Download - Turneky Solutions Mobilecomm

Transcript
Page 1: Turneky Solutions Mobilecomm

RF Network Planning and Design Services

• MACRO NW DESIGN:• Network

dimensioning• CW & Propagation

Model Tuning• Detailed Coverage

Planning & Capacity Design

• RAN Network Audit & Parameter Planning

• RFDS Creation• SMALL

CELL/DAS/WLAN /HET-NET• Network Goal

identification• Requirements

Survey• Profiling – Area,

Device, Applications

• Coverage/Capacity Planning

• Dimensioning• RSRQ/RSINR

Considerations• Link Budget, PCI,

Neighbor planning

Transport Network Services

• BACKHAUL DEPLOYMENT• MICROWAVE

• Microwave network Design, Assessment & performance Analysis

• Backhaul capacity dimensioning( Macro/ Small cell/DAS/WLAN)

• Line Of Sight "LOS" Surveys

• Microwave links provisioning

• Installation, commissioning & integration of microwave Links.

• FIBER • Pre Deployment

Field Survey • OSP Planning and

Design• Backhaul capacity

dimensioning and planning( Macro/ Small cell/DAS/WLAN

• Installation, commissioning & integration of Fiber Nodes

• Post deployment site Audits

Network Deployment Assurance services -RAN• WAR ROOM:

• E2E Project Management

• Data build creation and XML script Generation

• Scheduling Sites for construction & Integration

• Construction and Integration Support to field crews

• Troubleshooting Network alarms/RSSI Issues

• Site Acceptance & Tuning support

• New Feature/License Implementation

• Software Upgradation and Patch Installation on RAN Nodes

• OTHER RAN SERVICES• Site Construction

(I&C)-Small cell/DAS/WLAN

• EF&I Services• Post Deployment Site

Audits.• EME Site Audits &

compliance Reports• Logistic Support

Services

Network Deployment Assurance services-RF Optimization

• MACRO NW• PRE-LAUNCH

• Pre Deployment KPI monitoring and Analysis.

• Parameter Auditing and adjustment

• Single Site optimization including Drive testing

• Drive test post processing and Report generation.

• POST-LAUNCH• Post Deployment KPI

Monitoring and Analysis

• Cluster Tuning including Drive testing

• Post Launch Optimization support.

• SMALL CELL/DAS/HET-NET/WLAN• PRE/POST LAUNCH

• Area survey & Base-lining

• Pre-Installation Walk/Drive Test

• Post Installation Verification drive/walk

• Optimization Recommendations

• Performance validation & Acceptance

• Post Launch Optimization support.