![Page 1: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers](https://reader033.fdocuments.net/reader033/viewer/2022053014/5f11d91ed60daf727a788529/html5/thumbnails/1.jpg)
February 2011 Construction Photos
Page 1
Balfour Beatty subcontractor Harreld’s Hi Voltage - foreground. Installation of last 84” pump - background.
Balfour Beatty welding trash rack supports and tuning baffles at Pumping Plant.
![Page 2: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers](https://reader033.fdocuments.net/reader033/viewer/2022053014/5f11d91ed60daf727a788529/html5/thumbnails/2.jpg)
February 2011 Construction Photos
Page 2
Balfour Beatty subcontractor Central Sierra Electric installing Fish Screen motor control center, conduit, & bracing.
Balfour Beatty erecting Switchyard steel structures with takeoff structure steel staged for erecting.
![Page 3: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers](https://reader033.fdocuments.net/reader033/viewer/2022053014/5f11d91ed60daf727a788529/html5/thumbnails/3.jpg)
February 2011 Construction Photos
Page 3
Balfour Beatty installing the oil containment system around the two transformers in the Switchyard.
Balfour Beatty subcontractor Meyers Earthwork excavating the forebay upstream side of the Pumping Plant
![Page 4: February 2011 Construction Photos - Bureau of Reclamation · February 2011 Construction Photos Page 3 Balfour Beatty installing the oil containment system around the two transformers](https://reader033.fdocuments.net/reader033/viewer/2022053014/5f11d91ed60daf727a788529/html5/thumbnails/4.jpg)
February 2011 Construction Photos
Page 4
Balfour Beatty subcontractor Virginia Transformers checking the installation of the cooling radiators.
Balfour Beatty subcontractor Central Sierra Electric pulling cables into Fish Screen Motor Control Center