETTER BID IN DISTRICT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 73 077-04 STCASH 22 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 45 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.011211 - LA 64: MEDIAN IMPROVEMENTS
Type Impv: MEDIAN MODIFICATIONS TO PREVENT U TURNS FROM BEING DONE.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 64 253-02 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.000698 - BAKER CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT & ASPHALT WIDENING
Project Manager: CAVALIER, STEPHANIE
Remarks: 019-02-0054;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 019-02 NHPP 3,186 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE US 61 019-02 NHPP 800 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.002320 - SULLIVAN RD (WAX - HOOPER)
Type Impv: 4 LN DIVIDED CONC HWY RAISED MEDIAN
Project Manager: JESCLARD, TREY
Remarks: 255-30-0014;GREEN LIGHT PROJECT.LET BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3034 255-30 LOCAL 19,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE LA 3034 255-30 STBONDS 3,000 PRESERVATION
NON-INTERSTATE
E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 PRESERVATION
NON-INTERSTATE
Project: H.002822 - NICHOLSON @ BRIGHTSIDE LANE
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: DEVILLE, JACQUES
Remarks: 414-01-0036;SEE NOTES USE TTF AS MATCH FOR R/W ON LA 30
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 30 414-01 CM 3,816 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE 000-17 CM 2,763 URBAN SYSTEMS
Project: H.006499 - SAFE ROUTES TO WESTDALE MIDDLE SCHOOL
Type Impv: CONSTRUCTION OF BIKEPATH AND PURCHASE OF SPEED FEEDBACK
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 SR2S 210 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.007160 - EBR COMPUTERIZED TRAFFIC SIGNAL
Type Impv: TRAFFIC SIGNAL SYNCHRONIZATION
Project Manager: BROWN, JEFF
Remarks: 742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009144 - LA 42: CORRIDOR IMPROVEMENTS
Type Impv: CLEARING AND GRUBBING
Project Manager: ALLAIN, PETER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 42 257-04 STPFLEX 100 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010251 - CHIPPEWA ST PUMP STATION IMP US61/190-X
Type Impv: REPLACE/UPGRADE PUMP HOUSE COMPONENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61-X 817-20 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 46 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.010253 - BLUEBONNET BLVD. PUMP STAT. IMP LA 1248
Type Impv: REPLACE PUMP STATION FLOAT SYSTEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 1248 258-33 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010262 - LA 42: DRAINAGE IMPROVEMENTS
Type Impv: REGRADE TRAVEL LANE AND ADJUST CATCH BASIN
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 42 257-04 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010439 - BOYD ST & 21ST ST PUMPING STA IMP I-110
Type Impv: REPLACE PUMP STATION FLOAT SYSTEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 50 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE I-110 450-92 NHPP 50 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
Project: H.010560 - ESSEN LANE WIDEN: PERKINS RD TO I-10
Type Impv: WIDEN TO 6 LANES SECTION W/16'CURB & GUTTER MEDIAN
Project Manager: TSAI, LOONG SHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3064 258-32 STBONDS 5,900 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE LA 3064 258-32 STPFLEX 100 CAPACITY
Project: H.010565 - ACADIAN STREET PUMPING STATION
Type Impv: REPLACE/UPGRADE PUMPHOUSE COMPONENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 427 258-02 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010648 - ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY
Type Impv: PAVEMENT REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 2,900 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010649 - EBR PARISHWIDE SIGNAL MODIFICATIONS
Type Impv: SIGNAL MODIFICATIONS
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 1,439 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010650 - OLOL MEDICAL COMPLEX AREA STREETS
Type Impv: REHABILITATE EXISTING ROADWAY
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 1,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010723 - NORTH BOULEVARD PROMONADE
Type Impv: PED. AND BIKE PATH
Project Manager: JONES, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 DEMO 1,500 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 47 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.010792 - US 61 & LA 73: IMPROV'S AT PECUE LANE
Type Impv: INTERSECTION MODIFICATIONS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-08 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE LA 73 077-04 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.010866 - LA 37: TREE AND STUMP REMOVAL
Type Impv: LA 37: TREE AND STUMP REMOVAL
Project Manager: KELLEY, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 37 254-02 HSIPPEN 2,600 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010869 - WARDS CREEK TRAIL - BLUEBONNET EXTENSION
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 256 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE 000-17 LOCAL 140 RECREATIONAL TRAILS PROGRAM
Project: H.010875 - WARDS CREEK TRAIL - SIEGEN EXTENSION
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 222 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE 000-17 LOCAL 106 RECREATIONAL TRAILS PROGRAM
Project: H.011109 - US 61: IC RR XING (BATON ROUGE)
Type Impv: INSTALL NEW CROSSING SURFACE
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 RAIL HE 400 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011115 - PENNINGTON TRAIL SEGMENT
Type Impv: CONST. OF 12' X 1480' PED-BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE 000-17 LOCAL 397 RECREATIONAL TRAILS PROGRAM
Project: H.011120 - RIVERBEND CONNECTIVITY TRAIL
Type Impv: CONST. OF A 3700' PED-BIKE TRAIL THAT CONNECTS PUBLIC FCLTS.
Project Manager: RIGGS, LAURA
Remarks: MICHAED DOMINGUE IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE 000-17 LOCAL 94 RECREATIONAL TRAILS PROGRAM
Project: H.011135 - E. PERDUE: IC RR XING (BATON ROUGE)
Type Impv: INSTALLATION OF ACTIVE WARNING DEVICES.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 48 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.011186 - DIST. 61 TRAFFIC CONTROL UPGRADE 3
Type Impv: SIGNALS TO BE UPGRADE TO CURRENT DOTD STANDARDS
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61-X 019-01 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE US 61-X 013-04 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
E BATON ROUGE LA 67 060-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
E BATON ROUGE LA 67 060-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.011212 - LA 948: EXTEND WB RIGHT TURN LANE
Type Impv: EXTEND WESTBOUND RIGHT TURN LANE FOR ADDITIONAL CAPACITY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 948 258-01 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011213 - I 12: SOUND BARRIER WALL @ ESSEN LANE
Type Impv: CONSTRUCT SOUND BARRIER WALLS ALONG I-12 WESTBOUND AT E
Project Manager: ISEMANN, ROBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-12 454-01 NHPP 1,250 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011236 - I-10 OVER LA42 GIRDER REPLACEMENT
Type Impv: REPLACE IMPACT DAMAGED GIRDER
Project Manager: TSAI, CHING
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 REIMB 400 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE I-10 450-10 NHPP 100 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.002301 - NORTH SHERWOOD FOREST DRIVE IMPROVEMENTS
Type Impv: WIDEN FROM 2 TO 5 LANES
Project Manager: DEVILLE, JACQUES
Remarks: 742-17-0118;ENV DOC. BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 14,710 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.002337 - BAYOU FOUNTAIN
Type Impv: NEW BRIDGE
Project Manager: MOORE, DARRELL
Remarks: 257-03-0025;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 327-S 257-03 STPFLEX 1,666 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.007961 - BLACKWATER BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 817-05-0015;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 410 817-05 STPFLEX 2,379 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 49 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.009649 - LA 67: US 61/190 - LA 3006
Type Impv: PCCP PATCHING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 67 060-01 STPFLEX 2,167 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 67 060-01 STPFLEX 333 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
E BATON ROUGE LA 67 060-02 STPFLEX 1,733 PRESERVATION
NON-INTERSTATE
E BATON ROUGE LA 67 060-02 STPFLEX 267 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.009651 - US 61/190: US 61/190 BUS - MISS RIVER BR
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 NHPP 8,438 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010020 - I-110 BRIDGE OVER LA 67 CLEAN & PAINT
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 650 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.010319 - I-110: NORTH ST. - PLANK RD.
Type Impv: RECONSTRUCT JCP @ GRADE
Project Manager: MOORE, DARRELL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 27,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010652 - LA 73: US 61 (AIRLINE) - ESSEN LANE
Type Impv: PCCP PATCHING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 73 077-05 NHPP 3,500 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010659 - RAFE-MEYER ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 FBROFF 732 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE 000-17 FBROFF 593 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010660 - TUCKER RD/DYER RD/DENHAM RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 FBROFF 732 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE 000-17 FBROFF 593 PRESERVATION
BRIDGE (OFF SYSTEM)
E BATON ROUGE 000-17 FBROFF 739 PRESERVATION
BRIDGE (OFF SYSTEM)
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 50 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.010661 - N. FLANNERY/FIREWOOD/CLOVERLAND BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 FBROFF 601 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE 000-17 FBROFF 439 PRESERVATION
BRIDGE (OFF SYSTEM)
E BATON ROUGE 000-17 FBROFF 439 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010729 - TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)
Type Impv: TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATION
Project Manager: BROWN, JEFF
Remarks: EBR WILL PROVIDE 20% MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION
E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION
E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION
Project: H.011098 - LA 30: CORRIDOR IMPROVEMENTS
Type Impv: ACCESS MANAGMENT LA 30 - NICHOLSON DR.
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 30 414-01 NHPP 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.002344 - PERKINS RD. (SIEGEN - PECUE)
Type Impv: WIDEN TO 5 LANES
Project Manager: PICARD, TOBY
Remarks: 258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 427 258-01 LOCAL 26,948 CAPACITY 2-WAITING FOR FUNDING
Project: H.002358 - ESSEN LANE INTERCHANGE
Type Impv: (PHASE 2)(REQ DEMO FUNDS)
Project Manager: PICARD, TOBY
Remarks: 454-01-0068;IM-D $250K FY03.REQ MORE DEMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.002361 - ESSEN LANE AT I-10
Type Impv: CONCRETE NEW PAVEMENT
Project Manager: PICARD, TOBY
Remarks: 258-32-0022;GREEN LIGHT PROJ(G) LET BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3064 258-32 LOCAL 6,805 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.007970 - OLD HAMMOND (BLVD DE PROV-MILL)
Type Impv: WIDEN TO 4 LANES
Project Manager: PICARD, TOBY
Remarks: 817-09-0035;INCLUDES I'SECT @ FLANNERY; GREEN LIGHT PROJ
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 426 817-09 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.007973 - OLD HAMMOND (BLVD DE PROV-MILL)
Type Impv: CLEARING AND GRUBBING
Project Manager: PICARD, TOBY
Remarks: 817-09-0040; GREEN LIGHT PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 426 817-09 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 51 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.007974 - OLD HAMMOND HWY(MILLERVILLE-O'NEAL)
Type Impv: NEW CONC PAVEMENT
Project Manager: PICARD, TOBY
Remarks: 817-09-0042;LET BY CITY. GREEN LIGHT PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 426 817-09 LOCAL 12,062 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.009327 - I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE
Type Impv: EXPOXY BRIDGE DECK OVERLAY
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 NHPP 8,250 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
E BATON ROUGE I-110 450-92 NHPP 750 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
Project: H.009798 - CITY OF CENTRAL SIDEWALKS
Type Impv: SIDEWALK & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3034 255-30 STPENH 274 ENHANCEMENTS 2-WAITING FOR FUNDING
E BATON ROUGE 000-17 STPENH 168 ENHANCEMENTS
Project: H.009799 - EBR MISS E BANK MULTI-USE PATH, PHASE 3
Type Impv: MULTI-USE PATH & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STPENH 1,500 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.001606 - JEFFERSON HWY @ STUMBERG LN EXT
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: PICARD, TOBY
Remarks: 077-04-0025;GREEN LIGHT PROJECT (AA)LET BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 73 077-04 LOCAL 11,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.002297 - MAGNOLIA BRIDGE RD - INDIAN MOUND
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: RICHARD, RYAN
Remarks: 254-02-0040;SAFETY TRANSFER FUNDS-4 MILLION MAX
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.002313 - HOOPER RD.(BLKWATER BAYOU - DEVALL)
Type Impv: WIDEN TO 5 LANES
Project Manager: PICARD, TOBY
Remarks: 255-02-0027;HOLD - SEWER & FUNDING PROBLEM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 408 255-02 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.002317 - LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)
Type Impv: NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIAN
Project Manager: PICARD, TOBY
Remarks: GREEN LIGHT PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 52 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.003047 - PECUE LANE/I-10 INTERCHANGE
Type Impv: NEW INTERCHANGE
Project Manager: KENDRICK, BRIAN
Remarks: 450-10-0161;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE I-10 450-10 STGEN 0 DEMO / HIGH PRIORITY
Project: H.005403 - LA408(HOOPER RD EXT)LA37-LA16
Type Impv: EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.007963 - BLACKWATER BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: GAUDRY, CARL
Remarks: 817-05-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 410 817-05 STPFLEX 1,811 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008415 - INFORMATION CENTER @ SOUTHERN UNIVERSITY
Type Impv: FEDERAL EARMARK
Project Manager: UMEOZULU, JOE
Remarks: DEMO$ & $ FROM SOUTHERN;AUTHORIZED;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS
Project: H.008732 - STUDY OF BATON ROUGE LOOP
Type Impv: EIS
Project Manager: NGUYEN, WAYNE
Remarks: EIS IS DEMO WITH MATCH FROM LOCALS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009141 - LA 3246: ACCESS MGT. IMPROVEMENTS
Type Impv: MEDIAN AND SIGNAL IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3246 817-40 NHPP 426 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.009489 - US 61: JEFFERSON HIGHWAY OVERPASS
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 NHPP 6,854 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009725 - LA 3034: SULLIVAN RD @ WAX RD
Type Impv: PERMIT PROJECT WITH CEA
Project Manager: JESCLARD, TREY
Remarks: 255-30-0012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3034 255-30 LOCAL 4,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009745 - SCOTLANDVILLE PKWY MULTI-MODAL IMPRVMENT
Type Impv: MULTI-USE TRAIL & PED. BRIDGES
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 STPENH 234 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 53 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST BATON ROUGE
Project: H.009783 - BR DOWNTOWN GREENWAY MULTI-USE PATH
Type Impv: MULTI-USE PATH W/LIGHTING, LANDSCAPING & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 STPENH 401 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE I-10 450-10 STPENH 320 ENHANCEMENTS
E BATON ROUGE 000-17 STPENH 332 ENHANCEMENTS
Project: H.010051 - LSU HIGHLAND RD PED CORRIDOR, PHASE I
Type Impv: SIDEWALKS W/LIGHTING & LANDSCAPING
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STPENH 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.010211 - I-110 NB RAMP AT CAPITOL ACCESS ROAD
Type Impv: I-110 NB RAMP IMPROVEMENTS AT CAPITOL ACCESS ROAD
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.010320 - LA 42: JCT. HIGHLAND RD - LA 30
Type Impv: PCC PATCH
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 42 258-31 STPFLEX 2,400 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE LA 42 257-04 STPFLEX 4,100 PRESERVATION
NON-INTERSTATE
Project: H.010699 - LA 19 SIGNAL TIMING STUDY
Type Impv: SIGNAL TIMING STUDY AND RETIMING OF SIGNALS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 19 250-01 STPFLEX 19 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.011226 - US190/US61: LA 415 TO I-12 STUDY
Type Impv: CORRIDOR STUDY ON US 190 / US 61
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
W BATON ROUGE US 190 008-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.009300 - HOOPER ROAD WIDENING (LA 3034 - LA 37)
Type Impv: FEASIBILITY STUDY TO WIDEN HOOPER ROAD
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 408 255-02 0 CAPACITY 0-FEASIBILITY/SCOPING
Project: H.007137 - JONES CR. RD.(TIGER BEND - COURSEY)
Type Impv: WIDEN TO 5 LANES
Project Manager: DEVILLE, JACQUES
Remarks: 742-17-0131;NEED SCOPE FROM CITY(742-17-0155C&G
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 14,552 URBAN SYSTEMS
E BATON ROUGE 000-17 LOCAL 646 URBAN SYSTEMS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 54 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST CARROLL
Project: H.011035 - LA 580: JOES BAYOU - US 65
Type Impv: MAINTENANCE RESURFACING, 6" OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 580 818-01 STPFLEX 3,102 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.007992 - LA 883-1 - US 65
Type Impv: ASPHALT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 818-12-0004;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 883-2 818-12 STPFLEX 0 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.001961 - JOES BAYOU & CARRAWAY LAKE BRIDGES
Type Impv: NEW BRIDGES
Project Manager: HICKS, MELVIN
Remarks: 161-08-0022;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 134 161-08 STPFLEX 2,873 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010390 - US 65: PANOLA PLANT ROAD TO ARK. LINE
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL US 65 020-09 NHPP 3,600 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 55 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EAST FELICIANA
Project: H.009012 - WIDEN INTERSECTIONS AT LA 67 & LA 10
Type Impv: SAFETY - WIDEN INTERSECTION
Project Manager: LAI, QUANG
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 67 060-03 HSIP 125 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
E FELICIANA LA 67 060-04 HSIP 125 SAFETY
E FELICIANA LA 10 061-05 HSIP 50 SAFETY
Project: H.011050 - LA 952: LA 10 - LA 68
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 952 819-05 NFABOND 5,830 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.002365 - LA 63 BRIDGES NEAR BLUFF CREEK
Type Impv: NEW BRIDGES
Project Manager: BRAUNER, KURT
Remarks: 259-01-0011;3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 63 259-01 STPFLEX 5,497 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010562 - BANK STREET & SINGLETARY STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA 000-19 FBROFF 539 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E FELICIANA 000-19 FBROFF 300 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.009633 - LA 67: LA 10 - MISSISSIPPI STATE LINE
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 67 060-04 STPFLEX 8,813 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 56 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: EVANGELINE
Project: H.011032 - LA 374: LA 3277 - LA 13
Type Impv: STABILIZE BASE, OVERLAY, AND RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 374 820-01 NFABOND 6,219 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011048 - LA 95: ST. LANDRY PARISH LINE - LA 29
Type Impv: STABILIZE BASE, ASPHALT OVERLAY, AND RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 95 820-34 NFABOND 2,062 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011049 - LA 748: US 167 - LA 1169
Type Impv: STABILIZE BASE, ASPHALT OVERLAY, AND RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 748 380-01 NFABOND 1,197 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010208 - LA 104: CSLM 0.8 (END CURB & GUTR - 1161
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 104 202-01 STPFLEX 541 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.002101 - BAYOU DES CANNES BR NEAR VILLE PLATTE
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 202-01-0019;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 104 202-01 FBROFF 1,381 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010036 - FUSELIER ROAD & JEAN DUOS ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE 000-20 FBROFF 547 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010219 - LA 104: ALLEN P/L - LA 3277
Type Impv: STABLIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 104 200-02 STPFLEX 2,275 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.001524 - OAKDALE-LA 106
Type Impv: RECONSTRUCT
Project Manager: MOORE, DARRELL
Remarks: 066-05-0016;INCL204-01-0010 LM 0-0.38
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 10 066-06 NFI 14,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.010223 - LA 106: LA 10 - US 167
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 106 204-01 STPFLEX 6,426 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
EVANGELINE LA 106 204-02 STPFLEX 3,136 PRESERVATION
NON-INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 57 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: FRANKLIN
Project: H.001093 - LA 4: DEER CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 036-04-0064;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-04 STPFLEX 1,337 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006109 - PARISH LINE ROAD BRIDGE - EAST
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-21-0114
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN 000-21 FBROFF 267 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010530 - LA 555 & LA 572 OVERLAYS
Type Impv: PATCH, STABILIZE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 555 821-22 NFABOND 4,781 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
FRANKLIN LA 572 821-23 NFABOND 3,799 PRESERVATION
NON-INTERSTATE NFA
Project: H.009582 - US 425: LA 562 - N JCT LA 3210
Type Impv: COLD PLANE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN US 425 026-06 NHPP 3,000 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010068 - BUSH ROAD AND LISHMAN ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN 000-21 FBROFF 662 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
FRANKLIN 000-21 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010873 - EIGHTH STREET BICYCLE TRAIL
Type Impv: CONSTRUCTION OF A 3,810 BICYCLE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN 000-21 RTP 163 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
FRANKLIN 000-21 LOCAL 47 RECREATIONAL TRAILS PROGRAM
Project: H.009583 - LA 4: LA 562 - LA 128
Type Impv: PATCHING & SINGLE LIFT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-02 STPFLEX 452 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009586 - LA 4: LA 578 - LA 128
Type Impv: ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATION
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-04 STPFLEX 1,636 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 58 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: FRANKLIN
Project: H.009605 - LA 4: LA 128 - LA 15
Type Impv: CHIP SEAL
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-03 STPFLEX 1,716 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009784 - WINNSBORO: ADAMS&COMMON ST STREETSCAPING
Type Impv: SIDEWALKS W/LIGHTING, & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN 000-21 STPENH 229 ENHANCEMENTS 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 59 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: GRANT
Project: H.010906 - LA 123: US 167-.52 MI E DRY PRONG CREEK
Type Impv: ONE LIFT OVERLAY OF EXISTING ASPHALTIC PAVEMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 123 076-02 STPFLEX 700 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011061 - LA 1241: US 71 - US 167
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 1241 822-05 NFABOND 2,544 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010368 - US 167: LA 472 - WINN P/L (NB)
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT US 167 023-03 NHPP 2,858 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010669 - UP RR XINGS (GRANT)
Type Impv: INSTALL F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT 000-22 RAIL PD 600 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010793 - ROADWAY DEPARTURE SAFETY IMPROVEMENTS
Type Impv: PURCHASE/INSTALL SIGNS & SOLAR BEACONS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT 000-22 SATRANS 33 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010861 - KATELAND GIN ROAD / DARROW BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT 000-22 FBROFF 1,617 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011119 - LA 158: KCS RR XING (GRANT)
Type Impv: REPLACE CROSSING SURFACE
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 158 009-32 RAIL HE 158 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
GRANT LA 158 009-32 LOCAL 126 RAILROADS
Project: H.010592 - WILLET LOOP RD & ROCK HILL RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT 000-22 FBROFF 585 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
GRANT 000-22 FBROFF 470 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.001842 - LA 471: DARTIGO CREEK & CREEK BRIDGES
Type Impv: NEW BRIDGE
Project Manager: PAINE, PEGGY JO
Remarks: USE NFA FUNDS TO PAY FOR MITIGATION UNTIL FEMA REIMBURS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 471 123-01 FEMA 3,534 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 60 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: GRANT
Project: H.010362 - LA 8: JCT US 167 - N JCT US 165
Type Impv: MICROSURFACING
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 8 040-02 STPFLEX 270 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 61 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA
Project: H.009177 - NEW IBERIA INTERSECTION SAFETY IMPROVE
Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 SATRANS 120 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009467 - LA671: JEANERETTE BR WEDGE SYSTEM REPAIR
Type Impv: MECHANICAL REPAIRS
Project Manager: LAMBERT, JARRETT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 671 241-01 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
MOVABLE BRIDGE REHABILITATION
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010521 - LA 344: 2.18 MI N LA 86 - LA 86
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 344 823-14 NFABOND 2,754 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010850 - SIGN SAFETY IMPROVEMENTS
Type Impv: PURCHASE AND INSTALL REGULATORY & WARNING SIGNS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 SATRANS 23 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.002753 - BAYOU PARC PERDU & CREEK BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 397-05-0016; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 89 397-05 FBROFF 1,800 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009843 - BNSF (NEW IBERIA) LA 14/CENTER ST.
Type Impv: INSTALLING NEW F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 055-07-0077
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 14 055-07 RAIL PD 221 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009856 - BNSF (NEW IBERIA) JULIA ST.
Type Impv: INSTALL FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0100
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 221 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009857 - BNSF (NEW IBERIA) IBERIA ST.
Type Impv: INSTALL FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0101
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 222 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009860 - BNSF (NEW IBERIA) RR XINGS ALONG THE BNS
Type Impv: INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0102
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 222 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 62 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA
Project: H.009868 - BNSF (NEW IBERIA) JEFF. TERRACE BLVD.
Type Impv: INSTALL FLASHING LIIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0117; BNSF TO PAY 20% MATCH OF DEMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 DEMO 300 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
IBERIA 000-23 RAIL PD 0 RAILROADS
Project: H.009891 - BNSF (NEW IBERIA) WEEKS ST.
Type Impv: INSTALL F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0099
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 222 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010100 - PESSON ELEM. SAFE ROUTES PHASE I
Type Impv: SIDEWALK CONSTRUCTION, MARKINGS,
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 SR2S 240 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010256 - LA 182:BRUNER ST - VINE ST DRAINAGE IMP.
Type Impv: INSTALL NEW DRAINAGE STRUCTURES, CONCRETE CURB AND GUTT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 182 004-04 STPFLEX 653 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010614 - RT 207 (CENTRAL DR):BNSF RR XING(IBERIA)
Type Impv: UPGRADE BNSF RR SIGNALS AT IBERIA PARISH RT 207
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0114
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 60 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
IBERIA 000-23 LOCAL 15 RAILROADS
Project: H.010666 - DEARE STREET: BNSF RR XING (NEW IBERIA)
Type Impv: INSTALL F/L'S & GATES AT DEARE STREET
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011127 - LA 14: LDRR XING (NEW IBERIA)
Type Impv: REPLACE CROSSING SURFACE.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 14 055-07 RAIL HE 74 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
IBERIA LA 14 055-07 LOCAL 59 RAILROADS
Project: H.002762 - LA 86: LA 3242 - LA 347
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 400-01-0007; 400-01 NFA MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 86 400-01 STPFLEX 4,229 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 63 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA
Project: H.002893 - US 90 BRIDGE OVER LA 14
Type Impv: BRIDGE REHABILIATION
Project Manager: KEMP, KELLY
Remarks: 424-04-0059;EAST AND WEST BOUND LANES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 NHPP 5,000 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002896 - US 90 DRAIN BR. NEAR JEANERETTE
Type Impv: NEW BRIDGE
Project Manager: TONEY, PATRICK
Remarks: 424-04-0064;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 NHPP 1,025 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009142 - LA 86 & LA 320: ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 86 237-01 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
IBERIA LA 320 823-12 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.009861 - BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST
Type Impv: TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0105
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL HE 500 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.009892 - LDRR (NEW IBERIA) US 90 FR
Type Impv: NEW XING PER DISTRICT 03 & NEW IBERIA
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 STPFLEX 300 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010155 - US 90 RAILROAD OVERPASS SE OF LA 85
Type Impv: BRIDGE OVERPASS
Project Manager: RABALAIS, NICK
Remarks: STBONDS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 DEMO 15,000 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENT
Project: H.010922 - LA 88: REALIGN CURVES IN COTEAU
Type Impv: REALIGN 2 CURVES ON LA 88 IN COTEAU
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: USE HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 89 397-05 HSIP 4,030 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011026 - LA 182 WB: LASALLE ST. - VINE ST.
Type Impv: DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY W
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 182 004-04 STPFLEX 342 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.009862 - BNSF (NEW IBERIA) CAROLINE ST.
Type Impv: INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0108
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 215 RAILROADS 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 64 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERIA
Project: H.002765 - LA 86: LA 347 - LA 31
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 400-31-0013; 400-31 MATCH TTF
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 86 400-31 STPFLEX 1,008 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.006128 - VIDA SHAW BRIDGE OVER BAYOU TECHE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-23-0001;MOVEABLE BRIDGE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 FBROFF 4,177 PRESERVATION
BRIDGE (OFF SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010004 - BAYOU TECHE MOVABLE BRIDGES REHAB
Type Impv: MOVABLE BRIDGE REHABILITATION
Project Manager: HINGLE, STEWART
Remarks: NFA AS MATCH TO C.S. 823-12; TTF AS MATCH TO C.S 400-30
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 320 823-12 STPFLEX 3,642 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
ST MARTIN LA 350 400-30 STPFLEX 4,199 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.010267 - US 90: LEWIS ST. LEFT TURN LANE
Type Impv: CONSTRUCT LEFT TURN LANE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 65 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERVILLE
Project: H.009171 - PLAQUEMINE INTERSECTION SAFETY IMPROVE
Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE 000-24 SATRANS 30 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010531 - LA1148&LA988:943' W OF DANIEL LN-WBR P/L
Type Impv: STABILIZE & OVERLAY.
Project Manager: RAY, JARED
Remarks: CS 827-07 FROM 1.11 TO 1.19 USES TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 1148 229-01 NFABOND 2,418 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
IBERVILLE LA 1148 824-26 NFA 634 PRESERVATION
NON-INTERSTATE NFA
IBERVILLE LA 988 824-07 STPFLEX 72 PRESERVATION
NON-INTERSTATE NFA
IBERVILLE LA 988 824-07 NFABOND 954 PRESERVATION
NON-INTERSTATE NFA
Project: H.010318 - I-10: RAMAH - WBR P/L
Type Impv: THIN ASPHALTIC CONCRETE(OGFC), REPLACEMENT OF APPROACH S
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE I-10 450-07 NHPP 5,310 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010602 - LA 1: LA 69 - LA 75
Type Impv: PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 1 050-06 STBONDS 10,000 PRESERVATION
NON-INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010945 - LA 30 & LA 74: INTERSECTION IMPROVS
Type Impv: TURN LANE ADDITIONS AND CLOSURE OF SELECTED CROSSOVERS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 30 414-02 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
IBERVILLE LA 74 264-01 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.002333 - BAYOU PAUL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 257-02-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 327 257-02 FBROFF 1,397 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009485 - LA 404: BAYOU CHOCTAW BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 404 405-01 STPFLEX 1,992 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010598 - DERRICK ROAD BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE 000-24 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 66 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: IBERVILLE
Project: H.010924 - LA 75 ROUNDABOUTS
Type Impv: DESIGN AND CONSTRUCTION OF 2 ROUNDABOUTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 75 824-02 STPFLEX 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.009762 - ENTERPRISE BLVD MULTI-USE PATH
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE 000-24 STPENH 288 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009769 - ROSEDALE GATEWAY ENHANCEMENT
Type Impv: SIDEWALK & GATEWAYS W/LIGHTING,LANDSCAPE&SUBSURFACE D
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 77 219-03 STPENH 73 ENHANCEMENTS 2-WAITING FOR FUNDING
IBERVILLE LA 77 219-02 STPENH 24 ENHANCEMENTS
IBERVILLE LA 76 228-04 STPENH 73 ENHANCEMENTS
IBERVILLE LA 76 228-05 STPENH 24 ENHANCEMENTS
Project: H.009484 - LA 75: BAYOU BREAUX BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 75 257-01 FBROFF 1,381 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009930 - LA 1 STAGE 0
Type Impv: TRAFFIC STUDY
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 1 050-06 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
W BATON ROUGE LA 1 050-07 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.009952 - LA 1: MEDIAN CLOSURES
Type Impv: MEDIAN CLOSURE WITH HSIP FUNDS
Project Manager: BEAUVAIS, HEWITT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 1 050-06 HSIP 250 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.010437 - LA 77: LA 386 - I-10
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 77 219-02 STPFLEX 6,200 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 67 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JACKSON
Project: H.010423 - US 167 ROADWAY FLOODING 0.15 MI N LA 542
Type Impv: ADDITION OF TWO CB'S AND ONE DISCHARGE PIPE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON US 167 023-06 NHPP 18 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006511 - GUARDRAIL & ROAD ALLIGNMENT CHANGES
Type Impv: SITE DISTANCE IMPROVEMENTS
Project Manager: HOLM, RICK
Remarks: 737-25-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON 000-25 HRRR 402 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010420 - LA 505 ROADWAY FLOODING .9 MI N WINN P/L
Type Impv: REPLACE EXISTING CMP CROSS DRAIN WITH RCB CROSWS DRAIN
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 505 321-03 NFA 192 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010471 - LA 542: LA 811 - LA 155
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 542 319-01 STPFLEX 1,000 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010964 - US 167:TURN LANE IMPROVEMENT AT HODGE
Type Impv: TURN LANE IMPROVEMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON US 167 023-06 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010039 - BEAR KNOLL DRIVE & ZOAR ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON 000-25 FBROFF 578 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001553 - LA 146 BRIDGES NEAR KELLEYS
Type Impv: NEW BRIDGES
Project Manager: HICKS, MELVIN
Remarks: 068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 146 068-02 STPFLEX 4,696 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
JACKSON LA 4 068-03 STPFLEX 2,954 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.010388 - LA 155: US 167 - LA 542
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 155 319-30 STPFLEX 1,200 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010452 - LA 144: EROS (LA 34) - OUACHITA P/L
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 144 318-01 STPFLEX 1,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
JACKSON LA 144 319-04 STPFLEX 500 PRESERVATION
NON-INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 68 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.006138 - POPLAR STREET BRIDGE OVER BONNABEL CANAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-26-0106
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 FBROFF 602 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.007177 - AMES BOULEVARD IMPROVEMENTS
Type Impv: CONTINUOUS TURN LANE & DRAINAGE IMP
Project Manager: DEVILLE, JACQUES
Remarks: 742-26-0038;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 7,578 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.008046 - LA 3152 : CLEARVIEW OPERATIONAL IMPRV.
Type Impv: INTERSECTION IMPROVEMENTS, INCLUDING ADDITIONAL TURN LANES
Project Manager: FOSTER, AMANDA
Remarks: USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3152 826-03 STP>200K 846 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.008914 - US 90B:W.BANK EXPY DRAINAGE IMP @ STUMPF
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 598 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009187 - 23RD ST BRIDGE OVER CANAL NO 17(BUTLER)
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-26-0107
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 FBROFF 1,284 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009406 - LA 48 @ EVANS DR.
Type Impv: DRAINAGE STRUCTURE REPLACEMENTS AND ADDITIONS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 48 006-30 NHPP 451 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009441 - VETERANS BLVD OVLY AND BRIDGE MOD (PH 2)
Type Impv: RESURFACING AND MINOR BRIDGE WORK
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,473 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010327 - LA 45: TUSA DR. - OAK FOREST
Type Impv: DRAINAGE STRUCTURE ADDITIONS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-01 STPFLEX 379 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010505 - LA 303: LA 45 - END OF C.S. 826-07
Type Impv: ULTRATHIN OVERLAY
Project Manager: JOHNSON, ENNIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 303 826-07 NFA 186 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 69 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.010506 - LA 3150/LA 3151: THIN OVERLAY
Type Impv: ULTRATHIN OVERLAY
Project Manager: JOHNSON, ENNIS
Remarks: LETTER BID IN THE DISTRICT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3150 826-61 NFABOND 42 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
JEFFERSON LA 3151 826-62 NFABOND 164 PRESERVATION
NON-INTERSTATE NFA
Project: H.011023 - US 61: ST. CHARLES/JEFFERSON PARISH LINE
Type Impv: RAISING ROADWAY GRADE
Project Manager: GOLZ, SARAH
Remarks: $90K OF MATCH IS STBONDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 NHPP 443 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
ST CHARLES US 61 007-03 NHPP 443 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
Project: H.011182 - ITS DYNAMIC MESSAGE SIGNS (KENNER)
Type Impv: INSTALL 5 DYNAMIC MESSAGE SIGNS.
Project Manager: DELANEY, ELIZABETH
Remarks: ENTITY WILL PROVIDE MATCH FOR LOYOLA AND POWER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 49 283-30 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED IN CURRENT FY 13-14
JEFFERSON 000-26 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
JEFFERSON 000-26 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.002260 - GOOSE BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: TSAI, LOONG SHEN
Remarks: 249-90-0035;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 STPFLEX 3,836 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.006519 - SPEED CURVE ADVISORY
Type Impv: DYNAMIC MESSAGE SIGN&FLASHER INST.
Project Manager: HOLM, RICK
Remarks: 737-26-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 SATRANS 286 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009028 - AIRLINE PARK BLVD: W METAIRIE AV-0.4 M N
Type Impv: PANEL REPLACEMENT AND DRAINAGE
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 2,430 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010673 - US90Z:HARVEY CANAL TUNNEL REHABILITATION
Type Impv: CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILIT
Project Manager: REVIERE, RYAN
Remarks: SEE NOTES FOR FUNDING INFO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 12,700 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010882 - LA 18: 4TH STREET BRIDGE REHABILITATION
Type Impv: REPAIR AND REHABILITATION OF MECHANICAL, ELECTRICAL STRUCT
Project Manager: PENEGUY, MATT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 18 063-02 STPFLEX 5,000 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 70 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.010985 - US 90: EXTEND ACCELERATION LANE @ US 90B
Type Impv: EXTEND ACCELERATION LANE AT THE INTERSECTION OF US 90B
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90 005-10 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010986 - US 90B: INTERSECTION IMP. @ MANHATTAN
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010990 - I-10: CLEARVIEW PKWY - CAUSEWAY BLVD.
Type Impv: JOINT REPAIR AND OVERLAY
Project Manager: THOMAS, BEN
Remarks: PRESERVATION INTERSTATE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NHPP 4,000 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011158 - LA 3139: RAMP-A OVER LA 3152 REPAIR
Type Impv: REPLACE TWO PRESTRESSED CONCRETE GIRDERS AND ASSOCIATE
Project Manager: DELATTE, BRIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 STPFLEX 375 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
JEFFERSON LA 3139 430-01 REIMB 375 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.011201 - KENNER SRTS PROJECT - CHATEAU ELEM
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 SR2S 28 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.001439 - LA 1 BRIDGES NEAR GRAND ISLE
Type Impv: NEW BRIDGE
Project Manager: BUCCI, MARK
Remarks: 064-01-0047;STRU.IN POOR COND. JT W/064-02-0030
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 1 064-01 STPFLEX 800 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
LAFOURCHE LA 1 064-02 NHPP 2,900 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.002262 - DRAIN CANAL BRIDGE ON LA 45
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 249-90-0037;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 STPFLEX 1,592 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003074 - I 10: WILLIAMS BLVD - VETERANS BLVD
Type Impv: WIDENING
Project Manager: YANG, LI
Remarks: 450-15-0124
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NFI 70,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 71 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.007175 - LAPALCO (VICTORY - WESTWOOD)
Type Impv: WIDEN TO 4 LANES
Project Manager: DEVILLE, JACQUES
Remarks: 742-26-0033;FUND WITH DEMO FUNDS.PH.PUR.R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 3,600 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 STP>200K 8,578 URBAN SYSTEMS
Project: H.007181 - L&A ROAD IMPROVEMENTS
Type Impv: NEW ROADWAY AND ALIGNMENT
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007208 - HARVEY BLVD EXT(PETERS RD-MANHATTAN
Type Impv: NEW ROADWAY EXTENSION
Project Manager: DEVILLE, JACQUES
Remarks: 742-26-0073;SEE NOTES.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3017 826-11 STP>200K 876 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 STP>200K 9,597 URBAN SYSTEMS
Project: H.007214 - EAST AMES BOULEVARD IMPROVEMENTS
Type Impv: WIDEN FROM 2 TO 3 LANES
Project Manager: DEVILLE, JACQUES
Remarks: 742-26-0080;OREGON DR.-BLANCHE DR.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 7,400 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007223 - HARVEY BLVD (MANHATTAN - WALL)
Type Impv: WIDEN TO 4 LANE URBAD SECT W MEDIAN
Project Manager: DEVILLE, JACQUES
Remarks: 742-26-0090; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 7,100 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.008065 - HICKORY/DOCK ROUNDABOUT
Type Impv: ROUNDABOUT INSTALLATION
Project Manager: RAY, JARED
Remarks: 826-44-0032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3154 826-44 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.009087 - I-10: LOYOLA DR. TO WILLIAMS BLVD.
Type Impv: MAJOR WIDENING - ADD TRAVEL LANES
Project Manager: YANG, LI
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.010626 - SAUVE ROAD / SONIAT CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 FBROFF 1,033 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010973 - VETERANS BLVD LIGHTING(AIRPORT-LOYOLA)
Type Impv: ROADWAY LIGHTING
Project Manager: DEVILLE, JACQUES
Remarks: CITY OF KENNER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 660 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 72 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.011007 - CHATEAU BLVD RESURFACING
Type Impv: RE-SURFACING
Project Manager: DEVILLE, JACQUES
Remarks: CITY OF KENNER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,470 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.001413 - LA 18(4TH ST.EXT.-BURMASTER(GRETNA)
Type Impv: CONSTRUCT 2 LANES
Project Manager: DEVILLE, JACQUES
Remarks: 063-02-0048;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 18 063-02 STP>200K 9,500 URBAN SYSTEMS 2-WAITING FOR FUNDING
JEFFERSON LA 18 063-02 STGEN 1,000 OTHER / MISCELLANEOUS
JEFFERSON LA 18 063-02 TOLLS 2,000 CCC TOLL PROJECTS
Project: H.002955 - EARHART EXPRESSWAY
Type Impv: ACCESS IMPROVEMENTS
Project Manager: DEVILLE, JACQUES
Remarks: 430-01-0016
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 STP>200K 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.002956 - EARHART AT DAKIN
Type Impv: RAMP CONNECTOR (EB EARHART - DAKIN)
Project Manager: DEVILLE, JACQUES
Remarks: 430-01-0020; USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 STP>200K 2,375 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.004359 - HICKORY (LA 48 - MOUNES)
Type Impv: RELOCATION AND 4-LANING
Project Manager: YANG, LI
Remarks: 826-44-0027;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
JEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS
Project: H.004367 - LA3139:EARHART EXPRESSWAY EXT TO US 61
Type Impv: ENVIRONMENTAL. LINE & GRADE STUDY
Project Manager: YANG, LI
Remarks: 700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.009753 - JEAN LAFITTE: DOWNTOWN SIDEWALK, PHASE 2
Type Impv: SIDEWALK W/LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STPENH 336 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.002258 - LA 45 (FLOOD GATE - LA 560-4)
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 249-01-0056;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-01 STPFLEX 1,551 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 73 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.002264 - BAYOU BARATARIA BRIDGE@JEAN LAFITTE
Type Impv: BRIDGE REPL.(KERNER'S)
Project Manager: YANG, LI
Remarks: 249-90-0041;TEA-21 KERNER'S FERRY BRIDGE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 DEMO 4,146 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 45 249-90 FBR-ON/OFF 60,000 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.002861 - CAUSEWAY BLVD - EARHART EXPRESSWAY INTER
Type Impv: NEW INTERCHANGE
Project Manager: YANG, LI
Remarks: 430-01-0013;JEFF. PH CONSULTANT WORKING (E)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 NFI 60,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.005162 - MISS RIVER CORRIDOR INITIATIVE
Type Impv: INTERMODAL TRANSPORTATION STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-92-0015;STAGE 0 UNDERWAY BY UNO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.006442 - AIRPORT - CBD COMMUTER RAIL STUDY
Type Impv: STUDY
Project Manager: GAUTREAU, COLLEEN
Remarks: 736-92-0003;HP 1600 (SEE ALSO 700-26-0242)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.006513 - US 61 CORRIDOR PRESERVATION
Type Impv: ABANDONED RR R/W ACQ. (HP NO 1600)
Project Manager: GAUTREAU, COLLEEN
Remarks: 737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.006517 - NEW ORLEANS RAIL GATEWAY ANALYSIS
Type Impv: ENVR. GRADE X-ING. OPER IMPROVEMENT
Project Manager: GOODELL, DEAN
Remarks: 737-26-0006;MOVE MONIES FROM 737-26-0002 &
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 6,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.007468 - OPPHEUM - HURON (JEFF. PH) BIKE PATH
Type Impv: LINEAR BIKE PATH
Project Manager: HORTON, VALERIE
Remarks: 744-26-0021;TEA-21 DEMO FUNDED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 326 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.009307 - SMART GROWTH-LINKING EDUCATION & TRANS
Type Impv: DEVELOP A BICYCLE MASTER PLAN FOR JEFFERSON PARISH
Project Manager: NGUYEN, WAYNE
Remarks: MATCH BY THE RPC
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009570 - US 61:TRANSCONTINENTAL DR - DAVID DR
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 NHPP 1,469 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 74 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.009571 - US 61:DAVID DR - WILLIAMS BLVD
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 NHPP 1,998 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009794 - GRETNA BICYCLE ACCESS IMPROVEMENTS
Type Impv: SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STPENH 170 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
JEFFERSON US 90-Z 283-09 STPENH 75 ENHANCEMENTS
JEFFERSON LA 466 063-02 STPENH 50 ENHANCEMENTS
JEFFERSON LA 466 063-02 STPENH 25 ENHANCEMENTS
Project: H.009804 - KENNER: S WILLIAMS BLVD STREETSCAPING
Type Impv: SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STPENH 446 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.009959 - LA 301: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 301 826-06 FEMA 1,220 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009960 - LA 303: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 303 826-07 FEMA 1,597 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009974 - LA 3257: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3257 826-48 FEMA 3,743 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010017 - US 90Z: WESTBANK EXPRESSWAY REHAB
Type Impv: MAJOR BRIDGE REHABILITATION
Project Manager: THOMAS, HOLLY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 12,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010402 - I-10: WILLIAMS BLVD - VETERANS BLVD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NHPP 4,000 PRESERVATION
INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 75 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON
Project: H.010418 - LA 611-1 & LA 611-3:COLD PLANE & OVERLAY
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 611-1 826-14 STPFLEX 200 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 611-1 826-16 STPFLEX 500 PRESERVATION
NON-INTERSTATE
JEFFERSON LA 611-1 826-16 STPFLEX 100 PRESERVATION
NON-INTERSTATE
JEFFERSON LA 611-1 826-17 STPFLEX 325 PRESERVATION
NON-INTERSTATE
Project: H.010451 - BAYOU BARATARIA SWING BR REPAIRS- LA 302
Type Impv: BRIDGE INSPECTION AND REPAIR
Project Manager: GUIDRY, JOHN
Remarks: DIR LA-2012-1-051-003
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 302 826-39 ER 137 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010479 - AIRLINE PUMP STA: MECH& ELECT REP; US 61
Type Impv: REPAIR OR REFURBISH PUMP MOTORS AND OTHER DAMAGED EQUIP
Project Manager: MILLER, DAVID
Remarks: DIR LA-2012-1-051-004
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 ER 328 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 76 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON DAVIS
Project: H.008082 - LA 1126: LA 26 - US 90
Type Impv: MILL, STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 827-34-0001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 1126 827-34 NFABOND 1,750 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.000517 - US 165 BRIDGES NEAR FENTON
Type Impv: BRIDGE REPLACEMENT
Project Manager: KEMP, KELLY
Remarks: 014-02-0025;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS US 165 014-02 NHPP 5,500 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.002076 - LA 383: LA 101 - ALLEN PARISH LINE
Type Impv: PATCH.COLD PLANE & 2 LIFT OLAY
Project Manager: RAY, JARED
Remarks: 197-03-0016; NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 383 197-03 STPFLEX 3,275 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.002714 - LA 3059: CALCASIEU P/L - LA 383
Type Impv: PATCH, WIDEN, COLD PLANE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 383-02-0004
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 3059 383-02 NFABOND 742 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.006528 - FENTON ELEMENTARY
Type Impv: SIDEWALK CONSTRUCTION AND CROSSWALKS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS 000-27 SR2S 250 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009420 - US 165: INSTALL J-TURN @ LA 101
Type Impv: INSTALL J-TURN ON US 165 @ LA 101
Project Manager: CORMIER, CLAYTON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS US 165 014-02 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010235 - LA 14: LA 99-POTTER RD
Type Impv: PATCH, CP 2", OL 3.5"
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 14 196-03 STPFLEX 769 PRESERVATION
NON-INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010269 - LA 1131: US 90 - ARDOIN COVE RD
Type Impv: ASHPALT SURFACE TREATMENT
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 1131 827-07 NFA 80 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011052 - LA 3086: LA 102/99 - ALLEN P/L
Type Impv: PATCH, COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 3086 198-04 NFABOND 2,968 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 77 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: JEFFERSON DAVIS
Project: H.002980 - I-10 OVERPASS OVER US 165 & MP R.R
Type Impv: NEW BRIDGES
Project Manager: DELATTE, BRIAN
Remarks: 450-03-0085;PARALLEL BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS I-10 450-03 NHPP 14,536 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010079 - MOUTON RE/W DIVISION ST/POWELL RD BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS 000-27 FBROFF 1,317 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
JEFF DAVIS 000-27 FBROFF 732 PRESERVATION
BRIDGE (OFF SYSTEM)
JEFF DAVIS 000-27 FBROFF 439 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010864 - I-10: DISTRICT 07 CABLE BARRIER
Type Impv: INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.
Project Manager: CORMIER, CLAYTON
Remarks: USE HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS I-10 450-03 HSIP 3,219 SAFETY 3-DESIGN/DEVELOPMENT
CALCASIEU I-10 450-91 HSIP 2,541 SAFETY
Project: H.002091 - LA 97 OVERPASS (I-10)
Type Impv: BRIDGE REPLACEMENT
Project Manager: BROWN, JEFF
Remarks: 201-01-0008;PROJECT TO BE SCOPED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 97 201-01 STPFLEX 22,240 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002094 - TURN LANES @ US 90 & SHERMAN ST.
Type Impv: CONSTRUCT TURN LANES
Project Manager: CORMIER, CLAYTON
Remarks: 201-01-0012;WAITING FOR STAGE 0 DOCUMENT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 97 201-01 HSIP 500 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.009486 - US 90: BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS US 90 003-07 STPFLEX 1,370 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010238 - LA 26: US 90 - RACCA RD(JENNINGS)
Type Impv: PATCH, CP 2", OVERLAY 3", 3" SHLD
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 26 054-05 STPFLEX 1,156 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010243 - LA 26: HOSPITAL RD - JCT US 90
Type Impv: PATCH, CP 2", OVERLAY 3"
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 26 054-04 STPFLEX 576 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 78 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE
Project: H.007229 - LAFAYETTE CON.GOV. SR2S PROJECT
Type Impv: SIDEWALKS. ETC.
Project Manager: GROS, SCOTT
Remarks: 742-28-0003;SR2S PROGRAM FUNDING
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 SR2S 218 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009630 - LA 719: LA 342 - US 90
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 719 828-08 NFABOND 5,194 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010350 - I-10: RAMP IMPROVEMENTS AT JCT LA 3184
Type Impv: CONSTRUCT TURN LANES
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-10 450-05 NHPP 660 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
LAFAYETTE LA 3184 828-45 NHPP 165 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.010575 - LAFAYETTE URBAN BICYCLE TRAILS
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL SYSTEM.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
LAFAYETTE 000-28 LOCAL 16 RECREATIONAL TRAILS PROGRAM
Project: H.011102 - I-49 CONNECTOR BLDG DEMOLITION (PHASE 1)
Type Impv: DEMOLITION OF EXISTING BUILDINGS
Project Manager: WEDGE, ED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 STGEN 165 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.003459 - ROUNDABOUT @ LA 726 AND I-49 FRONTAGE RD
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 455-01-0054 AND 828-44-0015
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 HSIP 850 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE LA 726 828-44 HSIP 850 SAFETY
Project: H.005508 - VEROT SCHOOL RD (VINCENT - EX. 5-L)
Type Impv: RECONST. & ADD LANES
Project Manager: SMITH, DAVID
Remarks: 828-12-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 339 828-12 STBONDS 24,500 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE LA 339 828-12 STPFLEX 2,110 CAPACITY
Project: H.006538 - LAFAYETTE SAFE ROUTES TO SCHOOL PROJECT
Type Impv: CONSTRUCTION OF SIDEWALKS AND CROSSWALKS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 SR2S 147 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE LA 92 213-05 SR2S 70 SAFETY
SAFE ROUTES TO SCHOOLS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 79 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE
Project: H.007232 - LAFAYETTE MPO NON STATE PVT MARKING
Type Impv: PAVEMENT MARKINGS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 742-28-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP<200K 1,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009494 - I-49 FRONTAGE ROADS:I-10 - ST.LANDRY P/L
Type Impv: PATCH, OVERLAY AND RELATED WORK
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 STPFLEX 3,500 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010351 - I-49: RAMP IMPROVEMENTS AT JCT. LA 726
Type Impv: CONSTRUCT TURN LANES ON RAMPS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 NHPP 180 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE LA 726 828-44 STPFLEX 120 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.010442 - LA 3073: INTERSECT IMPROVE @ JCT LA 89
Type Impv: CONSTRUCT TURN LANES
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 3073 828-39 NHPP 900 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010713 - LA 89: ROUNDABOUT AT FORTUNE RD.
Type Impv: RECONSTRUCTION, ADDED CAPACITY
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 89 216-03 HSIP 1,175 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010826 - BEAU BASSIN RD OVERLAY
Type Impv: OVERLAY/PAVEMENT PRESERVATION
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 530 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010863 - I-10: INTERSTATE LIGHTING @ AMB CAFFERY
Type Impv: INTERSTATE LIGHTING
Project Manager: LEBOURGEOIS, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-10 450-05 NHPP 700 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010870 - ATAKAPA-ISHAK BREAUX BRIDGE TRAIL
Type Impv: CONSTRUCTION OF A 8.2 PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 RTP 128 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE 000-28 LOCAL 12 RECREATIONAL TRAILS PROGRAM
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 80 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE
Project: H.010878 - ACADIANA HILLS TRAIL
Type Impv: CONSTRUCTION OF 900' OF PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 RTP 78 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE 000-28 LOCAL 14 RECREATIONAL TRAILS PROGRAM
Project: H.011018 - CHEMIN METAIRIE PARKWAY BIKE LANES
Type Impv: STRIPING, PAVEMENT MARKINGS AND SIGNING OF BIKE LANES.
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 116 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.002163 - ROUNDABOUT ON LA 342 AT LA 724
Type Impv: ROUNDABOUT
Project Manager: PICARD, TOBY
Remarks: 218-01-0019;PRIORITY 3
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 342 218-01 HSIP 1,100 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.003003 - I-10: E. JCT I-49 TO ST.MARTIN P/L
Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO
Project Manager: OLIVIER, NICHOLAS
Remarks: 450-05-0062;450-06-0068
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-10 450-05 NHPP 10,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
LAFAYETTE I-10 450-05 NHPP 9,000 PRESERVATION
INTERSTATE
LAFAYETTE I-10 450-05 NHPP 30,000 CORRIDOR
Project: H.007233 - LAFAYETTE MPO NON STATE PVT MARKING
Type Impv: PAVEMENT MARKINGS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 742-28-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP<200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.009181 - US167(Johnston St)@LA3073(Amb Caff Pkwy)
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: HANKS, ANNA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 167 080-02 STP<200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
LAFAYETTE LA 3073 828-39 STP<200K 500 URBAN SYSTEMS
Project: H.010557 - LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010995 - LA 724:[email protected](LAFAYETTE)
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: REVIERE, RYAN
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 724 828-28 CM 860 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 81 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE
Project: H.011151 - US 90: BNSF RR FRONTAGE RD BRIDGES
Type Impv: NEW FRONTAGE ROADS AND RR BRIDGE FOR FUTURE I-49 SOUTH
Project Manager: PAINE, PEGGY JO
Remarks: STGEN IS UNCLAIMED PROPERTY FUNDS.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 STGEN 21,000 CAPACITY 3-DESIGN/DEVELOPMENT
LAFAYETTE US 90 424-02 DEMO 5,000 CAPACITY
Project: H.000201 - LA 182 AT BENDEL ROAD
Type Impv: GEOMETRIC IMPR. (INCL PINHOOK IMPR)
Project Manager: HANKS, ANNA
Remarks: 004-01-0039;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 004-01 LOCAL 4,252 URBAN SYSTEMS 2-WAITING FOR FUNDING
LAFAYETTE LA 182 004-01 HSIP 731 SAFETY
Project: H.006530 - ROUNDABOUT AT GEN. MOUTON/TAFT STREET
Type Impv: CONSTRUCTION OF A ROUNDABOUT
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 SAFETY
LOCAL ROADS SAFETY
2-WAITING FOR FUNDING
Project: H.009625 - LA 182: LA 89 - 0.36 MI. N. US 90 UPASS
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 004-02 STPFLEX 2,159 PRESERVATION
NON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.009629 - US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)
Type Impv: P.C.C.P. REHABILITATION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 167 424-02 NHPP 8,813 PRESERVATION
NON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.002151 - BAYOU PARC PEROU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 216-02-0016; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 734 216-02 FBROFF 1,025 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002735 - BAYOU VERMILLION BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: LAI, QUANG
Remarks: 391-04-0018; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 1252 391-04 FBROFF 2,335 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002868 - I-49 S:AMB CAFFERY/US90 INTERCHANGE
Type Impv: NEW INTERCHANGE
Project Manager: RABALAIS, NICK
Remarks: 424-02-0090;ENG DEMO. RW/UTL S9$? NFI FOR CONST
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 NFI 35,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.003454 - LAFAYETTE CONNNECTOR
Type Impv: IN LAFAYETTE NEW INTERSTATE
Project Manager: WEDGE, ED
Remarks: 455-01-0035;ENGR 700-24-0073. R/W 455-01-0034
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 DEMO 400,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 82 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE
Project: H.004490 - STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS
Type Impv: STAGE 0 STUDY
Project Manager: BROUSSARD, DAN
Remarks: 700-28-0221; MATCH BY LAF MPO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.004492 - I-10 INTERCHANGE AT N AMBASSADOR CAFFERY
Type Impv: PLANNING STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks: 700-28-0223;STUDY FED FY2013.ENGR FED FY2014
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.006531 - ROUNDABOUT AT HOSPITAL DRIVE AND GIRARD
Type Impv: CONSTRUCTION OF A ROUNDABOUT
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 SAFETY
LOCAL ROADS SAFETY
1-PLANNING/ENVIRONMENTAL
Project: H.009335 - LA 182: I-10 TO WEST PONT DES MOUTON RD
Type Impv: WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWA
Project Manager: BABIN, TEDDY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.009500 - 2035PLAN IMPLEMENTATION&I-49 ACTION PLAN
Type Impv: PLAN IMPLEMENTATION AND ACTION PLAN
Project Manager: BROUSSARD, DAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009520 - LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 3168 433-01 STPFLEX 24,700 RAILROADS
GRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
Project: H.009639 - LA 343: LA 342 - 1.0 MI. N. LA 342
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 343 393-03 STPFLEX 619 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009767 - PREJEAN RD: CARENCRO SIDEWALKS, PHASE 3
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STPENH 106 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.009795 - LA 182: US 90-MLK DRIVE SIDEWALKS
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 032-01 STPENH 571 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 83 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFAYETTE
Project: H.009997 - US 167 CORRIDOR STAGE 0 STUDY
Type Impv: ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURES
Project Manager: RENARD, APRIL
Remarks: STUDY FUNDED WITH SAFETY TRANSFER FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 167 080-02 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.010005 - VERMILLION RIVER MOVABLE BRIDGES REHAB
Type Impv: MOVABLE BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks: CONTROL SECTION 828-14 IS IN URBANIZED AREA, THE OTHER N
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 733 828-14 STPFLEX 4,568 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
VERMILION LA 82 194-07 STPFLEX 3,418 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.010207 - LA 94: LA 353 - ST. MARTIN PL
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 94 080-03 STPFLEX 127 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011235 - I-49 SOUTH @ VEROT SCHOOL ROAD
Type Impv: CONSTRUCT NEW INTERSECTION - CONCRETE
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 NFI 20,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.009214 - LA 339: WIDENING (LA 82 TO LA 3073)
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 339 828-11 0 CAPACITY 0-FEASIBILITY/SCOPING
LAFAYETTE LA 339 828-12 0 CAPACITY
Project: H.009215 - LA182:WIDENING(W PONT DES MOUTON RD-I49)
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 032-01 0 CAPACITY 0-FEASIBILITY/SCOPING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 84 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE
Project: H.009346 - ACADIAN WEST TRAIL
Type Impv: CONSTRUCTION OF RAILS-TO-TRAILS BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
LAFOURCHE 000-29 LOCAL 33 RECREATIONAL TRAILS PROGRAM
Project: H.009561 - LA 652:LA 182-0.25 MILES E OF DADHILL RD
Type Impv: MILL AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 652 829-13 NFABOND 1,029 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010169 - KRAEMER LIFT BRIDGE MECHANICAL REPAIRS
Type Impv: MECHANICAL REPAIR
Project Manager: LAMBERT, JARRETT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 307 829-15 STPFLEX 650 OPER EFFICIENCY/MOTORIST ASSISTANCE
MOVABLE BRIDGE REHABILITATION
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010884 - LA 309: LA 20 - LA 1 OVERLAY
Type Impv: SINGLE LIFT THIN OVERLAY
Project Manager: RAY, JARED
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 309 413-04 STPFLEX 1,118 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
TERREBONNE LA 309 413-03 STPFLEX 125 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
LAFOURCHE LA 309 413-04 STPFLEX 68 PRESERVATION
NON-INTERSTATE
Project: H.001491 - LA 20 WIDENING: LA 308 - ST PATRICK ST
Type Impv: COLD PLANE AND OVERLAY
Project Manager: PAINE, PEGGY JO
Remarks: 065-06-0046;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 20 065-06 STBONDS 2,190 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
LAFOURCHE LA 20 065-06 HSIPPEN 4,878 SAFETY
- LOCAL 800 SAFETY
Project: H.002780 - LA 308 CURVE IMPROVEMENT
Type Impv: STRAIGHTEN CURVE IN ROADWAY
Project Manager: PICARD, TOBY
Remarks: 407-04-0043;407-04-0044
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-04 HSIP 2,073 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009479 - WEST LAROSE VERTICAL LIFT BRIDGE REHAB
Type Impv: BRIDGE REHABILITATION
Project Manager: HINGLE, STEWART
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-05 STPFLEX 13,594 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010109 - RACELAND SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, CROSSWALK, SPEED DETECTION DEVICES
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 SR2S 254 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 85 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE
Project: H.011214 - RWD SIGNING (ST. PATRICK ST.)
Type Impv: PURCHASE AND INSTALL REGULATORY AND WARNING SIGNS.
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 SATRANS 5 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011239 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2E
Type Impv: CONSTRUCT LEEVILLE MAIN LINE INTERSECTION
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 STBONDS 8,584 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15
LAFOURCHE LA 1 829-32 LOCAL 1,416 OTHER / MISCELLANEOUS
Project: H.008118 - BAYOU DUMAR & DRAIN CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 829-12-0021;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 653 829-12 FBROFF 670 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009320 - ACADIAN ROAD ROUNDABOUT
Type Impv: 5 LEGGED ROUNDABOUT
Project Manager: HANKS, ANNA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 20 065-05 HSIP 1,570 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.010324 - LA 1: GOLDEN MEADOW - LEEVILLE
Type Impv: RAISING ROADWAY GRADE TO CONSISENT ELEVATION BY ADDING
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-90 NHPP 900 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.008145 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C
Type Impv: ROUTE LA 1 RELOCATION
Project Manager: NICKEL, TIM
Remarks: 829-32-0010;NEW BRIDGE.NEW ALLIGNMENT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 STBONDS 31,416 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
LAFOURCHE LA 1 829-32 LOCAL 5,184 OTHER / MISCELLANEOUS
Project: H.009742 - ACADIA RD: AUDUBON-CARDINAL PED PATHS
Type Impv: SIDEWALK WITH LIGHTING
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 STPENH 204 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.010469 - EMERG CONT F/REPAIR TO ELMER'S ISLAND RD
Type Impv: FURNISH, PLACE, AND COMPACT AGGREGATE SURFACE COURSE MA
Project Manager: GISCLAIR, GARY
Remarks: LETTER BID 9/17/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 STCASH 300 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.002794 - VALENTINE CANAL BR. NEAR RACELAND
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 407-90-0018; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-90 FBROFF 1,421 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 86 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE
Project: H.009658 - US 90: LA 182 - LA 1
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE US 90 424-08 NHPP 3,938 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009662 - LA 308: GOLDEN MEADOW BR - GALLIANO BR
Type Impv: ASPHALTIC CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-01 STPFLEX 2,115 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009664 - LA 20: TERREBONNE P/L - JACKSON ST.
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 20 065-05 STPFLEX 1,116 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009969 - LA 654: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 654 829-10 FEMA 2,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010006 - LA 182 & LA 58: MOVABLE BRIDGE REHAB
Type Impv: MOVABLE BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks: BOTH CONTROL SECTIONS IN HOUMA MPO AREA.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 182 005-07 STPFLEX 5,089 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
TERREBONNE LA 58 247-30 STPFLEX 4,253 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.010152 - CONSTRUCTION CANAL DREDGING
Type Impv: DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIO
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-90 NHPP 2,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010403 - LA 182/LA1: US 90 - ST. MARY ST
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 182 005-06 STPFLEX 2,750 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010404 - US 90: 2.5 MI E LA 182 - ST CHARLES P/L
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE US 90 005-07 NHPP 4,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010408 - LA 1: VALENTINE BR - LA 655
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-05 STPFLEX 2,300 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 87 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LAFOURCHE
Project: H.010409 - LA 1: LA 655 - CHAMPAGNE-HARRELSON BR
Type Impv: COLD PLANE AND SUPERPAVE ASPHALTIC CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-06 STPFLEX 1,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010454 - EXTRUDED PANEL SIGN REPAIRS; LA 1
Type Impv: MATERIAL AND LABOR TO REINSTALL SIGNS DAMAGED DURING ISA
Project Manager: COURVILLE, CARL
Remarks: DIR LA-2012-1-057-001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-90 ER 21 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010474 - LA 1 EMERG REPAIR: CAMINADA BR - LA 3090
Type Impv: ADD 4' SHOULDERS AND ARMOR EMBANKMENT SLOPES ON LA 1
Project Manager: BRANTON, JENNIFER
Remarks: DIR LA-2012-1-057-003
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-02 ER 2,017 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 1 064-01 ER 300 OTHER / MISCELLANEOUS
Project: H.010688 - LA 3235 FEASIBILITY STUDY
Type Impv: ACCESS MANAGEMENT
Project Manager: FARR, ALEX
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 3235 829-26 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011207 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A
Type Impv: CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTURE
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NFI 43,400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.011208 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B
Type Impv: ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEE
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.011209 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D
Type Impv: NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACH.
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.007234 - ACADIAN RD-WEST (CANAL TO LA 3185)
Type Impv: 4-LANE
Project Manager: HANKS, ANNA
Remarks: 742-29-0001;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 STP<200K 9,359 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 88 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LASALLE
Project: H.009592 - LA 8: US 84 INTERSECTION
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 8 152-02 STPFLEX 132 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009604 - LA 460: LA 127 - US 84
Type Impv: THIN OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 460 152-01 STPFLEX 2,878 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009982 - JEREMY ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE 000-30 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
LASALLE 000-30 FBROFF 300 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.009983 - WHITE SULPHUR SPRINGS ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE 000-30 FBROFF 470 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
LASALLE 000-30 FBROFF 323 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.011058 - LA 503: LA 127 - LA 126
Type Impv: PATCH & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 503 130-02 NFABOND 2,756 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.000754 - UNION PACIFIC R.R.OPASS NEAR TULLOS
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 022-04-0033;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE US 84 022-04 NHPP 3,500 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009589 - LA 28: RAPIDES LINE - DIVERSION CANAL
Type Impv: ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATION
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 28 074-03 NHPP 1,604 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009765 - JENA: MULTI-MODAL CONNECTIVITY
Type Impv: MULTI-USE PATH W/LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE 000-30 STPENH 787 ENHANCEMENTS 2-WAITING FOR FUNDING
LASALLE LA 8 830-08 STPENH 120 ENHANCEMENTS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 89 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LASALLE
Project: H.000758 - LA 772 - HAIR CREEK(JENA)
Type Impv: WIDENING (STAGE 0 STUDY)
Project Manager: OLIVIER, NICHOLAS
Remarks: 022-05-0045;FEASIBILITY STUDY (STAGE 0)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE US 84 022-05 NHPP 12,500 CORRIDOR 1-PLANNING/ENVIRONMENTAL
Project: H.001133 - LA MIDLAND RR OVERPASS REPLACEMENT
Type Impv: REPLACE RR OVERPASS/BRIDGE REMOVAL
Project Manager: HICKS, MELVIN
Remarks: 040-04-0030;DOES NOT QUALIFY FOR BR FUNDS.WANT TO REMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 772 040-04 STPFLEX 687 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009588 - LA 125: PENTECOSTAL CHURCH RD - US 165
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 125 131-01 STPFLEX 1,448 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
CALDWELL LA 125 811-13 STPFLEX 47 PRESERVATION
NON-INTERSTATE
Project: H.009603 - LA 3259: LA 125 - US 165
Type Impv: ASPHALT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 3259 830-21 STPFLEX 294 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009644 - LA 125: US 165-PENTECOSTAL CHURCH ROAD
Type Impv: ASPHALT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 125 131-01 STPFLEX 1,384 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 90 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN
Project: H.006551 - MONDY RD&DICK'S RD SIGHT IMPROVE.
Type Impv: SITE DISTANCE IMPROVEMENTS
Project Manager: HOLM, RICK
Remarks: 737-31-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 HRRR 188 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009277 - GRAMBLING SR2S PROJECT
Type Impv: SIDEWALK, CROSSWALKS, MARKINGS ETC.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 SR2S 240 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
LINCOLN LA 149 831-16 SR2S 30 SAFETY
SAFE ROUTES TO SCHOOLS
Project: H.010270 - I-20: TREE REMOVAL IN LINCOLN PARISH
Type Impv: I-20: TREE REMOVAL IN LINCOLN PARISH
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN I-20 451-05 HSIPPEN 827 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.003708 - TREMONT EB REST AREA IMPROVEMENTS
Type Impv: RECONSTRUCT REST AREA
Project Manager: GUINN, MICHAEL S
Remarks: 695-01-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 NHPP 11,229 OPER EFFICIENCY/MOTORIST ASSISTANCE
REST AREAS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.006548 - LINER & ROUGH EDGE ROAD IMPROVEMENT
Type Impv: SITE DISTANCE AND ALIGNMENT
Project Manager: HOLM, RICK
Remarks: 737-31-0003;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 HRRR 195 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009871 - KCS(SIMSBORO) WOODLAND DR.
Type Impv: INSTALL F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-31-0110
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010009 - LA 507 OVER I-20 BRIDGE REHABILITATION
Type Impv: REPLACEMENT OF SUPERSTRUCTURE
Project Manager: BUCCI, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 507 308-04 FBROFF 3,247 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010066 - I A LEWIS ELEM. SRTS SIDEWALK PROJECT
Type Impv: SIDEWALK IMPROVEMENT, TRAFFICE CALMING, SPEED REDUCTION IM
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 SR2S 250 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010239 - TREMONT WB REST AREA IMPROVEMENTS
Type Impv: ADD PAVILIONS, SIDEWALKS, SECURITY, LIGHTING, ADD. R/W.
Project Manager: GUINN, MICHAEL S
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 NHPP 5,550 OPER EFFICIENCY/MOTORIST ASSISTANCE
REST AREAS
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 91 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN
Project: H.010424 - LA 823 ROADWAY FLOODING 1.8 MI E LA 151
Type Impv: RAISE THE ROADWAY ELEVATION
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 823 314-01 NFA 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010432 - US 167 & US 63: TURN LANE @ REYNOLDS DR
Type Impv: US 167 ADD RT TURN LANE AT REYNOLDS RD
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 63 023-10 NHPP 700 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010911 - I-20: MEDIAN CABLE (LINCOLN/OUACHITA)
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN I-20 451-05 HSIPPEN 3,500 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
OUACHITA I-20 451-06 HSIPPEN 3,500 SAFETY
Project: H.011036 - LA 545: LA 146 - LISBON ROAD
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 545 308-07 NFABOND 2,389 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011037 - LA 563: LA 150 - LA 544
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 563 316-05 NFABOND 2,775 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011040 - LA 556: JACKSON PARISH LINE - LA 145
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 556 318-03 NFABOND 1,350 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011121 - TRAIL TO HIDEAWAY PARK
Type Impv: CONSTRUCTION OF 1275' WALKING TRAIL
Project Manager: RIGGS, LAURA
Remarks: MICHAEL DOMINGUE IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 RTP 93 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
LINCOLN 000-31 LOCAL 7 RECREATIONAL TRAILS PROGRAM
Project: H.010056 - EAVES ROAD & JEFFERSON AVENUE BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 FBROFF 693 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001550 - CHATHAM RD. (RUSTON)
Type Impv: WIDEN TO 5 LANES
Project Manager: JESCLARD, TREY
Remarks: 068-01-0009;$200 BONDS AVAIL. FOR PE (E?)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 92 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN
Project: H.003298 - ROAD INTERCHANGE & I-20 FRONTAGE RD
Type Impv: NEW CONC PVMT TARBUTTON RD OVERPASS
Project Manager: REVIERE, RYAN
Remarks: 451-05-0115;STAGE 3
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN I-20 451-05 TCSP 4 PRESERVATION
INTERSTATE
2-WAITING FOR FUNDING
LINCOLN I-20 451-05 IM DISCR 927 PRESERVATION
INTERSTATE
LINCOLN I-20 451-05 DEMO 3,477 DEMO / HIGH PRIORITY
LINCOLN I-20 451-05 STGEN 250 PRESERVATION
INTERSTATE
LINCOLN I-20 451-05 NFI 9,641 PRESERVATION
INTERSTATE
Project: H.004608 - CHOUDRANT I-20 SERVICE ROAD
Type Impv: NEW SERVICE ROAD
Project Manager: PAINE, PEGGY JO
Remarks: 700-31-0121;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.000133 - US 80 OVERPASS @ KCS RR
Type Impv: BRIDGE REPLACEMENT
Project Manager: JONES, MATTHEW
Remarks: 001-07-0026;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 80 001-07 STPFLEX 22,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001679 - LA 146 BRIDGES NEAR VIENNA
Type Impv: NEW BRIDGES
Project Manager: UMEOZULU, JOE
Remarks: 085-09-0017;3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 146 085-09 STPFLEX 3,569 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008157 - JCT US 80 - JCT LA 150
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: BORNE, FRED
Remarks: 831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 150 831-07 SATRANS 4,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
831-12 NFI 5,000 OTHER / MISCELLANEOUS
Project: H.008159 - JCT US 80 - JCT LA 150
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: BORNE, FRED
Remarks: 831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 818 831-12 SATRANS 350 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
LINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS
Project: H.008161 - CALVIN CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 831-14-0005; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 3072 831-14 FBROFF 1,199 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 93 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LINCOLN
Project: H.009746 - RUSTON DOWNTOWN REVITALIZATION PHASE 6
Type Impv: SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 150 831-07 STPENH 895 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
LINCOLN LA 150 831-07 LOCAL 190 OTHER / MISCELLANEOUS
LINCOLN 000-31 STPENH 1,569 ENHANCEMENTS
LINCOLN 000-31 LOCAL 284 OTHER / MISCELLANEOUS
Project: H.010389 - LA 507: US 80 - S. END OVERPASS I-20
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 507 308-04 STPFLEX 735 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010453 - US 80: RIVER OAK DR - 0.92 E OF LA 818
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 80 001-07 STPFLEX 2,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010472 - US 80: 0.9 MILES E. OF LA 818 - US 167
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 80 001-07 STPFLEX 700 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010616 - I 20: LA 544 OVERPASS REPLACEMENT
Type Impv: OVERPASS REHABILITATION
Project Manager: BUCCI, MARK
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 544 296-03 FBROFF 4,807 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 94 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON
Project: H.002373 - LA 16 @ LA 22 INSTALL ROUNDABOUT
Type Impv: INSTALL ROUNDABOUT
Project Manager: MUSA, ELNUR
Remarks: 260-02-0037;JT W 260-03-0014
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 260-02 HSIP 1,032 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
LIVINGSTON LA 22 260-03 HSIP 438 SAFETY
LIVINGSTON LA 22 266-03 HSIP 371 SAFETY
Project: H.006157 - WAX ROAD BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: USE PRIORITY 2 BOND AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 FBROFF 700 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.008166 - LA 1036: W JCT LA 442 - ST HELENA P/L
Type Impv: MILL, STABILIZE BASE, DRAINAGE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 832-01-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1036 832-01 NFABOND 4,553 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010504 - LA 444: GUM SWAMP ROAD - LA 22
Type Impv: COLD PLANE, DRAINAGE, BASE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 444 832-19 NFABOND 3,287 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010638 - RIVER RD: GOVERNMENT ST - CENTERVILLE ST
Type Impv: MINOR WIDENING AND OVERLAY, SOME PAVEMENT PATCHING REQU
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 395 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010701 - LIVINGSTON PARISH RR SAFETY IMPROVEMENTS
Type Impv: INSTALL SIGNS & PAVEMENT MARKINGS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 HRRR 140 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010979 - LA 43: TURN LN @ LA 1040 & JAMES CH RD
Type Impv: DUAL LEFT TURN LANES OR CONTINUOUS 3 LANE SECTION
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 43 260-06 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.000466 - US 190: ROUNDABOUT AT EDEN CHURCH ROAD
Type Impv: CONSTRUCT 4-LEGGED SINGLE LANE ROUNDABOUT
Project Manager: PAINE, PEGGY JO
Remarks: 013-06-0054
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 HSIP 2,500 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.005693 - LA 447/I-12 INTERCHANGE
Type Impv:
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 447 268-01 STPFLEX 5,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 95 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON
Project: H.008173 - US 190 & LA 1032
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: SMITH, DAVID
Remarks: 832-12-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1032 832-12 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.008193 - LA 1034 - US 190
Type Impv: COLD PLANE. PATCH AND OLAY
Project Manager: RAY, JARED
Remarks: 832-32-0015
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 3002 832-32 HSIP 1,300 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
LIVINGSTON LA 3002 832-32 NHPP 774 PRESERVATION
NON-INTERSTATE
Project: H.009140 - LA 1026 AT LA 1030 ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: LAI, QUANG
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1026 273-03 STPFLEX 3,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009179 - WAX ROAD
Type Impv: OVERLAY AND WIDENING
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL OF MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 1,150 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009180 - PLANTATION RD / ENTERPRISE RD
Type Impv: OVERLAY AND WIDENING
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 555 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009595 - I-12:LIVINGSTON PAR APPROACH SLAB REP P2
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 7,200 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010124 - LA 16: ROUNDABOUT @ LA 447
Type Impv: ROUNDABOUT
Project Manager: RICHARD, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010558 - I-12 WDN: .5 M W SATSUMA-SATSUMA RAMPS
Type Impv: WIDEN I-12 TO 3 LANES
Project Manager: TSAI, LOONG SHEN
Remarks: CAN'T ADD TO TIP & STIP UNTIL COMPLETE NEW CONFORMITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 12,000 CORRIDOR 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010781 - LA 1032: LA 16 - LA 3003
Type Impv: WIDEN CURVES, OVERLAY, RESTRIPE AND PAVEMENT MARKERS
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1032 832-12 HSIPPEN 3,437 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 96 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON
Project: H.010842 - SIDNEY HUTCHINSON WALKING TRAIL
Type Impv: CONSTRUCTION OF A PEDESTRIAN TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
LIVINGSTON 000-32 LOCAL 33 RECREATIONAL TRAILS PROGRAM
Project: H.011129 - LA 1029: IC RR XING (WALKER)
Type Impv: REPLACE CROSSING SURFACE.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1029 832-25 RAIL HE 64 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
LIVINGSTON LA 1029 832-25 LOCAL 51 RAILROADS
Project: H.011210 - LA 22: DIVERSION CANAL - LA 16 OVERLAY
Type Impv: OVERLAY AND PATCHING
Project Manager: ISEMANN, ROBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 22 266-03 STBONDS 450 PRESERVATION
NON-INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.002381 - LA 43 CREEK BRIDGE NEAR ALBANY
Type Impv: NEW BRIDGE
Project Manager: ISEMANN, ROBERT
Remarks: 260-07-0025;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 43 260-07 STPFLEX 651 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003425 - I-12: LA 63 - TANGIPAHOA PARISH LINE
Type Impv: C.P. AND OVERLAY
Project Manager: THOMAS, BEN
Remarks: 454-02-0077;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 7,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.004634 - JUBAN RD WIDENING (I-12 - US 190)
Type Impv: WIDENING (CONC PAVEMENT)
Project Manager: PAINE, PEGGY JO
Remarks: 832-13-0019;700-32-0122 ENGINEERING ($800.000)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1026 832-13 STBONDS 5,980 CAPACITY 3-DESIGN/DEVELOPMENT
LIVINGSTON US 190 013-06 STBONDS 2,070 CAPACITY
LIVINGSTON US 190 013-06 HSIP 3,530 SAFETY
Project: H.008190 - LA 1025: CREEK BR. NEAR FRIENDSHIP
Type Impv: NEW BRIDGE
Project Manager: RICHARD, RYAN
Remarks: 832-29-0012;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1025 832-29 STPFLEX 571 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009548 - E. BATON ROUGE PARISH LINE - W JCT LA 16
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 NHPP 1,211 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 97 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON
Project: H.010625 - PEA RIDGE AND JOHN BARBER ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 FBROFF 370 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
LIVINGSTON 000-32 FBROFF 254 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010992 - I-12: I-12 INTERSTATE RAMP REPAIR
Type Impv: PATCHING AND STRIPING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 5,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011014 - LA 3002: J-TURN
Type Impv: ADD SOUTH BOUND J-TURN FOR LEFT TURNING VEHICLES EXITING C
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 3002 832-32 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011189 - LA 1026 @ DUNN & EDEN CHURCH ROUNDABOUTS
Type Impv: ROUNDABOUT INTERSECTION IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1026 273-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011197 - DENHAM SPRINGS SRTS PROJ - NORTHSIDE
Type Impv: SIDEWALKS, STRIPING AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 SR2S 220 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.009749 - WALKER SIDEWALKS, PH 3
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1027 273-03 STPENH 323 ENHANCEMENTS 2-WAITING FOR FUNDING
LIVINGSTON LA 447 268-02 STPENH 31 ENHANCEMENTS
LIVINGSTON 000-32 STPENH 223 ENHANCEMENTS
Project: H.000464 - US 190 & LA 1026 (ROUNDABOUT)
Type Impv: ROUNDABOUT
Project Manager: PAINE, PEGGY JO
Remarks: 013-06-0052;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 HSIP 1,200 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.002375 - AMITE R.BR. NEAR FRENCH SETTLEMENT
Type Impv: NEW BRIDGE
Project Manager: BROWN, JEFF
Remarks: 260-02-0040;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 260-02 STPFLEX 23,124 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 98 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON
Project: H.002397 - PETE'S HWY(LA 16)INTERCHANGE @ I-12
Type Impv: INTERCHANGE IMPROVEMENTS - STAGE 0
Project Manager: BROADBENT, RONALD
Remarks: 262-01-0037;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.008170 - LA 1024 CREEK BRS. NEAR FRIENDSHIP
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 832-10-0019;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1024 832-10 FBROFF 1,302 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009549 - E. JCT. LA 16 - JCT. LA 447
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 STPFLEX 2,322 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009552 - JCT. LA 1034 - JCT. US 190
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 STPFLEX 1,405 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010030 - LA 16 TRAFFIC STUDY
Type Impv: STUDY TRAFFIC ALONG LA 16 IN DIST 62
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.010091 - LA 447 CORRIDOR STUDY PHASE II
Type Impv: TRAFFIC STUDY ON LA 447
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 447 268-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 447 268-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.010383 - LA 441: LA 442 - ST. HELENA PARISH LINE
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 441 270-03 STPFLEX 2,480 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010384 - LA 442: LA 63 - W. JCT. LA 441
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 442 269-01 STPFLEX 2,420 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010551 - LA 16: LA 64/LA 1026 - AMITE CHURCH RD.
Type Impv: ASPHALT SURFACE TREATMEENT
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-02 STPFLEX 199 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 99 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: LIVINGSTON
Project: H.009837 - LA 64 MOBILITY IMP. (LA 1019 TO LA 16)
Type Impv: FEASIBILITY STUDY FOR MOBILITY IMPROVEMENTS OF LA 64
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 64 273-03 0 CAPACITY 0-FEASIBILITY/SCOPING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 100 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MADISON
Project: H.003332 - I-20: RICHLAND/MADISON PARISH RAMP REHAB
Type Impv: RAMP REHAB (RICHLAND PARISH AND MADISON PARISH)
Project Manager: THOMAS, BEN
Remarks: 451-07-0052;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 7,078 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
RICHLAND I-20 451-07 NHPP 6,242 PRESERVATION
INTERSTATE
Project: H.010603 - I-20 MR BR MOD FOR TRAN REALIGN PIER E-2
Type Impv: PIER E2 TO MODIFICATION TO ACCOMODATE LATERAL MOVEMENT
Project Manager: D'ANDREA, ARTUR
Remarks: $4.25M RURAL TIGER GRANT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-09 DEMO 4,031 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010927 - SLOPE REP @ LETOURNEAU ON I-20 OVERPASS
Type Impv: EMBANKMENT AND ABUTMENT REPAIR
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 1,500 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010930 - SLOPE REPAIR ON I-20 OVERPASSES
Type Impv: EMBANKMENT AND ABUTMENT REPAIR
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 392 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
MADISON I-20 451-08 NHPP 392 PRESERVATION
INTERSTATE
MADISON I-20 451-08 NHPP 392 PRESERVATION
INTERSTATE
MADISON I-20 451-08 NHPP 392 PRESERVATION
INTERSTATE
RICHLAND I-20 451-07 NHPP 392 PRESERVATION
INTERSTATE
Project: H.011000 - I-20: MOUND TO DELTA SCALES
Type Impv: INSTALL SHOULDER UNDER-DRAIN W/SEL. COLD PLANING & OVERLA
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 2,000 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010612 - I-20 MRB SOIL AND SCOUR STABILIZATION
Type Impv: IMP SLOPE & SOIL STABILITY AROUND PIERS E1 & E2 ADD RIP RAP
Project Manager: D'ANDREA, ARTUR
Remarks: OTHER IS $ FROM MDOT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-09 NHPP 13,973 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
MADISON 000-33 OTHER 13,973 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.011047 - LA 577: LA 860 - NEW BOYS ROAD
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: NFA WILL BE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON LA 577 164-02 STPFLEX 3,710 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011077 - I-20: MOUND TO DELTA SCALES
Type Impv: COLD PLANE AND OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 6,000 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 101 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MADISON
Project: H.003353 - I-20 DRAINAGE CANAL BRIDGE
Type Impv: BRIDGE REHAB
Project Manager: CAVALIER, STEPHANIE
Remarks: 451-08-0086;REHAB ABUTMENT WALLS. & APP. SLABS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 2,724 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010038 - TENDAL NORTH RD / DRAIN TO TENSAS BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON 000-33 FBROFF 1,001 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010897 - I-20: MRB ISLAND ANCHORING PIER E1
Type Impv: REHABILITATION
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-09 NHPP 13,500 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
MADISON 000-33 OTHER 13,500 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.008200 - US 65 - FRONTAGE ROAD
Type Impv: ASPHALT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 833-06-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON LA 601 833-06 STPFLEX 0 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010455 - US 80: JCT LA 577 TO QUBEC
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON US 80 002-04 STPFLEX 4,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 102 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MOREHOUSE
Project: H.010422 - LA 830-3 ROADWAY FLOOD 1.3 MI W LA 830-4
Type Impv: EXISTING CROSS DRAIN WILL BE REPLACED WITH LARGER STRUCTU
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 830-3 834-15 STPFLEX 162 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010277 - LA 593: INTER. IMPRV. NAFF @ COLLINGSTON
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 593 162-01 HSIP 800 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011031 - LA 834: BURLEIGH TRAIL-BAYOU BARTHOLOMEW
Type Impv: MILL & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 834 329-03 NFABOND 1,036 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011039 - LA 590: US 425 - ELVIN ROAD
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 590 834-03 NFABOND 848 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011124 - US 425: UP RR XING (MER ROUGE)
Type Impv: REPLACE CROSSING SURFACE AND ADJUST GRADE OF APPROACHE
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE US 425 037-01 RAIL HE 40 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
MOREHOUSE US 425 037-01 LOCAL 40 RAILROADS
Project: H.002631 - OVERFLOW CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 329-03-0014; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 834 329-03 FBROFF 1,555 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009535 - LA 599: S JCT US 165 TO N JCT US 165
Type Impv: COLD PLANE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 599 328-31 NFA 2,326 PRESERVATION
NON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
MOREHOUSE LA 599 328-02 NFA 3,255 PRESERVATION
NON-INTERSTATE NFA
Project: H.010040 - BUD ROAD & BONNE IDEE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE 000-34 FBROFF 585 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
MOREHOUSE 000-34 FBROFF 416 PRESERVATION
BRIDGE (OFF SYSTEM)
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 103 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: MOREHOUSE
Project: H.000665 - UP R.R. OVERPASS NEAR BONITA
Type Impv: NEW BRIDGE
Project Manager: OLIVIER, NICHOLAS
Remarks: 016-05-0031;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE US 165 016-05 STPFLEX 8,926 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008203 - LA 835 CREEK BRIDGES
Type Impv: NEW BRIDGES
Project Manager: BROWN, JEFF
Remarks: 834-07-0022;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 835 834-07 STPFLEX 2,892 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009538 - US 165: S LA 599 - N LA 599
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE US 165 016-05 STPFLEX 1,220 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010470 - LA 138: JCT LA 593 TO JCT LA 2
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 138 330-01 STPFLEX 5,600 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 104 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES
Project: H.010594 - LOUISIANA TRAIL: GOLDONNA TO CHESTNUT
Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010900 - LA 486: SOUTH JCT US 71-NORTH JCT US 71
Type Impv: CEMENTED BASE AND 2-LIFT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 486 835-01 NFA 1,600 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14
NATCHITOCHES LA 486 835-01 NFABOND 1,335 PRESERVATION
NON-INTERSTATE NFA
Project: H.011051 - LA 480: US 71 - CLEAR LAKE
Type Impv: STABLIZATION AND INSTALLATION OF TWO (20 LIFT OVERLAY OF L
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 480 835-09 NFABOND 3,710 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011057 - LA 490: EMMANUEL RD-0.12 SW SPURGEON RD
Type Impv: STABILIZE AND INSTALL TWO (2) LIFT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 490 835-08 NFABOND 1,749 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009721 - LA 1X: TURN LANES-46' N HANCOCK-LA 494
Type Impv: WIDEN ROADWAY FOR LEFT TURN LANE IMPROVEMENTS
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1-X 053-04 HSIPPEN 3,850 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
NATCHITOCHES LA 1-X 053-04 TAP<200K 200 SAFETY
Project: H.010178 - LA 120: CURVE REALIGNMENT
Type Impv: REALIGNMENT OF LA 120 TO ELIMINATE SHARP REVERSE CURVE
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-05 HSIP 1,120 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010486 - I-49: RAPIDES P/L - 1.1 MI S LA 485
Type Impv: CRACK SEALING,PCCP PATCH&U-SEALING. SIDE ROADS -CP & OVER
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES I-49 455-06 NHPP 4,218 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
NATCHITOCHES LA 490 835-08 STPFLEX 417 PRESERVATION
INTERSTATE
NATCHITOCHES 000-35 STPFLEX 365 PRESERVATION
INTERSTATE
Project: H.010491 - I-49: 1.11 MI S LA 485- 0.57 MI N LA 174
Type Impv: PATCH, COLD PLANE, AND OVERLAY (ROADWAY, RAMPS, AND SIDE
Project Manager: THOMAS, BEN
Remarks: 455-06 TTF AS MATCH AND 115-02 NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES I-49 455-06 NHPP 4,955 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
NATCHITOCHES LA 485 115-02 STPFLEX 510 PRESERVATION
NON-INTERSTATE
NATCHITOCHES LA 485 115-02 STPFLEX 445 PRESERVATION
INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 105 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES
Project: H.010830 - LOUISIANA TRAIL - GOLDONNA TO POND
Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
NATCHITOCHES 000-35 LOCAL 0 RECREATIONAL TRAILS PROGRAM
Project: H.010901 - LA 1265: FIVE FORKS ROAD REALIGNMENT
Type Impv: RECONSTRUCTION WITH GEOMETRIC IMPROVEMENTS
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1265 835-23 NFA 1,900 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011063 - LA 1220: LA 119 - LITTLE RIVER BRIDGE
Type Impv: STABLIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1220 361-01 NFABOND 1,537 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011071 - LA 493: LA 1 - LA 119
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 493 835-14 NFABOND 1,272 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011145 - LOUISIANA TRAILS RESTORATION PHASE 2
Type Impv: RESTORATION, NON-ROUTINE MAINT & CONS. OF 30 MILES OF TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
Project: H.001145 - JCT. LA 487 - JCT. LA 6
Type Impv: CBT AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: AC WITH NFA FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-05 STPFLEX 3,500 PRESERVATION
NON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001146 - LA120: BRIDGES NEAR PROVENCAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 042-07-0022;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-07 FBROFF 2,000 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009559 - LA 156: MAMMY TRAIL - LA 479
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 156 092-01 STPFLEX 2,813 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 106 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES
Project: H.010943 - CLARK/GOOD HOPE/ROBELINE-PROVENCAL BRDGS
Type Impv: BRIDGE REPLACEMENTS
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 FBROFF 1,224 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES 000-35 FBROFF 601 PRESERVATION
BRIDGE (OFF SYSTEM)
NATCHITOCHES 000-35 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.001809 - AJAX - I-49
Type Impv: CURVE REALIGNMENT
Project Manager: MOORE, DARRELL
Remarks: 112-06-0008;PROJECT TO BE RE-SCOPED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 174 112-06 STPFLEX 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.003741 - NATCHITOCHES REST AREA
Type Impv: REST AREA
Project Manager: DUPUY, ROY
Remarks: 698-08-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 NHPP 8,455 OPER EFFICIENCY/MOTORIST ASSISTANCE
REST AREAS
2-WAITING FOR FUNDING
Project: H.001061 - EL CAMINO EAST/WEST COR (EAST SEG )
Type Impv: MAJOR WIDENING LA 117 TO I 49
Project Manager: TSAI, LOONG SHEN
Remarks: 034-05-0035;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 6 034-05 DEMO 2,478 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
NATCHITOCHES LA 6 034-05 NFI 25,022 DEMO / HIGH PRIORITY
Project: H.001270 - NATCH. BY-PASS - KEYSER AVE
Type Impv: WIDEN TO 5 LANES
Project Manager: TONEY, PATRICK
Remarks: 053-04-0025;(NO FUNDING)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1-X 053-04 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.001271 - CANE RIVER BRIDGE AT CHURCH STREET
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks: 053-04-0031;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1-X 053-04 STPFLEX 4,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001820 - LA 485 BRIDGES NEAR ALLEN
Type Impv: BRODGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 115-01-0017;4 NEW BRIDGES.JT W/115-02-0011
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 485 115-01 FBROFF 7,326 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.007503 - NATCHITOCHES T&P RR DEPOT REHAB
Type Impv: MISCELLANEOUS
Project Manager: HORTON, VALERIE
Remarks: 000-35
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 STPENH 597 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 107 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: NATCHITOCHES
Project: H.009992 - LA 120: ROADWAY ELEVATION PROJ./ROADWAY
Type Impv: ELEVATION AND MITIGATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-07 FEMA 4,508 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010342 - LA 155: RED RIVER P/L - S JCT LA 153
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 155 091-02 STPFLEX 1,939 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010343 - LA 174: DESOTO P/L - I-49 INTERCHANGE
Type Impv: PATCH. COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 174 112-06 STPFLEX 1,925 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010346 - LA 487: LA 120 - LA 174
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 487 113-03 STPFLEX 3,844 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010357 - LA 153: JCT LA 9 - FIVE FORKS ROAD
Type Impv: STALIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 153 088-01 STPFLEX 1,600 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010359 - LA 9: JCT US 71 - JCT LA 156
Type Impv: PATCH. COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 9 089-01 STPFLEX 1,509 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010365 - LA 117: BELLWOOD - LA 478
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 117 114-03 STPFLEX 1,288 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 108 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.003181 - I-10 WB OVER JULIA STREET GIRDER REHABIL
Type Impv: REPLACE AND REPAIR DAMAGED STEEL AND CONNECTION PLATES
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 1,083 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.003182 - IHNC AND ALGIERS CUTOFF BRIDGE REHAB
Type Impv: FINGER JOINTS,ROCKER BEARINGS & DECK OVERLAY
Project Manager: KEMP, KELLY
Remarks: 450-90-0246;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 7,400 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
ORLEANS LA 407 836-08 NHPP 760 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
Project: H.004730 - US 61/90(TULANE) CLAIBORNE - CARROLLTON
Type Impv: SAFETY AND TRAFFIC OPERATIONAL IMPROVEMENTS
Project Manager: BAJEWSKI, CHRISTINA
Remarks: 700-36-0187;STAGE 0 AND STAGE 1 MATCH BY RPC
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 61 007-01 HSIP 1,000 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
ORLEANS US 61 007-01 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
ORLEANS US 90 006-03 HSIP 1,000 SAFETY
ORLEANS US 90 006-03 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.006566 - NEW ORLEANS SAFE ROUTES TO SCHOOL PROJ.
Type Impv: SIDEWALKS/SIGNS/ETC.
Project Manager: GROS, SCOTT
Remarks: 737-36-0015;SR2S PROGRAM FUNDING.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 477 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.007265 - ST CHARLES AVE (LA AVE-CALLIOPE ST)
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0126; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,666 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009069 - TRI-CENTENNIAL PL PARKING, CITY PARK NO
Type Impv: PARKING LOT
Project Manager: FLETCHER, CURTIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 TCSP 2,107 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
ORLEANS 000-36 LOCAL 190 DEMO / HIGH PRIORITY
Project: H.009354 - BROAD STREET CORRIDOR BIKEWAY
Type Impv: CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSING
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM
Project: H.009579 - I-10: I-610 SPLIT - US 90 SPLIT
Type Impv: COLD PLANE AND OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 6,365 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 109 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.010113 - EINSTEIN CHARTER SCHOOL SRTS NON-INFRAST
Type Impv: BIKE/PED SAFETY TRAINING, PURCHASES, ENCOURAGEMENT ACTIVI
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 100 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010576 - JEFFERSON DAVIS TRAILS
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL SYSTEM.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
ORLEANS 000-36 LOCAL 14 RECREATIONAL TRAILS PROGRAM
Project: H.010712 - I-10 MEDIAN CABLE BARRIER:I510-TWIN SPAN
Type Impv: MEDIAN CABLE BARRIER
Project Manager: FOSTER, AMANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 HSIP 2,188 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010719 - US 90 RAMP IMPROVEMENTS
Type Impv: IMPROVE EB ONRAMP TO US 90Z FROM CLAIBORNE AVE.
Project Manager: NICKEL, TIM
Remarks: USE CCCD TOLL CREDITS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
ORLEANS US 90-Z 283-08 NHPP 1,250 OTHER / MISCELLANEOUS
Project: H.010789 - I-10: IRISH BAYOU BRIDGE EMERGENCY REP
Type Impv: SCOUR REPAIR AND EROSION PROTECTION
Project Manager: JOHNSON, ENNIS
Remarks: DIR REPORT # LA-2012-1-071-005
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 ER 956 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010892 - US 90: IMPROVE U-TURN TO DANZIGER BR
Type Impv: IMPROVE U-TURN UNDER DANZIGER BRIDGE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 NHPP 111 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010893 - US 90: LEFT TURN LANES & PAVED MEDIANS
Type Impv: ADD LEFT TURN LANE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 STPFLEX 302 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011078 - NO RTMC BUILDING SECURITY
Type Impv: BUILDING SECURITY SYSTEM FOR THE NO RTMC
Project Manager: DELANEY, ELIZABETH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPFLEX 120 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 110 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.011090 - PATHS TO PROGRESS (GROUP 39)
Type Impv: OVERLAY, PATCHING, STRIPING, IMPROVING ADA RAMPS
Project Manager: BURST, JEFFERY
Remarks: 704-36-0044; DIR # 071-GALVEZ-01 & 071-DOWNMAN ROAD-01
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 ER 2,277 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
ORLEANS 000-36 ER 413 OTHER / MISCELLANEOUS
Project: H.011139 - NEW ORLEANS SRTS PROJECT - YLC (NI)
Type Impv: BICYCLE RACKS AND TRAINING.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 150 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011140 - NEW ORLEANS SRTS PROJECT - KIDSWALK (NI)
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 150 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011198 - NEW ORLEANS SRTS PROJ. - EINSTEIN II
Type Impv: SIDEWALKS, STRIPING AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 208 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011238 - I-910/US 90-Z: GENERAL DE GAULLE RAMPS
Type Impv: ASPHALT OVERLAY AND APPROACH SLAB LEVELING OF RAMPS
Project Manager: FOSTER, AMANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 400 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006196 - WISNER BLVD BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-36-0108;ENHANCEMENTS PROVIDING $ 2,000,000
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 FBROFF 10,000 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
ORLEANS 000-36 STPENH 2,000 ENHANCEMENTS
Project: H.006567 - PEDESTRIAN CROSSWALK ENHANCEMENTS
Type Impv: SIGNS & PVMT.MARKINGS INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-36-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SATRANS 276 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.007271 - CANAL BLVD (R.E. LEE - AMETHYST)
Type Impv: RECONSTRUCT EXISTING 4 LANE DIVIDED
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0135; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.007273 - MAGAZINE ST (BROADWAY - CALHOUN)
Type Impv: REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0137; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 111 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.007274 - MAGAZINE ST RECONSTRUCTION PHASE 2
Type Impv: REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0139; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.007275 - ST CHARLES AVENUE OVERLAY (PHASE II
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0140; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 1,700 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.007277 - LAKE FOREST BOULEVARD
Type Impv: MINOR WIDENING
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0142;ADD ENGINEERING TO FY 10
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 370 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009308 - NEW ORLEANS DPW - EP HARNEY SCHOOL PROJ.
Type Impv: BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 25 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
ORLEANS US 90 006-03 SR2S 225 SAFETY
SAFE ROUTES TO SCHOOLS
Project: H.009419 - LA 3019: ROUNDABOUT @ I-10 RAMP
Type Impv: TWO-LANE ROUNDABOUT
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 3019 836-13 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009838 - SAFE ROUTES TO ARISE ACADEMY
Type Impv: NON-INFRASTRUCTURE SRTS PROJECT ONLY
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 50 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009949 - ESPERANZA SAFE ROUTES TO SCHOOL
Type Impv: NON-INFRASTRUCTURE SRTS PROJECT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 18 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010086 - E.P. HARNEY SCHOOL SRTS NON-INFRASTRUCT
Type Impv: SRTS NON-INFRASTRUCTURE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 35 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010111 - AUDUBON CHARTER SCHOOL SRTS INFRASTRUCT
Type Impv: SIDEWALK IMPROVMENTS, TRAFFIC CALMING, STRIPING AND MARKIN
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 235 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 112 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.010112 - AUDUBON CHARTER SCHOOL SRTS NON-INFRAST
Type Impv: BIKE AND PED SAFETY TRAINING,PURCHASES, ENFORCEMENT ACTIV
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 125 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010114 - EINSTEIN CHARTER SCHOOL INFRASTRUCTURE
Type Impv: SIDEWALK IMPROVEMENTS, TRAFIC CALMING, MARKINGS AND STRIP
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 458 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010189 - NEW ORLEANS HOSPITALITY ZONE
Type Impv: CONGESTION MANAGEMENT
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010636 - US 90 OVER MISS RVR (GNO2)-CLEAN & PAINT
Type Impv: BRIDGE REPAIRS, CLEANING & PAINTING
Project Manager: REVIERE, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 9,000 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010736 - ALGIERS AREA ROADWAYS #2
Type Impv: PCC REHAB INCLUDING PANEL PATCHING/REPLACEMENT, CLEANING
Project Manager: BURST, JEFFERY
Remarks: USE STBONDS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 1,877 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
ORLEANS 000-36 STP>200K 709 URBAN SYSTEMS
Project: H.010872 - EARHART CORRIDOR BIKEWAY LINKAGE
Type Impv: CONSTRUCTION OF 2.3 MILES OF BIKE LANE.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RTP 146 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ORLEANS 000-36 LOCAL 30 RECREATIONAL TRAILS PROGRAM
Project: H.011108 - NS SEVERAL RR XINGS (NEW ORLEANS)
Type Impv: RAIL/HIGHWAY CROSSING WARNING IMPROVEMENTS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011146 - CITY PARK BICYCLE TRAIL
Type Impv: CONST. & IMPROVE. TO BICYCLE INFRAS. TO 1300 ACRES CITY PARK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ORLEANS 000-36 LOCAL 10 RECREATIONAL TRAILS PROGRAM
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 113 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.011150 - I-10 WB OVER CHEF MENTEUR BL BR REPAIR
Type Impv: REPLACE TWO STEEL GIRDER AND ASSOCIATED DECK.
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 850 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011167 - I-10: HOWARD AVENUE SERVICE ROAD
Type Impv: ROADWAY RESTORATION AND REHAB
Project Manager: FOSTER, AMANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 850 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011172 - US 90-Z: PAVEMENT MARKING REPLACEMENT I
Type Impv: PAVEMENT MARKING REPLACEMENT
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 14-15
JEFFERSON US 90-Z 283-09 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.011199 - NEW ORLEANS SRTS PROJ. - EINSTEIN II NI
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 50 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011219 - I-10: NO CBD1 I610-CARROLLTON
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 14-15
Project: H.007259 - FLEUR DE LIS BLVD. PH 3
Type Impv: RECONSTRUCTION
Project Manager: DEVILLE, JACQUES
Remarks: 742-36-0118;(HARRISON - OLD HAMMOND HWY)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 6,100 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.010331 - US 90: FLOODWALL - CHEF PASS BRIDGE
Type Impv: RAISING ROADWAY GRADE TO CONSISENT ELEVATION BY ADDING
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011200 - NEW ORLEANS SRTS PROJ. - AUDUBON N.I.
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 74 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.011220 - I-10: NO CBD2 CARROLLTON - POYDRAS
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 114 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.011221 - I-10: NO CBD3 POYDRAS - LOUISA
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.011222 - I-10: NO CBD4 LOUISA - I-510
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 5,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.007250 - ALMONASTER BRIDGE AND APPR.
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 742-36-0104;OTHER FUNDS - PORT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPFLEX 20,000 INTERMODAL CONNECTOR 2-WAITING FOR FUNDING
ORLEANS 000-36 STPFLEX 20,000 PRESERVATION
BRIDGE (ON SYSTEM)
ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS
Project: H.007272 - HOWARD AVENUE EXTENSION
Type Impv: NEW 2-LANE ROADWAY
Project Manager: NICKEL, TIM
Remarks: 742-36-0136;CITY OWNS R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.009938 - MAGNOLIA CONVERTED PED BRIDGE REHAB
Type Impv: REHAB OF EXISTING PED BRIDGE (CONVERTED VEHICLE) & REL. WOR
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPENH 889 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.000263 - CHEF MENTEUR PASS BRIDGE & APPROACH
Type Impv: BRIDGE REPLACEMENT
Project Manager: RABALAIS, NICK
Remarks: 006-05-0067;STAGE 1 PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-05 STPFLEX 85,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.000304 - I 10 - US 61 OVERPASS
Type Impv: BRIDGE REHABILITATION
Project Manager: D'ANDREA, ARTUR
Remarks: 007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 61 007-01 NHPP 4,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.004738 - I-610 - TWIN SPANS AND I-10 @ RR
Type Impv: STATE FUNDS FOR STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-36-0198;(STAGE 0.PHASE1)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.006561 - N.O. UNION PASSENGER TERMINAL M.P.
Type Impv: STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 737-36-0006;$360K H.P.DEMO. MATCH BY RPC $90K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 DEMO 450 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 115 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.008220 - LA406/WOODLAND HWY (LA23 - LA407)
Type Impv: WIDENING
Project Manager: DEVILLE, JACQUES
Remarks: 836-14-0002;JT W 838-06-0002
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 406 836-14 STP>200K 1,500 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009340 - PONO ALMONASTER BR GUSTAV REPAIRS
Type Impv: REIMBURSEMENT FOR EMERGENCY WORKED ALREADY COMPLETED
Project Manager: WINCHESTER, CHAD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 ER 2,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009572 - LA 39:JUDGE SEEBER BR-ST BERNARD P/L
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 39 046-31 NHPP 1,406 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009661 - LA 406: DONNER CANAL BR - STANTON RD
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 406 409-02 STPFLEX 823 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009663 - LA 47: I-10 - BULLARD RD.
Type Impv: PCC REHAB AND ASPHALTIC CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 47 148-03 STPFLEX 4,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009764 - NO CITY PARK: MARCONI MULTI-USE PATH
Type Impv: MULTI-USE PATH, LANDSCAPING & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPENH 727 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.009939 - ST CHARLES AVE: STREETSCAPING IMP., PH 1
Type Impv: STREETSCAPING, DECORATIVE LIGHTING, & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPENH 1,053 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.010016 - US 11: LAKE PONTCHARTRAIN BRIDGE REHAB
Type Impv: MAJOR BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks: PRIORITY BRIDGE PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 11 018-02 STPFLEX 25,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010018 - I-10: NO EAST DRAIN CANAL BRIDGE REPLACE
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 11,758 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 116 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ORLEANS
Project: H.010405 - US 90: CAMELOT DR - FLOOD GATE
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 STPFLEX 1,400 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010414 - LA 1253: DOWMAN RD - I-10 FRONTAGE RD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 1253 419-02 STPFLEX 250 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010634 - CCCD-US90BUS SIGN UPGRADE-EAST/WEST BANK
Type Impv: UPGRADING SIGNS ENTIRE LIMITS. UPGRADING STRUCTURES AS NEE
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
JEFFERSON US 90-Z 283-09 NHPP 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.005720 - FLORIDA AVENUE EXPRESSWAY FEASIBILITY ST
Type Impv: FLORIDA AVENUE EXPRESSWAY FEASIBILITY STUDY - RESCOPE
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 TIME 0-FEASIBILITY/SCOPING
Project: H.009920 - REMOVE TOLL BOOTHS/RECONFIG TRAVEL LANES
Type Impv: REMOVE TOLL BOOTHS/RECONFIGURATION OF TRAVEL LANES/SIGN
Project Manager: REVIERE, RYAN
Remarks: USE FEDERAL CCC TOLL CREDITS AS MATCH TO STP>200K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
Project: H.009918 - REPLACE 2 CCCD FERRIES
Type Impv: REPLACE UP TO 2 CCCD FERRIES
Project Manager: REVIERE, RYAN
Remarks: USE TOLLS AS MATCH TO CMAQ AT 80/20 SPLIT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 CM 16,000 CCC TOLL PROJECTS STAGES 4, 3, 2, 1, 0
Project: H.009919 - REHABILITATION OF CCCD FERRY TERMINALS
Type Impv: REHABILITATION OF CCCD FERRY TERMINALS
Project Manager: REVIERE, RYAN
Remarks: USE TOLLS AS MATCH TO STPENH AT 80/20 SPLIT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPENH 3,000 CCC TOLL PROJECTS STAGES 4, 3, 2, 1, 0
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 117 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA
Project: H.001943 - LA 15 (US 80 - LA 616)
Type Impv: SAFETY IMPROVEMENTS
Project Manager: COLQUETTE, PAUL
Remarks: 156-01-0024;LA 15 @ EXCALIBER (HILL CUT DOWN)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 15 156-01 HSIP 373 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
OUACHITA LA 15 156-01 STBONDS 225 SAFETY
Project: H.006205 - MOORE ROAD BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: USE PRIORITY 2 BOND AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 FBROFF 1,189 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009360 - RUSSELL SAGE WMA - HOG PEN & PUMP TRAIL
Type Impv: RESTORATION & NON-ROUTINE MAINTENANCE OF MOTORIZED TRAIL
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RTP 173 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
OUACHITA 000-37 LOCAL 1 RECREATIONAL TRAILS PROGRAM
Project: H.009842 - US 80: LA 617 - LA 34 SIDEWALKS
Type Impv: REPAIR AND RECONSTRUCTION OF SIDEWALKS
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 STPENH 1,673 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009999 - LA 594: TURN LN @ US 165 SERVICE RD.
Type Impv: WIDENING AND REALIGNING US 165 SERV RD ACROSS KCS & LA 594
Project Manager: HICKS, MELVIN
Remarks: 015-31-0053
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 594 326-01 HSIPPEN 1,059 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
OUACHITA US 165 015-31 RAIL HE 450 RAILROADS
OUACHITA US 165 015-31 HSIPPEN 995 SAFETY
Project: H.010419 - LA3033 ROADWAY FLOODING 1.5 MI S LA840-1
Type Impv: ADDITIONAL CROSS DRAIN & ADJACENT SIDE DRAIN WILL BE ADDED
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3033 837-12 STPFLEX 57 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010582 - LOUISIANA DELTA COMMUNITY COLLEGE TRAIL
Type Impv: CONSTRUCTION OF A PED NATURE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RTP 18 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
OUACHITA 000-37 LOCAL 16 RECREATIONAL TRAILS PROGRAM
Project: H.010725 - ARKANSAS RD (CALDWELL RD-LA 143) CL&GRUB
Type Impv: CLEARING AND GRUBBING
Project Manager: BORNE, FRED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 616 324-02 STPFLEX 500 CAPACITY 4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 118 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA
Project: H.010732 - LA 151: LA 546 TO US 80
Type Impv: THIN ASPHALTIC OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 151 317-01 STPFLEX 784 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010886 - LA 546: I-20 TO LA 34
Type Impv: OGFC
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 546 158-01 HSIPPEN 1,691 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.000169 - UNION PACIFIC RAILROAD BRIDGE AT SICARD
Type Impv: BRIDGE REPLACEMENT
Project Manager: RABALAIS, NICK
Remarks: 002-01-0047;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 002-01 STPFLEX 7,780 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.000640 - US 165: LA 841 TO RILLA
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 015-08-0051
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 015-08 NHPP 4,050 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.002622 - ARKANSAS ROAD: (CALDWELL ROAD - LA 143
Type Impv: WIDENING
Project Manager: BORNE, FRED
Remarks: 324-02-0008;CONVERTED FROM BOND TO FED AID-2001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 616 324-02 STPFLEX 24,955 CAPACITY 4-SCHEDULED FOR LETTING FY 14-15
OUACHITA LA 616 324-02 STGEN 45 CAPACITY
Project: H.003331 - ROUNDABOUT @ GARRETT RD INTERCHANGE
Type Impv: SAFETY AND TRAFFIC FLOW
Project Manager: COLQUETTE, PAUL
Remarks: 451-06-0161;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
OUACHITA I-20 451-06 LOCAL 300 OTHER / MISCELLANEOUS
Project: H.007288 - MONTGOMERY ST (LA 34 - I-20)
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: HANKS, ANNA
Remarks: 742-37-0015
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 4,295 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009297 - OUACHITA PAR. POLICE JURY SRTS PROJECT
Type Impv: SIDEWALKS/PED PATHS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 240 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009531 - US 165: CALDWELL PARISH LINE TO LA 841
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 015-08 NHPP 3,780 TIME 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 119 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA
Project: H.010092 - SRTS JACK HAYES ELEM., OUACHITA PARISH
Type Impv: CONSTRUCT SIDEWALKS AND CROSSWALKS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 460 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010115 - JACK HAYES ELEM. SRTS NON-INFRASTRUCTURE
Type Impv: PURCHASES, INCENTIVES, BICYCLE RACKS, TRAINING.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 100 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010287 - LA 3249: ROUNDABOUT @ I-20/WELL RD.
Type Impv: ROUNDABOUT AT I-20/WELL RD.
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3249 837-19 HSIP 1,400 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010396 - US 165: BAYOU DESIARD - STERLINGTON
Type Impv: ASPHALT USING CRACK & SEAT METHOD BECAUSE OF EXIST. BASE
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 016-01 NHPP 5,955 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010430 - LA 594: TURN LANE @ OUACHITA PAR HIGH
Type Impv: THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOL
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010698 - RIVERBARGE ST: UP RR XING (MONROE)
Type Impv: INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSING
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010827 - RUBY ROAD / YOUNGS BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: USE PRIORITY 2 BOND AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 FBROFF 1,224 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010874 - RIVERSIDE HIKING TRAIL
Type Impv: CONSTRUCTION OF 1.4 MILES OF PED-BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RTP 150 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
OUACHITA 000-37 LOCAL 34 RECREATIONAL TRAILS PROGRAM
Project: H.011106 - SOUTH GRAND STREET TRAIL
Type Impv: CONST. OF 10' X 1,000' BOARDWALK ALONG THE RIVERFRONT
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
OUACHITA 000-37 LOCAL 14 RECREATIONAL TRAILS PROGRAM
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 120 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA
Project: H.011144 - ALM SEVERAL RR XINGS (OUACH & MOREHOUSE)
Type Impv: INSTALL CROSSBUCK ASSEMBLIES AT ALM'S PASSIVE PUBLIC XING
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RAIL PD 50 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
MOREHOUSE 000-34 RAIL PD 50 RAILROADS
Project: H.011153 - OUACHITA WMA - SALINE AND SOUTH TRAILS
Type Impv: RESTOR. OF 3.2 MILES OF MOTORIZED TRAIL AND A .2 TRAILHEAD
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RTP 145 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
Project: H.000163 - US 80 STEEP BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: MOORE, DARRELL
Remarks: 001-09-0089;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 STPFLEX 1,537 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.006202 - BREARD STREET BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-37-0109;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 FBROFF 400 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.007300 - KANSAS LANE-GARRETT RD CONNECTOR
Type Impv: RD CONNECTOR & INTERCHANGE IMPRVMNT
Project Manager: BROADBENT, RONALD
Remarks: 742-37-0028;4TH FUND SOURCE US $300K STP<200K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STPFLEX 10,000 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENT
OUACHITA 000-37 DEMO 6,616 DEMO / HIGH PRIORITY
OUACHITA 000-37 NFI 7,431 OTHER / MISCELLANEOUS
Project: H.008226 - CHENIERE SPILLWAY & BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 837-12-0026;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3033 837-12 STPFLEX 1,500 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009433 - OUACHITA SRTS PROJECT - JACK HAYES II
Type Impv: SIDEWALKS, SIGINING AND STRIPING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 181 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.010015 - LA 143: BAYOU D'ARBONNE BRIDGE REHAB
Type Impv: BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 143 315-02 STPFLEX 626 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 121 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA
Project: H.010352 - OUACHITA SRTS PROJECT - RISER
Type Impv: SIDEWALKS, SIGINING AND STRIPING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3033 837-12 SR2S 29 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
OUACHITA 000-37 SR2S 120 SAFETY
SAFE ROUTES TO SCHOOLS
Project: H.010989 - I-20: LINCOLN/OUACHITA P. RAMP REHAB
Type Impv: RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISH
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 NHPP 2,500 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
LINCOLN I-20 451-05 NHPP 1,500 PRESERVATION
INTERSTATE
Project: H.011192 - OUACHITA SRTS PROJECT JACK HAYES II N.I.
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 50 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.011193 - OUACHITA SRTS PROJECT - RISER N.I.
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 50 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.001952 - US 165 - MOREHOUSE PH. LINE
Type Impv: DOUBLE CHIP SEAL
Project Manager: CHENEVERT, MARK
Remarks: 160-01-0012;JTW/318-03-07.325-01-24.831-15-03
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 554 160-01 STCASH 106 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.002624 - US 165 - W.JCT. LA 2
Type Impv: DOUBLE CHIP SEAL
Project Manager: CHENEVERT, MARK
Remarks: 325-01-0024;JTW/160-01-12
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 553 325-01 STCASH 461 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.007284 - FINKS HIDEAWAY (HOLLAND-RAYMOND)PH2
Type Impv: WIDEN TO 5 LANES
Project Manager: HANKS, ANNA
Remarks: 742-37-0011;PH.TO OBTAIN UTILITY AGREE.& R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 4,600 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.007289 - KANSAS LANE EXTENSION
Type Impv: ASPHALT NEW PAVEMENT
Project Manager: BROADBENT, RONALD
Remarks: 742-37-0016;US 80 - US 165. R/W & UTIL BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 DEMO 4,531 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
OUACHITA 000-37 LOCAL 15,470 OTHER / MISCELLANEOUS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 122 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: OUACHITA
Project: H.009752 - DESIARD ST: STREETSCAPING S GRAND-6TH ST
Type Impv: SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STPENH 513 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009828 - US 80: LA 617 - LA 143 SIDEWALKS
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 STPENH 540 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.004782 - LA 143 - US 165 CONNECTOR& OUACH
Type Impv: CONNECTOR & OUACHITA R. BR.(ENGR)
Project Manager: PAINE, PEGGY JO
Remarks: 700-37-0129;STAGE O
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.006578 - FAIRWAY DRIVE SIGN IMPROVEMENTS
Type Impv: SIGN & FLASHING BEACON INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-37-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 HRRR 16 SAFETY
LOCAL ROADS SAFETY
1-PLANNING/ENVIRONMENTAL
Project: H.008230 - LA 838 STEEP BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: HICKS, MELVIN
Remarks: 837-14-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 838 837-14 STPFLEX 1,055 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009932 - US 80 WIDENING: WELL ROAD - AVANT ROAD
Type Impv: WIDEN LANES 4-12' DIVIDED, CURB & GUTTER,SUBSURFACE DRAINA
Project Manager: FLETCHER, CURTIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 NFI 4,800 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010012 - I-20: US 80 OVERPASS BRIDGE REPLACEMENT
Type Impv: REPLACEMENT OF BRIDGE OVERPASS
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 STPFLEX 3,414 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010391 - US 80: GILBERT ST TO JCT LA 139
Type Impv: MILL & OVERLAY; OFGC WITH SAFETY FUNDS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 002-01 NHPP 1,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010550 - I 20: LA 546 TO LA 594
Type Impv: WIDEN FROM 4 TO 6 LANES
Project Manager: WINCHESTER, CHAD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 NHPP 200,000 CORRIDOR 0-FEASIBILITY/SCOPING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 123 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: PLAQUEMINES
Project: H.010326 - LA 23: AVE. B - APRICOT ST.
Type Impv: MODIFICATION OF CB-06 AND CB-07 TOPS AS PER LADOTD STANDA
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES LA 23 062-02 NHPP 231 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010484 - EMERG DREDGE OSTRICA LOCK & CANAL
Type Impv: DREDGE CANAL TO THE DESIGN TEMPLATE TO ALLOW SAFE NAVIGA
Project Manager: ROONEY, BRITTANY
Remarks: SECRETARY EMERGENCY LETTER 9/5/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 STGEN 1,921 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010508 - LA 3137: LA 39 - FERRY LANDING ROAD
Type Impv: ULTRATHIN OVERLAY
Project Manager: JOHNSON, ENNIS
Remarks: LETTER BID IN THE DISTRICT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES LA 3137 838-05 NFABOND 489 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010935 - LA 23: ACCESS/OPERATION IMP BELLE CHASSE
Type Impv: ADD TURN LANES, CLOSE CROSSOVERS, AND IMPROVE CROSSOVE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES LA 23 062-02 NHPP 810 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.007712 - SOUTH PLAQUEMINES OFF ROAD PARK
Type Impv: CONSTRUCTION OF TEN MILES OF OFF ROAD TRAILS
Project Manager: RIGGS, LAURA
Remarks: 745-38-0005; MATCH BY PLAQUESMINES PARISH GOVERNMENT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 RTP 100 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
PLAQUEMINES 000-38 LOCAL 150 RECREATIONAL TRAILS PROGRAM
Project: H.006441 - LA 23 (ENGINEERS RD. - WALL BLVD.)
Type Impv:
Project Manager: DEVILLE, JACQUES
Remarks: 736-38-0002;TRAFFIC STUDY FOR BELLE CHASE HWY.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 STP>200K 6,245 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
PLAQUEMINES 000-38 LOCAL 0 OTHER / MISCELLANEOUS
Project: H.001399 - HAPPY JACK - N.PORT SULPHUR
Type Impv: WIDEN TO 4 LANES
Project Manager: LAFLEUR, MIKE
Remarks: 062-04-0029;$1M GS9$ FOR STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES LA 23 062-04 NFI 0 CORRIDOR 1-PLANNING/ENVIRONMENTAL
Project: H.004791 - REPL.BRIDGE AND TUNNEL BELLE CHASSE
Type Impv: STATE FUNDS FOR STUDY
Project Manager: REVIERE, RYAN
Remarks: 700-38-0108;FEASIBILITY STUDY STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.010590 - EMERG ELEC REP&DEBR REM OSTRICA LK&CANAL
Type Impv: EMERGENCY ELECTRICAL REPAIR AND DEBRIS REMOVAL
Project Manager: MILLER, DAVID
Remarks: SECRETARY EMERGENCY LETTER 9/5/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 STGEN 400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 124 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: PLAQUEMINES
Project: H.010912 - MISSIPPIPPI RIVER TRAIL-PLAQUEMINES PAR
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: NGUYEN, WAYNE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 125 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: POINTE COUPEE
Project: H.009911 - LA 414(N): THIN ASPH CONC OVERLAY
Type Impv: THIN ASPHALTIC CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks: USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 414 839-14 STPFLEX 498 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010435 - LA 411 & LA 413: PATCH,STABILIZE,OVERLAY
Type Impv: PATCH, STABILIZE, & OVERLAY
Project Manager: RAY, JARED
Remarks: 229-04 100% NFABOND; 227-03 USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 411 229-04 NFABOND 2,760 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
W BATON ROUGE LA 413 227-01 STPFLEX 3,303 PRESERVATION
NON-INTERSTATE NFA
W BATON ROUGE LA 413 227-02 STPFLEX 2,018 PRESERVATION
NON-INTERSTATE NFA
POINTE COUPEE LA 413 227-03 STPFLEX 1,458 PRESERVATION
NON-INTERSTATE
Project: H.010263 - LA 1: DRAINAGE IMPROVEMENTS
Type Impv: CROSS DRAIN IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 1 052-04 STPFLEX 88 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011116 - FALSE RIVER DRIVE PEDESTRIAN WALKWAY
Type Impv: CONST. OF 5' X 2700' TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE 000-39 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
POINTE COUPEE 000-39 LOCAL 94 RECREATIONAL TRAILS PROGRAM
Project: H.011224 - US 190: GUARDRAIL REPL. (PHASE 1)
Type Impv: REPLACE GUARDRAIL.
Project Manager: RICHARD, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE US 190 008-03 HSIPPEN 3,300 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
POINTE COUPEE US 190 008-02 HSIPPEN 2,300 SAFETY
Project: H.010724 - PECAN ISLAND ROAD BRIDGE OVER THE CHENAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE 000-39 FBROFF 1,109 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002184 - BAYOU CHENAL & BAYOU DISCHARGE BRS.
Type Impv: NEW BRIDGES
Project Manager: MOORE, DARRELL
Remarks: 227-04-0019;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 413 227-04 STPFLEX 4,395 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009991 - LA 81: ROADWAY ELEVATION & MITIGATION
Type Impv: ELEVATION AND MITIGATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 81 839-08 FEMA 851 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 126 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: POINTE COUPEE
Project: H.010434 - LA 15: LA 1 - W. FELICIANA P/L
Type Impv: STABILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 15 177-01 STPFLEX 4,200 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 127 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.006228 - BRIDGE OVER BAYOU BOEUF
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-40-0101
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 FBROFF 892 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.007005 - CENTRAL STATE HOSPITAL STREETS
Type Impv: REHABILITATE AND OVERLAY CERTAIN STREETS AND PARKING ARE
Project Manager: MATHEWS, LARRY
Remarks: MAX AMOUNT AVAILABLE W CE&I AND INCIDENTALS IS $908,123
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 FBR-ON/OFF 802 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.008259 - LA 1204: 0.369 MI E SPRINGHILL RD-US 165
Type Impv: AC OVERLAY/INPLACE BASE
Project Manager: HANKS, ANNA
Remarks: 840-31-0014; USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1204 840-31 STP<200K 764 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009516 - LA 1177: AVOYELLES PARISH - JCT. US 71
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1177 840-18 NFABOND 742 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009539 - I-49: NORTH OF LA 181 - NORTH OF LA 498
Type Impv: CRACK SEALING, PCCP PATCH & U-SEALING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 5,701 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
RAPIDES I-49 455-05 HSIP 2,807 SAFETY
RAPIDES I-49 455-05 HSIP 1,250 SAFETY
Project: H.010367 - LA 463: 221' S OF VERNON P/L - LA 121
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 463 139-07 STPFLEX 1,839 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
VERNON LA 463 139-06 STPFLEX 21 PRESERVATION
NON-INTERSTATE
Project: H.010425 - LA 28: TURN LANES @ CLOVERLEAF BLVD
Type Impv: CONSTRUCTION OF DOUBLE LEFT AND RIGHT TURN AT CLOVERLEF B
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 417-02 HSIP 605 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010490 - I-49: 0.66 MI S LA 1200 - 0.36 MI N LA 8
Type Impv: PATCH, COLD PLANE, & OVERLAY ROADWAY
Project Manager: THOMAS, BEN
Remarks: USE NFA AS MATCH FOR C.S. 134-04
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 5,129 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
RAPIDES LA 8-S 134-04 STPFLEX 71 PRESERVATION
INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 128 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.010492 - I-49: 0.36 MI N LA 8 - NATCHITOCHES P/L
Type Impv: CRACK SEALING,PCCP PATCH&U-SEALING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 852 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
RAPIDES I-49 455-05 HSIP 225 SAFETY
Project: H.011060 - LA 461: CALCASIEU - LA 121
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 461 371-04 NFABOND 2,650 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011062 - LA 1203:US 71-0.27 MI W HICKORY HILL RD
Type Impv: STABILIZE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: TTF AS MATCH FOR CS 369-02 FROM 0.0 TO 0.19
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1203 369-02 NFABOND 1,696 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
RAPIDES LA 1203 369-02 STPFLEX 76 PRESERVATION
NON-INTERSTATE
Project: H.011068 - LA 454: AVOYELLES P/L - LA 107
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 454 370-02 NFABOND 3,604 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.000577 - US 165-X: KCS RAILWAY OVERPASS
Type Impv: BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSING
Project Manager: RABALAIS, NICK
Remarks: 015-01-0049;SCOPE CHANGED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165-X 015-01 STPFLEX 1,763 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.004823 - 3RD ST ENHANCEMENTS-ST JAMES TO BROADWAY
Type Impv: ENHANCEMENT
Project Manager: MATHEWS, LARRY
Remarks: 700-40-0143;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 DEMO 2,590 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009299 - RAPIDES PARISH SCHOOL DIST. SRTS PROJECT
Type Impv: SIDEWALK CONSTRUCTION, MARKINGS, ADA IMPROVEMENTS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 285 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009555 - LA 1199: LA 112 - LA 121
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1199 840-27 STPFLEX 3,479 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010070 - RUGG ELEM. SAFE ROUTES TO SCHOOL PH. II
Type Impv: SIDEWALKS, STRIPING AND ARKINGS.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 210 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 129 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.010171 - COA VERSAILLES BLVD ROADWAY LIGHTING
Type Impv: ROADWAY LIGHTING
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STP<200K 605 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010193 - ALEXANDRIA ITS PHASE 1
Type Impv: ITS DEPLOYMENT AS PER REGIONAL ARCHITECTURE
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010280 - US 167: LEFT TURN LANE SB FROM LA 28
Type Impv: INSTALLATION OF AN ADDITIONAL LEFT TURN LANE
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 167 023-01 HSIP 1,363 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010322 - LA 28: LA 3144 - LA 1205
Type Impv: MICROSURFACING
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 074-01 NHPP 922 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010349 - US 165: HORSESHOE DR - US 71
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165 014-06 NHPP 1,079 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010777 - US 71: TURN LANES FOR LEE ST & RANDOM DR
Type Impv: CONSTRUCTION OF POSITIVE OFFSET LEFT TURN LANE ON US 71
Project Manager: MATHEWS, LARRY
Remarks: THIS IS A "B" PROJECT.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 HSIP 385 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
RAPIDES US 71 008-30 HSIP 125 SAFETY
Project: H.010821 - US 71:WIDENING OF SERVICE RD CONNECTIONS
Type Impv: WIDEN EXISTING SERVICE ROAD CONNECTIONS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-30 NHPP 270 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010894 - US 165: RIGHT TURN LANE AT LA 112
Type Impv: CONSTRUCT RIGHT TURN LANE ON US 165 TO THE INTERSECT LA 11
Project Manager: MATHEWS, LARRY
Remarks: THIS IS A "B" PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165 014-05 HSIP 250 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
RAPIDES US 165 014-05 NHPP 65 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 130 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.011154 - US 71 AND LA 3170 INTERSECTION IMPRS.
Type Impv: ADD TURN LANE AND INSTALL CONCRETE ISLAND
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 NHPP 225 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
RAPIDES LA 3170 840-35 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.011169 - US 165: ALLEN P/L- 0.312 S OF ASHMORE NB
Type Impv: PATCH, COLD PLANE, AND OVERLAY ROADWAY AND SHOULDERS
Project Manager: CHENEVERT, MARK
Remarks: TIMED FUNDS USED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165 014-05 NHPP 2,431 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011204 - ALEXANDRIA SRTS PROJECT - MARTIN PARK NI
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 15 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.001923 - FLAGON BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 149-02-0011;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 623 149-02 STPFLEX 1,916 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002672 - JACKSON(LA 1208-3) @ HORSESHOE
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: HANKS, ANNA
Remarks: 368-03-0030
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1208-3 368-03 STP<200K 1,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.008278 - US 71:UP RR OVERPASS NEAR TIOGA
Type Impv: BRIDGE REPLACEMENT
Project Manager: RABALAIS, NICK
Remarks: 840-43-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 840-43 NHPP 15,862 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009122 - LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES
Type Impv: NEW BRIDGES
Project Manager: YANG, LI
Remarks: 840-31-0015; 3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1204 840-31 STPFLEX 3,000 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009707 - LA 112: LA 113 - E DAVIS ROAD
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: APPLIED FOR STBONDS. DID NOT MAKE LIST.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 112 141-03 NFI 3,400 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010014 - LA 1 OVER I-49 BRIDGE REHABILITATION
Type Impv: BRIDGE OVERPASS REHABILITATION
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1 053-01 STPFLEX 525 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 131 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.010488 - I-49: 0.32 MI S LA 181-0.44 MI N US 167
Type Impv: PATCH,COLD PLANE, & OVERLAY(MAINLINE SHOULDERS & RAMPS)
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 1,650 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011194 - PINEVILLE SRTS PROJECT - PINEVILLE ELEM.
Type Impv: SIDEWALKS, SIGNING AND STRIPING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165-X 015-01 SR2S 200 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
RAPIDES 000-40 SR2S 27 SAFETY
SAFE ROUTES TO SCHOOLS
Project: H.011195 - ALEXANDRIA SRTS PROJECT - MARTIN PARK
Type Impv: SIDEWALKS, STRIPING AND SIGNAGE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 302 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.011203 - PINEVILLE SRTS PROJ - PINEVILLE ELEM NI
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 15 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.008251 - LA456:RDWY CLOSURE@UPRR CROSSING (MEEKER
Type Impv: RDWY CLOSURE@UPRR CROSSING
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 456 840-07 RAIL HE 34 RAILROADS 2-WAITING FOR FUNDING
Project: H.009720 - LA 1250: PINEVILLE URBAN STREETSCAPING
Type Impv: SIDEWALK WITH LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGE
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1250 142-01 STPENH 227 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009723 - WOODWORTH SIDEWALK IMPROVEMENTS PH 3
Type Impv: SIDEWALKS AND REALTED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STPENH 251 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009852 - MASONIC DRIVE CORRIDOR ENHANCEMENT, PH 3
Type Impv: SIDEWALK W/LIGHTING & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STPENH 575 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.000582 - US 165 WIDENING @ PINEVILLE EXPRESSWAY
Type Impv: WIDENING
Project Manager: MATHEWS, LARRY
Remarks: 015-30-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165 015-30 NHPP 5,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 132 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.000790 - US 167 BRIDGE MAINTENANCE
Type Impv: BRIDGE MAINTENANCE
Project Manager: MATHEWS, LARRY
Remarks: 023-01-0069;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 167 023-01 NHPP 3,000 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.004825 - WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)
Type Impv: WIDEN FROM 3 TO 4 LANES
Project Manager: MUSA, ELNUR
Remarks: 700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.007311 - MASONIC DR. @ HORSESHOE DR.
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: HANKS, ANNA
Remarks: 742-40-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STP<200K 540 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.008263 - LA 3144/SUSEK DRIVE ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: MATHEWS, LARRY
Remarks: 840-34-0008;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.008265 - SUGARHOUSE RD. RECONSTRUCTION
Type Impv: RECONSTRUCT
Project Manager: HANKS, ANNA
Remarks: 840-37-0001;ON STATE SYSTEM (WAS 742-07-0040)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 3250 840-37 STP<200K 4,953 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.008271 - SUGARHOUSE RD EXTENSION
Type Impv: NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERS
Project Manager: HANKS, ANNA
Remarks: 840-37-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
RAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS
Project: H.008277 - FT. BUHLOW BR (US 71/US 165)
Type Impv: RED RIVER BRIDDE
Project Manager: UMEOZULU, JOE
Remarks: 840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009498 - LA 121: CALCASIEU RIVER BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 029-05 USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 121 029-05 FBROFF 8,900 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009543 - LA 113: VERNON LINE - LA 112
Type Impv: BASE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 113 140-02 STPFLEX 3,449 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 133 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RAPIDES
Project: H.009556 - LA 107: LA 454 - 320' S OF ESTATE DRIVE
Type Impv: STABLIZE BASE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 107 142-04 STPFLEX 3,251 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010341 - LA 115: LA 1207 - LA 28
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 115 033-04 STPFLEX 1,928 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010355 - LA 113: LA 112 - CALCASIEU RIVER
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 113 140-03 STPFLEX 1,679 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010482 - US167 FRONT: HICKORY HILL - KIWANIS CAMP
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 167 023-01 STPFLEX 526 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010824 - US 71 CORRIDOR STUDY
Type Impv: CONDUCT CORRIDOR STUDY ALONG US 71
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.011072 - CENTRAL LA BELTWAY FEASIBILITY STUDY
Type Impv: PLANNING STUDY
Project Manager: BROUSSARD, DAN
Remarks: RAPIDES AREA PLANNING COMMISSION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 134 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RED RIVER
Project: H.009515 - LA 786: US 371 TO LA 507
Type Impv: MILL AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 306-02-0010
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER LA 786 306-02 NFABOND 2,427 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010095 - LA 515: LA 514 TO US 71
Type Impv: OVERLAY AND EMBANKMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER LA 515 302-02 NFA 3,200 PRESERVATION
NON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
BOSSIER LA 515 302-03 NFA 780 PRESERVATION
NON-INTERSTATE NFA
Project: H.011087 - WESTDALE PLANTATION ROAD / BAYOU PIERRE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: DOTD PROVIDES THE MATCH FOR THE OFF-SYSTEM HWY BR PR
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER 000-41 FBROFF 1,794 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001761 - LA 507 CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 100-02-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER LA 507 100-02 FBROFF 2,133 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009402 - RDWY DRAINAGE IMP.-US 71 @ US 371 PH III
Type Impv: SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER US 371 021-30 STPFLEX 535 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Project: H.009961 - LA 507: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER LA 507 100-02 FEMA 12,466 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 135 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RICHLAND
Project: H.002646 - LA 576: LA 132 - LA 135
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 341-01-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 576 341-01 NFABOND 4,377 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010733 - LA 183: US 80 TO LA 134
Type Impv: ASPHALT SURFACE TREATMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 134 185-01 STPFLEX 829 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.000174 - BAYOU LAFOURCHE BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: GAUDRY, CARL
Remarks: 002-02-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 80 002-02 STPFLEX 6,723 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
OUACHITA US 80 002-01 STPFLEX 370 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.000974 - BOUEF RIVER BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: FLETCHER, CURTIS
Remarks: 026-09-0024;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 15 026-09 STPFLEX 7,000 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.008793 - LA 183: REALIGNMENT NEAR FRANKLIN FARMS.
Type Impv: ROADWAY REALIGNMENT AND OVERPASS
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 183 185-01 STBONDS 14,000 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT
Project: H.010204 - US 425: ROUNDABOUT @ JULIA & LOUISA
Type Impv: INSTALL ROUNDABOUT
Project Manager: GUEST, DEBRA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 425 071-01 HSIP 1,200 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011021 - LA 17: SHARON STREET TO TENNESSEE STREET
Type Impv: REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTU
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.001970 - BOEUF RIVER BRIDGE NEAR HEBERT
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 166-03-0015;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 561 166-03 FBROFF 7,011 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001972 - MUDDY BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: BROWN, JEFF
Remarks: 167-02-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 135 167-02 STPFLEX 1,128 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 136 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: RICHLAND
Project: H.008288 - BOEUF RIVER BRIDGE NEAR BUCKNER
Type Impv: BRIDE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 842-13-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 132 842-13 FBROFF 3,672 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009530 - US 80: OUACHITA PL TO 1.32 MILES EAST
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 80 002-02 STPFLEX 6,204 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010395 - US 425: JCT I-20 TO JCT US 80
Type Impv: MILL & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 425 071-01 STPFLEX 750 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010457 - US 80: LA 133 TO US 425
Type Impv: MILL AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 80 002-02 STPFLEX 2,058 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
RICHLAND US 80 002-03 STPFLEX 1,442 PRESERVATION
NON-INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 137 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: SABINE
Project: H.010538 - LA 474: YELLOW PINES RD - DESS ROAD
Type Impv: PATCH AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 474 120-01 NFABOND 390 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010539 - LA 1217: LA 6 - 400' N OF PATTON RD
Type Impv: COLD PLANE, BASE, OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 1217 113-01 NFABOND 2,380 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009451 - VARIOUS ROADS:SIGNING (SABINE)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 SATRANS 23 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010696 - BROWN & GANDY: KCS RR XINGS (SABINE)
Type Impv: INSTALL F/L'S & GATES AT BROWN AND GANDY XINGS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 RAIL PD 500 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010032 - SHUTEYE ROAD & MARTHAVILLE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 FBROFF 393 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
SABINE 000-43 FBROFF 593 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010033 - PIONEER ROAD & LAKESIDE LOOP BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 FBROFF 193 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
SABINE 000-43 FBROFF 585 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010344 - LA 174: LA 175 - DESOTO P/L
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 174 112-04 STPFLEX 1,888 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010345 - LA 175: N JCT LA 120 - RAY CANTO RD
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 175 035-02 STPFLEX 1,973 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010366 - LA 175: 300' S OF SHIRWILLIS DR - LA 120
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 175 035-01 STPFLEX 2,456 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 138 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST BERNARD
Project: H.007331 - PACKENHAM DR (LA46 - LA39)
Type Impv: RECONSTRUCT
Project Manager: DEVILLE, JACQUES
Remarks: 742-44-0006;WAS 742-07-0079
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 STP>200K 3,141 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010586 - ST BERNARD P MISSISSIPPI RIVER TRAIL PH3
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
ST BERNARD 000-44 LOCAL 425 RECREATIONAL TRAILS PROGRAM
Project: H.010970 - LA 39: TURN LANE AT ST BERNARD HOSPITAL
Type Impv: ADD TURN LANE TO THE ST. BERNARD HOSPITAL
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 39 046-32 NHPP 160 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.002562 - BAYOU LALOUTRE BRIDGE REHABILITATION
Type Impv: STRUCTURAL/ELECTRICAL REPAIRS, CLEANING & PAINTING
Project Manager: KEMP, KELLY
Remarks: 284-02-0032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 46 284-02 FBROFF 3,500 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
ST BERNARD LA 46 284-02 ER 800 OTHER / MISCELLANEOUS
Project: H.009418 - LA 39: ROUNDABOUT @ LA 46 & LA 300
Type Impv: INSTALL SINGLE-LANE ROUNDABOUT
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 39 046-32 HSIP 550 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009834 - ST BERNARD PARISH STREET REHAB PROGRAM
Type Impv: OVERLAYS/PANEL REPAIR/PANEL REPLACEMENT
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 STP>200K 4,668 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011103 - NS SEVERAL RR XINGS (PLAQUEM. & ST.BERN)
Type Impv: UPGRADE RAILROAD WARNING SIGNALS.
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 39 046-03 RAIL PD 60 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
PLAQUEMINES LA 39 046-04 RAIL PD 120 RAILROADS
Project: H.011118 - ST. BERNARD PARISH MRT TRAILHEADS
Type Impv: CONST. OF 1600' OF LEVEE ACCESS RAMPS ALONG MS RIVER TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ST BERNARD 000-44 LOCAL 44 RECREATIONAL TRAILS PROGRAM
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 139 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST BERNARD
Project: H.010406 - LA 46: ORLEANS P/L - PARIS RD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 46 046-03 NHPP 3,000 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010407 - LA 46: PARIS - 0.025 MI N WEBSTER ST
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 46 046-03 STPFLEX 1,500 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.002567 - REGGIO CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 284-30-0023;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 300 284-30 FBROFF 1,834 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009573 - LA 39:LAKE BORGNE CANAL BR - LA 46
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 39 046-32 STPFLEX 2,614 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009967 - LA 624: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 624 844-02 FEMA 3,869 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009968 - LA 625: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 625 844-03 FEMA 403 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 140 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST CHARLES
Project: H.009359 - BONNET CARRE'S SPILLWAY ATV RIDING AREA
Type Impv: RESTORATION AND CONSTRUCTION OF A MOTORIZED TRAIL SYSTEM
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010756 - US 90: LA 52- LA 3060
Type Impv: COLD PLANE, OVERLAY, STRIPING, CURB
Project Manager: ROONEY, BRITTANY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 90 005-09 STGEN 3,710 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010780 - US 90: LA 306 - EARLY ST
Type Impv: COLD PLANE, OVERLAY, STRIPING, CURB
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 90 005-08 STGEN 1,500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
ST CHARLES US 90 005-08 NHPP 225 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: H.010889 - LA 3127: ADD ACCELERATION LANES
Type Impv: ADD ACCELERATION LANES
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 3127 428-03 STPFLEX 1,197 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010891 - US 90: LEFT TURN LANE AT LA 635
Type Impv: ADD LEFT TURN LANE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 90 005-08 NHPP 78 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009176 - LULING INTERSECTION SAFETY IMPROVEMENTS
Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 SATRANS 10 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009453 - VARIOUS ROADS:SIGNING (ST. CHARLES)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 SATRANS 5 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010843 - ORMOND BLVD PAVEMENT REHAB
Type Impv: COLD PLANE, ASPHALT PATCHING, OVERLAY EXISTING ASPHALT, N
Project Manager: DEVILLE, JACQUES
Remarks: ST. CHARLES PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 STP>200K 4,284 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011010 - LA 628: ST. CHARLES PL - AIRLINE OVERLAY
Type Impv: THIN LIFT OVRLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 628 845-02 STPFLEX 900 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 141 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST CHARLES
Project: H.011054 - LA 306: BARBER RD - W END BURCHELL CANAL
Type Impv: MILL & OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: CHENEVERT, MARK
Remarks: NFA AS MATCH FOR CS 845-07 FROM 0.39 - 4.47
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 306 845-07 STPFLEX 2,226 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
ST CHARLES LA 306 845-07 NFABOND 2,497 PRESERVATION
NON-INTERSTATE NFA
Project: H.011132 - LA 50: KCS RR XING (ST. ROSE)
Type Impv: REPLACE CROSSING SURFACE.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 50 845-17 RAIL HE 61 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
ST CHARLES LA 50 845-17 LOCAL 49 RAILROADS
Project: H.011230 - LA 48: INTERSECTION IMP @ RIVER OAKS DR
Type Impv: INTERSECTION IMPROVEMENTS AT RIVER OAKS DRIVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 48 282-02 STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009326 - I-10/610 BRIDGE REPAIRS & PAINTING
Type Impv: BRIDGE DECK PATHCING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES I-10 450-14 NHPP 3,600 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
ST JOHN I-10 450-13 NHPP 510 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
ORLEANS I-610 450-34 NHPP 2,100 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
Project: H.010498 - I-310: LULING BR DECK OVERLAY & REPAIR
Type Impv: REMOVE AND REPLACE BRIDGE DECK OVERLAY & STRUCTURAL REP
Project Manager: GUIDRY, CHRIS
Remarks: PRIORITY BRIDGE PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES I-310 450-37 NHPP 10,000 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
ST CHARLES I-310 450-37 NHPP 10,000 PRESERVATION
INTERSTATE
Project: H.011022 - US 61 @ EVANGELINE RD.
Type Impv: RAISING ROADWAY GRADE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 61 007-03 STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.009763 - ST CHARLES EBANK LEVEE MU PATH, PHASE 6
Type Impv: MULTI-USE PATH & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 STPENH 1,025 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.000320 - JEFFERSON PARISH LN. - LA 50
Type Impv: ULTRATHIN HMAC WEARING COURSE
Project Manager: RAY, JARED
Remarks: 007-03-0060;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 61 007-03 NHPP 1,688 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 142 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST CHARLES
Project: H.004876 - LA 52: LA 18 - N OAK COURT
Type Impv: SAFETY AND TSM IMPROVEMENTS
Project Manager: DEVILLE, JACQUES
Remarks: DTSGE O COMPLETED UNDER DESIGN PHASE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 STP>200K 1,850 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
ST CHARLES 000-45 OTHER 1,850 URBAN SYSTEMS
Project: H.010413 - LA 48: ORMOND PLANTATION - WESCO ST
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 48 282-02 STPFLEX 1,750 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010416 - LA 3127: ST. JOHN P/L - 3700' W I-310
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 3127 428-03 STPFLEX 5,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010417 - LA 306: LA 18 - LA 632
Type Impv: COLD PLANE, GEOGRID & 4" OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 306 845-07 STPFLEX 3,600 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010753 - US 90/I-310 INTERCHANGE
Type Impv: RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMP
Project Manager: LANDRY, COREY
Remarks: MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
ST CHARLES US 90 005-08 NFI 0 CAPACITY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 143 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST HELENA
Project: H.010623 - LA1042:LA37-LA43 & LA10S:LA43-CSLM 0.54
Type Impv: ASPHALTIC CONCRETE PAVEMENT OVERLAY AND STRIPING
Project Manager: BRANTON, JENNIFER
Remarks: LETTER BID IN DISTRICT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 10-S 846-12 NFA 225 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 13-14
ST HELENA LA 1042 846-03 NFA 50 ROAD TRANSFER
Project: H.011015 - LA 441, LA 38, LA 10: CHIP SEALS
Type Impv: ASPHALT SURFACE TREATMENT
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 441 260-10 STPFLEX 271 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
WASHINGTON LA 38 263-06 STPFLEX 252 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
WASHINGTON LA 10 277-03 STPFLEX 222 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
TANGIPAHOA LA 10 277-01 STPFLEX 179 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
Project: H.011046 - LA 1044: JCT LA 432 - MISS. STATE LINE
Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 1044 846-11 NFABOND 3,935 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.002311 - LA 38 - MISSISSIPPI STATE LINE
Type Impv: COLD PLANE.BASE.DRAINAGE & OLAY
Project Manager: RAY, JARED
Remarks: 254-07-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 43 254-07 STPFLEX 3,790 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.002407 - PIGEON CREEK
Type Impv: NEW BRIDGE
Project Manager: YAP, KIAN
Remarks: 262-30-0008;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 63 262-30 STPFLEX 1,611 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.008312 - LA 1042 BRIDGES NEAR GREENSBURG
Type Impv: BRIDGE REPLACEMENT
Project Manager: UMEOZULU, JOE
Remarks: 846-03-0014;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 1042 846-03 FBROFF 2,161 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010382 - LA 441: LA 16 - LA 10
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 441 260-09 STPFLEX 3,972 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 144 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JAMES
Project: H.010138 - SUNSHINE BRIDGE ITS
Type Impv: CCTV CAMERAS AND FIBER OPTIC COMMUNICATIONS
Project Manager: DELANEY, ELIZABETH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 70 426-02 STPFLEX 52 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED IN CURRENT FY 13-14
ASCENSION LA 70 426-03 STPFLEX 753 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
ST JAMES LA 70 426-02 NFI 701 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.010082 - IC (LUTCHER/GRAMERCY) SEVERAL RR X-ING
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES 000-47 RAIL PD 600 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
ST JAMES LA 3274 256-32 RAIL PD 200 RAILROADS
ST JAMES LA 3193 847-07 RAIL PD 200 RAILROADS
ST JAMES LA 641 847-02 RAIL PD 200 RAILROADS
Project: H.011176 - INSTALL SE LA PERM CONTRAFLOW SIGNING
Type Impv: SE LA - PERMANENT SIGNING FOR CONTRAFLOW EVACUATION EVEN
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES I-10 450-12 NHPP 830 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 14-15
JEFFERSON I-10 450-15 NHPP 89 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ST JOHN I-10 450-13 NHPP 45 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ASCENSION I-10 450-11 NHPP 23 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ST JOHN US 61 007-04 NHPP 67 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ST JAMES US 61 007-05 NHPP 103 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ST CHARLES I-310 450-36 NHPP 11 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ST JOHN I-55 452-01 NHPP 45 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.009481 - LA 20 BAYOU CHEVREVIL BRIDGE
Type Impv: BRIDGE REHABILITATION
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 20 065-07 STPFLEX 821 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011190 - LA3213: MISS RIVER BR REHAB (GRAMERCY)
Type Impv: REHABILITATE SUPERSTRUCTURE OF THE MAIN TRUSS
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 3213 434-02 STPFLEX 1,500 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002426 - SUNSHINE BRIDGE - I-10
Type Impv: CLEARING AND GRUBBING
Project Manager: TONEY, PATRICK
Remarks: 426-02-0052;(CONST)426-02-42.426-03-04.NO FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 145 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JAMES
Project: H.009483 - LA HIGHWAY 44 RE-ROUTE
Type Impv: ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44
Project Manager: WAGUESPACK, BRENT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS
Project: H.009724 - ST JAMES MISS EBANK MULTI-USE TRAIL PH 1
Type Impv: MULTI-USE PATH AND RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES 000-47 STPENH 1,259 ENHANCEMENTS 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 146 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JOHN
Project: H.008322 - LA 637: PORT OF S.LOUISIANA CONNECTOR
Type Impv: ASPH WIDEN AND OVERLAY
Project Manager: TSAI, LOONG SHEN
Remarks: 848-12-0016; $1M OF RR WORK IN PHASE 4
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 637 848-12 STPFLEX 6,418 INTERMODAL CONNECTOR 4-SCHEDULED IN CURRENT FY 13-14
ST JOHN LA 637 848-12 DEMO 500 DEMO / HIGH PRIORITY
Project: H.009282 - ST. JOHN THE BAPTIST PARISH PROJECT
Type Impv: SIDEWALKS,MARKINGS,SIGNALS,EDUCATION&ENCOURAGEMENT AC
Project Manager: GROS, SCOTT
Remarks: ST. JOHN THE BAPTIST PH.LAPLACE ELEMENTARY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 SR2S 295 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010185 - GARYVILLE MILL POND &NORTHERN TRAIL PH 1
Type Impv: CONSTRUCTION OF 8' WIDE BY 2,800'LONG ASPHALT PED BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011128 - I-10 @ LA 3188 OVERPASS GIRDER REPAIR
Type Impv: REPAIR. TRUCK IMPACTED GIRDERS
Project Manager: TSAI, CHING
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3188 848-15 REIMB 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.000326 - HEMLOCK ST.(LA 3224) @ US 61
Type Impv: SAFETY & CAPACITY MODIFICATIONS
Project Manager: DEVILLE, JACQUES
Remarks: 848-19-0007;STP>200K FUNDS, USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3224 848-19 STP>200K 505 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009391 - LA 3188 DRAINAGE IMPROVEMENTS
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3188 848-15 STP>200K 700 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010110 - EAST ST. JOHN ELEM SCHOOL SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, TRAFFIC CALMING, STRIPING AND MARKIN
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 SR2S 260 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010257 - GRADE RAISING I-10 RAMPS @ LA 3188 INT.
Type Impv: RAISING THE EXISTING GRADE OF THE I-10 RAMPS AT LA 3188
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-10 450-13 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010693 - LA 54: IC RR XING (GARYVILLE)
Type Impv: UPGRADE THE EXISTING SIGNALS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 54 256-31 RAIL PD 75 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 147 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JOHN
Project: H.011043 - LA 643:ST JAMES P/L-LAC DES ALLEMANDS
Type Impv: PATCH & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 643 848-13 NFABOND 1,306 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009593 - I-10,I-12,I-55,I-59:DISTRICTWIDE SPOT RP
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-10 450-13 NHPP 1,500 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009594 - I-10:RESERVE RELIEF CANAL - I-55 NB RAM
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-10 450-13 NHPP 10,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010076 - IC (RESERVE) W. 19TH ST.
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks: 714-48-0001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 RAIL PD 150 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010077 - IC (RESERVE) SEVERAL RR X-ING GARYVILLE
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 RAIL PD 400 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.009770 - ST JOHN MISS EASTBANK MU PATH, PH 3/3A
Type Impv: MULTI-USE PATH ON EB MISS. RIVER LEVEE
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 STPENH 855 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.002960 - LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD
Type Impv: GRADE SEPARATE EXISTING AT GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3213 434-01 STPFLEX 20,000 RAILROADS
GRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
Project: H.003378 - I-55 SERVICE ROAD
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks: 452-01-0056;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-55 452-01 NHPP 800 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Project: H.008318 - JCT. LA 628 - JCT. LA 44
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks: 848-04-0010
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 636-3 848-04 STPFLEX 804 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 148 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST JOHN
Project: H.010385 - LA 3127: ST. JAMES P/L - ST. CHARLES P/L
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3127 428-02 STPFLEX 3,115 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010902 - US 61 FEASIBILITY STUDY
Type Impv: FEASIBILITY STUDY
Project Manager: FARR, ALEX
Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN US 61 007-04 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011136 - MRT EXTENSION ST. JOHN PARISH
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 20% NON-FEDERAL MATCH PROVIDED BY RPC
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 149 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST LANDRY
Project: H.009468 - US 190 KROTZ SPGS ATCHAF BR CLEAN&PAINT
Type Impv: CLEANING AND PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 008-04 NHPP 11,200 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009704 - MANUEL ST AT S EAST ST AND E DEAN ST
Type Impv: GUARD RAIL INSTALLATION
Project Manager: HOLM, RICK
Remarks: 000-49
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 SATRANS 50 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010090 - UP (OPELOUSAS) SEVERAL RR X-ING
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 RAIL PD 980 RAILROADS 4-SCHEDULED IN CURRENT FY 13-14
- LOCAL 420 RAILROADS
Project: H.010523 - LA 361: LA 107 - AVOYELLES P/L
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 361 375-02 NFABOND 1,131 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010526 - LA 95: US 190 - EVANGELINE P/L
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 95 849-27 NFABOND 1,842 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010593 - BAYOU TECHE PADDLE TRAIL
Type Impv: CONSTRUCTION OF A PADDLE AND ATV TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 RTP 104 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
ST LANDRY 000-49 LOCAL 13 RECREATIONAL TRAILS PROGRAM
Project: H.010910 - LA 13: CROSS DRAIN REPLACEMENT CSLM .541
Type Impv: CROSS DRAIN REPLACEMENT
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: SECRETARY'S EMERGENCY LETTER DATED 5/12/2013
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 13 057-04 STGEN 260 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.008332 - ROGUE BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: KEMP, KELLY
Remarks: 849-11-0010; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 360 849-11 FBROFF 3,062 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.008335 - LA 91 DRAINAGE CANAL BRIDGE
Type Impv: NEW BRIDGE
Project Manager: HERATH, ANANDA
Remarks: 849-23-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 91 849-23 STPFLEX 1,032 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 150 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST LANDRY
Project: H.010034 - JOE W ROAD & GALLOW ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 FBROFF 570 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
ST LANDRY 000-49 FBROFF 246 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010035 - ANDREPONT RD & BAYOU GERMOND RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 FBROFF 293 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
ST LANDRY 000-49 FBROFF 601 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.000445 - MISSOURI PACIFIC R.R. OVERPASS
Type Impv: BRIDGE REHAB.REDECK & MAYBE WIDEN
Project Manager: GAUDRY, CARL
Remarks: 012-13-0101;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-13 NHPP 6,500 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002176 - BAYOU HA HA & PALMETTO CO.CANAL BRS
Type Impv: NEW BRIDGES
Project Manager: BUCCI, MARK
Remarks: 219-07-0025;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 10 219-07 STPFLEX 4,950 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009626 - US 190 (WB):MPRR OPASS-BAYOU COURTABLEAU
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-13 NHPP 6,863 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010214 - US 71: LA 10 - AVOYELLES P/L
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 71 008-06 STPFLEX 6,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010225 - LA 178: ACADIA P/L - LA 357
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 178 208-02 STPFLEX 700 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 151 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARTIN
Project: H.010522 - LA 347: LA 86 - 0.46 MI. SW OF LA 96
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 347 400-03 STPFLEX 3,708 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
IBERIA LA 347 400-02 STPFLEX 629 PRESERVATION
NON-INTERSTATE NFA
Project: H.010546 - LA 96: 0.66 MILES W OF LA 352 - LA 352
Type Impv: ASPHALT OVERLAY
Project Manager: RAY, JARED
Remarks: FROM 11.41 TO 11.47 HAS TO BE STPFLEX WITH NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 96 238-03 NFABOND 196 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
ST MARTIN LA 96 238-03 STPFLEX 24 PRESERVATION
NON-INTERSTATE NFA
Project: H.008345 - BAYOU ALEXANDRE
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 850-29-0005;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 3083 850-29 FBROFF 1,219 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009143 - LA 31 & LA 92: ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-02 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
ST MARTIN LA 92 213-08 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.009456 - LA 347: ROUNDABOUT @ MELANCON RD.
Type Impv: INSTALL ROUNDABOUT
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 347 056-04 HSIP 1,700 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
ST MARTIN LA 347 400-30 HSIP 1,398 SAFETY
Project: H.009847 - BNSF (CADE) LA 92
Type Impv: UPGRADE CIRCUITRY AND SIGNALS
Project Manager: SHREWSBERRY,BILL
Remarks: 213-07-0013
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 92 213-07 RAIL PD 150 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010828 - PARC DES PONTS TRAILHEAD
Type Impv: CONSTRUCTION OF MULTI-USE TRAILHEAD.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 RTP 200 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
Project: H.003014 - I-10: CSLM 5.50 TO ATCHAFALAYA FLDWY BR
Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO
Project Manager: OLIVIER, NICHOLAS
Remarks: 450-06-0068;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 30,000 CORRIDOR 3-DESIGN/DEVELOPMENT
ST MARTIN I-10 450-06 NHPP 24,900 PRESERVATION
INTERSTATE
ST MARTIN I-10 450-06 NHPP 1,100 PRESERVATION
INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 152 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARTIN
Project: H.009461 - I-10 ATCHAFALAYA FLDWY CLEAN & PAINT
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 2,400 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.010216 - LA 31: LA 351 - BEG. OF CURB & GUTTER
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-03 STPFLEX 1,771 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010559 - BAYOU MERCIER ROAD / BERARD CANAL BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 FBROFF 1,178 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010601 - I-10: LAFAYETTE P/L TO CSLM 5.5
Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 30,000 CORRIDOR 3-DESIGN/DEVELOPMENT
ST MARTIN I-10 450-06 NHPP 25,420 PRESERVATION
INTERSTATE
ST MARTIN I-10 450-06 NHPP 13,000 PRESERVATION
INTERSTATE
LAFAYETTE I-10 450-05 NHPP 1,280 PRESERVATION
INTERSTATE
LAFAYETTE I-10 450-05 NHPP 300 PRESERVATION
INTERSTATE
Project: H.004924 - DEV.& CONST ST. MARTINVILLE BYPASS
Type Impv: FEDERAL EARMARK FOR STUDY
Project Manager: YANG, LI
Remarks: 700-50-0112;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.009747 - LA 31: PEDESTRIAN IMPROVEMENTS, PH 2
Type Impv: SIDEWALK W/ LANDSCAPING & RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-02 STPENH 467 ENHANCEMENTS 2-WAITING FOR FUNDING
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 153 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARY
Project: H.010183 - PHARR ESTATES TRAIL (PHASE I)
Type Impv: CONSTRUCTION OF 850' OF BICYCLE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 RTP 127 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
ST MARY 000-51 LOCAL 96 RECREATIONAL TRAILS PROGRAM
Project: H.002798 - BAYOU TECHE BRIDGE(OAKLAWN)
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 408-30-0008;CG PERMIT SURV ORDERED IN METRIC (M
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY LA 323 408-30 STPFLEX 9,342 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010003 - US 90: BAYOU RAMOS REHABILITATION PH. II
Type Impv: REHABILITATION PRESTRESS GIRDERS WITH CARBON FIBER WRAP
Project Manager: FENG, DANA
Remarks: USE HPB FUNDING. PROJECT REPAIR REMAINING DAMAGED GIRD
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 NHPP 4,500 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010268 - US 90: CURVE IMPROVEMENTS
Type Impv: INCREASE VERTICAL GRADE
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 HSIP 655 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010829 - ST. MARY PARISH BAYOU TECHE TRAILHEADS
Type Impv: CONSTRUCTION OF MULTI-USE TRAILHEADS.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM
Project: H.010877 - PHARR ESTATES TRAIL, PHASE 2
Type Impv: CONSTRUCTION OF 850' OF PED-BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 RTP 223 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ST MARY 000-51 LOCAL 107 RECREATIONAL TRAILS PROGRAM
Project: H.011034 - LA 87: LA 324 - 1.7 MI S LA 323
Type Impv: ASPHALT OVERLAY & RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY LA 87 408-01 NFABOND 6,303 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.004932 - INTERCHANGE US 90 @ LA 318
Type Impv: EA FOR NEW INTERCHANGE
Project Manager: NICKEL, TIM
Remarks: 700-51-0110; STGEN IS UNCLAIMED PROPERTY FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 STGEN 45,000 CAPACITY 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 154 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST MARY
Project: H.010213 - LA 182: IBERIA P/L - LA 670
Type Impv: COLD PLANE, PATCH, & OVERLAY
Project Manager: RAY, JARED
Remarks: USE STATE BONDS FOR MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY LA 182 004-06 STPFLEX 2,880 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.004929 - IMP RALPH DARDEN PKWY B/W LA182 MLK
Type Impv: LA 182 & MLK IMPROVEMENTS
Project Manager: NGUYEN, WAYNE
Remarks: 700-51-0107;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 DEMO 315 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.006392 - ELIMINATE HIGHWAY-RAIL CROSSINGS
Type Impv: RELOCATE BALDWIN TRACK
Project Manager: NGUYEN, WAYNE
Remarks: 714-51-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.009748 - BERWICK DOWNTOWN SIDEWALKS
Type Impv: SIDEWALKS AND RELATED WORK
Project Manager: HORTON, VALERIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 STPENH 73 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 155 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.001340 - LA 21 WIDENING (BOOTLEGGER - 11TH)
Type Impv: WIDENING
Project Manager: FLETCHER, CURTIS
Remarks: 059-01-0028;DEMO & STP<200K.STATE MATCH(STAGE1)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 21 059-01 DEMO 0 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
ST TAMMANY LA 21 059-01 STP<200K 11,007 URBAN SYSTEMS
ST TAMMANY LA 21 059-01 STPFLEX 5,892 PRESERVATION
BRIDGE (ON SYSTEM)
Project: H.005972 - LAKE PONCHARTRAIN CAUSEWAY(9 MILE TURNAR
Type Impv: CROSSOVER WIDENING AND ELEC. MODS.
Project Manager: PICARD, TOBY
Remarks: DIR #K-051-LA-CAUSEWAY-01
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 ER 2,474 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.006298 - OAK STREET BRIDGE OVER GUM BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-52-0105
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 FBROFF 649 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006299 - GRANDE AVENUE BRIDGE OVER CYPRESS BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-52-0106
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 FBROFF 399 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009185 - I-12: NORTHSHORE/AIRPORT RD. - US 11
Type Impv: MAJOR WIDENING - ADD TRAVEL LANE EB AND WB
Project Manager: REVIERE, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 19,282 CORRIDOR 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009309 - SUMMIT BLVD (US 190 TO LA 433)
Type Impv: NEW 4 LANE DIVIDED ROADWAY
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 STP<200K 3,948 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.009600 - I-12: TANGI. PH. LINE - PONCHATOLAWA CR.
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 9,704 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009835 - US 190 COLLINS BLVD RIGHT TURN LANE @LEE
Type Impv: RIGHT TURN LANE
Project Manager: HANKS, ANNA
Remarks: USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 059-30 STP<200K 1,200 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011045 - LA 1077: LA 1078 - LA 25
Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-05 NFABOND 2,970 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 156 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.000506 - LA 22 (DALWILL BLVD - US 190)
Type Impv: WIDENING AND DRAINAGE IMPROVEMENT
Project Manager: HANKS, ANNA
Remarks: 013-12-0060;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 STP<200K 2,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.000687 - I-12 @ US 11 INTERCHANGE LIGHTING
Type Impv: INTERSECTION LIGHTING IMPROVEMENTS
Project Manager: LEBOURGEOIS, CHRISTOPHER
Remarks: 018-04-0048;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.003107 - I-10: FRENCH BRANCH BR -W.PEARL RIVER BR
Type Impv: PAVEMENT REPLACEMENT
Project Manager: THOMAS, BEN
Remarks: 450-18-0108;INCL I-10/12/59 INTERCHANGE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 22,800 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY I-59 453-01 NHPP 6,200 PRESERVATION
INTERSTATE
ST TAMMANY I-12 454-04 NHPP 5,000 PRESERVATION
INTERSTATE
Project: H.003452 - I-12 @ NORTHSHORE BLVD INTER. LIGHTING
Type Impv: ROADWAY LIGHTING
Project Manager: LEBOURGEOIS, CHRISTOPHER
Remarks: 454-04-0089;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009152 - CLEVELAND AVE: NS RR XING (SLIDELL)
Type Impv: NEW ROAD TO CLOSE CROSSING
Project Manager: SHREWSBERRY,BILL
Remarks: THIS IS A SPECIAL FRA GRANT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 RAIL HE 0 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY 000-52 HSR 1,100 DEMO / HIGH PRIORITY
Project: H.009325 - SOUTH CHANNEL FENDER REPAIR
Type Impv: REPAIR DAMAGE AND DETERIORATION TO FENDER
Project Manager: FLETCHER, CURTIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 BDP 1,106 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009341 - LA 1085 & LA 1077: ROUNDABOUT
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1085 852-02 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY LA 1085 852-02 STP<200K 500 URBAN SYSTEMS
ST TAMMANY LA 1077 852-03 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: H.009460 - VARIOUS ROADS:SIGNING (ST. TAMMANY)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 SATRANS 14 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 157 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.009596 - I-10&I-12:ST.TAMMAY PAR APR SLAB REPAIRS
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 750 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY I-12 454-04 NHPP 750 PRESERVATION
INTERSTATE
Project: H.009706 - US 190 @ NORTHSHORE BLVD
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: HANKS, ANNA
Remarks: USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 STP<200K 2,300 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010184 - LA 59: CURVE REALIGN AND TUNNEL AT TRACE
Type Impv: REALIGN CURVE & PROVIDE A TUNNEL FOR TAMMANY TRACE CROS
Project Manager: JONES, MATTHEW
Remarks: ENG & R/W BY ST TAMMANY PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 59 281-03 STPENH 1,900 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY LA 59 281-03 HSIP 750 SAFETY
Project: H.010728 - LA 1090: US 190 TO I-10 WIDENING
Type Impv: THREE LANE BY WIDENING.
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1090 852-26 STPFLEX 550 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010982 - LA 25 : JACKSON ST. - HAY HOLLOW RD.
Type Impv: WIDENING & RE-STRIPING FOR CENTER TURN LANE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 25 059-02 STPFLEX 550 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010984 - US 190: DUAL LT. TURN LA @ HARRISON AVE
Type Impv: DUAL LEFT TURN LANES ONTO HARRISON AVENUE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-11 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010987 - LA 433: BYU BONFOUCA - US 11 CENTER TURN
Type Impv: CENTER TURN LANE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 852-21 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011042 - LA 450: LA 25 - LA 16
Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY
Project Manager: RAY, JARED
Remarks: NFA WILL BE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 450 852-07 STPFLEX 2,028 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
WASHINGTON LA 450 859-03 STPFLEX 2,940 PRESERVATION
NON-INTERSTATE NFA
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 158 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.011114 - COVINGTON COMMUNITY TRAIL
Type Impv: CONST. OF 1380' MULTI-USE TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 RTP 108 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY 000-52 LOCAL 20 RECREATIONAL TRAILS PROGRAM
Project: H.011117 - WEST HALL TRAIL
Type Impv: CONSTRUCTION OF 1,746' PED-BIKE TRAIL EXTENSION
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY 000-52 LOCAL 20 RECREATIONAL TRAILS PROGRAM
Project: H.011131 - CARROLL ROAD TRAIL
Type Impv: CONST. OF 10'X240' PED-BIKE TRAIL WITH CROSSWALK
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
ST TAMMANY 000-52 LOCAL 23 RECREATIONAL TRAILS PROGRAM
Project: H.011206 - REPLACE HIGH VOLTAGE CABLE SUPPORT TRAY
Type Impv: INSPECT AND REPLACE OR REPAIR MAINLINE CABLE TRAY
Project Manager: FLETCHER, CURTIS
Remarks: DIR NO. LA-2012-1-051-009
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 ER 1,256 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011216 - CITY OF SLIDELL PAVEMENT MARKINGS
Type Impv: PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROAD
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 SATRANS 95 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011217 - DEMOLISH NINE MILE TURNAROUND
Type Impv: PROVIDE FOR THE DEMOLITION OF THE NINE MILE TURNAROUND.
Project Manager: FLETCHER, CURTIS
Remarks: DIR NUMBER LA-2012-1-051-010
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 ER 213 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011231 - NORTH CONTROL PLAZA SCOUR PROTECTION
Type Impv: REPAIR AND REPLACE REVETMENT AS NEEDED AND REPAIR FENCE.
Project Manager: FLETCHER, CURTIS
Remarks: DIR NO. LA-2012-01-051-008
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 ER 154 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011237 - MIDDLE MIDDLE PEARL RIVER BRIDGE REPAIRS
Type Impv: STRUCTURAL TRUSS REPAIRS
Project Manager: FOSSIER, PAUL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-07 STPFLEX 500 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 159 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.000497 - US190: BAYOU CASTINE-SE LA HOSPITAL
Type Impv: WIDEN TO 4 LANES
Project Manager: BORNE, FRED
Remarks: 013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.000689 - SALT BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 018-30-0024;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 018-30 FBROFF 3,358 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002446 - TCHEFUNCTE RIVER BRIDGE
Type Impv: NEW BRIDGE
Project Manager: BUCCI, MARK
Remarks: 269-07-0012;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 40 269-07 STPFLEX 3,260 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003451 - I-12: LA 434 INTCHG LIGHTING (LACOMBE)
Type Impv: INTERSTATE LIGHTING
Project Manager: FOSTER, RICHARD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 850 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
3-DESIGN/DEVELOPMENT
Project: H.004113 - LA 435 TO LA 40/LA 41
Type Impv: NEW 4-LANE
Project Manager: BURST, JEFFERY
Remarks: 852-33-0001;BL DATE 10-08 404 RE-SUBMITTED 3-96
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 3241 852-33 NHPP 63,000 TIME 3-DESIGN/DEVELOPMENT
Project: H.004435 - LA 36 TO LA 435
Type Impv: NEW 4-LANE
Project Manager: BURST, JEFFERY
Remarks: 852-33-0003;BL DATE 7-08
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 3241 852-33 NHPP 92,000 TIME 3-DESIGN/DEVELOPMENT
Project: H.004957 - I-12/LA 434 INTERCHANGE TO LA 36
Type Impv: NEW 4-LANE
Project Manager: BURST, JEFFERY
Remarks: 852-33-0002;BL DATE 7-08
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 3241 852-33 NHPP 70,000 TIME 3-DESIGN/DEVELOPMENT
Project: H.009597 - I-10: W PEARL RIVER BR - PEARL RIVER BR
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 3,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010668 - MIL DOLLAR/HOSMER MILL/HWY 41 SPUR BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 FBROFF 3,389 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 160 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.010720 - I-12: LA 1088 INTCHG LIGHTING
Type Impv: INTERSTATE LIGHTING
Project Manager: FOSTER, RICHARD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 850 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
3-DESIGN/DEVELOPMENT
Project: H.010993 - I-10: TWIN SPANS - FRENCH BRANCH
Type Impv: MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 10,993 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010994 - I-12: BAYOU LACOMBE - NORTHSHORE BLVD.
Type Impv: MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 5,830 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011024 - I-10: OAK HARBOR RAMPS
Type Impv: RAISING EXISTING GRADE WITH EMBANKMENT IN EXISTING CROWN.
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011030 - LA 59:ROUNDABOUT @ LONESOME RD.
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: JONES, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 59 281-03 HSIP 1,709 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011075 - LA 59:ROUNDABOUT @ SHARP RD.
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: JONES, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 59 281-03 HSIP 1,914 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011137 - I-12: LA 21 TO US 190
Type Impv: ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEM
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 44,257 CAPACITY 3-DESIGN/DEVELOPMENT
ST TAMMANY I-12 454-04 NHPP 4,917 PRESERVATION
INTERSTATE
Project: H.011138 - COVINGTON SRTS PROJ. - PINE VIEW MIDDLE
Type Impv: SIDEWALKS, DRAINAGE, STRIPING AND SIGNAGE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 SR2S 210 SAFETY
SAFE ROUTES TO SCHOOLS
3-DESIGN/DEVELOPMENT
Project: H.011152 - I-12: US 190 TO LA 59
Type Impv: ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEM
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 39,557 CAPACITY 3-DESIGN/DEVELOPMENT
ST TAMMANY I-12 454-04 NHPP 4,395 PRESERVATION
INTERSTATE
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 161 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.000494 - LA 433 - US 11
Type Impv: WIDEN TO 4 LANES
Project Manager: JESCLARD, TREY
Remarks: 013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING
Project: H.002391 - TCHEFUNCTE - CAUSEWAY APPROACH
Type Impv: WIDEN TO 4 LANES
Project Manager: BROADBENT, RONALD
Remarks: 261-06-0030;CITY/STATE AGREEMENT REQUIRED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDING
ST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS
Project: H.002394 - LA 22:TCHEFUNCTE RIVER BRIDGE-ADIN DRIVE
Type Impv: COLD PLANE.PATCH AND OLAY
Project Manager: HANKS, ANNA
Remarks: 261-06-0041;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 STPFLEX 494 PRESERVATION
NON-INTERSTATE
2-WAITING FOR FUNDING
ST TAMMANY LA 22 261-06 STP<200K 2,800 URBAN SYSTEMS
Project: H.009793 - SLIDELL: OLDE TOWN STREETSCAPING
Type Impv: SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 STPENH 954 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.010446 - EMERGENCY BR REPLACE: LA 1077-ST TAMMANY
Type Impv: CONT TO FURNISH ALL MATERIALS AND LABOR TO RECONSTRUCT B
Project Manager: SIBLEY, STEVEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-13 STCASH 200 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.000284 - US 90: PEARL RIVER BRIDGES
Type Impv: NEW BRIDGES
Project Manager: OLIVIER, NICHOLAS
Remarks: 006-07-0048;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-07 STPFLEX 24,382 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.000286 - EAST PEARL RIVER BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 006-08-0031;STAGE 0 PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-08 STPFLEX 15,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.000688 - US 11 NORFOLK SOUTHERN R.R.OVERPASS
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 018-04-0049;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 11 018-04 STPFLEX 21,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001006 - E. JCT. LA 40 - LA 16
Type Impv: RUBBLIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 030-02-0029;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 21 030-02 NHPP 7,575 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 162 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.001344 - JCT LA 25 - JCT US 190 BUS
Type Impv: WIDENING
Project Manager: JESCLARD, TREY
Remarks: 059-30-0008;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 059-30 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.004937 - US 11 - US 190
Type Impv: 2 LANE RECONSTRUCTION
Project Manager: JESCLARD, TREY
Remarks: 852-21-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 852-21 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.004983 - US 11 (EDEN ISLES BLVD - SPARATAN DR)
Type Impv: WIDENING WITH BIKE PATH
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-52-0196
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 DEMO 3,517 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
ST TAMMANY 000-52 NFI 15,829 DEMO / HIGH PRIORITY
Project: H.006599 - TAMMANY TRACE CAMP SALMEN CONNECTOR
Type Impv: CONSTRUCT PEDESTRIAN AND BIKE PATH
Project Manager: FLETCHER, CURTIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 DEMO 144 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
ST TAMMANY 000-52 STPENH 219 ENHANCEMENTS
Project: H.008358 - BLACK BAYOU BR. NEAR MADISONVILLE
Type Impv: BRIDGE REPLACEMENT
Project Manager: GAUDRY, CARL
Remarks: 852-13-0017; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-13 FBROFF 1,391 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008369 - US 11 @ CLEO ROAD
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks: 852-26-0021;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 852-26 STPFLEX 950 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.009934 - ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING
Type Impv: SIDEWALK LIGHTING & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 STPENH 218 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
ST TAMMANY LA 435 281-04 STPENH 82 ENHANCEMENTS
Project: H.010116 - LA 1088 CORRIDOR STUDY
Type Impv: TRAFFIC STUDY ON LA 1088
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1088 852-11 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 163 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.010274 - US 190: US 11 TO LA 433
Type Impv: STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENT
Project Manager: NGUYEN, WAYNE
Remarks: DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PR
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.010375 - LA 1077: LA 21 - U.S. 190
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-03 STPFLEX 2,484 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010377 - LA 36: LA 41 - IGC RAILROAD
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 36 280-03 STPFLEX 1,120 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010380 - LA 433: U-PASS I-10 - BEHRMAN STREET
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 018-30 STPFLEX 740 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010387 - U.S. 90: LA 433 - U.S. 190
Type Impv: RUBBILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-07 STPFLEX 3,323 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010441 - GRADE RAISING ON LA 1077
Type Impv: DRAINAGE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-13 NFA 2,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Project: H.010456 - BAYOU LIBERTY SWING BR; ELECT REP;LA 433
Type Impv: INSPECTION AND REPAIR
Project Manager: LUPER, CONRAD
Remarks: DIR LA-2012-1-103-007
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 852-21 ER 77 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010473 - ISAAC, I-10, FLOOD PROTECT ST. TAMMANY
Type Impv: PROVIDE TEMPORARY SAND BERM LEVEE FOR PROTECTION OF I-10
Project Manager: MURRAY, WILL
Remarks: SECRETARY EMERGENCY LETTER DATED 9/2/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 STGEN 130 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010823 - LA 21: ROUNDABOUT @ US 190
Type Impv: ROUNDABOUT
Project Manager: FARR, ALEX
Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 21 030-01 SATRANS 25 SAFETY 1-PLANNING/ENVIRONMENTAL
ST TAMMANY US 190-X 013-10 SATRANS 25 SAFETY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 164 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: ST TAMMANY
Project: H.011223 - I-10: NO CBD5 I-510 - STATELINE
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADE
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 2,412 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ORLEANS I-10 450-90 NHPP 1,578 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ORLEANS I-10 450-17 NHPP 1,010 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 165 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA
Project: H.009599 - I-12:BAPTIST WEIGH STATION SPOT REPAIRS
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-12 454-03 NHPP 174 OPER EFFICIENCY/MOTORIST ASSISTANCE
WEIGH STATIONS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010210 - TANGIPAHOA PARISH RR SAFETY IMPROVEMENTS
Type Impv: TANGIPAHOA PARSH PUBLIC RR CROSSING
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 SATRANS 140 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010710 - I-55 GRADE RAISING
Type Impv: DRAINAGE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 430 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010790 - I-55 CN R/R & I-12 US 51 SLOPE FAILURE
Type Impv: EMBANKMENT AND ABUTMENT REPAIR
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 1,500 PRESERVATION
INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
TANGIPAHOA I-12 454-03 NHPP 250 PRESERVATION
INTERSTATE
Project: H.010981 - US 51-X: RIGHT TURN LANE @ W. JCT. LA 22
Type Impv: RIGHT TURN LANE FROM LA 22 TO LA 51 (VETERANS BLVD)
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51-X 853-36 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011002 - LA 440 & LA 40 OVERLAYS
Type Impv: CONTRACT MAINTENANCE OVERLAY
Project Manager: RAY, JARED
Remarks: USE NFA AS MATCH FOR C.S.276-03. TTF FOR OTHER C.S.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 40 415-02 STPFLEX 138 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
TANGIPAHOA LA 440 276-03 STPFLEX 477 PRESERVATION
NON-INTERSTATE
Project: H.000673 - US 51 BRIDGE REHABILITATION
Type Impv: TEMP. SUPPORT, REPAIR CONCRETE, INSTALL POST-TENSIONING
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51 017-04 STPFLEX 380 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.003432 - I-12 & U.S.51 BUS INTERCHANGE IMP.
Type Impv: INTERCHANGE IMPROVEMENTS
Project Manager: OLIVIER, NICHOLAS
Remarks: 454-03-0067;$450K TOTAL IN SE FOR ENV & CONST MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51-X 853-36 HSIP 4,400 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.008390 - LA 1053: US 51-MISSISSIPPI STATE LINE
Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 853-26-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1053 853-26 NFABOND 3,858 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 166 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA
Project: H.009598 - I-55: END OF ELEVATED ROADWAY - US 51
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 5,000 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009900 - FRANKLINTON INTERSECTION SAFETY IMPROVE
Type Impv: PURCHASE/INSTALL SIGNS & SOLAR BEACONS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 SATRANS 10 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010108 - INDEPENDENCE SRTS - PHASE II
Type Impv: SIDEWALK IMPROVMENTS, CROSSING AND STRIPING, NON-INFRASTR
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 SR2S 250 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010289 - LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.
Type Impv: CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELL
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 22 261-04 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010683 - I-12 & I-55: MEDIAN CABLE BARRIER
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 HSIPPEN 5,936 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
LIVINGSTON I-12 454-02 HSIPPEN 3,836 SAFETY
Project: H.010702 - IC SEVERAL RR XINGS (HAMMOND)
Type Impv: INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMOND
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 RAIL PD 700 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010703 - IC SEVERAL RR SPUR XINGS (HAMMOND)
Type Impv: INSTALL F/L'S AT LA 443 & CBA'S AT SEVERAL OTHER SPUR XINGS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 443 853-27 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
TANGIPAHOA 000-53 RAIL PD 50 RAILROADS
Project: H.010983 - I-55: RAMP WIDENING, NB OFF RAMP @ LA 16
Type Impv: RAMP WIDENING, ADDITIONAL TURN LANE ON EXIT RAMP
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011008 - LA 3026: LA 22 - END OF CONTROL
Type Impv: COLD PLANING, CEMENT TREATED BASE, ASPHALT OVERLAY
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 NFA 1,700 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 167 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA
Project: H.011044 - LA 1058: JCT LA 10 - W JCT LA 1054
Type Impv: COLD PLANE, BASE, DRAINAGE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1058 853-16 NFABOND 2,701 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.011113 - LA 1064: IC RR XING (TANGIPAHOA)
Type Impv: REPLACE THE SURFACING OF THE CROSSING.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1064 853-09 RAIL HE 40 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
TANGIPAHOA LA 1064 853-09 LOCAL 40 RAILROADS
Project: H.009425 - LA 16 AMITE DRAINAGE IMPROVEMENTS
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 16 047-01 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.009547 - JCT US 190 - S. JCT LA 40
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 445 278-02 STPFLEX 3,515 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010061 - N. RIVER ROAD AND DURBIN ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 FBROFF 731 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010062 - WEINBERGER RD & JERUSALEM CH RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 FBROFF 878 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010645 - IC(KENTWOOD) LA 38 RR X-ING IN KENTWOOD
Type Impv: RAILROAD SIGNALS AND SURFACE WORK
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 38 263-04 RAIL HE 300 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010991 - I-12: LIVINGSTON PARISH LINE - I-55
Type Impv: MILL, OVERLAY AND PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-12 454-03 NHPP 7,000 PRESERVATION
INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011025 - LA 40: NATALBANY RIVER TO I-55
Type Impv: ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 40 415-02 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 168 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TANGIPAHOA
Project: H.003672 - KENTWOOD WEIGH STATION REHAB.
Type Impv: DEMO..CONST. AND PIT SCALE REHAB
Project Manager: MCCOY, JANET
Remarks: 690-29-0008;PRIORITY 7
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 NHPP 2,901 OPER EFFICIENCY/MOTORIST ASSISTANCE
WEIGH STATIONS
2-WAITING FOR FUNDING
Project: H.008399 - US 51 (LA 22 TO CLUB DELUXE RD)
Type Impv: WIDEN TO 5 LANES
Project Manager: OLIVIER, NICHOLAS
Remarks: 853-36-0031;PORTION OF PROJECT COMPLETED UNDER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51-X 853-36 STPFLEX 13,100 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010374 - LA 1064: U.S. 190 - LA 443
Type Impv: COLD PLANE , BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1064 853-28 STPFLEX 1,932 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010378 - LA 38: U.S. 51 - WASHINGTON PARISH LINE
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 38 263-04 STPFLEX 6,487 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010379 - LA 40: N. JCT. LA 445 - ST. TAMMANY P/L
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 40 269-06 STPFLEX 1,782 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.008915 - LA3234 EXT FROM LA1065 - HAMMOND AIRPORT
Type Impv: FEASIBILITY STUDY FOR LA 3234 EXTENSION
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 3234 853-40 0 INTERMODAL CONNECTOR 0-FEASIBILITY/SCOPING
Project: H.009321 - DISTRICT 62 TRAFFIC CONTROL
Type Impv: INTERSECTION IMPROVEMENTS - STUDY
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51 017-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
0-FEASIBILITY/SCOPING
TANGIPAHOA LA 38 263-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
ST TAMMANY LA 437-S 059-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
WASHINGTON LA 1069 859-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
TANGIPAHOA LA 16 262-07 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
WASHINGTON LA 10 047-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
WASHINGTON LA 3124 030-32 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
WASHINGTON LA 60 279-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
WASHINGTON LA 16 058-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 169 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TENSAS
Project: H.011059 - LA 606, LA 887 & LA 570 PATCH & OVERLAY
Type Impv: PATCH & OVERLAY/STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 606 854-10 NFABOND 3,180 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
TENSAS LA 887 181-02 NFABOND 424 PRESERVATION
NON-INTERSTATE NFA
TENSAS LA 570 854-13 NFABOND 848 PRESERVATION
NON-INTERSTATE NFA
Project: H.011076 - LA 605/607 STABILIZE, PATCH, OVERLAY
Type Impv: STABILIZE & OVERLAY/PATCH & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 854-23/LA 605 USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 605 854-23 STPFLEX 3,022 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
TENSAS LA 605 854-23 STPFLEX 102 PRESERVATION
NON-INTERSTATE
Project: H.009591 - LA 4: US 65 - LA 605
Type Impv: ASPHALT OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 4 173-01 STPFLEX 541 PRESERVATION
NON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009585 - LA 128: LA 573 - US 65
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 128 036-06 STPFLEX 1,772 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 170 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE
Project: H.009564 - LA 24 & LA 3040: DRAINAGE & RT TURN LANE
Type Impv: INSTALL RIGHT TURN LANE
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 3040 065-30 STP<200K 107 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
TERREBONNE LA 24 065-04 STP<200K 195 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
Project: H.009567 - LA 311:INTERSECTION IMP @ SAVANNE RD
Type Impv: ADD THROUGH LANE @ TRAFFIC SIGNAL
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 311 413-01 STPFLEX 296 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010579 - WESTSIDE BIKE TRAIL ROUTE
Type Impv: CONSTRUCTION OF A BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
TERREBONNE 000-55 LOCAL 13 RECREATIONAL TRAILS PROGRAM
Project: H.007351 - COUNTRY DRIVE WIDENING PHASE A
Type Impv: WIDENING
Project Manager: HANKS, ANNA
Remarks: 742-55-0102;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 STP<200K 4,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009408 - LA 24: RECREATION BRIDGE - ROD BRIDGE
Type Impv: RAISE THE ELEVATION OF THE ROADWAY TO PREVENT FLOODING
Project Manager: GOLZ, SARAH
Remarks: 065-04
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 STP<200K 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009462 - VARIOUS ROADS:SIGNING (TERREBONNE)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 SATRANS 32 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010398 - LA 57:LA 3011-LA 56
Type Impv: SUPERPAVE ASPHALTIC CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks: AC WITH NFA AND USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 57 246-01 STPFLEX 1,299 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010997 - LA 3185: IMP @ MAIN PROJECT RD
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 3185 855-17 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.001498 - LA 24 & LA 316: COMPANY CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PAINE, PEGGY JO
Remarks: 065-91-0017;STAGE 0 FEASIBILITY STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-91 STPFLEX 16,700 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 171 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE
Project: H.005043 - LA311: LA 664 (ST CHARLES ST)-SAVANNE RD
Type Impv: WIDEN TO 4 LANES
Project Manager: BROWN, JEFF
Remarks: 700-55-0122
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 3-DESIGN/DEVELOPMENT
Project: H.010890 - LA 182: ROUNDABOUT AT HOLLYWOOD RD
Type Impv: ADD ROUNDABOUT
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 182 005-05 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011159 - CAROLL STREET AND BUQUET STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT - NO ADDED CAPACITY
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 FBROFF 939 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
TERREBONNE 000-55 FBROFF 585 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.011187 - DISTRICT 02H: SIGNAL TIMING
Type Impv: SIGNAL TIMING
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 STPFLEX 2 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
TERREBONNE LA 3040 065-30 STPFLEX 1 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
TERREBONNE LA 24 065-91 STPFLEX 1 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
LAFOURCHE LA 1 064-06 STPFLEX 2 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.008411 - BAYOU TERREBONNE BR (LA 660)
Type Impv: BRIDGE REPLACEMENT
Project Manager: PICARD, TOBY
Remarks: 855-07-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 660 855-07 STPFLEX 507 PRESERVATION
BRIDGE (ON SYSTEM)
2-WAITING FOR FUNDING
Project: H.009766 - WPARK AVE: ROYCE ST-MARIETTA PL SIDEWALK
Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 STPENH 959 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.002238 - ROBINSON CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: CAVALIER, STEPHANIE
Remarks: 247-01-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 56 247-01 FBROFF 1,200 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002244 - BOUDREAUX CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: KEMP, KELLY
Remarks: 247-02-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 56 247-02 STPFLEX 30,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 172 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE
Project: H.005039 - LA 3040 (REPLACE TUNNEL)
Type Impv: STATE FUND FOR STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-55-0118;FEASIBILITY STUDY STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009568 - LA 660:US 90 - LA 316
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 660 855-07 STPFLEX 1,125 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009569 - LA 182:MAIN ST - LA 308
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 182 005-05 STPFLEX 2,025 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009659 - US 90: 1.5 MI E LA 20 - 0.3 MI W LA 309
Type Impv: COLD PLANE AND OVERLY OF EXISTING ASPHALTIC CONCRET PAVE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE US 90 424-07 NHPP 2,115 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009660 - LA 311/312: US 90 - LA 24
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 312 413-30 STPFLEX 844 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009957 - LA 56: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 56 247-01 FEMA 1,251 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009958 - LA 57: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 57 246-01 FEMA 4,183 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009970 - LA 3011: ELEVATION AND STABILIZATION
Type Impv: ELEVATION AND STABILIZATION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 3011 855-13 FEMA 1,597 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010328 - LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE
Type Impv: CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 659 855-04 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 173 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: TERREBONNE
Project: H.010410 - LA 24: LA 20 - LA 664 (SB)
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 NHPP 4,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010411 - LA 24: LA 55 - PROSPECT STREET BRIDGE
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-91 STPFLEX 4,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010412 - LA 57: THOMPSON RD - CEDAR GROVE RD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 57 246-01 STPFLEX 1,750 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 174 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: UNION
Project: H.009278 - BERNICE SR2S PROJECT
Type Impv: SIDEWALK, CROSSWALKS, HANDICAP RAMPS, ETC
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION 000-56 SR2S 225 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011033 - LA 826: LA 33 - HUTTIG ROAD
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 826 856-06 NFABOND 1,580 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009412 - US 63: 0.16 MI N LA 2 ALT-0.8 MI N LA 15
Type Impv: COLD PLANE & ASPHALTIC CONCRETE OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION US 63 023-11 NHPP 2,344 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009415 - US 63: LA 15 - ARKANSAS STATE LINE
Type Impv: COLD PLANE & ASPHALTIC CONCRETE OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION US 63 023-11 NHPP 3,192 TIME 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011038 - LA 828: LA 33 - LA 2
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 828 856-07 NFABOND 7,012 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009532 - LA 2: E END D'ARBONNE BRIDGE TO LA 15
Type Impv: COLD PLANE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 2 070-04 STPFLEX 2,250 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010392 - LA 550: LA2 - LA 15
Type Impv: OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 550 311-01 STPFLEX 3,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 175 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERMILION
Project: H.002132 - MAREE MICHEL AND CREEK BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 212-01-0008;FY 2012 OVER PROGRAM PROJECT;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 91 212-01 FBROFF 2,248 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010524 - LA 696: 0.6 MI E LA 35 - US 167
Type Impv: ASPHALT OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 696 857-25 NFABOND 4,925 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010525 - LA 91: 2.95 MI N OF FLORENCE - LA 14
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 91 212-01 NFABOND 2,074 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010547 - LA 700: LA 699 - LAFAYETTE PARISH LINE
Type Impv: BASE REHABILITATION & ASPHALT OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 700 207-04 NFABOND 1,935 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010548 - LA 335:0.038 MI E LA 3093-1.51 MI W LA35
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 335 396-02 STPFLEX 2,555 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.002133 - BAYOU QUEUE DE TORTUE
Type Impv: BRIDGE REPLACEMENT
Project Manager: CAVALIER, STEPHANIE
Remarks: 213-02-0007; NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 705 213-02 FBROFF 1,763 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.008441 - CREEK BRIDGES NEAR BOSTON
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 857-37-0011;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 331 857-37 FBROFF 1,323 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009463 - VARIOUS ROADS:SIGNING (VERMILION)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION 000-57 SATRANS 170 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010353 - US 167: ACCESS MANAGEMENT (LFT TURN LNS)
Type Impv: ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION US 167 080-01 STPFLEX 248 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
LAFAYETTE US 167 080-02 NHPP 3,352 SAFETY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 176 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERMILION
Project: H.002048 - LA 82 BRIDGES NEAR ESTHER
Type Impv: BRIDGE REPLACEMENT
Project Manager: LAI, QUANG
Remarks: 194-07-0056;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 82 194-07 STPFLEX 3,181 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002747 - LA 335 BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: TONEY, PATRICK
Remarks: 396-02-0008;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 335 396-02 FBROFF 1,735 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010867 - JUDE & PLACIDE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION 000-57 FBROFF 308 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
VERMILION 000-57 FBROFF 300 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.002148 - JCT LA 35 - JCT LA 700
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 214-01-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 699 214-01 STPFLEX 4,220 PRESERVATION
NON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.009761 - LA 14: DOWNTOWN ABBEVILLE STREETSCAPING
Type Impv: SIDEWALKS W/LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 14 055-06 STPENH 500 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009792 - LA 35: KAPLAN SIDEWALKS, PHASE 1
Type Impv: SIDEWALKS W/ LANDSCAPING, SUBSURFACE DRAINAGE & RELATED
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 35 207-03 STPENH 324 ENHANCEMENTS 2-WAITING FOR FUNDING
Project: H.009627 - LA 35: LA 335 - LA 14
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 35 207-02 STPFLEX 2,234 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009972 - LA 3147: EMBANKMENT SLOPE REST & PROTECT
Type Impv: EMBANKMENT SLOPE RESTORATION AND PROTECTION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 3147 857-66 FEMA 1,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
VERMILION LA 3147 857-66 FEMA 875 OTHER / MISCELLANEOUS
Project: H.010226 - LA 82: LA 35 - LA 333
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 82 215-01 STPFLEX 5,383 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 177 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERNON
Project: H.010536 - LA 392: US 171 - PEASON RIDGE WILDLIFE
Type Impv: PATCH AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 392 135-02 NFABOND 1,130 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010541 - LA 8: 170' W LA 465 - 775' W RAPIDES P/L
Type Impv: THIN OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 8 134-02 STPFLEX 878 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006618 - SIDEWALK ON HIGH SCHOOL DRIVE
Type Impv: SIDEWALK INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-58-0001;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 HRRR 96 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.006619 - SIDEWALK ON LOUISIANA AVENUE
Type Impv: SIDEWALK INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-58-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 HRRR 134 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010264 - US 171: NB @ LA 1213 CROSS DRAIN REPLACE
Type Impv: CROSS DRAIN REPLACEMENT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON US 171 025-01 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010360 - US 171: 800' N BOONE ST - LA 8/LA 28
Type Impv: CRACK SEALING AND PCCP PATCHING
Project Manager: CHENEVERT, MARK
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON US 171 024-06 NHPP 886 TIME 4-SCHEDULED FOR LETTING FY 14-15
VERNON US 171 025-01 NHPP 414 TIME
Project: H.011067 - LA 399:LA 10 - FORT POLK MAINTAINED AREA
Type Impv: STABLIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 399 138-03 NFABOND 3,498 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010599 - WELCOME CEMETERY ROAD / MENACE CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 FBROFF 316 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011027 - LA 111 SOUTH OF EVANS - ADD CROSS DRAIN
Type Impv: REPLACE 4 EXISTING PIPE WITH 5 - 48" RCPAS AND ELEVATE ROAD
Project Manager: MATHEWS, LARRY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 111 132-02 STPFLEX 341 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 178 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: VERNON
Project: H.001883 - LA 8 - LA 28
Type Impv: CHIP SEAL
Project Manager: CHENEVERT, MARK
Remarks: 137-02-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 465 137-02 NFA 336 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.000986 - SABINE RIVER BR (BURR FERRY)
Type Impv: BRIDGE REPLACEMENT
Project Manager: BROWN, JEFF
Remarks: 029-01-0004;ADMIN. BY TEXAS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 8 029-01 STPFLEX 12,700 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001881 - LA 392 BRIDGES NEAR HORNBECK
Type Impv: BRIDGE REPLACEMENT
Project Manager: GAUDRY, CARL
Remarks: 135-02-0009;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 392 135-02 FBROFF 3,560 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.005083 - VERNON PARISH TRANSPORTATION PLAN
Type Impv: INCLUDES US 171 IMPROVEMENT STUDY
Project Manager: BARTKIEWICZ, THOMAS
Remarks: 700-58-0140;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009955 - LA 111: BEAUREGARD LINE - C DAVIS LOOP
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 111 132-02 STPFLEX 4,167 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010339 - LA 10: LOOK OUT RD - 850' E BAILEY RD
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 10 066-02 NHPP 1,226 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010348 - LA 8: LA 464 - US 171
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 8 029-02 STPFLEX 4,661 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010354 - LA 111: US 171 - LA 117
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 111 133-03 STPFLEX 1,898 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010358 - LA 3226: BEAUREGARD P/L - US 171
Type Impv: PATCH. COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 3226 858-11 STPFLEX 2,329 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 179 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WASHINGTON
Project: H.006621 - CITY OF BOGALUSA PAVEMENT MARKINGS
Type Impv: PAVEMENT MARKINGS INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-59-0005;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 SATRANS 112 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009553 - LA 438: JCT. LA 38 - JCT. 438 SPUR
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 438 275-01 STPFLEX 4,337 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
WASHINGTON LA 438 275-02 STPFLEX 2,432 PRESERVATION
NON-INTERSTATE NFA
Project: H.010106 - SUPERIOR AVE. ELEM. SCHOOL SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, STRIPING, ENCOURAGMENT AND EDUCAT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 SR2S 290 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010260 - LA 21 VARNADO DRAINAGE IMPROVEMENTS
Type Impv: ADDING A SUBSURFACE DRAINAGE SYSTEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 21 030-04 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010980 - LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)
Type Impv: LANE CONFIGURATION MODIFICATION
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 10 047-04 DEMO 150 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011122 - BOGALUSA TRAILS
Type Impv: CONSTRUCTION OF 4,000' AND RESTORATION OF 2,000' OF TRAIL
Project Manager: RIGGS, LAURA
Remarks: MICHAEL DOMINGUE IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 14-15
WASHINGTON 000-59 LOCAL 24 RECREATIONAL TRAILS PROGRAM
Project: H.011202 - FRANKLINTON SRTS PROJECT - FJHS
Type Impv: SIDEWALKS STRIPING AND SIGNAGE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 SR2S 284 SAFETY
SAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010608 - PLEASANT HILL RD & LAWRENCE CK RD BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
WASHINGTON 000-59 FBROFF 655 PRESERVATION
BRIDGE (OFF SYSTEM)
WASHINGTON 000-59 FBROFF 739 PRESERVATION
BRIDGE (OFF SYSTEM)
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 180 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WASHINGTON
Project: H.006622 - REHABILITATION-STREET ROUTES IN BOGALUSA
Type Impv: REHABILITATION OF CITY LIMITS ROAD IN BOGALUSA
Project Manager: WAGUESPACK, BRENT
Remarks: 737-59-0006
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 NFA 356 ROAD TRANSFER 2-WAITING FOR FUNDING
Project: H.008449 - DRAIN BRIDGE NEAR STONEY POINT
Type Impv: BRIDGE REPLACEMENT
Project Manager: GAUDRY, CARL
Remarks: 859-04-0010;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 450 859-04 FBROFF 1,093 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010376 - LA 25: ST. TAMMANY P/L - S JCT. LA 16
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 25 059-03 STPFLEX 3,504 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010381 - LA 436: LA 62 - N. JCT. LA 21
Type Impv: COLD PLANE, BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 436 859-08 STPFLEX 7,618 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 181 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WEBSTER
Project: H.009504 - LA 2: BOSSIER PARISH LINE TO SYKES FERRY
Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RELATED W
Project Manager: CHENEVERT, MARK
Remarks: 083-06-0043; C.S. 083-06 IS STPFLEX WITH TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 2 083-06 STPFLEX 2,856 PRESERVATION
NON-INTERSTATE
4-SCHEDULED IN CURRENT FY 13-14
WEBSTER LA 2-S 860-11 NFA 174 PRESERVATION
NON-INTERSTATE NFA
Project: H.010314 - LA 518: US 79 TO CLAIBORNE PARISH LINE
Type Impv: CHIP SEAL, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 518 292-01 STPFLEX 108 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010511 - LA 3008: FLAT LICK BAYOU TO LA 160
Type Impv: ASPHALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 3008 288-02 NFABOND 3,256 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010516 - LA 528: LA 157 TO US 371
Type Impv: ASPALT OVERLAY, DRAINAGE PIPE, AND PAVEMENT MARKINGS
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 528 107-02 NFABOND 2,016 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
BOSSIER LA 528 107-01 NFABOND 769 PRESERVATION
NON-INTERSTATE NFA
Project: H.010961 - I-20: E. B. EXIT RAMP AT DIXIE INN
Type Impv: ADDING LENGTH TO DECELERATION LANE AT EXIT
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER I-20 451-03 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010996 - LA 531: LA 792 TO LA 532
Type Impv: CHIP SEAL
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 531 111-01 STPFLEX 317 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009466 - VARIOUS ROADS:SIGNING (WEBSTER)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER 000-60 SATRANS 19 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010024 - SMITHVILLE ROAD / BRALY CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER 000-60 FBROFF 354 PRESERVATION
BRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010203 - US 80: INTERS. IMPROVE @ ERWIN THOMPSON
Type Impv: IMP TURN RADIUS AT SW CORNER IN MINDEN.ACCESS TO INDUST PA
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER US 80 001-04 HSIP 100 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 182 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WEBSTER
Project: H.010275 - LA 792: CURVE IMPROVEMENT
Type Impv: REALIGN CURVE
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 792 293-03 HSIP 680 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
BIENVILLE LA 792 293-02 HSIP 100 SAFETY
Project: H.010480 - I-20: .9 MI E OF LA 7 OVP - BIENVILLE PL
Type Impv: COLD PLANE AND ASPHALTIC OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER I-20 451-03 NHPP 5,500 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010974 - US 79: NB LEFT TURN LANE AT MILLER ROAD
Type Impv: ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER US 79 027-04 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010008 - LA 532 OVER I-20 BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 532 860-07 FBROFF 3,517 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001838 - BOSSIER PARISH LINE - LA 163
Type Impv: MILL. OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: 122-02-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 164 122-02 STPFLEX 813 PRESERVATION
NON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.001666 - DORCHEAT BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 085-05-0029;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 160 085-05 FBROFF 4,100 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001798 - PARMERS CREEK BRIDGE
Type Impv: NEW BRIDGE
Project Manager: BUCCI, MARK
Remarks: 111-01-0018;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 531 111-01 STPFLEX 1,843 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001799 - LA 531 OVERPASS
Type Impv: NEW INTERCHANGE
Project Manager: OLIVIER, NICHOLAS
Remarks: 451-03-0047;GEOM. STUDY UNDERWAY (E)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 531 111-02 STPFLEX 20,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
WEBSTER I-20 451-03 NHPP 0 CAPACITY
Project: H.009513 - LA 164: JCT. LA 163 TO JCT. US 371
Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED W
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 164 122-03 STPFLEX 3,114 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 183 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WEBSTER
Project: H.010276 - LA 164: JCT LA 163 TO US 371
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 164 122-03 STPFLEX 2,650 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 184 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W BATON ROUGE
Project: H.011215 - ER RPL RPMS -EBR,WBR,ST.MARTIN,IBR PAR
Type Impv: EMERGENCY RAISED PAVEMENT MARKER REPLACEMENT
Project Manager: FAUST, JEFF
Remarks: SECRETARY'S EMERGENCY LETTER DATED 1/30/2014
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE I-10 450-08 SATRANS 20 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
E BATON ROUGE I-10 450-09 SATRANS 10 SAFETY
E BATON ROUGE I-10 450-10 SATRANS 20 SAFETY
W BATON ROUGE LA 415 013-01 SATRANS 10 SAFETY
IBERVILLE I-10 450-07 SATRANS 120 SAFETY
ST MARTIN I-10 450-06 SATRANS 120 SAFETY
Project: H.010075 - UP (ADDIS) SEVERAL RR-X-INGS
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 RAIL PD 1,000 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010653 - LA 986 SIDEWALKS
Type Impv: INSTALLATION OF SIDEWALKS
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 986 228-07 STP>200K 658 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010654 - LA 415:I-10 TO APPROXIMATELY 0.41M NORTH
Type Impv: PAVEMENT REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 415 861-22 STP>200K 530 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.010656 - LA 1 @ LA 76 INTERSECTION IMPROVEMENTS
Type Impv: TURN LANES
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 STP>200K 214 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 14-15
W BATON ROUGE LA 76 013-01 STP>200K 214 URBAN SYSTEMS
Project: H.010680 - I-10: CABLE BARRIER IN WBR & IBERVILLE
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: KELLEY, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE I-10 450-08 HSIPPEN 929 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
IBERVILLE I-10 450-07 HSIPPEN 710 SAFETY
Project: H.010768 - MULTI-USE TRAILS, PHASE I-B (WBR)
Type Impv: 3 MILES OF LEVEE-TOP TRAIL IN WBR
Project Manager: FLETCHER, CURTIS
Remarks: USE WBR AS 20% MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 CM 700 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 14-15
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 185 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W BATON ROUGE
Project: H.011133 - LA 1: UP RR XING (WEST BATON ROUGE)
Type Impv: IMPROVE ROADWAY SURFACING.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 RAIL HE 300 RAILROADS 4-SCHEDULED FOR LETTING FY 14-15
Project: H.011218 - LA 1: TRAVEL TIMES TO NORTH BR
Type Impv: INSTALLATION OF BLUETOOTH EQUIP. AND VARIABLE MESSAGE SIG
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 STCASH 50 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE US 190 007-10 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
E BATON ROUGE US 190 007-90 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
E BATON ROUGE US 190 007-90 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
E BATON ROUGE I-110 450-92 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
E BATON ROUGE I-10 450-09 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
W BATON ROUGE I-10 450-08 STCASH 25 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.011228 - US 190: LA 415 - I-110 SIGN-STRIPE-TREE
Type Impv: SIGNING-STRIPING-TREE ON US 190 - OLD MISSISSIPPI RIVER BRDG
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE US 190 008-01 NHPP 523 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 14-15
E BATON ROUGE US 61 007-90 NHPP 171 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
E BATON ROUGE US 61 007-90 NHPP 162 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
W BATON ROUGE LA 415-S 013-01 NHPP 77 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
W BATON ROUGE LA 415-S 013-01 NHPP 54 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
W BATON ROUGE LA 1 050-07 NHPP 70 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
W BATON ROUGE LA 415 225-01 NHPP 107 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
E BATON ROUGE US 61 019-01 NHPP 192 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
E BATON ROUGE I-110 450-92 NHPP 460 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
E BATON ROUGE US 190 007-10 NHPP 183 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: H.009288 - LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 NHPP 40,000 RAILROADS
GRADE SEPARATION
3-DESIGN/DEVELOPMENT
Project: H.010069 - UP (W. BATON ROUGE) WINTERVILLE RD.
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks: 714-61-0006
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 RAIL PD 250 RAILROADS 3-DESIGN/DEVELOPMENT
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 186 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W BATON ROUGE
Project: H.010655 - LA 1 LIGHTING RENOVATIONS
Type Impv: LIGHTING IMPROVEMENTS
Project Manager: DEVILLE, JACQUES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 STP>200K 485 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.009421 - LA 1: J-TURNS @ SUGAR MILL PARKWAY
Type Impv: FULL J-TURN & J-TURN BETWEEN TWO U-TURNS
Project Manager: BEAUVAIS, HEWITT
Remarks: 050-07
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 SATRANS 900 SAFETY 2-WAITING FOR FUNDING
Project: H.000358 - US 190 @ LA 415: LOBDELL INTERCHANGE
Type Impv: NEW BRIDGE
Project Manager: PAINE, PEGGY JO
Remarks: 008-01-0051;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE US 190 008-01 NHPP 55,866 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001234 - PORT ALLEN CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 050-07-0066;2 STRUCTURES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 NHPP 60,000 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.005121 - LA 1 - I-10 CONNECTOR STUDY
Type Impv: FEDERAL EARMARK FOR STUDY
Project Manager: KENDRICK, BRIAN
Remarks: 700-61-0113;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 STGEN 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009060 - ANALYSIS I-10 WB TRAFFIC EXISTIN TO LA 1
Type Impv:
Project Manager: COLVIN, JODY
Remarks: STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE I-10 450-08 SATRANS 38 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.009905 - LA 415 CORRIDOR STUDY
Type Impv: EFFICIENCY AS DETOUR ROUTE
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 415-S 013-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
W BATON ROUGE LA 415 225-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
W BATON ROUGE LA 415 861-22 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 187 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W CARROLL
Project: H.011020 - LA 585: 0.45 MILES EAST OF LA 17
Type Impv: THREE 42" RCPA CROSS DRAIN STRUCTURES ADDED TO PREVENT FL
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 585 332-04 STPFLEX 151 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009981 - SKINNER LANE & ODIS WADE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL 000-62 FBROFF 447 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W CARROLL 000-62 FBROFF 300 PRESERVATION
BRIDGE (OFF SYSTEM)
W CARROLL 000-62 FBROFF 231 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.008469 - LA 835: BOEUF RIVER BRIDGE NEAR CONCORD
Type Impv: NEW BRIDGE
Project Manager: RICHARD, RYAN
Remarks: 862-22-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 835 862-22 STPFLEX 3,551 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010393 - LA 582: JCT LA 17 TO EAST CARROLL LINE
Type Impv: STABILIZED BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 582 333-02 STPFLEX 3,000 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010394 - LA 585: LA 879 - SANDERS ROAD
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 585 332-02 STPFLEX 2,500 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 188 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: W FELICIANA
Project: H.010438 - US 61: E. FELICIANA P/L - MISS STATE LN
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks: USE TIMED AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA US 61 019-05 NHPP 5,679 TIME 4-SCHEDULED FOR LETTING FY 14-15
W FELICIANA US 61 019-04 NHPP 2,321 TIME
Project: H.011064 - LA 964&LA 965:PATCH, STABILIZE & OVERLAY
Type Impv: PATCH, STABILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA LA 964 863-09 NFABOND 2,035 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 14-15
W FELICIANA LA 965 863-08 NFABOND 1,357 PRESERVATION
NON-INTERSTATE NFA
Project: H.002281 - LA 66: BIG BAYOU SARA BRIDGE REHAB.
Type Impv: BRIDGE REHABILITATION
Project Manager: DELATTE, BRIAN
Remarks: 251-01-0018;STAGE 0 FEASIBILITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA LA 66 251-01 STPFLEX 4,106 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010596 - PETERSON ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA 000-63 FBROFF 385 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W FELICIANA 000-63 FBROFF 616 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: H.010597 - SLIGO ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA 000-63 FBROFF 3,388 PRESERVATION
BRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W FELICIANA 000-63 FBROFF 747 PRESERVATION
BRIDGE (OFF SYSTEM)
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 189 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WINN
Project: H.010537 - LA 471 AND LA 3136 OVERLAYS
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks: NFA AS MATCH ON C.S. 123-03
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 471 123-03 STPFLEX 3,275 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
WINN LA 3136 864-16 NFABOND 410 PRESERVATION
NON-INTERSTATE NFA
Project: H.011066 - LA 477: J E JONES RD - US 84
Type Impv: STABILIZE AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 477 864-11 NFABOND 4,134 PRESERVATION
NON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 13-14
Project: H.000382 - SALINE BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 009-04-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 71 009-04 STPFLEX 3,441 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010013 - US 84: LAS RAILROAD OVERPASS BR REHAB
Type Impv: REHABILITATION OF RAILROAD BRIDGE OVERPASS
Project Manager: HERATH, ANANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 84 022-02 NHPP 989 PRESERVATION
BRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.000750 - ROUNDABOUT US 84 AT LA 34 INTERSECTION
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: MATHEWS, LARRY
Remarks: 022-03-0046;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 84 022-03 HSIP 1,099 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.001711 - SALINE BAYOU RELIEF & MILL CR. BRS.
Type Impv: NEW BRIDGES
Project Manager: YANG, LI
Remarks: 091-05-0014;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 126 091-05 STPFLEX 3,023 PRESERVATION
BRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010081 - LA 156 IMPROVEMENTS (CALVIN TO US 167)
Type Impv: FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 156 092-03 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010356 - LA 126: JCT LA 34 - NW JCT LA 499
Type Impv: CTB AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 126 091-07 STPFLEX 2,733 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010361 - US 84: LA 477 TO WOLF CREEK
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 84 022-02 NHPP 3,790 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 190 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: WINN
Project: H.010363 - LA 34: 1200' S OF LA 1236 TO LA 126
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: CHENEVERT, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 34 124-01 STPFLEX 979 PRESERVATION
NON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 191 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 02
Project: H.010744 - ALT FUEL VEHICLES & IDLE REDUCT (NO RPC)
Type Impv: PURCHASE OF ALT FUEL VEHICLES,CONV OF EXIST VEH,IDLE REDUC
Project Manager: REVIERE, RYAN
Remarks: RPC WILL PROVIDE 20% MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 CM 107 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 13-14
DISTRICTWIDE 02 000-92 CM 206 CONGESTION MITIGATION
DISTRICTWIDE 02 000-92 CM 412 CONGESTION MITIGATION
DISTRICTWIDE 02 000-92 CM 412 CONGESTION MITIGATION
Project: H.011233 - DISTRICT 02 LOW COST SAFETY IMPROVEMENTS
Type Impv: ENHANCED SIGNING AND STRIPING
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 HSIPPEN 657 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009054 - DIST. 02 PAVEMENT MARKING REPLACEMENT II
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009186 - DIST. 02 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.005164 - SMART GROWTH STRATEGIES LAND USE
Type Impv: LAND USE STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-92-0017;STAGE O UNDER WAY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.005167 - LONG-RANGE TRANSPORTATION STRATEGY
Type Impv: GROWTH MANAGEMENT STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-92-0020;PRE STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.005168 - NEW ORLEANS RAIL GATEWAY EIS
Type Impv: EIS
Project Manager: GOODELL, DEAN
Remarks: STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009426 - DISTRICT 02 SIGNAL INVENTORY
Type Impv: INVENTORY SIGNALS IN DISTRICT 02
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 192 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 02
Project: H.009731 - L/CNG FUEL FLEETS DISTRICT 02
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 193 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 03
Project: H.009188 - DIST. 03 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 03 000-93 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010677 - DMS LADDER SYSTEM PHASE 3
Type Impv: INSTALLATION OF ACCESS LADDERS.
Project Manager: DELANEY, ELIZABETH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 03 000-93 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED FOR LETTING FY 14-15
DISTRICTWIDE 07 000-97 NHPP 75 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.006713 - DIST 03 BRIDGE JT REPAIRS & OVERLAY
Type Impv: DECK JT REPAIRS & DECK OVERLAY
Project Manager: TULLIER, DANNY
Remarks: 737-93-0074;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 03 000-93 NHPP 548 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.009732 - L/CNG FUEL FLEETS DISTRICT 03
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 03 000-93 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 194 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 04
Project: H.010705 - DMS LADDER SYSTEM PHASE 4
Type Impv: INSTALL OF LADDERS AND SIGN REPACEMENTS.
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 DEMO 1,646 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 13-14
DISTRICTWIDE 04 000-94 STPFLEX 543 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.009189 - DIST. 04 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009733 - L/CNG FUEL FLEETS DISTRICT 04
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Project: H.010876 - I-20 & I-49 SPEED STUDY
Type Impv: CONDUCT SPEED STUDY ON INTERSTATE 20 AND INTERSTATE 49
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
DISTRICTWIDE 05 000-95 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
DISTRICTWIDE 08 000-98 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 195 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 05
Project: H.009055 - DIST. 05 PAVEMENT MARKING REPLACEMENT:
Type Impv: PLASTICE PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 13-14
Project: H.009546 - I-20: DIST 05 CRACK & JOINT SEAL & PATCH
Type Impv: CRACK SEAL, JOINT SEAL & PATCHING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 NHPP 5,000 PRESERVATION
INTERSTATE
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009191 - DIST. 05 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009734 - L/CNG FUEL FLEETS DISTRICT 05
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 196 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 07
Project: H.009056 - DIST 07. PAVEMENT MARKING REPLACEMENT II
Type Impv: PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 07 000-97 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009193 - DIST. 07 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 07 000-97 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009735 - L/CNG FUEL FLEETS DISTRICT 07
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 07 000-97 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 197 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 08
Project: H.000792 - DIST 08 BRIDGE DK OVERLAYS & PAINTING
Type Impv: BRIDGE DECK EPOXY OVERLAY
Project Manager: TULLIER, DANNY
Remarks: 023-01-0073;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 08 000-98 STPFLEX 1,410 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.009194 - DIST. 08 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 08 000-98 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009736 - L/CNG FUEL FLEETS DISTRICT 08
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 08 000-98 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 198 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 58
Project: H.009052 - DIST. 58 PAVEMENT MARKING REPLACEMENT II
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009197 - DIST. 58 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009737 - L/CNG FUEL FLEETS DISTRICT 58
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 199 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 61
Project: H.009833 - DISTRICT 61 TRAFFIC CONTROL UPGRADE
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 STPFLEX 1,670 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 13-14
Project: H.006831 - BATON ROUGE ITS DEPLOYMENT (PHASE3)
Type Impv: BATON ROUGE ITS
Project Manager: BANKSTON, TANYA
Remarks: 737-99-0595;I-12 (AIRLINE - 2 MI PAST D.S.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 CM 3,143 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
4-SCHEDULED FOR LETTING FY 14-15
DISTRICTWIDE 62 000-90 CM 857 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.011205 - DISTRICT 61: THERMOPLASTIC STRIPING
Type Impv: UPGRADE PAVEMENT & REPLACE STRIPING WITH THERMOPLASTIC
Project Manager: KELLEY, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 SATRANS 250 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.000351 - DIST 61 BRIDGE DK JT & MISC REPAIRS
Type Impv: GROUT. REMOVE. REPLACE BEARINGS
Project Manager: TULLIER, DANNY
Remarks: 007-90-0029;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 STPFLEX 2,184 PRESERVATION
BRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.009199 - DIST. 61 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009738 - L/CNG FUEL FLEETS DISTRICT 61
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Project: H.009791 - LOW COST SAFETY COUNTERMEASURES
Type Impv: FEAS STUDY TO DETERMINE LOCATIONS COUNTERMEASURES NEEDE
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 0 SAFETY 1-PLANNING/ENVIRONMENTAL
DISTRICTWIDE 62 000-90 0 SAFETY
DISTRICTWIDE 02 000-92 0 SAFETY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 200 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: DISTRICTWIDE 62
Project: H.011234 - DISTRICT 62 LOW-COST SAFETY IMPROVEMENTS
Type Impv: ENHANCED SIGNING AND STRIPING
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 HSIPPEN 2,468 SAFETY 4-SCHEDULED FOR LETTING FY 14-15
Project: H.009200 - DIST. 62 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009739 - L/CNG FUEL FLEETS DISTRICT 62
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Project: H.010031 - DISTRICT 62 TRAFFIC SIGNAL INVENTORY
Type Impv: INVENTORY TRAFFIC SIGNALS IN DIST 62
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 201 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: STATEWIDE
Project: H.009374 - DEWEY WILLS WMA-NOLAN-MUDDY BAYOU TRAILS
Type Impv: RESTORATION & NON-ROUTINE MAINTENANCE OF MOTORIZED TRAIL
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 RTP 186 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010690 - M/V LEVY:DRY-DOCK -5 YEAR EXAM & REPOWER
Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWER
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 1,350 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010694 - INSTALL AND MODIFY BARGES AND FERRIES
Type Impv: MODIFICATION, INSTALLATION LANDING BARGE,CONVERSION TO FE
Project Manager: REED, KEVIN
Remarks: FB DISCR FLEXED TO FTA THEREFORE NOT AUTH THROUGH FHW
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 420 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 13-14
STATEWIDE 000-99 OTHER 330 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
Project: H.010788 - M/V ASCENSION: DRY-DOCK FOR 5 YEAR EXAM
Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STPFLEX 697 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010903 - LRSP TECH ASSISTANCE CRASH DATA ENGR
Type Impv: LRSP TECH ASSISTANCE CRASH DATA ENGR
Project Manager: CHAPMAN, JIM
Remarks: USE SATRANS FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.010904 - LRSP TECH ASSISTANCE ENGR
Type Impv: LRSP TECH ASSISTANCE ENGR
Project Manager: CHAPMAN, JIM
Remarks: USE SATRANS FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 SAFETY
LOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 13-14
Project: H.011012 - BICYCLE GOALS MAP
Type Impv: BICYCLE GOALS MAP FOR DISTRICT'S USE.
Project Manager: PARSONS, BRIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011080 - DISTRICT 03: SIGNAL HEAD REPLACEMENT
Type Impv: INSTALL SIGNAL HEADS WITH BACKPLATES IN DISTRICT 03
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 SATRANS 700 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011155 - STATEWIDE HEAT STRAIGHTENING
Type Impv: HEAT STRAIGHTENING OF DAMAGED STEEL BRIDGE GIRDERS.
Project Manager: BROWN, HAYLYE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 PRESERVATION
BRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 13-14
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 202 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: STATEWIDE
Project: H.011168 - I9000 BREATH TESTING INSTRUMENTS
Type Impv: SHSP PROJECT FOR IMPAIRED DRIVING
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 SATRANS 1,980 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.011178 - BREATH ALCOHOL TESTING MOBILE UNIT
Type Impv: SHSP IMPAIRED DRIVING EMPHASIS AREA STRATEGY
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 SATRANS 390 SAFETY 4-SCHEDULED IN CURRENT FY 13-14
Project: H.010037 - NEW FERRY BOAT / CAMERON FERRY CROSSING
Type Impv: CONSTRUCT NEW FERRY BOAT
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 NFI 12,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010689 - CCC FERRY VESSEL: TERM/LAND TECH UPGRADE
Type Impv: TECHNOLOGY IMPROVEMENTS TO FERRY VESSELS AND TERMINAL L
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 200 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.010691 - MV STUMPF: DRY-DOCK: 5 YR EXAM & REPOWER
Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWER
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
4-SCHEDULED FOR LETTING FY 14-15
Project: H.009884 - NOGC (STATEWIDE)
Type Impv: RELOCATING LED CROSSBUCK ASSEMBLIES
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 RAIL HE 200 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.007026 - ITS MAINTENANCE - STATEWIDE
Type Impv: ROUTINE & EMERGENCY REPAIR TO ITS STATEWIDE SYSTEM
Project Manager: SMITH, ERIK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STPFLEX 1,847 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
2-WAITING FOR FUNDING
STATEWIDE 000-99 STPFLEX 1,617 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
STATEWIDE 000-99 STPFLEX 1,617 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: H.005734 - LA 447 CORRIDOR STUDY
Type Impv: TRAFFIC ANALYSIS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.005746 - SIGNAL STUDY ALONG LA 1208-3
Type Impv: SIGNAL STUDY ALONG 1208-3
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 203 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: STATEWIDE
Project: H.006881 - WEIGH STATION SEWER TREATMENT EQU.
Type Impv: NEW SEWER TREATMENT EQU. STATEWIDE
Project Manager: MCCOY, JANET
Remarks: 737-99-0823;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCE
WEIGH STATIONS
1-PLANNING/ENVIRONMENTAL
Project: H.009785 - ROADWAY MITIGATION
Type Impv: ENGINEERING SUPPORT AND ANALYSIS FOR HMGP PROGRAM
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Project: H.010052 - BR - NO INTERCITY RAIL
Type Impv: FEASIBILITY STUDY
Project Manager: BROUSSARD, DAN
Remarks: NEW ORLEANS MPO TO PROVIDE MATCH TO BTR STP>200K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.011225 - TRAFFIC SIGNAL CONTROLLER EVAL. STUDY
Type Impv: STATEWIDE TRAFFIC SIGNAL CONTROLLER STUDY
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 204 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000001 - INTERMODAL CONNECTORS PROGRAM
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0
- NHPP 6,200 INTERMODAL CONNECTOR
Project: L.000002 - INTERSTATE PAVEMENT PREVENTIVE MAINT
Type Impv: SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENT
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,000 PRESERVATION
INTERSTATE
STAGES 4, 3, 2, 1, 0
Project: L.000003 - PREVENTIVE MAINTENANCE NON-INTERSTATE
Type Impv: PREVENTIVE MAINTENANCE/REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 2,000 PRESERVATION
NON-INTERSTATE
STAGES 4, 3, 2, 1, 0
Project: L.000004 - PREVENTIVE MAINT NON-INTERSTATE (NFA)
Type Impv: PREVENTIVE MAINTENANCE/REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NFA 2,500 PRESERVATION
NON-INTERSTATE NFA
STAGES 4, 3, 2, 1, 0
Project: L.000005 - ROAD PREVENTIVE MAINTENANCE
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 4,400 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
STAGES 4, 3, 2, 1, 0
- STCASH 6,000 PRESERVATION
ROAD PREVENTIVE MAINTENANCE
Project: L.000006 - MOTORIST ASSISTANCE PATROL
Type Impv: MAP
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
STAGES 4, 3, 2, 1, 0
- STCASH 1 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: L.000007 - TRANSPORTATION SYSTEMS MANAGEMENT
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRANSPORTATION SYSTEMS MANAGEMENT
Project: L.000008 - URBAN SYSTEM PROJECTS
Type Impv: SELECTED BY MPO'S
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
- STP<200K 1,000 URBAN SYSTEMS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 205 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000009 - MISC BOND PROJECTS
Type Impv: AS APPROVED BY LEGISLATURE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000010 - URGENT BRIDGE REPAIR/REPLACEMENT
Type Impv: REIMBURSABLE AND NON-REIMBURSABLE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- REIMB 5,000 PRESERVATION
BRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- NHPP 1,000 PRESERVATION
BRIDGE (ON SYSTEM)
- STPFLEX 1,000 PRESERVATION
BRIDGE (ON SYSTEM)
- STCASH 1,000 PRESERVATION
BRIDGE (ON SYSTEM)
Project: L.000011 - BRIDGE PREVENTIVE MAINTENANCE
Type Impv: MAINTENANCE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,500 PRESERVATION
BRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- STPFLEX 1,500 PRESERVATION
BRIDGE (ON SYSTEM)
- STCASH 1 PRESERVATION
BRIDGE (ON SYSTEM)
Project: L.000012 - BRIDGE PAINTING PROGRAM
Type Impv: MISC SITES
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 1,000 PRESERVATION
BRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 1 PRESERVATION
BRIDGE (ON SYSTEM)
Project: L.000013 - MOVABLE BRIDGE PREVENTIVE MAINTENANCE
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
MOVABLE BRIDGE REHABILITATION
STAGES 4, 3, 2, 1, 0
Project: L.000014 - MISC ECONOMIC DEVELOPMENT INITIATIVES
Type Impv: IN CONJUNCTION WITH DED
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
- STBONDS 500 OTHER / MISCELLANEOUS
Project: L.000015 - MISC FERRY PROJECTS
Type Impv: REHABILITATION/REPAIR
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- OTHER 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
FERRY PROJECTS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 206 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000016 - FEDERAL SAFETY PROGRAMS
Type Impv: MISC PROJECTS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0
- STPFLEX 200 SAFETY
- STCASH 100 SAFETY
Project: L.000017 - MISC ITS SYSTEMS
Type Impv: ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
STAGES 4, 3, 2, 1, 0
- DEMO 300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
- CM 400 OPER EFFICIENCY/MOTORIST ASSISTANCE
ITS
Project: L.000018 - INTERSTATE LIGHTING PROGRAM
Type Impv: IN ACCORDANCE WITH MAINTENANCE AGREEMENTS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
STAGES 4, 3, 2, 1, 0
- STCASH 100 OPER EFFICIENCY/MOTORIST ASSISTANCE
INTERSTATE LIGHTING
Project: L.000019 - STATE PARK ROADS
Type Impv: OVERLAY/REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000020 - MISC DRAINAGE PROJECTS
Type Impv: TO ALLEVIATE FLOODING
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
STAGES 4, 3, 2, 1, 0
- STCASH 250 OPER EFFICIENCY/MOTORIST ASSISTANCE
ROADWAY FLOODING
Project: L.000021 - MISC FEDERAL PROJECTS/PROGRAMS
Type Impv: FEDERAL LANDS HIGHWAYS, ETC.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000022 - RAILROAD CROSSING IMPROVEMENTS
Type Impv: FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAM
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0
- RAIL PD 3,000 RAILROADS
- STPFLEX 2,000 RAILROADS
- STCASH 200 RAILROADS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 207 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000025 - TOLL FUNDED PROJECTS
Type Impv: ORLEANS AND JEFFERSON PARISHES
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000026 - WETLAND MITIGATION BANK
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
- TIME 1,000 OTHER / MISCELLANEOUS
Project: L.000027 - EMERGENCY RELIEF PROVIDED BY CONGRESS
Type Impv: EMERGENCY RELIEF
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000028 - MAINTENANCE MATERIALS
Type Impv: HOT MIX, PIPE, BRIDGE MATERIAL, ETC
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 5,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000029 - FEDERAL ENHANCEMENT PROGRAM
Type Impv: MISC PROJECTS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0
Project: L.000030 - CRASH ATTENUATOR REPAIRS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 200 SAFETY STAGES 4, 3, 2, 1, 0
- STCASH 100 SAFETY
Project: L.000031 - DEMO/HI-PRI/OTHER FEDERAL PROGRAMS
Type Impv: AS DEFINED BY FEDERAL GOVERNMENT
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0
Project: L.000032 - REST AREA REHABILITATION
Type Impv: FACILITY REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
REST AREAS
STAGES 4, 3, 2, 1, 0
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 208 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000033 - MISC SIGNS, STRIPING, SIGNALS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
STAGES 4, 3, 2, 1, 0
- STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
Project: L.000034 - INSTALL RAISED PAVEMENT MARKERS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 2,000 OPER EFFICIENCY/MOTORIST ASSISTANCE
TRAFFIC CONTROL DEVICES
STAGES 4, 3, 2, 1, 0
Project: L.000035 - MISC FEDERAL OFF-SYSTEM BRIDGES
Type Impv: BRIDGE REPLACEMENTS/INSPECTIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- FBROFF 1,000 PRESERVATION
BRIDGE (OFF SYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 200 PRESERVATION
BRIDGE (OFF SYSTEM)
Project: L.000036 - WEIGH STATION REHABILITATION/UPGRADE
Type Impv: MISC SITES STATEWIDE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,900 OPER EFFICIENCY/MOTORIST ASSISTANCE
WEIGH STATIONS
STAGES 4, 3, 2, 1, 0
Project: L.000037 - HIGHWAY SAFETY IMPROVEMENTS
Type Impv: RUMBLE STRIPS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0
Project: L.000039 - ACCELERATED LOADING FACILITY
Type Impv: CONSTRUCT TEST SECTIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000040 - FEDERAL BRIDGE INSPECTION PROGRAMS
Type Impv: INSPECTIONS, RATINGS, LOAD FACTORS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 3,000 PRESERVATION
BRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 600 PRESERVATION
BRIDGE (ON SYSTEM)
Project: L.000041 - CONGESTION MITIGATION PROJECTS
Type Impv: NON-ATTAINMENT AREAS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 209 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000042 - MISC CONGESTION MITIGATION PROJ - LKC
Type Impv: IN LAKE CHARLES AS APPROVED BY FHWA
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
Project: L.000043 - MISC CONGESTION MITIGATION PROJ - BTR
Type Impv: IN BATON ROUGE AS APPROVED BY FHWA
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
Project: L.000068 - ACCESS MANAGEMENT PROJECTS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
STAGES 4, 3, 2, 1, 0
- STPFLEX 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
- STPFLEX 8,300 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
- STPFLEX 8,100 OPER EFFICIENCY/MOTORIST ASSISTANCE
ACCESS MANAGEMENT
Project: L.000069 - ROAD TRANSFER PROGRAM
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0
- STPFLEX 1,000 ROAD TRANSFER
Project: L.000093 - STATEWIDE CONGESTION MITIGATION
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0
Project: L.000094 - URBAN TRANSIT(INCL TRANSFER TO AGENCIES)
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
- STP<200K 100 URBAN SYSTEMS
- STPFLEX 100 URBAN SYSTEMS
Project: L.000024 - SOFT SIDE SAFETY
Type Impv: HANDLED THROUGH OPERATIONS BUDGET
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- HSIP 1,000 SAFETY STAGES 2, 1, 0
- STCASH 500 SAFETY
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 210 of 211
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2014 - 15Parish: L-PROJECTS
Project: L.000038 - PLANNING, TRAINING AND RESEARCH
Type Impv: HANDLED THROUGH OPERATING BUDGET
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0
- SPR OPT 7,000 OTHER / MISCELLANEOUS
Project: L.000023 - SCOPING AND ENVIRONMENTAL STUDIES
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0
- STPFLEX 300 OTHER / MISCELLANEOUS
- STCASH 300 OTHER / MISCELLANEOUS
Report Date: 2/26/2014 6:55:27AMVersion No: 1.14.1Page 211 of 211