7/26/2019 SHP2016 - Phase 1 Employment Access Temporary Tie in to Existing Layout
1/1
PROJECT
Stone Hill Park
I/R
ISOA3420x297mm
ISSUE/REVISION
SHEET TITLE
SHEET NUMBER
PROJECT NUMBER
D AT E D ES IG N D R AW N C HK 'D A PP 'D
Lastsavedby:TURLEYC(2016-04-29)
LastPlotted:2016-06-03
Filename:F:\LONDONDEVPLANNINGLIBRARY\PROJECTS\60430453-MANSTONAIRPORTMASTERPLAN\DRAWINGS\MODELS\SHPACCESSDWG\60340453-M001-SKE-0030.DWG
AECOM
MidCity Place
71 High HolbornLondon, WC1V 6QS
+44 (0)20 7061 7000www.aecom.com
60430453
60340453-M001-SKE-0030
PHASE 1 EMPLOYMENT ACCESS
All rights reserved. License Number 100019139
TEMPORARY TIE IN TO EXISTING
LAYOUT
VISIBILITY SPLAYS EXTENTS ALONG SPITFIRE WAY FOR PHASE 1
ACCESS TO BELL
HELLICOPTERS
PHASE 1 EMPLOYMENT
ACCESS
40200Meters
1:1000 @ A3
20
HIGHWAY BOUNDARY
VISIBILITY SPLAYS
20100Meters
1:500 @ A3
10
THIS DRAWING IS A PROPOSED
TEMPORARY TIE IN TO THE
EXISTING LAYOUT ALONGSPITFIRE WAY
DUE TO CONSTRUCTIONPHASING, THE PRIORITY
JUNCTION FOR PHASE 1
EMPLOYMENT WILL TIE ININITIALLY WITH THE EXISTING
SPITFIRE WAY ALIGNMENT, UNTIL
THE CONSTRUCTION OF ALLANDGRANGE LANE ROUNDABOUT.
FOR DETAILS ANDARRANGEMENT OF THE FINAL
PROPOSED LAYOUT SEEDRAWINGS
60340453-M001-SKE-0026/29
FOR VEHICLE TRACKING IN&OUTOF THE NEW ACCESS SEE DWG.60340453-M001-SKE-0027(PHASE 1 EMPLOYMENT ACCESSSWEPT PATH ANALYSIS)