Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
CDM Project PortfolioCDM Project PortfolioEgypt Egypt
Amr Abdel-Aziz, Ph.D. Egypt
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Egyptian CDM Strategy
CD4CDM Project
Egyptian DNA
Current Active CDM Project Portfolio
- 5 PDDs
- 7 PINs
CDM Projects PortfolioCDM Projects Portfolio28 Projects28 Projects
12 Projects12 Projects
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Egyptian CDM Strategy ProjectsEgyptian CDM Strategy ProjectsElectricity Generation
–Wind Farms (1)
–Integrated Solar Thermal System (1)
Other Renewable Energy Applications –Solar Energy Applications (2)
Transportation Projects –Railways Electrification Projects (1)
–Underground (1)
–Waterway Transportation (1)
–Switching to N.G in Transportation (1)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Egyptian CDM Strategy ProjectsEgyptian CDM Strategy ProjectsEnergy Efficiency
–Control Systems and Energy Saving Equipment (1)– Waste Heat Recovery (1) –Cogeneration (4)
Waste Management –Solid Waste Management (2)
Land Use, Land-Use Change and Forestry
–Tree Plantations Using Sewage Water (2)–Protection of Irrigation and Drainage Canals (1)–Stabilization of Coastal Sand Dunes (1)–Protection of Roads and Highways (1)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Developed PDDsDeveloped PDDs
Zaafarana 85 MW Windfarm (LS)
Damietta Barage Mini-Hydro (SS)
Glass Dying Fuel Switching (SS)
El Nasr Cartoon Cogeneration (SS)
Energy EfficiencyEnergy Efficiency
Onyx Gas Capture and Flaring (LS)
WasteWaste
Renewable EnergyRenewable Energy
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Developed PINsDeveloped PINs
Brick Factories Fuel Switching
Zenotex Energy Management System
Misr El Monofyia Cogeneration
AfforestationAfforestationGreater Cairo Ring Road
10th of Ramadan
Cairo Aswan Road
Bioreactor Landfill Gas Capture and Flaring in Greater Cairo
WasteWaste
Energy EfficiencyEnergy Efficiency
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Large Scale ProjectsLarge Scale Projects(PDDs) (PDDs)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project
Borg El Arab and El Hammam, Alexandria
LocationLocation
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project
Flaring excess methane not needed for leachate treatment
DescriptionDescription
3 flaring units of capacity 1,500 m3/h each
TechnologyTechnology
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Crediting Period: 11 y 4 m
Annual CERs: 400,000 (average)
Total CERs (11 y and 4 m): 4.8 M
Emissions ReductionEmissions Reduction
June 2005
Starting DateStarting Date
$ 0.9 M
CostCost
Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
PDD: Final Draft
Financing Situation: Self Financed
DNA Approval: Preliminary approval
Project Implementation: Not yet
Project StatusProject Status
Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm
Zaafarana, Red Sea
LocationLocation
Wind farm site
Zafarana
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
100X850 kW Wind Turbines9 m/s Average Wind Speed45% capacity factor335 GWh/year
DescriptionDescription
Three blade wind turbineType G52 Manufactured by GAMESA
(Spanish Co.)
TechnologyTechnology
Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Crediting Period: 21 Years
Annual CERs: 155,313
Total CERs (20 Y): 3 M
Emissions ReductionEmissions Reduction
June 2005
Starting DateStarting Date
$ 90 M
CostCost
Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
PDD: Final Draft
Financing Situation: Self / Spanish Financing
DNA Approval: Preliminary approval
Project Implementation: Not yet
Project StatusProject Status
Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Small Scale ProjectsSmall Scale Projects(PDDs) (PDDs)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project
Al-Qanater Al-Khairyyah, Qalyoubyia
LocationLocation
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Power plant within the river channel immediately downstream Damietta Barrage
DescriptionDescription
Powerhouse with three 4.15 m diameter bulb turbines
A 114 m forebay enclosed by an embankment
TechnologyTechnology
Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Crediting Period: 21 y
Annual CERs: 47,000
Total CERs (21 y): 988,200
Emissions ReductionEmissions Reduction
June 2007
Starting DateStarting Date
$ 35 M
CostCost
Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
PDD: Final Draft
Financing Situation: Sponsored by KfW
DNA Approval: Preliminary approval
Project Implementation: Not yet
Project StatusProject Status
Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project
Shoubra El Kheima, Qalyoubyia
LocationLocation
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Switching 3 steam boilers (two 6 t/hr and one 4 t/hr) operating on fuel oil and a gas oil boiler to natural gas
DescriptionDescription
Natural gas-based burners and an automatic control system
TechnologyTechnology
Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Crediting Period: 21 y
Annual CERs: 4,600
Total CERs (21 y): 96,600
Emissions ReductionEmissions Reduction
Jan 2006
Starting DateStarting Date
$ 90,000
CostCost
Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
PDD: Final Draft
Financing Situation: Requires external funding
DNA Approval: Preliminary approval
Project Implementation: Not yet
Project StatusProject Status
Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project
Borg El Arab, Alexandria
LocationLocation
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Generation of base electricity and heat (steam) from a NG cogeneration unit to replace electricity from the grid and gas oil for boiler
DescriptionDescription
1.1MWe NG-based gas cogeneration set
TechnologyTechnology
El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project
Cogeneration unit
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Crediting Period: 10 y
Annual CERs: 2,500
Total CERs (10 y): 25,000
Emissions ReductionEmissions Reduction
Dec 2005
Starting DateStarting Date
$ 370,000
CostCost
El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
PDD: Final Draft
Financing Situation: Requires external funding
DNA Approval: Preliminary approval
Project Implementation: Not yet
Project StatusProject Status
El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Egyptian CDM Projects
Encouraging Investment Environment
Existence of Local capacity to implement energy efficiency and environmental projects
Large potential for CDM projects
Why Should You Invest in Egypt?Why Should You Invest in Egypt?