01 SHF01 - Plovput introduction, ENG (20120626).ppt20120626)… · Microsoft PowerPoint - 01 SHF01...

Post on 17-Jul-2020

3 views 0 download

Transcript of 01 SHF01 - Plovput introduction, ENG (20120626).ppt20120626)… · Microsoft PowerPoint - 01 SHF01...

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

of stakeholders of the project

Directorate for Inland WaterwaysBelgrade, 26‐06‐2012

Forum“Preparation of Documentation for River Training and Dredging Works on 

Critical Sectors of the Danube River in Serbia”

Project Funded bythe European Union

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Directorate for Inland WaterwaysBelgrade, 26‐06‐2012

AgendaIntroductions

Introduction to PlovputPresentation of the project

The role of the Stakeholders’ ForumRules of ProcedureQ&A, discussion

Conclusions, next meetings timetable, closing words

of Stakeholders of the ProjectForum

“Preparation of Documentation for River Training and Dredging Workson Critical Sectors of the Danube River in Serbia”

Project Funded bythe European Union

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Directorate for Inland WaterwaysBelgrade, 26‐06‐2012

Introduction to Plovput

Zaneta Ostojic BarjaktarevicManaging Director

of Stakeholders of the ProjectForum

“Preparation of Documentation for River Training and Dredging Workson Critical Sectors of the Danube River in Serbia”

Project Funded bythe European Union

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Content

EU funded projects – strategic partnerships

Mission statement

International IWW network in Serbia

Plovput in numbers

Legal status

Business portfolio

International activities

Challenges ahead

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

International IWW Network in Serbia

Danube – 588 kmSava – 211 kmTisza – 164 kmTotal – 963 km

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

• Established in 1963• Managing 963 km of international IWWs (Danube, Sava, and Tisza)

• Over 500managed projects so far

Plovput in Numbers

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

• 101 employees• Fleet of 18 vessels• Annual budget ofEUR 1.7Million (2012)

Plovput in Numbers

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

• Law on Ministries (2007, 2008)

• Plovput is a special organization of the Government of the Republic of Serbia

• Law on Navigation andPorts on IWWs (2010)

Legal Status

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

• Our mission is to provide efficient, sustainable, standardized and environmentally friendly system of inland waterways which will be used by businesses and general public at local and international scale

Mission Statement

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Business Portfolio

Hydrographic Survey

River Training Works

Waterway MarkingWaterway Design

River Information Services

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

International Activities

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

EU Funded Projects – Strategic Partnerships

Sharing a common 

vision with our strategic 

partners

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Challenges Ahead

Improvingcross-border and regional cooperation

ApplyingEuropean and UNECE standards in IWT

Promotinginland waterway transportation

The goal is to achieve standardized level of navigation safety and harmonized services on the Danube River, and to

become a fully integrated part of the European IWW network

Usingthe full potential of IWWs

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Summary

EU funded projects – strategic partnerships

Mission statement

International IWW network in Serbia

Plovput in numbers

Legal status

Business portfolio

International activities

Challenges ahead

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

www.plovput.rs

For More Information

Stakeholders’ ForumBelgrade, 26‐06‐2012

Project Funded bythe European Union

Thank youfor your kind attention

Directorate for Inland WaterwaysBelgrade, 26‐06‐2012

Zaneta Ostojic BarjaktarevicManaging Director

of Stakeholders of the ProjectForum

“Preparation of Documentation for River Training and Dredging Workson Critical Sectors of the Danube River in Serbia”

Project Funded bythe European Union