14 mars 2007 M. Dracos, Neutrino Design Study 1
Neutrino Oscillation Facility Neutrino Oscillation Facility Design Study in FP7Design Study in FP7
14 mars 2007 M. Dracos, Neutrino Design Study 2
• FP7 call and first discussion with EU officers
• DS structure
• Future actions
Neutrino Oscillation Facility Design Neutrino Oscillation Facility Design Study in FP7Study in FP7
14 mars 2007 M. Dracos, Neutrino Design Study 3
Work Program: Work Program: CapacitiesCapacities
14 mars 2007 M. Dracos, Neutrino Design Study 4
FP7 Capacities Work Programme: FP7 Capacities Work Programme: InfrastructuresInfrastructures
14 mars 2007 M. Dracos, Neutrino Design Study 5
Design Studies budgetDesign Studies budget
14 mars 2007 M. Dracos, Neutrino Design Study 6
ESFRI and CERN strategy ESFRI and CERN strategy group reportgroup report
14 mars 2007 M. Dracos, Neutrino Design Study 7
Discussion with EU officersDiscussion with EU officers(meeting the 05/01/07 with D. Pasini and C. Kurrer)(meeting the 05/01/07 with D. Pasini and C. Kurrer)
•Encouragements for a neutrino DS,•not more than 5 M€ by EU,•duration: 4 years,•possibility to extent the DS using the 2010 call,•meanwhile possible to participate to IA proposals,•but very difficult to obtain funding for R&D,•IA more for improving existing facilities,•investigate for ERC grants (young physicists).
14 mars 2007 M. Dracos, Neutrino Design Study 8
Neutrino Oscillation Facility Design Neutrino Oscillation Facility Design Study in FP7Study in FP7
Title: European Design Study of a High Intensity Neutrino Facility
Acronym: EURO-
Aim:Study and comparison (physics performances and cost) of the different options in order the neutrino European community to be ready for the particle physics decisions of 2010-2012.
Duration: 4 years
Cost: <5 M€ (+institutes participation ~50% with a minimum of 25%)
Coordinating person: R. Edgecock
Host institutes: CCLRC
more details in: http://gdrneutrino.in2p3.fr/documents/euro_nu_DS.pdf
14 mars 2007 M. Dracos, Neutrino Design Study 9
p-driver
target
collector
front-end
accel.
stor. ring
technologies
beam
OverviewOverview
SB BB NF
13 CPV MSW…
(non-acc. ?)
LAr
Cerenkov
Emulsions
magnetized
physics
detectors
facilities
optional or not baseline
14 mars 2007 M. Dracos, Neutrino Design Study 10
p-driver
target
collector
front-end
accel.
stor. ring
technologies
beam
Work PackagesWork Packages
Super-BeamSuper-Beam
Neutrino FactoryNeutrino Factory
Beta-BeamBeta-Beam
in order to underline synergies…
Near det.
Beam instr.
Far det.
Perform.
Comparison
DetectorsDetectors
PhysicsPhysics
14 mars 2007 M. Dracos, Neutrino Design Study 11
Work PackagesWork Packages
1. Management (R. Edgecock, M. Lindroos, M. Dracos)
2. Super-Beam (M. Zito, C. Densham)
3. Neutrino Factory (K. Long, J. Pozimski)
4. Beta-Beam (complementarities with EURISOL DS) (A. Fabich, M. Benedikt)
5. Detectors (near, far, beam instrumentation) (P. Soler, xx)
6. Physics (performances, comparisons) (P. Hernandez, A. Donini)
14 mars 2007 M. Dracos, Neutrino Design Study 12
Distribution of resourcesDistribution of resourcesWP months %
Management 48 7.4
Super-Beam 168(78 target
36 horn
24 p-driver
30 integration)
25.9(12.0 target
5.6 horn
3.7 p-driver
4.6 integration)
Neutrino Factory 144 22.2
Beta-Beam 132 20.4
detectors 84 13.0
physics 72 11.1
TOTAL 648 ~13.5 FTE/year
14 mars 2007 M. Dracos, Neutrino Design Study 13
EURO-EURO- and ESGARD and ESGARD• ESGARD supports the DS on neutrinos with all the partners ready to contribute. It is in
line with the strategy document and would enhance the EU role in this field.
• P-driver is studied elsewhere. Therefore, it should only be in this DS for consistency of the whole project, with a lower priority and without asking for money.
• Detectors should not be a large part of the DS and be only included for consistency of the project. Astrophysics community is working on detector proposals.
• Caveat:
1. all ingredients must be part of the project so that its success does not depend on institutes external to the collaboration.
2. There must be a unique coordinator who can be helped by additional scientific coordinators if necessary.
14 mars 2007 M. Dracos, Neutrino Design Study 14
Proposal preparationProposal preparation• Proposal preparation: R. Edgecock, M. Lindroos, M. Dracos (under BENE SG
supervision).
• Identify all interested institutes: under way (summary of the project already prepared: http://bene.web.cern.ch/bene/euro_nu_DS.pdf)
• Propose WP coordinators: finished
• Proposal presentation: 7 Feb. (BENE SG meeting) and 28th March(?).
• Draft to be sent to the participating institutes for approval: end of March
• Discussion with Brussels: end of March
• Signature by participating institutions: beginning of April
• Final proposal agreed: 20 Apr.
• Proposal delivery: 2nd May
14 mars 2007 M. Dracos, Neutrino Design Study 15
ENDEND
14 mars 2007 M. Dracos, Neutrino Design Study 16
Possible participantsPossible participantsBulgaria: Sofia
France: Grenoble, Saclay, Strasbourg
Germany: Julich, Rostock
Italy: Bari, Genoa, LNF, LNGS, LNL, LNS, Milan
Latvia: IPUL
Russia: Dubna, ITEP, Novosibirsk
Sweden: Uppsala
Switzerland: CERN, ETH, Geneva, PSI
UK: Brunel, CCLRC, IC, Oxford, Sheffield, Warwick
Poland: Cracow
14 mars 2007 M. Dracos, Neutrino Design Study 17
Work Package Proposal 1Work Package Proposal 1
• WP1 – Management:Coordinator: Edgecock Lead lab: CCLRC
Consortium Board Membership: DS
coordinators WP coordinators 1 member/institute Purpose: Oversight of DS Meetings:
Twice per year or as required
Steering Committee Membership: DS coordinators
WP coordinators IDS
representatives Others ex-officio as required Purpose: Running the DS Meetings:
Every two months