Agenda

DCB-definition and process (NATO)

Introduction: CIED COE and DCB

Case Study: Jordan and Iraq

Summary

Identified Challenges and Gaps

Recommendations

DCB Definition (NATO)

Nord Atlantic Council 2014 (Defence and related Security Capacity Building - PO(2014)0582, paragraph 5):

“Defence and related security capacity building efforts encompass advice,assistance, support, training, education and mentoring activities in thedefence and related security sector. These efforts are focused inparticular on

1) strategic-level advice on defence and related security reform andinstitution building, including national security architecture, policy anddefence planning development and related procedures, and/or

2) defence capability and local forces development, usually focused oneducation and training.

NATO can undertake such activities in support of a partner nation,international organization, or non-partner country, with a view topromoting democratic values and human rights, contributing to securityand stability, and developing or enhancing interoperability.”

What is DCB? (1)

• What? : Advice, assistance, support, training, education and mentoring in building local defence capacities– Strategic-level advice on defence and related security reform and institution

building

– Development of defence capability and local forces, usually focusing on education and training

• Who?: Partner nation, international organisation or non-partner country

• Why? To contribute to international security and conflict prevention without deploying large combat forces

• How? Through tailored assistance to a number of non-member states

DCB Responsibilities

NationsNATO

COE´s support

Key principles of DCB

• Strategic guidance and political control by NAC

• Complementarity to other actors, international and national

• Coordination is essential

• Contribution of Allies and also partner nations

• Local ownership

• Local SME POC

• Review and re-assessment for follow up

How is DCB Organised?

• Special Coordinator (Deputy SG)

• Executive Board (IS, IMS, SCs)

• DCB Task Force

• Military Hub (NMA, MPD)

• Experts Network in capitals

• DCB Trust Fund … or others?

IS/IM

S

Bi-S

C

1. SG appointed Deputy SG as SC2. Chaired by SC/DSG3. Newly created in IS to enhance political-military coordination

4. DCOS MP also sits on DCB EB5. Comprehensive Crisis and Operations Management Centre

DCB Project process

POLITICAL Level

OPERATIONAL Level

NATO HQ

Financial

Partner Contact

Nations engagement

Lead

SC’s Nat´s Contributions

EXECUTION Level

ACT

ACOPlanning

D&G

NATO SC´s must control the process

Nations

NNE (inc COEs)

Contractor

CONTROL

Introduction: CIED COE and DCB from 2014

DRC Congo (under UN/MONUSCO)

– Nov 2014: CIAC

Mali (under UN/ MINUSMA):

– Jan 2015: CIAC

Ukraine (under ACT / direct request from UKR MIA):

– 2015: Staff Assessment Visit (SAV)

– Jan 2016: UKR MOD / MOI: CIAC (with USAREUR and CAN support)

– June 2016: UKR MIA National Police EOD Reorganization: CIED Staff Assessment Visit

Jordan (under NATO SPS):

– May 2015: Basic IED Exploitation Course (BIFEC)

– June 2015: CIED Staff Assessment Visit (SAV)

– Nov 2015: CIED WS for JOR Interagency (Police & Army) Senior Leaders

– May 2016: Out brief Dep CHOD and discuss a practical two year plan

– Oct 2016: Basic IED Field Exploitation Course (BIFEC) JAF and Police

– 2017: Senior Leader Engagement (SLE) and 1x MAT (Training or Programs TBD)

Introduction: CIED COE and DCB: 2014-2017

Introduction: CIED COE and DCB: 2014-2017

Egypt (under NATO SPS and IS)

– Apr 2016: CIED Staff Assessment Visit

– Oct 2016: 2x BIFEC observers (MOD level Training Developers)

– 2017: New Project ?

Tunisia (under NATO SPS)

– Sept 2016: CIED Staff Assessment Visit (DOTMLPF-I)

– 2017: New Project ?

Iraq (under NATO SPS)– Mar-Jun 2016: IRQ Training (KASOTC Jordan)

– Oct 2016: IRQ SLE

– Sep-Nov 2016: 2nd IRQ Training (KASOTC Jordan)

– 2017: Confusion WHERE and to WHOM (MoD – MoI)

Conducted SLS/SAV/MAT/MTT in 2016

In the POW 2016 six (6) placeholders were determined for: SLS/SAV/MAT/ MTT.

During 1st Semester 2016 the following SLS/ SAV/MAT/ MTT were conducted:

a. UKR CIAC (MTT), 20-31 JAN: 5 PAX (2x MTT)

b. NATO SHAPE SLS 11 APR: 2 PAX -

c. SAV EGYPT, 11-15APR: (1x MAT)

d. IRQ IED Clearance and T3, 1APR-17JUN, 1PAX -

e. Search Course, 16-30APR: 4 PAX (2x MTT)

f. T3-course: 1JUN-17-JUN: 5 PAX (2x MTT)

g. UKR MIA SAV: 7-11JUN: 3 PAX (1x MAT)

8 SLS/SAV/MAT/MTT

Case Study: Jordan and Iraq (1)

Jordan Iraq2 Date approved Apr2015 Jul2015 (Actual start 4 March2016)

3 Objectives DCB Package for Jordan (PO(2014)0755) is initiated at the Wales Summit (Sep2014).

Approval of package incl. measures of support in 7 priority areas C-IEDto IRQ.

4 Program execution (what, who, when, where)

a. Basic IED Exploitation Course (BIFEC), CIED COE.

b. C-IED Staff Assessment Visit (SAV), CIED COE and SPS

c. CIED SLS WS for JOR Police & Army Senior Leaders, CIED COE

May and Nov2015, CIED COE, Madrid (BIFEC/ CIED SLS. June2015, Amman (SAV).

a. Prep-course JAFb. Search-course CIED COE/ SNc. IEDD-course ISSEE/ CIED COEd. T3-course ISSEE/ SN/CIED COE

March-Jun2016, KASOTC, Amman

Case Study: Jordan and Iraq (2)

Jordan Iraq

5 Lead agency NATO SPS NATO SPS

6 Stakeholders JAFSPS, CIED COE

IRQ MOI and MODKASOTC-organisation, JORD GOV, SPS, NSPA, ISSEE (contractor), JAF, CIED COE, Sponsoring Nations (SME’s)

7 COO(Chief Operating Officer)

COO in place. No COO.

Observations

Jordan

The DCB-package ( BIFEC, SAV and SLS WS) was developed after receivingpolitical guidance from NATO HQs, and in close coordination between CIEDSMEs and Jordanian SMEs. It was executed in 8 months since approval, bothin Madrid and Amman (SAV) by CIED COE with a realistic time frame forplanning and execution. The number of stakeholders was limited.

Iraq

The Iraq training program (Prep, Search, IEDD and T3) actually started morethan 6 months after approval by the nations. Between actual start andexecution less than 1 month preparation time. SPS had the lead and therewas no coordination between the Iraqi and the CIED COE. The number ofstakeholders was numerous and complex. Besides the program had to beexecuted in a third country.

Identified Challenges and Gaps (1)

Both cases were under the control of SPS. In case of Iraq timewas lost at the tactical level while waiting for guidance.

A mismatch between the intended TA and the actual TA. In theJordan training this was not the case.

TA was uninformed and unprepared for the 11 week Iraqtraining program.

Lack of equipment has hampered course execution during theSearch Course.

Identified Challenges and Gaps (2)

In the Iraq project the COE was asked to provide training in MilitarySearch TTP’s. Military Search is more a MILENG function.

The Iraq training program were developed by different trainingentities without coordination and finally showed redundancy withregards to subjects and lessons.

• In case of Jordan there was only one training entity.

Recommendations (1)

1. The IS should provide political guidance and “desired end state” veryearly in the process, before engaging with partner nations

2. ACO or a lead nation should lead DCB execution; using their robust staffsand if requested with COEs in support

3. Coordination between partner nation and NATO SMEs must begin duringprogram development

4. All DCB projects should begin with an assessment (SAV) in order toestablish a baseline and to develop useful training programs

5. Partner nation must receive preparatory information and TA selectioncriteria directly from the COE; this is critical to minimize confusion priorto arrival

Recommendations (2)

6. Before course execution starts the procurement of all neededequipment has to be complete and training facility set up

7. Recommend limiting number of different agencies providingdifferent related courses of instruction; deliver a completetraining team

8. Complete, sequence and approve all POI’s in advance of trainingbeginning

9. Permanent review, re-assessment and adapt for follow up

Ctra. M-618 Colmenar Viejo-Torrelodones ,km 14

28240 - HOYO DE MANZANARES

MADRID (Spain)

N 40.62962º, W 3.875594º

Phone: +34 918 561 048

Fax: +34 918 562 390

info@ciedcoe.org

www.ciedcoe.org

https://nllp.jallc.nato.int/CMNT/CIEDCOI/Pages/home.aspx