SOCIALIST REPUBLIC OF VIETNAM
Second Rural Energy Project Addional Financing
Construction Inve'stment Sac Giang Province
Volume 2
Environmental [
Management Plan
Dii' Power Company No 1 W Power Construction Consulting Center No 1
JAN 2012
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
wb406484Typewritten TextE2105 v28
SOCIALIST REPUBLIC OF VIETNAM
Second Rural Energy Project Additional Financing
Construction Investment Bac Giang Province
Volume 2
Environmental Management
Plan
HEAD OF DEP. No2: TRAN MINH DO CHIEF OF PROJECT: TRAN NGOC MINH
POWER CONSTRUCTION CONSULTING CENTER Not DIRECTOR
TOHIEN SON
JAN 2012 ":i' Power Company No 1 ~ Power Construction Consulting Center No 1
Second Rual Energy Project - Additional Financing Bac Giang Province
Table of content
• Environmental Management Plan
PART 1. SCBPROJECT DESCRIPTIO:\' ............................................................................. 2 1. Subproject Overview ..................................................................................................... 2 1.1 Ecological and social context.. ......................................................................................... 2 1.2 Volume offuels/materials ................................................................................................ 2 2. Second Rural Energy Subproject - Additional Financing ............................................... 5
2.1 Objectives of the Subproject: .................................................................................... 5 2.2 Capital sources: ......................................................................................................... 5 2.3 Executions in sequences: .......................................................................................... 5 2.4 Required materials and machines: ............................................................................ 5 2.5 Material- to - works transportation manners: .......................................................... 5
3. Second Rual Energy Subproject - Additional Financing ................................................ 5 3.1 Bac Giang general instruction ................................................................................... 5 3.2 Bac Giang subproject site .......................................................................................... 7
4. Legal foundation ............................................................................................................ 7 4.1 Vietnamese Laws and Regulations: .......................................................................... 7 4.2 The Word Bank safety policy: .................................................................................. 8
PART II: E\"VIRO~;vrEl\TAL IMPACTS DEFI:\ITIO:-""- .................................................... 9 PART III: MITIGATIO);, PLAK TABLE ........................................................................... 15 1. Mitigation plan table .................................................................................................... 15 2. The response plan table in case of emergency- cultural vestige discovery .................. 19 PART IV - PCBLIC CO);"SCLTATIO:\' ............................................................................. 20 1. Public consultation methods: ....................................................................................... 20 2. Realized public participation: ...................................................................................... 21 3. Disclosllre .................................................................................................................... 40 1. Provincial People's Committee ........................................................................................ 40 PART V: MO~ITOR.L\G PLA~ ........................................................................................ 41 1. Example environmental terms ofreference for SIMC .................................................. 39 2. Monitoring plan table .................................................................................................. 42 PART VI: CAPACITY BUILDI\G .................................................................................... 70 PART VII: IMPLEMEl\TATIO~ ARRA::\GEME~TS ...................................................... 72 PART VIII: MO::\ITORE\G A::\D REPORTI::\G SYSTEM ............................................... 73 PART IX: APPE).TIIX ........................................................................................................ 74
Construction ConSUlting Center - Power Company :\0.1,. Page I
Second Rual Energy Project - Additional Financing Bac Gian Province
• Environmental Management Plan
PART I. PROJECT DESCRIPTION
1. Project Overview
1.1 Ecological and social context Bac Giang is a province in northern midland and mountainous with administrative
boundariesare adjacent to the Bac Ninh, Lang Son, Thai Nguyen, Hanoi, Quang Ninh.
- Rural economy ofBac Giang mainly depend on agriculture for local handicraft industries
with mainly agricultural product processing, forest products, construction materials
manufacturing, tourism and mineral processing.
- Transport is convenient road and river.
-27 communes in the project scattered on the terrains of the 08 districts, Bac Giang province
is characterized by transition from the high terrain and mountainous, so the ecological
environmentis very diverse. Past due to harvesting of forest products without long-tenn
planning of the SFEleads to flora and fauna were devastated. Currently there is a change m
management thinking with the goal of sustainable development towards the hannony of
nature, protected areas were established in the province ofBac Giang.
1.2 Volume of fuels/materials
* LV line - Total length of lines: 393.091 kms. (each pole only nails from 1+2m2, the average
distance between the pile of about 40 m)
Among them:
+ Improvement: 393.091Km.
- Wires: Use wire AV (120-95-70-50-35) (aluminum bimetal)
* The meter - Total number of household meters: 51,609 meters.
Among them:
+ The new I-phase m~ter is installed: 51,609 units. 1.3 Volume of workers:
- 20 workers(estimated) x 27communes 540 workers
1.4 Criteria for selection of borrow areas for worker-base camp, storage and bandling of fuels/materials, and concrete mixing.
- The construction activities must comply with building codes and construction
standards. The scope· of the camps for the workers to areas with materials,
materials held areas of construction activities must obtain pennission from
the local authority.
Construction Consulting Center Power Company No.1,. Page 2
Second Rual Energy Project - Additional Financing Bac Giang Province
1.5 Sensitive sites map: See Annex 6
• Environmental Management Plan
1.6 The effects of the project to the community include: The area of land occupied permanent and temporary
Land in permanent form of land to build the foundation of the building line. Due to
large projects, the total land in large format fmished in 27 communes spread. Moreover,
each pole foundation accounts from 1 to 2 meters square, the average distance
between the poles of about 40m. Thus_the effects of land to each family occupied is very
small. Through the preliminary survey, the land occupied land are permanent gardens,
agricultural land, other land should not be considered through the resettlement of people
affected.
Land in the form of temporary land mainly to dump construction materials, waste land.
If the construction period at harvest layout is complete, the compensation effect is greatly
reduced.
* Compensation in the construction process Because of wiring, up the poles and the transport during the construction phase also
affect crops, trees, in this scheme lists the estimated costs for these effects. in the
construction process should be arranged to progress in accordance with the service will
reduce the large amount of compensation and cost reduction projects and reduce
overall damage to society.
1.7 Total subproject cost: VNIl 170,329,00,000
1. Project title Second Rual Energy Project - Additional Financing
2. Programmed title
3. New- construction or New:D Rehabilitation: [2] rehabilitation project
District Commune Tan Yen Dai Roa, Nha Nam, Phuc district Hoa, Quang Tien, Song
4. Project location Van, Tan Trung communes I •
Commune(s) Luc Nam Cam Ly, Chu Dien, Dong 11.
ii. District, town (s) district I Hung, Huyen Son, Tam Di iii. Province communes
Luc Ngan Bien Dong, Tan Quang,
district i Tan Son, Phong Van, Quy Son communes
Construction Consulting Center - Power Company No.1,. Page 3
Second Rual Energy Project - Additional Financing Bac Giang Province
• Environmental :\Ianagement Plan ,~~~." ~-, --- - -- .- - ., -- .,-
Lang Giang Phi Mo, '.'\ghia Hung communes district
Yen district
Yen
district
Dung Lang Son, Tan An, Thang
Cuong communes
The Dong Ky, Dong Tam, Huong Vi, Tam fIiep, Tam
Tien communes --------~
Viet Yen Bich Son communes
district ;-------~-
1. Length and voltage of low
voltage 0,4kV (LV) line - Rehabilitation construction: 393.091 km , 2. Width of Right "~f "Way-CROW) - Width of LV line: from 0.5m
• 3. Estimated number and height - Quantity: 11.919 pole
and the ending - The beginning:
of construction stage QUI/2010
(month/year)
The i QUII2011
-"-""~- -- -----------,--------"--· 5. Implement construction
· rainy season
6. Number of subproject affected 152/10
· households (PAHs)1 ethnic
minority households
ending:
7. Total land required for 0.28ha
I subproject . 0.35ha I - ------------- ----.-- ---;.---------i-• 8. Total productive land required -Temporary: ' - Permanent: 0.28ha
: for subproject 0.35ha 1------------"-----._- -----: 9. Total planted forest land -Temporary: Oha
~---~---.. --"-"-------------10. Total industry land -Temporary: Oha
11. Total residential land -Temporary: Oha-'''---
12 . Total others
A resettlement plan and an indigenous peoples plan are separately prepared in other
Subproject's Volume
-Construction Consulting (' enter Po We!' Company :'\ 0.1 ,. Page -I
Second Rual Energy Project - Additional Financing Bac Giang Province
• Environmental Management Plan
2. Second Rural Energy Project - Additional Financing
2.1 Objectives of the Project:
- Rehabilitating and extending the power networks in rural areas required the
accelerating additional charge, strengthening capacity of the distribution networks
to meet the additional charge development demand and ensure the electrical supply
quality.
Giving support to the power distribution companies to overcome overload,
network blocking in the rural power distribution system by upgrading and
extending the distribution networks, meeting the additional charge demand,
ensuring the electrical supply quality, reducing the distribution losses, reinforcing
the safety and reliability of distribution for customers, improving the power
business efficiency.
2.2 Capital sources:
- Loan from the World Bank. This loan is for equipment purchase, building and
assembling.
Domestic counterpart capital is to cover taxes, fees and others costs.
- L V section: The PPCs that are project investors will borrow money from the above
loan for investment, post-investment poverty management and operation of the LV
power networks.
2.3 Executions in sequences:
- Lines: pole foundation pit digging - materials transporting to works pole erecting
- installing line components.
2.4 Required materials and machines:
The volume of materials, construction machines used in the project: Cement (2.324.828kg),Sand (5.317m3), Stone (9.525m3), Iron (194.496kg), Poles(
12,245), Beam (30,934 sets),porcelain (85,916 units), Crane (38), Vehicle (62),
Concrete mixer (124).
2.5 Material - to - works transportation manners:
Manual and machine-made
3. Second Rual Energy Project - Additional Financing
3.1 Bac Giang general instruction Natural characteristics and current environment
Construction Consulting Center-Power Company No.1,. PageS
•
Second Rual Energy Project - Additional Financing Hac Giang Province
a) Geography
• Environmental Management Plan
Bac Giang is the midland and mountainous province, contiguous to the Northeastern, the Red River Delta and the Northwestern. It borders with Quang Ninh province in the northeastern, with Quang Ninh and Hai Duong provinces in the east, with Thai Nguyen and Ha Noi capital in the west, with Thai Nguyen and Lang Son in the northwest, with Bac Ninh in the south and southwest.
Bac Giang has the natural area of 3,823 km2, accounting for 12% of the whole nation area
The total population up to the 31 st December, 2009 is 1,755,720 persons. The average population density is 407 personslkrn2. Bac Giang has over 26 ethnic groups living together, of which Kinh and Nung are majority.
Bac Giang has the administrative structure of 9 districts and 1 city, including 7 mountainous districts namely Son Dong, Luc Nam, Luc Ngan, Yen The, Tan Yen, Yen Dung and Lang Giang, and 2 midland districts namely Hiep Hoa and Viet Yen, with 229 wards and towns.
With the favorable geographical position, Bac Giang is considered as the gate of economic, cultural, scientific-technical exchanges among the Tonkin Delta, Ha Noi capital and the northern provinces, and among the the northern provinces and Quang Tay province of China. Especially, Ha Noi capital next to Bac Giang is the 1 st high ranking extensive market of agricultural and forest products, paper, fabric, chemical substance for industry made in Bac Giang area.
b) Topographv
Bac Giang topography has two sub-areas including midland and mountainous ones with plain interposed. The former covers two districts of Hiep Hoa, Viet Yen and Bac Giang city. The later covers 7 districts of Son Dong, Luc Nam, Luc Ngan, yen The, Tan Yen, Yen Dung, Lang Giang, of which some parts are high mountainous areas.
The prominent features of the terrain area (accounting for 72% of the whole province area) are strong separated, complicated and highly uneven in term of height level. It has much rich land area, particularly natural forest. The low land hill is available for planting fruit and industrial trees such as Thieu litchi, orange, lemon, custard-apple, persimmon, soybeans, green tea v.v. or feeding livestock, poultry, aquatic products .
The prominent features of the midland area (accounting for 28% of the whole
province area) are hill and hillock land intermingled with large, narrow plain. This area is available for planting foodstuff, fruit and industrial trees and feeding livestock, poultry, fish and many kinds of aquatic product.
c) Climate
Construction Consulting Center - Power Company No.1,. Page 6
Second Runl Energy Project Additional Financing Bac Giang Province
• Environmental :\Ianagement Plan
Bac Giang locates in the mountainously tropical and monsoon climate and has rarely
long illuminated timc. The non-tropical features expose clearly during the winter with
the temperature in both high and low areas not meeting tropical temperature standard.
d) Commerce and Tourism
In recent years, the service sector has witnessed the relatively fast growth and played
the important role in fostering production development. The system of commerce,
tourism and hotel has fairly developed, getting 12,800 units in 2006, of which the
repair trade part accounted for 53.5%, the tourism and hotel part 33.9%, the private
service 12.6%. In 2010, it has 14,950 units, of which the repair trade accounts for
62.8%, the %, the tourism and hotel part 23.7%, the private service 13.4%.
3.2 Bac Giang subproject site Second Rual Energy Project Additional Financing is scheduled to rehabilitate,
upgrade and expanse the LV power networks in 7 districts in Bac Giang named: Tan
Yen, Luc );"am, Luc ?\gan, Lang Giang, Yen Dung, Yen The and Viet Yen, improving
the distribution business services ofBac Giang LV power network, meeting the local's
development.
4. Legal foundation
Subproject legal framework
4.1 Vietnamese Laws and Regulations: - The 2005 Environment Protection Law.
- The Decree :\0. 80/2006r.\D-CP dated 09/08/2006 by the Vietnamese Government
specifying the implementation of some articles of The Law on Environment
Protection.
- The Decree :\0 21/2008/?\D-CP dates 28/212008 by the Vietnamese Government on
modifying and supplementing some articles of The Decree :\0.80/2006r.\D-CP dated
09/08/2006.
- The Decree :\0. 8112006r.\D-CP dated 09108/2006 by the Vietnamese Government on punishment of administrative Violation of environmental protection aspect.
Circular :\0. 05/2008/TT-BT:\\1T dated 0811212008 by the :\atural Resources and
Environment .Ministry on implementation of strategic environmental assess,
environmental impact assess, and environmental protection commitment.
- The Decree :\0. 106/2005r.\D-CP dated 17108/2005 by the Vietnamese Government
specifying the implementation of some articles of Thc Electricity La\v on safety protection of IN power network works.
The Decree :\0. 24/2000r.\D-CP by the Vietnamese Government spi:cifying the
implementation of The Foreign Investment Law regarding environment protection.
The current Vietnamese Standards.
Construction Consulting Center·- PoneI' Company :\0.1,. Page 7
Second Rual Energy Project - Additional Financing Bac Giang Province
4.2 The Word Bank safety policy: - OP 4.01 Environmental Assessment.
- OP 4.10 Indigenous Peoples.
- OP 4.12 Involuntary Resettlement.
•
- The World Bank Policy on Access to Information
('oflstr'uction Consulting Center Power Company "0.1,.
Environmental xlanagement Plan
Page 8
Second Rual Energy Project - Additional Financing Bac Gian Province
• Environmental Management Plan
PART II: ENVIRONMENTAL IMPACTS DEFINITION
Impact Potential Comment impact (about rate and level of impact)
Yes No
Pre-construction phase
Impacts associated with X - All of parts of trees that are higher than
clearing the ROW 4m need to be .cut. The trees are still
remained.
- The construction work will need to
excavate soil, tree cutting and other
activities along the route. But main part
of route is aligned along the main roads
so the interference by these activities is not much and not lasts for a long time.
- The lines are not going through any
forested areas or areas with highly
ecological value.
- Trees that are to be effected are mainly
fruit trees ... these trees have economic
value rather than environmental value
- The rural power network is installed
along the rural transportation roads, that
are not cutting any dense vegetation cover.
Health risk due to X The Project is carried out in the rural
explosives, chemical areas, that have no problem with
hazard explosive or chemical hazard in the past.
During Project implementation, there is no explosive or hazardous matter
allowed to used.
Construction Consulting Center - Power Company No.1,. Page 9
Second Rual Energy Project - Additional Financing Bac Giang Province
Loss of historical and cultural properties
Construction phase
1. The effect of mixing the concrete area to the
surrolll1ding water. The impact of the project to
cultivation
2. Soil erOSlon, sediment X generation and surface water turbidity caused by earthwork.
I
Construction Consulting Center- Power Company No.1,.
x
x
• Environmental Management Plan
- The routes are designed to avoid cultural, historical properties in the areas, so the Project will not effect any cultural
heritages
- During construction if there is any valuable historical or cultural properties
are fOlll1d underground, the Contractor
and Project owner will report to local
Department of Culture and infonnation for further consideration.
Since the preparation of materials is done by construction equipment such as
mixers .. , so wastewater is thoroughly limited impact to nearby water sources.
The time of construction are selected to avoid the season should hardly affect
crops.
- During construction process, the
amount of soil and rock excavated for making the L V and LV pole foundation
is about 17.800 m3 in which 12.500 m3 is used for filling up pole foundations, The
rest 5.300 m3 of its residue will be removed to fill in the hollow places or the areas where do not cause mud when water erodes. The place used to be filled the residue of soil should be permitted by the local authorities. The excavation should be implemented in dry season to avoid erosion. The L V and LV tower foundations in this project have relative
small depth (under l.Om). The soil in this
project site is at level 3 or 4. According
to the standard of sector, with this soil level it need not build embankment. It
Page 10
Second Rual Energy Project - Additional Financing Bac Giang Province
3. Affects on air quality X from vehicle and equipment exhausts and dust generated by construction activities.
4. Noise generated by X vehicles and equipments used during construction time.
I I
Construction Consulting Center- Power Company No.1,.
• Environmental Management Plan
means that the soil of the foundation is not erodedlsedimented/landslided at the above depth level.
- During the stage of investigating and designing locations of the tower foundation, the layer structure are taken
into account to avoid constructing on the land areas erodible or nearby stream, river where are easy to landslide and affect on the foundation positions. Thus, sediment generation caused by soil erosion has been also limited at the lowest level in the investigation and design stage.
- During construction process, the exhaust fume discharge from vehicles and machines used for transporting materials on the national or provincial ways is able to limit or control. In the areas far from the main roads, the material is mainly manually transported so it does not cause any adverse affects on the environment at all. During construction period, only crane generates exhaust, noise but these impacts are able to mitigate. - Dust generated during the construction period may cause little effects on residences in communes in the project area. - Transportation occurs in a short time so the impact level is limited.
- Noise may cause negative effects on the residential areas of the project site, so it is necessary to control that noise to avoid possible bad effects on the residents.
- The proposed construction plan has been released to avoid working at night in the area nearby the residents.
Page 11
Second Rual Energy Project - Additional Financing Hac Giang PrOVInce
5. Affects on cultural vestiges through direct physical disturbance or on the surrounding areas.
6. Affects on ecological reserve through direct. physical disturbance or on .
. the surrounding areas.
7. Contamination of soil, air or water from using or leakage of hazardous materials including PCBs.
8. Affects on traffic due to X construction activities nearby public roads.
Construction Consulting Center Power Company No.1,.
x
x
X
• Environmental Management Plan
- This project does not affect on cultural vestiges or surrounding areas. Factually, the project area has some historical places as Bo De, Duc Lang Pagoda, Dinh Huong temples, Suoi Mo vestige ... and The Khe Ro primeval forest, etc. But the survey showed that the possible affected nearest area would be over 3km far from the existing historical monument community. Therefore, the project does not affect the scenery of cultural vestiges.
Bac Giang has some ecological tourist area i.e Suoi Mo vestige, The Khe Ro primeval forest, ... but the distance from the project site to this forest is over 3km .
- PCBs have been forbidden to use for electric material and equipment for a long time.
- Environmental affected - materials discharged during the construction time as disposal oil, chemical are so little that they don't cause any bad effects on the local environment.
- During construction process, there isn't disassembling of old transformers therefore risk of hazardous materials leakage, including PCBs doesn't occur at all.
- Construction activities maybe cause effect on public tri:1.l1sportation in the nearly whole roads In the province because this project is developed in 27 communes over Bac Giang province. But in fact, these activities only impact on inter-commune roads. The national and provincial roads are less affected because the project is mainly developed in the communes that have not been completed power networks. Furthermore, most communes are located in low population density areas and not close to the national or provincial ways.
Page 12
Second Rual Energy Project - Additional Financing Bac Giang P"oyince
9.Impact due compliance with safety regulations
to non- X working
10. Environmental impacts X
caused by using worker
camps set during
construction.
. 11. Effects by gathering X
workers to local
community.
12. Other effects X
OQeration Qhase
13. Exposure to EMF
levels exceeding the
Vietnamese government's
standards. . ----------•.. ~-. --
14. Affects on flora and X
Construction Consulting Center- Powel" CO!llpa ny '10.1,.
X
• Enyironmental .\Ianagement Plan ---.'~""--. --- - . ~ -" _. ~~.- - _._ ..
in low population density areas and not close to the national or provincial ways.
Accidents might happen during construction if the safety issues are not well considered.
- Accidents might happen not only for · workers but also for local peoples. For. · example: some object might fall down.
• - The impacts are minor, because the
· camps are built on the fallow far from
the residential areas. In case the camping
• site is closed to the residential areas, the .
construction workers will stay at hiring
; house or with local family. The camping
: sites will exist parallel with the
: subproject schedule. The sanitation !
· facilities with required conditions will be i : built. The freshwater resource is from
! well, stream, river. There must be. : measures for cleaning up solid water and
: collecting litter.
: Workers gathering to works may partly .
i cause negative effects on the local
: community but not so much. Due to
i working particularity, the worker amount ! and the workers' staying time will be ! decided by the investor and the
• contractor so that it will not negatively
• cause life, culture, activities of both · workers and locals.
- Solid waste arising by foundation
excavation.
~"--~-.--~- -- "
- There are no impacts because the
design stage is in compliance with the
regulations on technique of design
norms. ------_. __ ..
- There are some small impacts during
Page 13
Second Rual Energy Project - Additional Financing Bac Giang Province
!
15. Interference with radio,
TV or other
communication means
16. Affects on public
health, safety and security.
17. Impacts on water
· quality because of discharge of employee sewage (project's
substations only)
18. Contamination of soil. air or water from use of
• hazardous including
• (arrounding
materials. PCBs
the. transformer station)
19 . Noise generated from substation operation
Construction Consulting Center Power Company No.1,.
x
x
x
x
x
• Environmental Management Plan
(banana .. ). Cutting off the trees on the ROWs is also considered In the construction stage. Planting low crops
around the tower foundations are not
forbidden
- The impacts are minor because the
design is in compliance with the line
designing standards.
- No impact because all possible affected
houses have been relocated and forbidden to build in the area of electric
magnetic field. Anywhere has the TIL
traverses, people will be trained and pre-warned in an electrical security program. The operation and design measures are
strictly obeyed on the required standard in order to keep safety for people.
- No impact, because this IS the
transmission line project. There is no worker's new accommodation.
- No impact. The project absolutely does
not use hazardous materials.
- No impact. As the capacity of the substation in the project site is small, the noise is not big enough to harm the surrounding environment.
Page 14
Second Rual Energy Project - Additional Financing Bac Giang Province
• PART III: MITIGATION PLAN TABLE
1. Mitigation plan table
Issues Mitigating Measure
Pre-Construction I!hase
Impacts To minimize the area of compensation for
associated crop on the corridor line goes through, pulling
with the strings, transportation to the location and
clearing the erection pole, primarily done at a later time and
ROW harvest paddy and crops
Compliance with the compensation policy
or policies to support the recovery of land by
the GoV. and the World Bank
Construction I!base
1. Effects on • Utilizing hand clearing away vegetation if vegetation possible. A void cutting trees or damaging the when surrounding flora beyond ROWs. clearance for • Forbidding to fire trees and others during cutting Right of Way and clearance. (ROW) takes place.
• 2. Temporary • Using the existing roads for transporting. If the Access project uses the temporary access roads during Roads the construction time, it then needs to recover
the roads as the original state, avoiding causing bad impacts on current environment and the people's living.
• Ensuring to restore the disturbed areas with native species existing in the province.
Construction ConSUlting Center - Power Company No.1,.
Environmental Management Plan
Cost Responsib I
ility i
No cost Contractor
Included In Contractor contractor bidding pnce
i
Included in Contractor contractor bidding price
Page IS
Second Rual Energy Project - Additional Financing Bac Giang Province
•
Issues Mitigating Measure
3. Runoff. sedimentatio
As excavating the soil of the pole foundation, building the drainage ditches at the erodible and limiting excavating work in the rainy season. n and Soil
Erosion • •
Using embankment for an ti-erosion.
Minimizing choosing pole foundation at slope land areas.
• Replant the vegetation with native species as soon as possible in slop land areas excavated to build pole foundation.
• The residue of soil should be removed to the
Environmental Management Plan
Cost Responsib
ility
Included in Contractor contractor bidding price
areas that are permitted by the local authorities. r~----~~+-~----------~------~----------------~----------+-------~ 4. Air • Ensure that all machineries using combustion No cost Pollution engines have a valid operating license during the
project schedule.
5. Noise
6.Traffic disturbance due to construction and transporting means.
• Ensure that all trucks transporting dusty materials to/from the project sites are covered.
• Spray water to the dusty areas (construction site, roads etc.) in hot, dry, and windy conditions.
• the anti-wind clothes should be put at the places where have strong wind to avoid dust.
• Avoid burning removed vegetation during the construction time.
•
•
All construction activities are conducted during daytime hours. In case of evening construction, pre-notification and approval by affected local are required.
This impact is unavoidable. The mitigation measure is to try to shorten the construction time and avoid transporting at the rush hours.
Construction Consulting Center - Power Company No.1,.
Contractor , transportin g unit
Included in Contractor contractor bidding price
No cost Contractor
Page 16
Second Rual Energy P"ojeci Bac Giang Province
Additional Financing • Environmental :\lanagement Plan
Issues
7. People' safety due to the construction activities and transporting means
~.Ln. __ _._ ~ _x.
Mitigating Measure Cost
• The transporting means should be marked by the "0 cost name and symbol ofthe subproject.
• Assigning workers to direct traffic whencver trucks go in works or stop for unloading materials.
• Limiting the speed of transporting means in areas near the subproject site and setting railings and risk plates at the under-construction pole foundations.
• Prohibiting unauthorized persons to enter construction sites
Responsib i1ity
Contractor
.---~--------- .. 8 Measures for ensuring working
• Inform workers the safety regulations and Included in Contractor
• . safety
•
•
•
•
procedures
The workers must be provided with thc knowledge of occupational safety and equipment safety in the construction process ..
Workers that are not equipped with thc knowledge of occupational safety and labor protection equipment shall not be employed.
Do not allow people who have no duty to go into the construction area.
-:\ot allow to work during special climate conditions such as fog, strong wind, dark etc.
Regularly check and maintain construction equipment before use.
contractor's cost.
~------,---------.:------.- --.--------------------------------- --- . - - . ---- --. - - -- ----------_._--Safety and • Improve construction unit's awareness of - Included m: Contractor
sanitation at environmental protection by disseminating contractor's worker's requirements on environment protection fixed in cost. camping sites the contract.
•
•
1 O. Effects. on u nd iscovered cultural vestiges.
Pointing out the detail plan on waste water treatment such as: drainage trench, sanitary landfill, building isolated latrines and dispose solid waste in proper places.
Giving out the measures of preventing explosive and fire at
In the case of discovering the underground items or vestiges, the measures regulated by certain processes placed in the Emergency Response p,lan.
--------.--- -----------
Constl"uction Consulting Center - Power" Company :\'0. I '"
The cost will be accounted into the arising cost and to the additional cost later.
Page 17
Second Rual Energy Project - Additional Financing Bac Giang Province
• Environmental Management Plan
Issues Mitigating Measure
11. Solid. The quantity of the solid sewage arising in the construction schedule is relative small. The other sewages should be cleared off by the construction unit according to the agreement signed with the local authorities.
sewage arising in the construction
i schedule
11. Contradiction between
• Requesting and reminding workers of carrying out measures to ensure sanitation in works and at camps, and healthy lifestyle.
workers and • locals or the Employing local workers for simple operations. possibility of disease infect. 12.The effect of mixing the concrete area to the surrounding water source. 13. The impact of the project to cultivation
• Ensure close process concrete mixing machine, do not dump waste water into the surrounding environment
• Conduct construction after crop harvest
Operation phase
Cost
1. Tree. cutting
Do not cut trees below the minimal height No cost requirement
2. Wastes. (dirty water, oil discharged during the operation time)
Effects of oil discharge from additives in the operation time is very little small. The dirty water will be accessed before discharging to the surrounding areas.
Treatment of • Transformers waste oil from substation
are used as hanging should not have waste oil
Construction Consulting Center-Power Company No.1,.
Responsib ility
BAC GIANG PMB
Page 18
Second Rual Energy Project -- Additional Financing Bac Gia.ng Province
• Environmental :\lanagement Phw
2. The response plan table In case of emergency - cultural vestige
discovery.
Finds Actions__ _ ___ ~~_~!l!~J!Sibl~ ______ _ I. Discovering cultural archaeological-valued vestige while digging
or - The contractor protects actual state of Contractor,
2. Discovering tomb digging
executing spot and report to the Execution' Supervision · Supervision Cnit, the Electrical Company, • Consultancy to co-'
the local museum and the local Department. ordinate. of Culture and Information, - Giving vestiges found to the local museum. Contractor
· / cultural administrative agency. . -~ Considering to decide moving on digging or stopping to further investigate. ,.;.. The leader of the local Department of' Department of : Culture and Information is responsible for. Culture and Sports'
· managing discovered vestiges under Article '. and tourism :-\0.21 of Decree );0. 9212002 specifying the: implementation of The Cultural Heritage' Law.
- Protecting actual state and reporting to the. Contractor, local authority. . concerned units. - Defining the solutions and assignments of concerned individuals, timetable and:
site if available. --
3. Complaints about - Carrying out instant repair measures Contractor environment issue related to possible. : Contractor, The operations. - Taking note in the execution journal. , P~B and the local •
- Discuss the issue with the contractor/the! authority. local authority in case C?f conflict.
4. Accidents related to' - First and instantly removing the victims to ,workers and the! execution or operation.
5. Discovering explosive materials
· the nearest health care base if necessary. nearest residential' - Laying down the plate of "danger area". . community; - ~aking a report of the accident. . Investor, Contractor;
- Protecting actual state (scene). - Reporting to the local authority. - Contacting with local military unit to ask for
. the local
. Contractor and the local authority to co-ordinate.
Construction Consulting Center - Power Company 'io.1,. Page 19
Second Rual Energy Project - Additional Financing Bac Giang Province
• Environmental Management Plan
PART IV - PUBLIC CONSULTATION
1. Public consultation methods:
CONSULTATION DETAILS OF CONSULTATION METHOD ACTIVITIES OUTCOMES
Public Notice Date(s) of notice - nla Location of notice -
Newspaper Date(s) of notice - nla Notification Name of newspaper -Public Date(s) of nla announcement! announcement
radio Time(s) of
announcement
Newsletter I Date( s) sent Announcement! Date( s) sent questionnaire Questionnaire
Number sent - Number sent
Area of distribution Not - Area of Feedback sought implementation distribution
(Yes I No) - Feedback sought (Yes I No)
'Public meeting Date(s) held --'r::--~--~-
2611112009 Meeting minutes ------------:-
Issues discussed to 5112/2009 attached (Yes I No) at meeting:
- Yes • noise impacts
• dust impacts • water quality • protecting
trees
• safe operation
Location(s) held communes in Attendees CPCs affected area DPCs
by the project Women's Union I
Construction Consulting Center - Power Company No.1,. Page 20
Second Rual Energy Project - Additional Financing Bac Giang Province
Invitees
• CPCs,
DPCs,
Women's
union,
Fatherland
front,
Youth Union,
Local
residents
Methods of CPC called
invitation
Agenda attached No
(Yes / No)
2. Realized public participation:
- Held the public participation meetings:
Environmental Management Plan
Fatherland
Front Youth Union
Local residents
+ Held the meetings at district-level in all districts participating in the projects. The participators included: the representative of district PPC, project's commune People Committees, the Construction Consulting Center - Power Company No.1,
+ Held the meetings at all project communes. The participators included: the representative of commune people committee, Women's Union, Youth Union, representative of possible affected households and the Construction Consulting Center
- Power Company No.1,
+ The meetings aimed to introduce the project, environmental impact issues, opinions and measures to ~itigate, and others opinions of the participators. There are many opinions at the meetings, the mains are: the contractors try to avoid working at night as noise may cause bad effects on the residential areas; the vehicles have to be
covered; the roads have to be spitted water during transportation period; the height limitation of trees planted in the ROW; the resettlement policy.
Construction Consulting Center - Power Company No.1,. Page il
Second Rual Energy Project - Additional Financing Hac Giang Province
• Environmental .\[anllgcment Plan
SL"yLVIARY OF COMME~TS/OPI~IO~S FROM PLBLIC CO~SL"L TATIO~
District and Consultation C It t' ' ,. onsu a IOn p .. .
commune S site f artIclpatlOn Comments! Opinions
name ~posi!ion_) _____ ~~~ ______ ~ _______________ ,_ 01. Tan
Yen
District -~~~-. ~
1.Dai Boa CPC's
• Commune Dai Hoa
HQ 26.11.2009 1, Trinh Van -:\0 comment
Thang - Chairman
of commune
people's committee
, (CPC's Chairman)
2, :\guyen Van
, Kiem CFF's
, Chairman
3, ~go Van Thanh
, - CFO's Chairman
4, ~guyen Thi Hoi
CWL's
Chairwoman
5, Ho Sy Hung
, CYL"'s Secretary.
6, :\guyen Dinh
, Hai CVO's
Chairman
7, - Household's
Representative -- ----- ----- - '.----------,- -- - ,,--- -" _.,,-'-'----,
2. ~11a "\'am CPC's HQ 27.11.2009 1, Do Quang Thom -Suggestingn the,
Commune Dai Iloa -Vice. Chairman subproject's eady
of commune implementation
people's committee - Asking for
(CPC's Chairman) apprppriate
2. Pham Viet Dien compensation
CFF's Chairman policy for
3, '\"guyen Van Cai households
- CFO's Chairman affected by land
.. Construction Consulting Center Power Company :\0.1,. Pagen
Second Rual Energy Project Additional Financing Bac Giang Pmvince
_ ~.__ _ '$±Eli
• Enyironmental :VIanagement Plan
-",--,--
4, Tran Thi Vinh and farm produce
cwe's effects.
Chairwoman - Avoiding crop
· 5, );" guyen Van time during the
: Viet Cye's subproject's
: Secretary. implementation in
i 6, Le Thien Loc - order to reduce· ! CVO's Chairman negative effect on
· 7, - Household's farm produce ...
Representati ve
3.Phuc-fi~;---cp-C-'-s -HQ 28.11.2009 ! 1, ?\guye~- Hong - Asking for'
Commune . Phuc Hoa
4.Song Van CPC's HQ . 29.11.2009
Commune Song Van
Construction (onslIltill!! (enter- Ponel' Company :-\0.1,.
I
: Linh - Chairman appropriate
of commune compensation
, people's committee , policy for '
, (CPC's Chairman) i i 2, Bui Van Chinh ..
households
affected by land
! CFF's Chairman and farm produce,
· 3, Bui Van Thang effects.
- CFO' s Chairman Asking
• 4, Hoang Thi envionment
· Hanh cwe's treatment.
· Chairwoman
· 5, Tran Van Trang
: - Cye's Secretary.
• 6, Le :\goc Trung
• - CVO's Chairman
7, - Household's
Representati ve
1, Giap Van Tin - Asking
Chairman of appropriate
compensation
for
for,
commune people's
committee (epC's
Chairman)
policy for ~
households
2, Duong Van Due affected by land
CFF's Chairman and fanTI produce'
3, Ta Xuan Tho - effects.
Page 23
Second Rual Energy Project - Additional Financing Bac Giang Pro\'ince
5.Tan Trung CPC's HQ ; 30.11.2009
Commune Tan Trung
-!" ,-,,~,-,--,,-"'--------,,---
6.Quang CPC's HQ • 1.12.2009
lien
Commune
Quang Tien
Construction Consulting Center Power Company :\0.1,.
• Environmental :\'lanagement Plan _U ___ .. _______ ""____ __ _ _ __ >
CFO's Chairman Asking
4, Pham Thi Hong envionment
CW'C's treatment.
Chairwoman
5, Ta Kim Tiep -
CY'C's Secretary.
6, ~ guyen Dinh
Thi CVO's
Chairman
7, - Household's
Representati ve
1, :\1ac Van Chan Asking
Vice. Chairman of appropriate
, commune people's; compensation
'" ,
for
for
committee (CPC's policy for ,
Chairman) households
'2, ~guyen Thai affected by land
Binh CFF's and farm produce,
Chairman effects.
'3, ~guyen Danh - Asking for
. Hai CFO' s envionment
Chairman
4, ~guyen Thi
Tho CW'C's'
Chairwoman
5, ~guyen Van
Quang CY'C's
, Secretary.
6, Giap Van Tuan
CVO's Chairman
7, - Household's
Representative ~ '.
treatment.
1, :\ guyen Dang " Asking for
Hoan Chairman appropriate
of commune compensation
people's committee policy for
Page 2-1
Second Rual Energy Pmject - Additional Financing Bac Giang Province
• Environmental ~1anagement Plan ... ~-, .-~ -- "- ~.. --~- ~ .. _... ~.-- --.----.- ,._.---_. .-~. -.. - -,_.
02. Luc
~am
District
1.Cam Ly CPC's HQ •. 1.12.2009
Commune CamLy
(CPC's Chairman) households
2, Ph am Van Hoan affected by land
CFF's Chairman and farm produce
3, Le Duc Hoan - effects.
CFO's Chairman Asking for
4, Pham Van Tinh envionment
Second Rual Energy Project - Additional Financing Bac Giang Province
3.Dong
Hung
CPC's HQ ; 3.12.2009
Dai Hoa
4.Huyen Son CPe's HQ 4.12.2009
Commune . Dai Hoa
Constn!ction Consulting Center-- Power Company :\0.1,.
• Environmental :Vlanagement Plan .. -
Thinh CFF's
Chainnan
3, Phan Thi Chu -
CFO's Chairman
4, Pham Thi Su
CWU's
Chairwoman
5, Hoang Van Dem
CYe's Secretary .•
Kguyen Thai 6,
Hoc CVO's
Chainnan
7, - Household's.
Representati ve
1, Le Van Tuy
Chainnan of - Asking
commune people's' appropriate
committee (CPC's' compensation
for'
Chainnan) • policy for
2, Kguyen Van' households
Hoan CFF's : affected by land
Chainnan . and fann produce •
3, Tran Van Chien. effects.
- CFO' s Chainnan - Asking for .
4, :\guyen Thi envionment
Dung - CWC's treatment.
Chairwoman
5, i\guyen Van.
Kien CYe's
Secretary.
6, Bui Van Thanh
eve)' s Chainnan 7, ~ Household's
Representative .-~,,--.---.----.- "
1, ~ guyen Duy
Quang Chainnan -:\0 comment.
Page 26
Second Rual Energy Project - Additional Financing Bac Giang Province
-~-,--.--
! 5.Tam Di I CPC'S HQ 5.12.2009 . Commune . TamDi
Construction Consulting Center Po\H~r Company \0.1,.
• Environmental Management Plan
of commune
people's committee
(CPC's Chairman)
2, Pham
Minh
Chairman
Hong
CFF's
3, :\"guyen Xuan
Thuy - CFO's
Chairman
4, :\"guyen Thi
:\1inh CWt;'s
Chainvoman
5, :\"guyen Van
Tuu Cyt;'s.
Secretary.
6, Tran Van Binh!
- CVO's Chairman
7, - Household's.
Representative 1, ~g;y~;--- Huu . --.------
Dang .- Chairman. - No comment
of commune
people's committee •
(CPC's Chairman)
2, :\"guyen Quang
Khuy CFF's
Chairman
3. :\" guyen Van
Thanh - CFO's
Chairman
4. Luong Thi
Dung Cwt;'s
'Chainvoman
S. Dao Van Quang
CYL's Secretary.
6. :\"guycn Sy Tan
Page 27
Second Rual Encrg)' Project - Additional Financing Bac Giang Province
• Environmental :\Ianagement Plan
--- CVO's Chairman
7, - Household's
Representative .. _----_._- ---_. ---.-.~--~.
03.Luc
~gan
District
l.Bien Dong CPC's HQ 26.11.2009
Commune Bien Dong
~.- --_.. . ~-" - ---
1, :\go Van Hoi - Asking for
Chairman of : envionment
commune people's: treatment.
committee (CPC's: - Asking for
Chairman) . appropriate
, 2, Le Van Thuong ! compensation
- CFF's Chairman policy for
· 3, Tran Quang Hop! households , :
- CFO's Chairman . affected by land · I
• 4, Than Thi! and farm produce
Phuong - CWU's effects.
Chairwoman
5, Ngo
Phuong
· Secretary.
Van;
CYe's
· 6, Ngo Van Thuy i
CVO's Chairman'
· 7, - Household's
· Representative
: 2.Tan Quang. HQ 27.11.2009 1, Nguyen Van Be . - Asking for
Commune Tan Quang
Construction Consulting Center -- Power Company :\0.1,.
Chairman of appropriate
commune people's compensation
committee (CPC's policy for
Chairman) households
2, Tran Dinh Nam affected by land
- CFF's Chairman and farm produce
3, Tran Huy Duong effects.
- CFO's Chairman
4, Tran Thi
Phuong CWU's
Page 28
Second Rual Energy Project - Additional Financing Sac Giang Province
• Enyironmental :\Ianagement Plan .-
Chairwoman
Lam Van Bao
CYG's Secretary.
6, :\guyen Van Phu
-- CVO's Chairman
7, - Household's
Representative ..... _._----_._---- .... ~
Son CPCs HQ 28.11.2009
Commune Tan Son
--~---- •.. --. 4. Phong CPC's HQ 29.11.2009
Van Phong Van
Commune
.. -
5. Quy Son CPCs HQ 30,ll.2009
1, Giap Van Trong . -Asking
Chairman of envionment
· commune people's treatment.
· committee (CPC' s
· Chairman)
, 2, Trieu Thi Minh - ,
· CFF's Chairman
: 3, Tran Van Tuyen .
· - CFO's Chairman
· 4, ?\ong Thi Chieu
CWU's
• Chairwoman · 5, :\ong Van
: Huong -- CYU's
· Secretary.
: 6, ?\guyen Van Vat
• - CVO's Chairman
· 7, - Household's'
· Representative
.. 1, Vi Van Giang -Chairman of
commune people's
committee (CPC's
Chairman)
2, Vi Van Diep
CYG's Secretary.
3, - Household's
Representative ~--.--~-"
1, An :\ goc Luong
._----- - -_ . - Asking envionment
treatment.
Asking
for
for ..
[or
Construction Consulting Centc,' Powcr Compan)' :'\0.1.. Page 29
Second Runi Energ), PI'oject- Additional Financing Bac Giang Province
Commune
·4.Lang
Giang
. District
Quy Son
1, Phi Mo CPC's HQ 1.12.2009
. Commune PhiMo
Construction Consulting Ccnter -- Power ComJlnn~ '\ 0.1 ,.
• Envimnmental Management Plan -- - .. -
Chainnan of envionment
commune people's treatment.
committee (CPC's
Chainnan)
: 2, Vu Van Dung
! CFF's Chainnan
: 3, Xguyen Xuan
i Diep CFO's : Chainnan , i 4, Tran Thi Thanh
cwe's
; Chairwoman
i 5, Tran Van Sang--
: CYU's Secretary.
: 6, Tran Van Ke
: CVO's Chainnan
i 7, - Household's i Representative
1, Hoang Xuan Ha - Asking
- Vice. Chairman envionment
of commune treatment.
for!
people's committee - Asking for :
(CPC's Chainnan) appropriate
: 2, ~guyen Xuan compensation • Hop - C?\ Hgp Tac policy for
Xii households
3, Tran Van Quyen affected by land
. - CFO's Chairman and farm produce
4, Hoang Thi effects.
Phuong -- cwe's
Chairwoman
5, Hoang Tien
Dung Cye's
Page 30
Second Rual Energy Project- Additional Fimtncing Bac Giang Province
• Environmental ~[anagemcnl Plan
Secretary.
6, Do Duy Tnmg
CVO's Chairman
7, - Household's
Representati ve ---.... ---.~ --.... --.. -.. -.. -.-.. -~
2, :\'ghia CPC's HQ 2.12.2009 1, Chu Van Tien - - Asking for .
• Hung
Commune
·S.Yen Dung
. District
:\' ghia Hung
l.Lang Son CPC's HQ 3.12.2009
Commune Lang Son
Construction Consulting ("cnter Power Company :'\0.1,.
Chairman of appropriate
commune people's compensation
committee (CPC's policy
· Chairman) households
i for i
· 2, Chu Van - affected by land
CFF's Chairman and farm produce
3, ~ guyen Thi effects.
Thao CFO's
Chairman
4, Kguyen Thi
Bich Thuy
CvVU's
Chairwoman
5, Le Quang Hung
- CYU's Secretary .
. 6, Le Manh Thang
CVO's Chairman
7, - Household's
· Representative
1, K guyen Thai -Suggesting the .
Quynh - Vice subproject's early·
. Chairman of implementation
commune people's - Asking for ;
committee (epC' s appropriate
Chairman) compensation
2, :\'guyen Van policy for
Quang CI,T's households
Chairman aiTected by land
Page 31
Second Rual £nel'g~' Project Additional Financing Bac Giang Province
2.Tan An ' CPC's HQ 4.12.2009
Commune Tan An
• Environmental .\'lanagement Plan -- - .. J
3,
Due
).; guyen Due and farm produce
- CFO's effects.
Chairman A voiding crop
. 4, :\guycn Thi time during the
, ).;ga ewe's subproject's
• Chairwoman
: 5, Vu Chi Van
implementation in
order to reduce
cye's Secretary. negative effect on
i 6, Ta Quang Hanh farm produce ...
: - CVO's Chairman
,7, - Household's
Representati ve
1, Chu Van Tien Asking for
: Chairman of appropriate
commune people' s compensation
committee (CPC's policy for;
, Chairman) households
2, Chu Xuan Suu affected by land
i - CFF's Chairman and farm produce
: 3, ~guy Van Dien effects.
: - CFO's Chairman
i 4, Tr~n Thi Thu
, cWC's
1 Chairwoman
: 5, ~guycn ~goe
Binh eyC's
Secretary.
6, Le Quang I,uu
CVO's Chairman
7, - Household's
Representat i ve
3.Thang ,.,. CPC's HQ 5.12.2009 -'-'C-r:;a Hong Hanh - - 'Avoiding~rop ~
Cuong
Commune
Thang Cuong
Construction Con~lIlting Center - POller Company "io.l,.
Vice. Chairman of time during the
commune pcople' s subproject's
committee (C PC' s implementation m
Page 32
Second Rual Energy Project - Additional Financing Bac Giang Province
6.Yen The.
District
• Environmental :\Ianagement Plan
Chairman) order to reduce
2, I.e Cong Thuan negative effect on
.... Cff's Chairman farm produce ...
3, Tran Van Han -
CFO's Chairman
4, La Thi Xoa
cwe's Chairwoman
5, :\guyen Huu
Toan CYU's
Secretary.
6, Tran Van Vinh
CVO's Chairman
7, - Household's
Representative
-.,--------:---------~.~- - .. -~ ... --------.-- .... ---------' 1.Dong Ky CPC's HQ 26.11.2009
Commune , DongKy
Consh·uction Consulting Center·· Powel' Company :'\:0.1..
1, Lang Quoc Long -Suggesting the'
- Vice. Chairman subproject's early:
of commune implementation
people's committee - Asking for.
(CPC's Chairman) appropriate
2, :\guyen Huu compensation
Khai CFF's . policy for'
Chairman
3, Bui Van Sau
CFO's Chairman
4, :\guyen Thi
households
. affected by land
and farm produce
effects.
Tiep C\VlJ's - Avoiding crop
Chairwoman time during the
5, :\guyen Van subproject's
Lam CYU's implementation in
Secretary. order to reduce
6, :\ guyen Hoai negative effect on
:\am evo's farm produce ...
Chairman
Page 33
Second Rual Energy Project Additional Financing Bac Ciang Province
• Environmental :\1anagement Plan
-- ~~ . 7. - Household's
Representative ""--~--.--~---~-~ ... -~- ----~ .- ... , - --_ .. __ ... _----, .. _----,- ------~ ...•
2.Dong Tam CPCs IIQ 27.11.2009 1, Vu Trang Dung - Asking for
Commune . Dong Tam
Construction Consulting Center - Power Compan)' :\'0.1,.
- V ice. Chairman appropriate
of commune compensation
people's committee policy for
(CPC's Chairman) households
2, :\guyen Thi affected by land
Thu CFF' s and farm produce
Chairman effects.
3, :\guyen Van
Tiep CFO's
Chairman
4, Tran Thi
Phuong . - CWU's'
Chairwoman
:\go Van Bac
CYC"'s Secretary.
6, II eva's' Chairman
7. - Household's.
Representative ._ .. _ .•.. -_ .. _._-------------"
Page 34
Second Rual Energy Project - Additional Financing Bac Giang Province
-,- ~ ~- ~. ~ --- ~--. - - £ _ .. 3. Huong Vi CPC's HQ . 28.11.2009
Commune Huong Vi
• Emironmental :Vlanagement Plan --,--
1, Hoang Van Huu -Suggesting the
Chairman of subproject's early
commune people's implementation -.
committee (CPC's Asking for
Chairman) appropriate
2, Dang Vo Luyen compensation
... CFF's Chairman policy for:
3, ~guyen The households
Binh - CFO's affected by land'
Chairman
4, '\"go Thi Lien
C\VU's
Chairwoman
and farm produce I
effects.
- Avoiding crop
time during the ~
5, Duong Van Binh subproject's
.- CIT's Secretary. implementation in .
6, Giap Van Cuong order to reduce
CVO's Chairman negative effect on
7, - Household's farm produce ...
Representative .---.-----~ -----_.
4. Tam Hiep CPC's HQ 29.11.2009 1, :\guyen Tien - Avoiding crop.
Commune i Tam Hiep
Construction Consulting Center Power Compan~' :\0.1, ..
Thinh - Chairman time during the,
of commune subproject's
people's committee. implementation In I
(CPC's Chairman) . order to reduce i
2, Trinh Van Luan negative effect on
- CFO' s Chairman farm produce ...
3, ~ong Thi Lien
CWC"'s
Chairwoman
4, Pham :\goc
Duoc CVO's
Chairman I
5, - Household's
Representative
Page 35
Second Rua! Eneq~y Project - Additional Financing Bac Giang Province
-- ... -. 5. Tam Tien CPC's HQ 30.11.2009
Commune
7.Viet Yen.
, District
Tam Tien
1. Bich Son CPC's HQ 1.12.2009·
Commune . Bich Son
Construction Consulting Center- Po\\er Company '10.1 ..
• Environmental \Ianagement Plan
1, Hoang Kim Loc - Asking for
Chairman of appropriate
commune people's compensation
committee CCPC's policy for
Chairman) households
2, Xguyen Thanh. affected by land
Biet CFF's • and farm produce
Chairman effects.
3, Vu Van Thanh - ,
CFO's Chairman
4, Luc Thi Quy -
Cwe-'s
Chairwoman
5, Luong Thi Hoi
Cye's Secretary.
6, Do Xuan Dinh - ~
CVO's Chairman
7, - Household's
Representative
1, Duong Thanh, Asking for
Phuong - . appropriate
Vice. Chairman of i compensation
commune people's; policy
committee CCPC's' households
for
Chairman) affected by land
2.
Dac
.:\guyen Van. and farm produce
CFF's effects.
Chairman
3. Xguyen Van
:r\guyen - CFO's
Chairman
4. Dao Thi Vi
CW'C's
Chairwoman
Page 36
Second Rual Energy Project Additionlll Financing Bile Giang p,'ovince
• Environmental :\lanllgement Plan ....
5, ="guyen Si Kien
Cye's Secretary,
G, ="guyen Trung,
Thong CVO's
Chairman
. 7, - Household's
, Representative .. ~-~~----
Responses of the subproject ovvner 10 opinions made by subproject-affected groups and local
NGOs:
Subproject owners approved the proposals in meetings with the affected households and local
community and will monitor to the recommendations being implemented
Disclosure: The subproject will get the investment license right after identification of subproject
location, design, capacity and technology, meeting the environmental and resettlement
requirements. To meet the requirements of OP 4.01, Bac Giang P:\1B will perform the
following issues:
Provides hard copies (Vietnamese versions) of E.MP to each subproject
districts/communes.
Hard copies of EMP ( both English and Vietnamese language) were submitted to the
World Bank for disclosure at Vietnam Development Information Center and Infoshop
at 63 Ly Thai To - Hanoi.
('onsh"uction Consulting Center Power' Company \0.1., Page 37
Second Rual Energy Project - Additional Financing Bac Giang Province
•
PART V: MONITORING PLAN
No Parties Main responsibility 1 Technical - Monitor (by observation) and assess of the
supervisor of PMU environmental parameters suggested by EMP report;
i-Prepare the monitoring re~ort to PMU 2 Safeguard - Monitor (by observation) and assess
Independent environmental quality based on parameters Monitoring suggested by EMP report. Consultant (SIMC) - Conduct public consultation to receive
comment, assessment of local people on environmental management of the Project.
3 Local - Monitor (by observati on) and assess communities environmental quality based on parameters
suggested by EMP report.
4 - Take ~art in ~ublic ~artici~ation
District people's - Monitor (by observation) and assess committees environmental quality based on parameters
suggested by EMP report . . - Take ~art in ~ublic ~artici~ation
Construction Consulting Center - Power Company No.1,.
Environmental Management Plan
Frequency Everyday
Once every six months
Everyday
I
Once every three I months
Page 38
Second Rual Energy Project-Additional Financing Bac Giang Province
• Environmental Management Plan
1. Monitoring plan table
I---~--
Phase! Environme ntal Issue
What parameter is to be monitored?
Where is the parameter to be
How is parameter monitored?
the When is the to be parameter to
be monitored? I
monitored? Right Way (ROW) Clearance
of Clearing technique Along the Visual observation
Temporary Access Roads
-The way to access the flora. - How much impacts on the flora when do clearance? Use of existing roads
In case of constructing
ROW
Along route Visual observation of access road
new temporary access At the road, it will affect on construction productive land because of site of access temporary land road acquisition.
Construction phase
Construction phase
Runoff, Level of soil erosion and The Visual observation Construction Sedimentati sedimentation caused by construction - Turbidity level of phase on and Soil project activities site and ROW surface water Erosion are in or caused by soil
along to any erosion, especially neighboring in rainy conditions. line, auxiliary - Mitigation
Air Pollution
subs, measures app lied neighboring by contractor. areas, surface of water near runoff waterfowl.
- Check the covers of the At Visual observation Construction phase vehicles.
- Check the dry level of the surface road when supposed that the transport will cause dusty.
construction site(s)
Construction Consulting Center - Power Company No.1,. Page 39
Second Rual Energy Project - Additional Financing Bac Giang Province
• Environmental Management Plan
Phase! Environme ntal Issue
What parameter is to be Where is the How is the When is the monitored? parameter to parameter to be parameter to
Noise
Impacts caused by construction workers camp sites Impacts caused by solid waste from digging
Noise level
All camps in the project site and campsites' sanitary and safety management
Dust dispersion or current of water oriented to the surrounding areas and other places.
Electric and The electric and magnetic Magnetic field intensity Field
Construction Consulting Center - Power Company No.1 t.
be monitored? be monitored? monitored? One meter Measured by from equipment
At the edge of the construction site
At the nearest population center
sonometer
At the Visual observation campsites
at the Visual observation temporary after -digging land gathering sites I At the edge Measured by EMF of ROW meter (at some points along
! the route)
Construction phase
Construction phase
Construction phase
In operation phase
Page 40
I ~
I
Second Rual Energy Project - Additional Financing Bac Giang Province
Phase! What parameter is to be Environme monitored? ntal Issue
Monitoring • Inform workers the of safety regulations and compliance procedures with • The workers must be working provided with safety the knowledge
of occupational safety and equipment safety in the construction process.
• Workers that are not equipped with the knowledge of occupational safety and labor protection equipment shall not be employed.
• Do not allow people who have no duty to go into the construction/working areas.
• Not allow to work during special climate conditions such as fog, strong wind, dark etc.
Construction Consulting Center - Power Company No.1,.
• Environmental Management Plan
Where is the How is the When is the parameter to parameter to be parameter to be monitored? be monitored? monitored? All Visual observation In construction and discussion construction!o sites with CMC and peration
PMU phases
Page 41
Second Rual Energy Project Additional Financing _~_~ Giang Province
PART VI: CAPACITY BUILDING
Training/Study course
Start Number Duration of of
Date/End Type oj Training
Students
1.E\1P training 7 l:oursc fix safeguard starr or. P:'v1B - I
2.E\1P training 2x27 course for Local communities
I - I
Training
I
! 3 days
2 days
Date each student)
! : early . August,
2010
early August, 2010
Constl"Uctiol1 Consulting Center Power Company No.1,.
(jor
• Environmental Management Plan
Place of Institute or Training (Domestic or Abroad)
Organization to I Cost (Local and Foreign) Provide Training
Bac Giang I PMB and - Living cost: 70.000 VND /day x 7persons x 3days . Technical VNl) 1.470.000 Consultancy
Bae Giang I PMB Technical Consultancy
Accommodation cost: 50,000 VND /day x 7 persons x 2 days VND 700.000
Movement cost for learners: 7 persons x 50.000 VND/day x 2 days VND 700.000 (from Hac Giang bus station to PMB)
Movement cost from bus station to the hostels: 7 persons x 20.000 VND Iday x 2 times VND 280.000
Cost for trainers: 500,000 VND Iday x 3days VND 1.500.000
___ ~ ___ .~ __ ._~ __ • __ "~. __________ ••• _ _ _ __ L
Living cost: 70.000 VND Iday x 2x27persons x 2days . VNl) 7.560.000
Accommodation cost: 50,000 VND /day x 2x27 persons x 1 days VNJ) 3.780.000
Movement cost for learners: 2x27 persons x 20.000 . V:'\D/day x 2 times . VND 2.160.000
Total: VND 19.150.000
Page 70
Second Rual Energy Project - Additional Financing Bac Giang Province
• Table 6: ESTIMATED COSTS FOR IMPLEMENTATION EMP (VND)
No Item Construction
1 Mitigation measures The costs are covered in Contract with Construction Contractors
2 Monitoring costs for substations, lines. The cost is covered in running cost ofPMU
(By technical supervisor consultant of PMU)
3 SMIC's project monitoring cost 3 persons/period x 10,000,000VND/times x 2 times =
(2months/times) VND 60,000,000
4 Training cost for Environmental VND 19.150.000 management
TOTAL VND 79.150.000
GRAND TOTAL VND 89,150,000
Construction Consulting Center - Power Company No.1,.
Environmental Management Plan
Operation
The cost is covered in production cost of the Provincial PMU
The cost is covered in running cost of Project investor
,
1 person/month x 10,000,000 = VND 10,000,000
I
10,000,000
I
Page 71
Second RUlli Encl'gy Project - Additional Financing Hac Gillng Province
• Environmental Management Plan
PART VII: IMPLEMENTATION ARRANGEMENTS
. ORGANIZATION
Subproject Owner
i BAC GlANG PtVIB I
.1 Contractors
l,ocal community
..
People's Committees
Construction Consulting Center - Power Company No.1 •.
RESPONSIBIIXflES
Ultimately responsible env ironmentalmanagel11ent.
overall subproject management including i
Responsible for coordination and management of overall subproject il11e!~_,!!~~ation .. includi_r:tg_g~i.dil1.g(i!ld sUI?~r.,-,is}l1gimpl?rr~entation of the Responsible for construction works and following contractor specifications outlined in the EMP. This includes:
i. Applying construction-phase mitigation measures.
ii. Ensuring safety of construction workers and construction.
people
iii. Following Vietnam and World Bank policies on environmental protection during construction.
Responsible for supervision of compliance with mitigation measures done by civil works _el:mtract()r~_ dur.ing .c()rI.s.truction DPCs will supervise implementing mitigation measures done by contractors and subproject owner as proposed in the EMP throughout subproject implementation
Page 72
.. Second Rual Energy Project - Additional Financing Bac Giang Province
• PART VIII: MONITORING AND REPORTING SYSTEM
Environmental Management Plan
REPORT TYPE I PRIMARY ~P?RT~~' L~VEL ~~ ':~. I ~~~~~Y_ _ I . ~ _ .. c • c"" , "
REPORTING.
BY F~Q"UJr,N,CY I BY
SITE
ENVIRONMENTAL
MANAGEMENT
. Contractor ' - 'Once" ,beftYre,,1 ~
ENVIRONMENTAL Techriical PERFORMANCE . supervisors MONITORING: .ofPMU CONSTRUCTION
SMIC'
PMUanrl BAC '~: GIANG ' PMB
World . Bank
construction ~ I commences " &>
. monthly thereafter · ,
ENVIRONMENTAL . Power BAC, , I Half-year PERFORMANCE . network GIANG MONITORING: Project " PMR OPERATION management
unit .
Construction Consulting Center-Power Company No.1,.
'Co
Bac Giang PPC
Bac· Giang. PPC
Quarterly
Page 73
•
Second Rual Energy Project - Additional Financing Bac Giang Province
+ Environmental Management Plan
PART IX: APPENDIX
1. Annex A - Copy of Environmental Certificate
2. Annex B - Subproject area Map
3. Annex C - List of establishing EMP
1. Tran Minh Do : Head of Consulting -Subproject manager
2. Tran ~goc Ylinh: Subproject manager
4. Annex D -Example environmental terms of reference for SIMC
5. Annex E Report of applying Environmental impact mitigation measures
6. Annex F -Example environmental terms of reference for SIMC
7. Annex G - Environmental Performance Monitoring Report
8. Annex H - Public consultation list
Construction Consulting Center - Power Company :\0.1,. Page 7~
Second Rual Energy Project - Additional Financing Sac Giang Province
Annex A: of Environmental Certificate
Construction Consulting Center - Power Company :\0.1 •.
• Envit'onmental \Ianagement Plan
Page 75
I:Y B.",S SHAS DAN mrt'E:N T . .\N Vt.N
56: ... ()9 AJliNo'~ iW.MT
CQNG HOA X.\ H()ICHl:.N(YHiA vltT :";,\:\t D(K' ,*p - Ttl. U.nb pbiK'
.. Tcin.Yen.I1gdy .. ci"f., 11r4f1g 5 n,l'" ~OIO . . .
GIAY xAc~fl.;'N nANG KY CAM KiT BAo VE'MOI TR't~OS(; Dl!an nlog tuqng:nong thonn ntO niDI (8£0) tiDIl B4c Gian~
, ' "~' • # " '.... ". '
, ·UYBANNHANOA.Nm;ytsTAN YtN . '.
On C1l ~ 9io ~ lriOi trubng ngay lSll 1/2005; On at. Nghj d~nh SOf2OO6lNU.CP ngiy09l8/2tXl6 CUa adnh phu quy d,nh
chi ua vi tumng din thi harth rrn)( s6 di~u ella t~ BiO'~ln6i ttuimg; Nghi d~nh 21/2OO81ND-CP ngly :ZSnJ200s cia Ollnh phia'sa dOi va b3 MITIg m(u' ~\ dl~u l'U., Nghi diM ~'I).:CP ngay 09f812(X)6 aia . Chinh phil quy d!nh chi lift va tn.QIg din dli h4nh' ~ s6'd~ucUa ~ 8VMt; ., ,
CU' cU ThOn# tit ~ OS/2008m-BTNMT' ngay 8/12/2008 aia ~ TN va ~rr "wOng din~ &inh ,il moi Inrbng chiEn 11A1C. danb ghi tac~, m{\i lnrbng \':. cam kit DVMT; . ' J. •
. XC. M ughj cua TruOng pI'tOOg 1li ngu~n vi Mt'ti Ir1tOitg.
-.: ( . xACNH!N:·
DICa I. Baa Qli8nly ell! an 4iubl uy'
Second Rual Energy Project Additional Financing BacGiang Province
Annex B: ST;BPROJECT AREA MAP
Construction Consulting Center - Powel' Com pan)' :\ 0.1"
• Environmental :\1anagement Plan
Pa~e 76
BAN DO cAe xA TRAM GIA DIJ AN -VA cAe viTNG BAO VE THIEN NHIEN HlEN Co - nIJ AN RE2 BO SUNG TiNH BAC GIANG • ••• MAP OF THE COMMUNES IN PROJECTS AND EXISTING NATURAL AREAS PROTECTION - RE2-AF PROJECT - HAC GIANG PROVINCE
Gm CHiJ - LEGEND
Vimg rirng dfc d1}ng, cac khn bio tan thlen nhien -Areas of special use forests, parks and nature conservation
• Xi tham gia dl}' an - sobproj ect communes
Second Rual Ener-gy Project Additional Financing Bac Giang Province
AXXEX C - LIST O:F ESTABLISIIIXG
• Environmental :\lanagement Plan
......... __ .. _--_ ...... _._ .•. _--_ .. _.-
1_ Tran :v1inh Do:
2. Tran ~goc Minh
Head of Consulting -Subproject manager
Subproject manager
Construction Consulting Center Poner Company 'io.l •. Page 77
Second Rual Energy Project - Additional Financing Bac Giang Pro\'ince
• Environmental \Ianagement Pilln
EXAYIPLE EXVIROXMEXfAL TERYIS OF RKFEREl\'"CE FOR SIMC --_.'--,.,-, -~--~,-~ .. ~~---
The Safeguard Independent :vtonitoring Consultant will:
1.1 Visually looking at the construction sites and making notes to the related environmental issues as follows:
• General clean-up after construction working, • Excessive clear cutting of trees beyond ROW in communal or forest land, • Yieasures taken by the contractor for cleaning up woody residues after tree cutting • Status of access roads (have they been closed if in a protected area, are they still being used and
to what extent, how are they being controlled/managed and by whom), Application of mitigation measures for or sign of soil erosion along T/L due to tree cutting and/or around tower foundation
• Status of re-vegetation in the ROWand tower foundation • Impacts on construction works (level of noise, dust, and damage to roads due to earthworks and
transportation of building materials) • Status of construction worker camps and sanitation facilities for them • Proper distance between the houses and TIL, • Status of implementation of safety measures (signboards, restricted zone, fences, isolation etc.)
1.2 Conduct public consultation to: • Assess the level of involvement by the local authorities in dealing with environmental issues
(dust, noise, and damage to roads due to the transport of construction materials, tree cutting on public lands and protected areas).
• Identify any other environmental issues and record environmental complaints from the DP. Report on responses (if any) from appropriate local authorities on environmental complaints or non-
compliance
('onstruction Consulting ('enter Power Company '\0.1 •. Page 78
Second Runl Energy Project - Additional Financing Bac Giang Province
• Envil'onmental Management Plan
A~EX E TABLE 1: REPORT OF APPLYI~G E~VIROX:VlEYrAIJ IMPACT MITIGATIOX ::VIEASrRES -_._---_.-(For contractors - Table V.l )
Project title: Project location: ::\'ame of Contractor: Commencement of Project report or monthly report: Date of report:
No . Impacts Mitigation measures
I implemented
1
2 Soil erosion
3 Air pollution caused by vehicle and machine exhausts . and of materials and soil.
vehicles and machineries
. 5 Impacts on undiscovered underground historical and ·
6
. Environmental impactsc_8:I:!.S!~b2'.~sing workers' camps .•
: Checking the solid waste collection during the . construction proces~ ________ _
l\'"ame of person prepared this Report: Title: Address: Telepbone:
Construction Consulting Center - Power Complln~' :\0.1..
Comment and
.. ~UJ!l!.lement
Page 79
Second Rual Energy Project Additional Financing Bac Giang Provi~c~
• En\'ironmental ;\Ianagement Plan
~~,,~x 1
Second Rual Energy Project - Additional financing Rae Giang Province
• Em'ir'onmental Management Plan
A..,\,EX G - TABLE 3: EXVIROXYrEXTAL IlERFOR.:.'1AN'CE YrOXITORIXG REPORT (This Report can be used for Subproject management unit's staff and independent monitoring consultant - Sample V.3)
Subproject title: Subproject location:
Date of report:
No Impacts/mitigation measures . comments commune
Transportation means or subproject activities that increase dust level in environment
2 Transportation means or subproject activities that increase noise level
--~~-------~---------------------~
3 Subproject activities that pollute the local's rivers,
, 4 The subproject's tree cutting will cause effects on the' local environment
• 5 Subproject activities that create effects on
:6
or residential land
Subproject activities that cause effects on cultural . fortunes
~---------------.--- ---------.--------------execution cause effects on traffic
-"-.--_ ..
; 8 The subproject causes bad effects because of solid
11
12
13
14
and wastes
The subproject causes impacts of social and labour • health issues,
Y1easures to reduce dust
Y1easures erosion and sedimentation
15 The Su bproject a ctivities will cause some certain . ____ ._~ff~~!S ()n _bi~
Second Rual Energy Pmject Additional Financing Bac Giang Province
, A:\,:\,EX II - PL'BLIC CO~S{;LT ATIO~ LIST
Construction COIl,ulting ('cntcr - Power Company :"\0.1,_
• En\'ironmental :\Ianagement Plan
Page 82
Dtr an nang luang nong thon 2
CONG HoA xA HOI CHU NmlTA vn;:T NAM DQc I~p - Tg do - H?nh phtic
BIEN BAN THAM VAN C
11- NQi dung tham v§n:
1. Dun vi tlfvdn thong bao vi: Noi dung Dl,l' an (ly do d~u tu, guy rno eong tri~h, vi tri huang tuy~n ... ).
Chinh sach D~n bu, Tai dinh cu, chinh sach Moi trtrang, ehinh sach d6i v6:i Nguai
Dan toe thi~u s6 eua WB va cua chinh phu Vi~t Nam.
Ml,lc tieu Clla Danh gia tac dong moi trtrang ( v6i y ki~n ill vAn cua ngum dan va cong d6ng) dS xu~t cac gilii phap giam thi~u cae tac dong tieu Cl,l'C ti~m tang v~
Moi truang ( rnoi truang 1\1' nhien va xii hoi ).
2. I' kiin tham van eila erng d6ng:
2.1 Ngum dan trong vung c6 d6ng y tham gia thl,l'c hi~n dl,l' an khong? C6: ...... . Khong : ....... N~u khong thi vi sao? ............................................... .
2.2 Tharn v~n clla cong d6ng vS nhfrng tac dong ttch cuc v~ Moi truang (bao g6m ca
rnoi trtrang W nhien va xii hoi, rnoi truang sinh thai, rnoi truang v~t 1y, truy~n
th6ng van hoa va sinh hOl;\t cong d6ng ... ) :
+ Truac khi xdy c4rng:
+ Trong khi XGY dz.mg:
+ Sau khi xdy dz.mg xong:
2.3 Tharn v~n ella c¢ng d6ng v~ nhfrng tac d¢ng tieu Cl,l'C ti~m tang (c6 th~ xay ra) v~
Moi trtrang va cac giai phap giam thi~u:
+ Truac khi x6y dl;mg:
2 ....
",: -
+ Trang khi xdy dVng:
+ Sau khi xdy dVng xang:
.2.4 D6i vcri nhiing hQ co nha 6, cong trinh trong·hanh lang an toan di~n, n~u ky' thu?t
cho phep, co d6ng y su d\mg nhiing bi~n phap h6 trCJ phong ch6ng chay n6 thay th~
cho cac giai phap di dail di chuy~n. hay khong?Co: .......... ; Khong: ........ ; N~u
kh A h" ? ong t I VI sao. : ........................................................................... .
2.5 Nguai dan va cQng d6ng trong vung dg an co d6ng y tham gia cong tac giam thi~u cac tac dQng Moi truang nhu:
a. Lam s~ch nai xay d¥llg cong trinh, thu gom rac thai, chAt bAn vS dung nai quy
dinh.
b. Cam k€t thgc hi~n dung cac quy diM vS hanh lang an toan lucri di~n (nhu
khong i1u(1c tr6ng cay lay nam hay xdy dl,mg cong trinh .. .)
c. Thgc hi~n cong tac phong ch6ng chay n6, cac tai n~m do di~n gi?t gay fa ?
Co .................... ; Khong .................... ; Neu khong thi vi sao .............. ?
2.6 Nguai dan va eQng d6ng trong v-ung dg an co co thge hi~n eong Hi.e giam sat moi
truang d6i vOi ehu thAu trong qua trinh tru6c khi xay d¥llg, trong khi xay d¥llg va
sau khi xay d¥llg k~t thue khong ?:
C ' 'Kh A N A kh A h" ? o .................... ; ong .................... ; eu ong t I VI sao .............. .
,. ........ ,. . " .. ,. ,. ............................................. " ................................. ~ ................................................................................ " .. . .
2.7 Cae y ki~n tham vAn khac ciia nguai dan va cQng d6ng:
3
.....
111- Y ki~n blnb lu£jn (nMn xet, danh gia) va di xu~t eiia Tlf v~n (v€ cac kSt qua tham v~n neu tren, d~c bi~t la giai phap giam thi~u cac tac dong tieu Cl,l'C ti€m tang v€
M6i trubng ... )
Bae Giang, ngay ...... thcmg ... nam 2009
D~I DI:E:N coo DAu TU D~I DltN DON VI TU VAN
D~I nI$N CHiNH QUYEN DJA PHUONG
D~I DI:E:N cAc CO QUAN ~QAN THE DIA PHUONG .. ;: ... -; ':-':::'::~.:
,.;\.
DAI DIEN NGU
Du an nang lU'
11- NQi dung tham van:
1. DO'n vi tu' van thong bao vR:
- N9i dung Dl,f an (ly do d~u ill, quy mo cong trinh, vi trf hu6ng tuySn ... ). - Chinh sach D6n bu, Tai dinh CU, chinh sach Moi truOng, chinh sach d3i v6i Nguai
Dan t9c thi8u s3 cm WB va cm chinh phll Vi~t Nam.
- M\lC tieu cua Danh gia tac dong moi truOng ( v6i y kiSn ill v~n cua ngum dan va cong d6ng) d~ xu~t cac giai phap giam thi€u cac tac d9ng tieu Cl,fC tiSm tang vS
M6i truang ( moi truang tl,f nhien va xa hQi ).
2. Y kdn tham van ella c{)ng dang: 2.1 Nguai dan trong vling co d6ng y tham gia thl,fc hi~n dl,f an khong? Co: ., .....
, Kh6ng : ....... Neu khong thi vi sao? ............................................... .
• • • • • * •••• '# • ~ •••••••• ,. ....................... ,. ................................................ ,. ........ . ,
2.2 Thrun v~n cua cQng d6ng v6 nhung mc dQng tich cuc v6 Moi' truOng (bao g6m ca
m6i tnrang tl,f nhien va xa h9i, m6i truang sinh thai, m6i truang v(it 1y, truySn
th3ng van hoa va sinh ho~t cQng d6ng ... ) :
+ TruCrc khi xdy d1!ng:
+ Trong khi xay d1!ng:
+ Sau khi xdy d1!ng xong:
2.3 Tham v~n clla cQng d6ng v~ nhUng tac dQng tieu Cl,fC ti6m Hmg (c6 th8 xay ra) vS
M6i truang va cac giai phap giam thi€u:
+ TruCJc khi xdy d1!ng:
2
+ Trang khi xiiy dz;mg:
+ Sau khi xay dVng xang:
2.4 Bdi vcri nhung hQ c6 nha a, cong trinh trong hanh lang an toan di~n, n~u kY thu~t cho phep, c6 d6ng y su dvng nhiing bi~n phap h6 trq phong chdng chay n6 thay th~ cho cac giai phap di dail di chuy€n hay khong?C6: .......... ; Khong: ........ ; N~u
khong thi vi sao? : .......................................................................... .
2.5 Nguai dan va cQng d6ng trong vung dV an c6 d6ng y tham gia cong tac giam
thi~u cac tac dQng Moi trlrang nhu:
a. Lam s~ch nai xay dl}11g cong trinh, thu gom reic thid, ch~t bAn v6 dUng nai quy . dinh.
b. Cam k~t thgc hi~n dung cac quy dinh v6 hanh lang an toan 'lucri di~n (nhu
khong dUt;lC tr6ng cay lay niim hay xay dvng cong trinh .. .)