February 2011 Construction Photos

Page 1

Balfour Beatty subcontractor Harreld’s Hi Voltage - foreground. Installation of last 84” pump - background.

Balfour Beatty welding trash rack supports and tuning baffles at Pumping Plant.

February 2011 Construction Photos

Page 2

Balfour Beatty subcontractor Central Sierra Electric installing Fish Screen motor control center, conduit, & bracing.

Balfour Beatty erecting Switchyard steel structures with takeoff structure steel staged for erecting.

February 2011 Construction Photos

Page 3

Balfour Beatty installing the oil containment system around the two transformers in the Switchyard.

Balfour Beatty subcontractor Meyers Earthwork excavating the forebay upstream side of the Pumping Plant

February 2011 Construction Photos

Page 4

Balfour Beatty subcontractor Virginia Transformers checking the installation of the cooling radiators.

Balfour Beatty subcontractor Central Sierra Electric pulling cables into Fish Screen Motor Control Center