Djerba Carbon Exhibition Djerba, September 22-24, 2004 Egyptian CDM ProjectsCDM Project Portfolio...

30
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Egyptian CDM Projects CDM Project Portfolio CDM Project Portfolio Egypt Egypt Amr Abdel-Aziz, Ph.D. Egypt

Transcript of Djerba Carbon Exhibition Djerba, September 22-24, 2004 Egyptian CDM ProjectsCDM Project Portfolio...

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

CDM Project PortfolioCDM Project PortfolioEgypt Egypt

Amr Abdel-Aziz, Ph.D. Egypt

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Egyptian CDM Strategy

CD4CDM Project

Egyptian DNA

Current Active CDM Project Portfolio

- 5 PDDs

- 7 PINs

CDM Projects PortfolioCDM Projects Portfolio28 Projects28 Projects

12 Projects12 Projects

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Egyptian CDM Strategy ProjectsEgyptian CDM Strategy ProjectsElectricity Generation

–Wind Farms (1)

–Integrated Solar Thermal System (1)

Other Renewable Energy Applications –Solar Energy Applications (2)

Transportation Projects –Railways Electrification Projects (1)

–Underground (1)

–Waterway Transportation (1)

–Switching to N.G in Transportation (1)

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Egyptian CDM Strategy ProjectsEgyptian CDM Strategy ProjectsEnergy Efficiency

–Control Systems and Energy Saving Equipment (1)– Waste Heat Recovery (1) –Cogeneration (4)

Waste Management –Solid Waste Management (2)

Land Use, Land-Use Change and Forestry

–Tree Plantations Using Sewage Water (2)–Protection of Irrigation and Drainage Canals (1)–Stabilization of Coastal Sand Dunes (1)–Protection of Roads and Highways (1)

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Developed PDDsDeveloped PDDs

Zaafarana 85 MW Windfarm (LS)

Damietta Barage Mini-Hydro (SS)

Glass Dying Fuel Switching (SS)

El Nasr Cartoon Cogeneration (SS)

Energy EfficiencyEnergy Efficiency

Onyx Gas Capture and Flaring (LS)

WasteWaste

Renewable EnergyRenewable Energy

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Developed PINsDeveloped PINs

Brick Factories Fuel Switching

Zenotex Energy Management System

Misr El Monofyia Cogeneration

AfforestationAfforestationGreater Cairo Ring Road

10th of Ramadan

Cairo Aswan Road

Bioreactor Landfill Gas Capture and Flaring in Greater Cairo

WasteWaste

Energy EfficiencyEnergy Efficiency

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Large Scale ProjectsLarge Scale Projects(PDDs) (PDDs)

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project

Borg El Arab and El Hammam, Alexandria

LocationLocation

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project

Flaring excess methane not needed for leachate treatment

DescriptionDescription

3 flaring units of capacity 1,500 m3/h each

TechnologyTechnology

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Crediting Period: 11 y 4 m

Annual CERs: 400,000 (average)

Total CERs (11 y and 4 m): 4.8 M

Emissions ReductionEmissions Reduction

June 2005

Starting DateStarting Date

$ 0.9 M

CostCost

Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

PDD: Final Draft

Financing Situation: Self Financed

DNA Approval: Preliminary approval

Project Implementation: Not yet

Project StatusProject Status

Onyx Gas Capture and Flaring Project Onyx Gas Capture and Flaring Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm

Zaafarana, Red Sea

LocationLocation

Wind farm site

Zafarana

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

100X850 kW Wind Turbines9 m/s Average Wind Speed45% capacity factor335 GWh/year

DescriptionDescription

Three blade wind turbineType G52 Manufactured by GAMESA

(Spanish Co.)

TechnologyTechnology

Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Crediting Period: 21 Years

Annual CERs: 155,313

Total CERs (20 Y): 3 M

Emissions ReductionEmissions Reduction

June 2005

Starting DateStarting Date

$ 90 M

CostCost

Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

PDD: Final Draft

Financing Situation: Self / Spanish Financing

DNA Approval: Preliminary approval

Project Implementation: Not yet

Project StatusProject Status

Zaafarana 85 MW Wind FarmZaafarana 85 MW Wind Farm

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Small Scale ProjectsSmall Scale Projects(PDDs) (PDDs)

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project

Al-Qanater Al-Khairyyah, Qalyoubyia

LocationLocation

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Power plant within the river channel immediately downstream Damietta Barrage

DescriptionDescription

Powerhouse with three 4.15 m diameter bulb turbines

A 114 m forebay enclosed by an embankment

TechnologyTechnology

Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Crediting Period: 21 y

Annual CERs: 47,000

Total CERs (21 y): 988,200

Emissions ReductionEmissions Reduction

June 2007

Starting DateStarting Date

$ 35 M

CostCost

Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

PDD: Final Draft

Financing Situation: Sponsored by KfW

DNA Approval: Preliminary approval

Project Implementation: Not yet

Project StatusProject Status

Damietta Barrage Small HydroPower ProjectDamietta Barrage Small HydroPower Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project

Shoubra El Kheima, Qalyoubyia

LocationLocation

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Switching 3 steam boilers (two 6 t/hr and one 4 t/hr) operating on fuel oil and a gas oil boiler to natural gas

DescriptionDescription

Natural gas-based burners and an automatic control system

TechnologyTechnology

Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Crediting Period: 21 y

Annual CERs: 4,600

Total CERs (21 y): 96,600

Emissions ReductionEmissions Reduction

Jan 2006

Starting DateStarting Date

$ 90,000

CostCost

Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

PDD: Final Draft

Financing Situation: Requires external funding

DNA Approval: Preliminary approval

Project Implementation: Not yet

Project StatusProject Status

Glass Dying Fuel Switching ProjectGlass Dying Fuel Switching Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project

Borg El Arab, Alexandria

LocationLocation

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Generation of base electricity and heat (steam) from a NG cogeneration unit to replace electricity from the grid and gas oil for boiler

DescriptionDescription

1.1MWe NG-based gas cogeneration set

TechnologyTechnology

El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project

Cogeneration unit

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Crediting Period: 10 y

Annual CERs: 2,500

Total CERs (10 y): 25,000

Emissions ReductionEmissions Reduction

Dec 2005

Starting DateStarting Date

$ 370,000

CostCost

El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

PDD: Final Draft

Financing Situation: Requires external funding

DNA Approval: Preliminary approval

Project Implementation: Not yet

Project StatusProject Status

El Nasr Company Cogeneration ProjectEl Nasr Company Cogeneration Project

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Encouraging Investment Environment

Existence of Local capacity to implement energy efficiency and environmental projects

Large potential for CDM projects

Why Should You Invest in Egypt?Why Should You Invest in Egypt?

Djerba Carbon Exhibition Djerba, September 22-24, 2004

Egyptian CDM Projects

Pyramids and Sphinx

A great opportunity to visit:A great opportunity to visit:Why Should You Invest in Egypt?Why Should You Invest in Egypt?

Nile River

Ancient Temples