SHP2016 - Phase 1 Employment Access Temporary Tie in to Existing Layout

download SHP2016 - Phase 1 Employment Access Temporary Tie in to Existing Layout

of 1

Transcript of SHP2016 - Phase 1 Employment Access Temporary Tie in to Existing Layout

  • 7/26/2019 SHP2016 - Phase 1 Employment Access Temporary Tie in to Existing Layout

    1/1

    PROJECT

    Stone Hill Park

    I/R

    ISOA3420x297mm

    ISSUE/REVISION

    SHEET TITLE

    SHEET NUMBER

    PROJECT NUMBER

    D AT E D ES IG N D R AW N C HK 'D A PP 'D

    Lastsavedby:TURLEYC(2016-04-29)

    LastPlotted:2016-06-03

    Filename:F:\LONDONDEVPLANNINGLIBRARY\PROJECTS\60430453-MANSTONAIRPORTMASTERPLAN\DRAWINGS\MODELS\SHPACCESSDWG\60340453-M001-SKE-0030.DWG

    AECOM

    MidCity Place

    71 High HolbornLondon, WC1V 6QS

    +44 (0)20 7061 7000www.aecom.com

    60430453

    60340453-M001-SKE-0030

    PHASE 1 EMPLOYMENT ACCESS

    All rights reserved. License Number 100019139

    TEMPORARY TIE IN TO EXISTING

    LAYOUT

    VISIBILITY SPLAYS EXTENTS ALONG SPITFIRE WAY FOR PHASE 1

    ACCESS TO BELL

    HELLICOPTERS

    PHASE 1 EMPLOYMENT

    ACCESS

    40200Meters

    1:1000 @ A3

    20

    HIGHWAY BOUNDARY

    VISIBILITY SPLAYS

    20100Meters

    1:500 @ A3

    10

    THIS DRAWING IS A PROPOSED

    TEMPORARY TIE IN TO THE

    EXISTING LAYOUT ALONGSPITFIRE WAY

    DUE TO CONSTRUCTIONPHASING, THE PRIORITY

    JUNCTION FOR PHASE 1

    EMPLOYMENT WILL TIE ININITIALLY WITH THE EXISTING

    SPITFIRE WAY ALIGNMENT, UNTIL

    THE CONSTRUCTION OF ALLANDGRANGE LANE ROUNDABOUT.

    FOR DETAILS ANDARRANGEMENT OF THE FINAL

    PROPOSED LAYOUT SEEDRAWINGS

    60340453-M001-SKE-0026/29

    FOR VEHICLE TRACKING IN&OUTOF THE NEW ACCESS SEE DWG.60340453-M001-SKE-0027(PHASE 1 EMPLOYMENT ACCESSSWEPT PATH ANALYSIS)