What is a PPAP (production part approval process) and how does it work? We answer the basic questions about PPAP and how it's used in this presentation.

Transcript of PPAP 101: What You Should Know About PPAP

PPAP 101

RAPID GLOBAL BUSINESS SOLUTIONS, INC.

what you should know about ppap from

what is PPAP? for starters…

what is PPAP?

www.rgbsi.com

PRODUCTION PART APPROVAL PROCESS

A P P P

A standardized process in the automotive and aerospace industries that helps manufacturers and suppliers communicate and approve production designs and processes before, during, and after manufacture.

what is PPAP?

production part approval process: (noun)

Essentially, PPAP helps ensure that a product’s parts can be reproduced again and again with the same quality and results.

what is PPAP?

www.rgbsi.com

PRODUCTION PART APPROVAL PROCESS

A P P P

PPAP is currently

governed by the Automotive Industry Action Group (AIAG).

For our automotive friends:

They make sure everyone is following the same PPAP process; they make the rules.

what is PPAP?

automotive industry action group (AIAG)

in a PPAP? what’s included

PPAP requirements

can be found in a PPAP manual.

(there’s one for aerospace and automotive)

what’s included in a PPAP?

www.rgbsi.com

PRODUCTION PART APPROVAL PROCESS

A P P P We find the PPAP requirements in a manual.

what’s included in a PPAP?

www.rgbsi.com

PRODUCTION PART APPROVAL PROCESS

A P P P

The manuals have PPAP checklists which include all requirements, called elements, for a complete PPAP package.

www.rgbsi.com

Level 1

Level 3

Level 2

Level 4

Level 5

what’s included in a PPAP?

There are 5 different levels of PPAPs identified on the checklists.

Each level has specific requirements for each element and indicates which elements should be submitted to the customer.

PPAP elements? what are the required

what are the required PPAP elements?

The required elements are different for the automotive and aerospace industries.

**Note: there are no standardized aerospace PPAPs. Many aerospace companies have developed their own process.

what are the required PPAP elements?

Automotive requirements

• Design records • Engineering change docs • Design FMEA • Process Flow Diagrams

• Process FMEA • Control Plan • MSA • Dimensional Analysis

• Material Performance Reviews • Initial Process Studies • Qualified Laboratory

Documentation • ARR

• Master Sample • Checking Aids • Records of Compliance • PSW • Sample Product

what are the required PPAP elements?

Aerospace requirements

• Production PO and Demand Fulfillment

• Production Drawings • Change Docs • Customer Engineering Approval • DFMEA

• Process Flow Diagrams • PFMEA • Dimensional Report • Production Verification Testing • Process Approval and Non-

Destructive Testing

• Measurement System Analysis • Engineering Planning/Source

Approval • Initial Process and Readiness

Study • Material Certification

Documentation

• Control Plan • Appearance Approval Report • Raw Material Approval • Package Preservation and

Labeling Approval

PPAP negotiation necessary? why is

PPAP is a work plan or strategy.

why is PPAP negotiation necessary?

www.rgbsi.com

PRODUCTION PART APPROVAL PROCESS

A P P P

Not every PPAP is the same, so negotiation helps to ensure that both parties (the customer and the supplier) have the same expectations.

PPAP required? when is a

Any time a new part or change to an existing part

or process is being planned.

when is a PPAP required?

www.rgbsi.com

PRODUCTION PART APPROVAL PROCESS

A P P P

PPAPs protect customers and consumers, making suppliers responsible for organizing and developing quality products.