EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study OUTCOME FROM THE PROJECT ACTIVITY in the period 20 March- 8.
Copyright © 2013 SCKCEN Pb-Bi target for ISOL@MYRRHA: Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
Accelerator Sessions Summary