AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting.

Post on 17-Dec-2015

217 views 2 download

Transcript of AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting.

AWBA Water Supply and Demand Study

October 4, 2011AWBA Meeting

Comparison 1997 Base to Base

1997 Base

• 1997 Reservoir Elevations• 15,000 AF Indian Firming• Indian Firming thru 2097 • Pro Rata CAP/On-River• Probability Base Shortage

Determination

Base

• 2012 Reservoir Elevation• 23,724 AF Indian Firming• Indian Firming Thru 2108• Shortage Sharing Proposal• Stepped Shortage

Determination

First Shortage YearBase vs. 1997 Base

Shortage VolumeBase vs. 1997 Base

Number of ShortagesBase vs. 1997 Base

Credits RemainingBase vs. 1997 Base

General Assumptions

• Starting Reservoir Elevation Jan. 2012• Shortage Triggers• CAP Shortage Distribution• No Yuma Desalter• M&I Firming thru 2097• Indian Firming thru 2108• Indian Firming 23,724 AF

Base vs. Scenarios

Base

• On-River/CAP shortage distribution pro rata based on demand

Scenarios

• Director’s Shortage Sharing Recommendation

ScenariosScenario

Upper Basin Depletion Schedule

On-River Tribal Schedule

Lake Mead Shortage Criteria

Mexico Shares in Shortage

Model Run Completed

AAWBA Upper Basin

AssumptionTen Tribes

Interim Guidelines Extended

Yes 8/29/2011

BAWBA Upper Basin

AssumptionTen Tribes

Interim Guidelines Extended

No 8/29/2011

CAWBA Upper Basin

AssumptionADWR 2010-2011

UpdateInterim Guidelines

ExtendedYes 8/30/2011

DAWBA Upper Basin

AssumptionADWR 2010-2011

UpdateInterim Guidelines

ExtendedNo  

EUpper Basin

ScheduleTen Tribes

Interim Guidelines Extended

Yes 8/29/2011

FUpper Basin

ScheduleTen Tribes

Interim Guidelines Extended

No 8/29/2011

GUpper Basin

ScheduleADWR 2010-2011

UpdateInterim Guidelines

ExtendedYes 8/29/2011

HUpper Basin

ScheduleADWR 2010-2011

UpdateInterim Guidelines

ExtendedNo 8/30/2011

Shortage VolumeBase, Scenario A and Scenario C

First Shortage YearBase, Scenario A and Scenario C

Number of ShortagesBase, Scenario A and Scenario C

Credits RemainingBase, Scenario A and Scenario C

Shortage VolumeMedian Traces

First Shortage YearMedian Traces

Number of ShortagesMedian Trace

Credits RemainingBase, Scenario A and Scenario C

Discussion