Download - y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Transcript
Page 1: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Ac

V

R

tive D

PreparThe PoThe PoMay 20

SumVerifi

RYPO

Diesel Tir

red For: ort of Los Aort of Long 0, 2015

mmarcatio

OS Ac

Particre Gan

Angeles Beach

ry Reon Te

ctiveD

culatentry C

eport sting

DPF/C

e FilterCranes

PrepareRYPOSwww.ryp508-429

© 2015 Rypos,

of g for

C3+TM

r for Rs

ed by: S, Inc. pos.com 9-4552

Inc. All Rights R

Rubbe

Reserved.

er

Page 2: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

This sum

San Pedr

the Port o

and recom

of the Po

employee

assume n

Questions

of Los An

rose.sieng

mary repor

ro Bay Port

of Los Ange

mmendatio

ort of Long

es, contract

no legal liab

s or comme

ngeles, at

[email protected]

rt was prep

ts Clean Ai

eles and th

ns are thos

Beach or

tors, and su

bility for the

ents regard

tpisano@p

m.

ared by Ry

ir Action Pl

he Port of L

se of the au

Port of Los

ubcontracto

information

ding this rep

portla.org, o

ypos, Inc. to

an Techno

Long Beach

uthor and d

s Angeles (

ors make n

n in this rep

port should

or Rose Sie

o documen

ology Advan

h. The opin

do not nece

(Ports). The

o warranty

port.

d be addres

engsubcha

nt work perf

ncement Pr

nions, findin

essarily rep

e Ports, its

y, expressed

ssed to Ter

arti, Port of

formed und

rogram (TA

ngs, conclu

present the

s commissi

d or implied

resa Pisano

f Long Bea

Page 2

der the

AP) for

usions,

views

oners,

d, and

o, Port

ach, at

Page 3: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

1. PRO Rypos hamobile anDPF/C Lelocated a40+ systethat RypoTraPac Tand agreeone of thDPF/C3+an initial PM. This durability hrs of rucompiled,final verifi The DPF/and the Pcost of thbalance o

2. PROJ Type of Vactive die

Type of VRubber T

Emissionrate no gr

Emision particulate

DescriptiparticulateRubber T

GRAM SU

as a historynd stationarevel 2+ syst terminals

ems had mos and its pTerminal pued to allowiheir Mitsui/ experimenPM test waled to a Cportion of

untime) afte, and the reication.

/C3+ emissPort of Longhe project of funds, $7

JECT PAR

Verified Diesel particul

VerificationTired Gantry

n Control Greater than

Reductione matter (L

ion of Inte filter, is i

Tired Gantry

UMMARY

y of providry engine astem had be

in both themet or exce

port customurchased foing Rypos t/Paceco RTntal unit andas conducteCARB Levethe proces

er which aesults subm

sions test ag Beach undwas $144,

72,260, was

RTICULA

esel Emisslate filter sy

n: Final Ley (RTG) cra

Group: P0.4 g/hp-hr

n Claim: dievel 3+) wh

tended Apntended to

y cranes (R

Y

ing diesel pplicationseen installee Port of Leded custo

mers had aour CARB to install anTG cranesd installed ted, and theel 3+ condss to achievan emissionmitted to CA

nd report pder the join520, with R

s provided b

ARS

sion Contrystem with d

evel 3+ Veranes both d

Pre-Tier 1 or. Engines

esel particuhile conform

pplication: o remediateRTGs, both d

emission r. By early

ed on over 4Los Angelesomer expeca need for verified Ry

n experimens. In May the unit at Te filter achiitional verifve CARB fns test waARB, result

project was nt TechnoloRypos provby the TAP

rol(VDEC):diesel oxida

rification foiesel-electr

or newer din this cont

ulate matteming to the

RYPOS Ae emissionsdiesel-elect

reduction so2012, the C40 Rubber s and the Pctations. Ita level 3+

ypos Activental Ryposof 2012, RTraPac. Aftieved a grefication. Frfinal verific

as performeting in the

sponsoredgy Advanceviding a fif.

: The RYPation cataly

r RYPOS Aric and dies

iesel engintrol group a

er. ReductioNO2 emiss

ActiveDPF/s from the tric and die

olution sysCARB verifTired Gan

Port of Lont was recogsolution.

e DPF/C leActive DPF

Rypos builtter accumueater than 8rom May toation was ed, a full lapproval a

d by the Porement Progfty-percent

POS Activeysts.

ActiveDPF/sel-hydrauli

nes a certifare listed in

on of 85% sion limit for

/ C3+TM, aexhaust of

esel-hydrau

stems for vfied Rypos try cranes ng Beach agnized, howIn April of

evel 2+ sysF/C3+ systet the first lating 50-185% reduco Decembeperformed laboratory nd issuanc

rt of Los Angram (TAP)cost share

DPF/C3+TM

C3+TM forc.

ied PM em Appendix

or greaterr January 2

an activef diesel polic).

Page 2

various Active (RTG)

and all wever, 2012,

stems, em on Active 00hrs, tion in er, the (1000 report

ce of a

ngeles ). The e. The

M is an

use in

mission G.2.

diesel 2009.

diesel wered

Page 4: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

3. DESC

General D

RYPOS Ahousing, RYPOS Afilter cartradded to (CO) and System O

The Activpressure locally rageneratorcartridge

Electroni

RYPOS hThere arechamberschambers48 cartrid

Two filtregereg

CRIPTION

Descriptio

ActiveDPF/electrical

ActiveDPF/ridges. A

remove thtotal hydro

Operation

veDPF/C3+and run tim

aise temperr, transformto the temp

ics Contro

has designe currently s and carts and up to ges per EC

ter cartridgeenerated dugeneration e

N OF RYP

n of the Di

C3+TM is acontrol circC3+TM usesDiesel Oxidhe Soluble ocarbon em

TM operatiome. The proratures and

mer or alternperatures re

Figure Re

ol Assembl

ned and de2 models

tridges tha32 cartridg

CU.

es can be ring a

event

POS DPF

iesel Emiss

n active diecuit, and fs controlleddation CataOrganic F

missions (TH

on is controoprietary Ryd periodicanator providequired.

1: Exampleegeneration

y

eveloped tof the EC

t can be ges per ECU

F SYSTEM

sion Contr

esel exhaufilter cartridd electric halyst (DOCFraction (SOHC).

olled by a ypos filter cally oxidizedes the requ

e of Regenin Progress

he ECU foCU. The d

controlled. U. The RC

M AND OP

rol Strateg

ust filter sysdges madeheating for C) attached OF) while

microprocecartridges ae the collecuired electr

neration Ev

or use in Adifferences

The RCC604 can co

PERATIO

gy

stem. It coe of sinterreliable regto the outreducing c

essor whicare energizcted soot. rical curren

vent

ActiveDPF/are only in

C404 modeontrol 6 cha

ON

onsists of ared metal generation let of the f

carbon mon

ch monitorszed individu

Power frot to heat th

/C3+TM sysn the numel can conambers and

Page 3

a filter fibers. of the

filter is noxide

s back ually to m the e filter

stems. ber of

ntrol 4 d up to

Page 5: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Fig

Fuel Req

Rypos AcRypos Acapproved

Installatio

RYPOS regeneratgeneratorby a circtemperatu

gure 2: Exp

quirements

ctiveDPF/CT

ctiveDPF/C fuel additiv

on Require

ActiveDPFtion is obtr, from the uit breakerure so it ma

Soleflo

con

ploded Vie

s and MisfuTM filters re

C3+TM can bves and low

ements

/C3+TM is tained by generator or or fuse. ay be moun

enoid ow trols

Cover

E

ew of RYPO

ueling Con

quire the usbe used wiw ash lubric

installed a transformoutput direcThe RYPO

nted wherev

Filter Cartridges

CU

OS ActiveD

sideration

se of Ultra ith biodiesecating oils.

in place mer connectly, or by tOS ActiveDver it is bes

Outlet

DPF/C3+TM

ns

Low Sulfur el blends u

of a muffected to ththe vehicle DPF/C3+TM

st suited for

t

DOC

Model RA

r fuel (15ppup to B20 a

fler. Eleche output alternator,

M does not r a given ap

H

A408L-C

m or lower)and engine

ctrical powof the eleand is prorely on ex

pplication.

Housing

Page 4

). The e OEM

er for ectrical tected xhaust

Inlet

Page 6: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Pre-insta

The enginonly othespecific athe RYPconfigura

Normal M

An annuaash if neewiring, cobefore pro

Descripti

The noisegrade sile

allation Co

ne in the apr pre-instal

application wOS Activetions best m

Maintenanc

al inspectioneded, is sufonnections, oceeding.

ion of Nois

e level atteencer.

mpatibility

pplication nlation compwith Rypos

eDPF/C3+TM

match up w

ce Require

n to test forfficient. Visand piping

se Level Co

nuation of

y Assessm

eeds to havpatibility ass for properM. Rypos

with the spac

ements

r proper funsually inspe

for problem

ontrol Com

the RYPOS

ent Proced

ve a measussessment tr system sis will thence available

nctioning of ct installatioms. If repa

mpliance

S ActiveDP

dures

ured PM levthat needs zing based

n decide we for the ins

the systemon, includinir is needed

PF/C3+TM is

vel below 0to be done

d on the spwhich of tstallation.

m, and for thng mountingd, disconne

s equivalen

0.4 g/bhp-hre is to reviepace availabthe Rypos

he removal g brackets,ect from pow

nt to an ind

Page 5

r. The ew the ble for s filter

of wer

dustrial

Page 7: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

4. SUM

Testing O

The RypoPort of Lowas instabackpressEngine sp1800 rpm

Emission system afconductedbefore coEnvironm

Durability

Los Ange920 WestWilmingto

Independ BEST EN6261 SouLivermore

MARY O

Overview

os ActiveDPos Angeles alled. Thesure and epeed was n

m.

testing wfter 98 hourd to make ontinuing w

mental with t

y Test Fac

eles Termint Harry Bridon, CA 9074

dent Emiss

NVIRONMEuthfront Roae, CA 9455

F VERIFI

PF/C3+TM wTerminal.

e system wexhaust temnot measu

as conducrs of normasure the sy

with further the engine

cilityLocatio

al, TraPac dges Blvd., 44-5230

sion Reduc

NTAL (BE)ad 1

CATION

was installeThe RTG

was instrummperaturered as the

cted on theal operationystem woutesting. E

hour meter

on

facility (Ber

ction Test

)

AND DUR

ed on RTGhad 13978 mented witonce evergenset is

e RTG witn to de-greeld produceEmission ter at 15375,

rths 136-14

Organizati

RABILITY

G #13 operahours on it

th a data ry second a constant

th the Rypen the filter the minimesting wasor after 139

42) RTG #1

ion

Y TESTIN

ated by Trat when the logger to with 10 se

t speed dev

pos Active. This emis

mum 85% fis again con97 hrs of du

3

NG

aPac, Inc. test filter smeasure eecond avevice operat

DPF/C3+TM

ssion testinltration efficnducted byurability tes

Page 6

at the system engine rages. ting at

M filter ng was ciency y Best sting.

Page 8: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Photo

1: TraPac

RTG in operation at the Port off Los Ange

Rypos DPF

eles

Page 7

Page 9: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Ph

hoto 2: Bes

st Environmmental teaam conduccting emisssion measu

urements

Page 8

Page 10: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Descripti

Descripti

CARB UL

Descripti

The vehicintervals per the re

Test Proc

One Modfor durabnormal opallow it tooperate inAt that tim8178-4:19durability shown bewas meas

ion of Test

ion of Test

LSD fuel wa

ion of Main

cles and enas recomm

ecommenda

cedure Des

del RA408Lbility and emperation in o pass CARn normal dame the emis996 8.4.1 Dtest and fo

elow. PM wsured using

Mode Load, SpeedWeigh

t Engine (M Engine MaModel: Year: Engine FamEngine SeDisplacemCompressiCombustioAspiration:Engine Pow

t Fuel

as used for

ntenance D

ngines weremended by ations provi

scription

L-C RYPOSmission tesorder to b

RB Level 3ay to day ossions reduD2 test cycor emission

was measurg EPA meth

% d hting Facto

Make, Mode

ake:

mily: rial #: ent: ion Ratio:

on System: wer

emission te

During Dur

e maintaineOEM. The

ided in the

S ActiveDPsting. Thee sure that

3 PM criteroperation unuction perfocle. CARBn testing. Ared using Chod 7E, 10,

ISO 8178

1100

ors 0.05

el Year, En

CummNTA82000Non E120214.014.0:

DirecTurbo465B

esting.

rability Tes

ed by TraPae RYPOS Aowner’s ma

PF/C3+TM w system wt the desigia (85% rentil it accum

ormance of B ULSD diA load banCARB meth 25A, and 3

D2 Test C

275

Rated Spe0.25

ngine Fam

mins 855 G-2 EPA certifie5736 liter 1

ct Injectionocharged, A

BHP

sting

ac, Inc. usinActive DPFanual.

was installewas emissio

n changes eduction) Tmulated 13the DPF wiesel fuel w

nk was usehod 5. NO3A.

Cycles

350

eed (1800 0.3

ily Name, e

ed

Aftercooled

ng their norF/C3+TM wa

d onto RTGon tested a

incorporatThe RTG th397 hrs of d

was measurwas used ded to load tOx, CO, VO

4 5 25 10rpm)0.3 0.1

etc.)

d

rmal procesas be main

G #13 at Tafter 98 hoted would ihen continudurability te

red using thduring the the genera

OC, CO2 an

0

1

Page 9

ss and tained

Trapac ours of ndeed ued to esting. he ISO

entire ator as nd O2

Page 11: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic

Test resu

Emission accumuladurability The baseemission and aged

Pho

Outcome

On SepteDE-13-00Filter (Act

ults and Co

Testing ated 98 ho

test operateline was rtest runs a DPF filter

Nox (g/bh(CARB) CO (g/bhpTHC (g/bhPM (g/bhpDPF

to 3: Emiss

e of Durabi

ember 10, 202 thereby tiveDPF/C3

omments was cond

ours of durtion. The erun withoutt the same reduction re

p-hr)

p-hr) hp-hr) p-hr) post

sion sample

ility and Em

2013, the Cproviding

3+TM). The

ucted afterability testexhaust stret the DPF operating

esults:

RYActive

EmRed

Efficienc

97

8

es being gat

mission Te

California Aifinal verifice executive

er the RYing, and aeam was sainstalled. condition.

YPOS eDPF/C3+ mission duction cy at 98 hrs

0%

93% 72%

89%

thered and

esting

ir Resourcecation for te order follo

YPOS Actiagain after ampled botAll data pBelow is a

s

RActiv

EmissioEfficienc

measured b

es Board isthe RYPOS

ows.

ive DPF/Caccumulat

th before anpoints are a

summary o

RYPOS veDPF/C3+ on Reductiocy at 1397

-4%

92% 76% 92%

by Best Env

ssued EXECS Active D

C3+TM filterting 1397 nd after thean averageof the degre

on hrs

vironmenta

CUTIVE ORDiesel Parti

Page 10

r had hrs of

e DPF. e of 3 eened

al

RDER iculate

Page 12: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic
Page 13: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic
Page 14: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic
Page 15: y Re port of V n Te RYPOS PF/C - Clean Air Action Plan...Ac V R tive D Prepar The Po The Po May 20 Sum erifi YPO iesel Tir ed For: rt of Los A rt of Long , 2015 mar catio S Ac Partic