Turneky Solutions Mobilecomm
-
Upload
kamaldhanota13 -
Category
Documents
-
view
58 -
download
0
Transcript of Turneky Solutions Mobilecomm
RF Network Planning and Design Services
• MACRO NW DESIGN:• Network
dimensioning• CW & Propagation
Model Tuning• Detailed Coverage
Planning & Capacity Design
• RAN Network Audit & Parameter Planning
• RFDS Creation• SMALL
CELL/DAS/WLAN /HET-NET• Network Goal
identification• Requirements
Survey• Profiling – Area,
Device, Applications
• Coverage/Capacity Planning
• Dimensioning• RSRQ/RSINR
Considerations• Link Budget, PCI,
Neighbor planning
Transport Network Services
• BACKHAUL DEPLOYMENT• MICROWAVE
• Microwave network Design, Assessment & performance Analysis
• Backhaul capacity dimensioning( Macro/ Small cell/DAS/WLAN)
• Line Of Sight "LOS" Surveys
• Microwave links provisioning
• Installation, commissioning & integration of microwave Links.
• FIBER • Pre Deployment
Field Survey • OSP Planning and
Design• Backhaul capacity
dimensioning and planning( Macro/ Small cell/DAS/WLAN
• Installation, commissioning & integration of Fiber Nodes
• Post deployment site Audits
Network Deployment Assurance services -RAN• WAR ROOM:
• E2E Project Management
• Data build creation and XML script Generation
• Scheduling Sites for construction & Integration
• Construction and Integration Support to field crews
• Troubleshooting Network alarms/RSSI Issues
• Site Acceptance & Tuning support
• New Feature/License Implementation
• Software Upgradation and Patch Installation on RAN Nodes
• OTHER RAN SERVICES• Site Construction
(I&C)-Small cell/DAS/WLAN
• EF&I Services• Post Deployment Site
Audits.• EME Site Audits &
compliance Reports• Logistic Support
Services
Network Deployment Assurance services-RF Optimization
• MACRO NW• PRE-LAUNCH
• Pre Deployment KPI monitoring and Analysis.
• Parameter Auditing and adjustment
• Single Site optimization including Drive testing
• Drive test post processing and Report generation.
• POST-LAUNCH• Post Deployment KPI
Monitoring and Analysis
• Cluster Tuning including Drive testing
• Post Launch Optimization support.
• SMALL CELL/DAS/HET-NET/WLAN• PRE/POST LAUNCH
• Area survey & Base-lining
• Pre-Installation Walk/Drive Test
• Post Installation Verification drive/walk
• Optimization Recommendations
• Performance validation & Acceptance
• Post Launch Optimization support.