Agenda
Proposed OPGW / ADSS networkTechnology overview
Indian scenarioCase studies
Challenges
Cost-benefit analysisy
Way Forward
Process Innovation with Three pronged approach for Fibre Roll-out Time to market | Financing | Implementation
Advisory ServicesAdvanced Telecom & Power Networks 1
Power Net architecture
• OPGW cable proposed on EHV lines of 132 KV or higher, very highreliability and less Repair & Maintenance cost;reliability and less Repair & Maintenance cost;
• ADSS cable proposed on LT lines, high fibre count, light weight, lessexpensive and more suited on intra city short routes
Advisory ServicesAdvanced Telecom & Power Networks 2
expensive and more suited on intra-city short routes.
OPGW -Optical Fiber Composite Overhead Ground Wire
Conventionally used in the constructionof electric power transmission anddistribution lines.
It combines the functionsof Grounding and Communications.
The OPGW cable is run between the topsof high-voltage electricity pylons.
It can be installed in live line conditions(without outages).
Considered to be more safe and requiresless R&M
Advisory ServicesAdvanced Telecom & Power Networks 3
INTEGRATED POWER & TELECOM
Case Study: MSETCL OPGW network
Advisory ServicesAdvanced Telecom & Power Networks
PPP model through Joint Venture Co: I t ll ti f 48 Fib OPGW C bl 2801 Kms in 3 phases1. Installation of 48 Fibres, OPGW Cable - 2801 Kms, in 3 phases
2. Installation of SDH & MUX Equipments 3. Installation of Network Management System
Estimated cost: Rs 165 Crores completion time 2 years
AMBAZARI
KORADI21
NAGPUR(Mankapur/HingnaII/Pardi)
85956060
BHUSAWAL MALKAPUR AKOLA
Estimated cost: Rs 165 Crores, completion time 2 years
10520 MALKINI 98 HVDC
70110
PUSAD
5BUTIBORI
ALDC
4
3124
55
PIPERKHED
DHULE
170
CHALISGAON
CHANDRAPURAMRAVATI
WARORA WARADHA
36
4553
20 175NASIK
PRAKASHGARH
PRAKASHGANGA
2080
BHABHALESWAR
PARLI
86
HIRVAGUHA
DAHEGAM70
10
AURANGABAD20
96
HATHUVAN
101AJEGAON
96 100DHABA
PARBHANI
800
90
Kamba
PUNE25
KALWA
56SLDC
2
20 20
119
4
175
KARAD247
MALINAGAR
SOLAPUR 400
140PARLI
1096
HIRVA 96DAHEGAM70
PADHGEHVDC
3015
(Bhiwandi)
15(CHAKAN/ CHINCHWAD/ HINJEWADI/
KOYNA
72
WAI
7 LONIKAND 213
30KHARGHAR
BORIWALI
OPGWOPGW N t k MSETCL EHV LiN t k MSETCL EHV Li
Colorchem(Thane)
PROPOSED F.O LINK EHV LINES
DCSLDCALDC
DC/ZCCPROPOSED F.O ON 132 KV LINE
ALDCHEAD QUARTER
EXISITING F.O LINK TROMBAY16MULUND
24
HINJEWADI/ GANESHKHIND/ RASTAPETH
130
KOLHAPUR3
Advisory ServicesAdvanced Telecom & Power Networks 5
OPGW OPGW Network on MSETCL EHV LinesNetwork on MSETCL EHV Lines IMPORTANTS STATIONSZONAL OFFICE
ALLDISTANCES IN KM, NOT TO SCALECIRCLE OFFICE
Case study: Wagoora
Udhampur
EXISTING FIBER
Srinagar
Pampore
Uri
EXISTING FIBER
Under 573 km approval
Powertel - PGCILChandigarh
Moga
*
*
*
*
Jallandhar
Kishenpur
p
Jammu
Amritsar
Hisar
Solan
Ambala
Hamirpur
Ludhiana
Bhiwani
Under 573 km approval
Shimla
Kunihar Under System Strengthening approval (1310km)
Under SR-I/II substation connectivity approval (207km)
Pinjore
Under 573 km approval
Under System Strengthening approval (1310km)
Under SR-I/II substation connectivity l (207k )
Countrywide network~25,000 kmsOPGW 15 000 k
Nirjuli
Gangtok
Tezpur
Kota
Itanagar
Nagaon
Bongaigaon
Meerut
Muradngr
SiliguriKahelipara
Misa*
*
*
*
*
*
*
Lucknow
*
*
Moradabad
*
Jaipur
Agra
Patna
Dimapur
Khleihriat
Shillong
*
*
*
*
*
Balipara
Malda
Kohima
Guwahati
Dadri
Panipat
Varanasi
Ballabhgarh
Mandola
NEW DELHI
Melli
G Noida
Noida
Kanpur
approval (207km)
OPGW>15,000 kmsAvailability >99%Utility network
Jabalpur
Ujjain
Vadodara
Asoj
*
Kahalgaon
*Durgapur
*
Badarpur
*
Agartala
*
Kumarghat
* Vindhyachal
Korba
Ranchi
Kolkata
*
*
*
Allahabad
*
**
*
Singrauli
Itarsi
Indore
Dehgam
Ahmedabad
Bhilai
*
*
*
Sasaram
Biharsariff
Jeerat
*Jam’pur
Rourkela*
*Raipur
Koradi
Bhopal
Dhule
*
Shillong
Imphal
*
Gandhinagar
Gandhar
Aizwal
Silchar
Talcher
Farakka
Operational with Last mile access Nasik
Surat
Rengali
*Ramagundam
Indravati
Khammam
MUMBAI
HYDERABAD
*
*Chandrapur
*
*
*
*
*
Vijayawada
Gazuwaka
Jeypore
Pune
Nagpur
*
*
Bhubaneshwar
*Vapi
Cuttack
Lonikhand
Vizag
Padghe
Warangal
CHENNAI
BANGALORE
N’Sagar
Nellore
*
Gooty
Kolar
Kozikode
Trichur*
Kalamassery
*
Udumalpet
Trichy
**
*
*
Madurai
Salem
Cochin
*
Mysore
Coimbature
Puducherry
Neyveli
Tirunelveli
Karur
Erode
Vellore
Kannur
Kalivanthapattu
Arasur
Source: www powergridindia com/
Apart from fast & reliable grid communication,
also becoming a preferred choice of telecom operators!
Advisory ServicesAdvanced Telecom & Power Networks 66
Trivandrum Source: www.powergridindia.com/
DHQ (OPGW) Network of RVPNL
REENGUSJaipur North
RAJWEST
Hindaun
DAHRA
J
KOTA
DAHRADEBARI
Proposed
Advisory ServicesAdvanced Telecom & Power Networks In strict confidence 7
Ordered by RVPN
PGCIL
Planned‐ NIT
Planned under PPP
In strict confidence 7
MP Power Net
Advisory ServicesAdvanced Telecom & Power Networks In strict confidence 8
ROW options for Roll out
RFP / RFQ OWNOWNRFP / RFQfor
BOT/ JV
OWNBUILDBOT/ JVOWN
BUILD
NO
ROWChargesNIL
ROWCharges
>P
ROWChargesNIL
ROWCharges
>P NONO NIL
Low Risk,
>P
High Risk,
YES YES
NIL>P NO
•Reduced InvestmentMiti t d Ri k
,Low Return/ Revenue shareNo (ZERO) Investment
High Risk,High Return by direct leasing,Upfront Investment
•Mitigated Risk•Dividend on equity•Good Revenue sharing model•Partner brings experience &competency
RELEASEBOT
RETAINOWN
(A)(A)(C) (B)(B)
SHARE RELEASEBOT
RETAINOWN
(A)(A)(C) (B)(B)
p y•Diversification opportunityin telecom business JV
Advisory ServicesAdvanced Telecom & Power Networks 9
BOT (PPP) model
UtilityROW 8 fibres for
exclusive use by UtilitUtility
OPGW Network
12~48 fibres
Technical, Financial & Marketing Expertise
Build Own Transfer(BOT)
Concession Period~15yrs
CCommercial use of fibres
Service Providers
N –8 fibresfor use by
Pvt CoService Providers
Model for OPGW / ADSS fibre sharingAdvisory ServicesAdvanced Telecom & Power Networks
Model for OPGW / ADSS fibre sharing
Implementation planNetwork Synergy• Wi-Fi Network• 2G / 3G /4G /5G
- Telco Voice & Data• SMART city & Public
services- CCTV surveillance- Traffic management- e Governance- e Hospital- e Hospital- e Education
OPGW / OFC NETWORK RING
Wi-Fi Hot Spot
Advisory ServicesAdvanced Telecom & Power Networks
Challenges
i. ROW -/ BOT model to unlock & monetizing
ii. Last mile access -/ using fibre & microwave
iii. Public inconvenience -/ reduced
iv. Complexity in Design & Erection -/ simplified
v. High Availability -/ much higher(Telecom networks require >99.9% availability)
vi Customer Support & Service Delivery -/ scope of service providersvi. Customer Support & Service Delivery -/ scope of service providers
Three pronged approach: Time to market, Financing & Roll out !
Advisory ServicesAdvanced Telecom & Power Networks 12
Cost Benefit Analysis
Investment of Rs 200 Cr for typical 3000 Km optic fibre network in a state,
• Network overlays electricity lines connects all districts and major talukas
i. CAPEX on backbone network reduced
• Network overlays electricity lines, connects all districts and major talukas.
• Technically can have deeper penetration to Gram Panchayats, Govt & e-Seva centres
ii. BOT/ JV model for implementation – no cost on ex-chequeriii. Additional revenue by ROW charges and leasing of spare fibresiv. Utility company gets fibres for tele-protection /grid-communication
R i i 40 fib il bl f Wi Fi j tRemaining ~40 fibres available for Wi-Fi projectSharing of Equipment (SDH, MUX, NMS) cost
v. Roll out tied up with technical & commercial obligationsvi. Pure play partners, third party selection through competitive biddingvi. Pure play partners, third party selection through competitive biddingvii. Maximising use of available infrastructureBenefits to Govt/ Utility company
NO Project cost borne by utilityT h l d i f T l i SCADA i i i & dTechnology up-gradation for Tele-protection, SCADA communication, voice & dataFast RolloutFibers available to utility for exclusive internal useNo equipment cost borne by utility. Future expansion very cost effective
Advisory ServicesAdvanced Telecom & Power Networks 13
No Govt assets shared with private parties, ownership of existing assets remains with the utility
Conclusion & Way forward
Collaborative model requiring tie-up / assurances for
Holistic approach required
[i] funding, against [ii] buyback of fibres for Time bound rollout
Overall telecom development with focus on infrastructure & backbone- Revenue generation possibilities- Internal requirement of utility companiesBOT d l i bli i t t hiBOT model using public-private partnershipOpportunity to monetise assets & infrastructureRevenue generation through ROW charges & leasing of fibres Speed to marketSpeed to marketLong term development
Expert team available with experience of similar projects
SYNERGY !! With fibre rollout, other projects can be kick startedCCTV surveillance Traffic management e Governance e Hospital e Education etcAdvisory ServicesAdvanced Telecom & Power Networks 14
CCTV surveillance, Traffic management, e Governance, e Hospital, e Education, etc.
Thank you
Bhoopesh RaghavAdvanced Telecom & Power NetworksAdvanced Telecom & Power Networks+91 96644 [email protected]
Advisory ServicesAdvanced Telecom & Power Networks 1515
Top Related