810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 1 OF 15
RE-SOLICITATION CLARIFICATION ISSUE NO. | RS
ISSUE DATE | 6/5/2020
PROJECT | Fort Rucker Shopping Center Image Update
Fort Rucker, AL
Building 9214
0843-18-000002
OWNER | Army and Air Force Exchange Service
3911 S. Walton Walker Blvd.
Dallas, TX 75236
ARCHITECT | Cyntergy AEC, LLC
810 S. Cincinnati Ave., Ste 200
Tulsa, OK 74119
This re-solicitation clarification forms a part of the contract documents and modifies previous documents, specifications and drawings pertaining to these items dated 11/22/2019. The General Contractor shall notify the architect immediately with any discrepancies or errors found in these documents.
DESCRIPTION
This drawing change covers drawing clarifications based on owner and general contractor feedback and the
addition of Subway and Starbucks tenants.
GENERAL
1. Sheet G-101 – Sheet Index, General Notes
1.1. General Contractor Bid Information
Add bid option #5
Rename bid options 8-12 to be bid alternate
Reword bid options for clarity
1.2. Sheet Index
Added sheets G-106, G107, KB101, KB102, KB103, KB201, KB501, KB502, KB503, KB600, KB701,
KB801, KBP101, KBP501 and KC101
1.3. Starbucks Project Contact and General Notes
Add to sheet
2. Sheet G-103 – Life Safety Plan
2.1. Detail 1 – Life Safety Plan
Added occupancy hatches for added Starbucks and Subway tenants
3. Sheet G-104 – General Information
3.1. Builder Staging Map
Moved staging area to avoid FDC and existing canopy
3.2. Base Map
Revised map image for clarification.
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 2 OF 15
4. Sheet G-105 – Construction Phasing Plan
4.1. Phasing Schedule
Revised phasing schedule for an 18-month duration.
4.2. Phasing Plan
Add location for temporary HVAC
4.3. General Notes
Add general note 24
5. Sheet G-106 – Signage Keyplan
5.1. Added in its entirety.
6. Sheet G-107 – Signage Schedule
6.1. Added in its entirety.
CIVIL
7. Sheet CD402 – Enlarged Site Demolition Plan
7.1. Detail 1 – Enlarged Site Demolition Plan
Removed Bid Option #10
8. Sheet CS-101 – Overall Site Plan
8.1. Detail 1 – Overall Site Plan
Removed Bid Option #10
9. Sheet CS-402 – Enlarged Site Plan
9.1. Detail 1 – Enlarged Site Plan
Removed Bid Option #10
Add a transformer for Starbucks
ARCHITECTURAL
10. Sheet AD111 – Demo Area Plan - PXTRA
10.1. Detail 1 – Demo Area Plan – PXTRA
Add keynote 60 at gun vault relocation
Show floor drains and cleanouts for clarity
Revise keynotes and graphics at exterior door on west side
10.2. Demolition Plan Legend
Add to sheet
10.3. Demolition Keynotes
Added Keynotes 59 and 60
10.4. Demolition General Notes
Revise note 20 and 21
11. Sheet AD112 – Demo Area Plan – Food Court / Mall
11.1. Detail 1 – Demo Area Plan – Food Court / Mall
Revised Subway plan for extents of work.
Revised keynotes for clarity in food court back of house
Added demo keynotes for canopy demo on north side of building
Clarify notes and graphics for mudbed removal under tile
Removed keynotes for asbestos removal for clarification
Revise keynote at mechanical room door
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 3 OF 15
11.2. Demolition Plan Legend
Add to sheet
11.3. Demolition Keynotes
Added Keynotes 59 and 60
11.4. Demolition General Notes
Revise note 20 and 21
12. Sheet AD-113 – Demo Area Plan – Exchange
12.1. Detail 1 – Enlarged Exchange Demo Plan
Revised keynotes at flooring transition
Added demo of existing wall at Office 3
Add keynotes at storage 1034 for clarification
12.2. Demolition Keynotes
Added Keynotes 59 and 60
12.3. Demolition General Notes
Revise note 20 and 21
13. Sheet AD121 – Demo RCP - PXTRA
13.1. Detail 1 – Demo RCP - PXTRA
Revised keynote for asbestos remove to a general note
Added keynotes at gun vault relocated area for clarity
13.2. Demolition Keynotes
Revised keynote 9
13.3. Demolition General Notes
Revise note 20 and 21
14. Sheet AD122 – Demo RCP - Food Court / Mall
14.1. Detail 1 – Demo RCP - Food Court / Mall
Revised removed ceiling areas to reflect Subway changes.
Remove ceiling at mechanical room
14.2. Demolition Keynotes
Revised keynote 9
14.3. Demolition General Notes
Revise note 20 and 21
15. Sheet AD123 – Demo RCP - Exchange
15.1. Demolition Keynotes
Revised keynote 9
15.2. Demolition General Notes
Revise note 20 and 21
16. Sheet AD201 – Demo Elevations
16.1. Detail 1 – Demo East Elevation
Renamed detail
Added keynote for louver removal
16.2. Detail 2– Demo South Elevation
Renamed detail
Added keynote for mechanical unit removal
16.3. Detail 3 – Demo North Elevation
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 4 OF 15
Renamed detail
Revised keynote for exhaust louver
Added keynote for louver
16.4. Detail 4 – Demo West Elevation
Renamed detail
Added keynote for canopy removal
16.5. Detail 5 – Demo Northeast Elevation
Renamed detail
Add keynote at front elevation for stucco prep
Add keynote for canopy removal
17. Sheet A-101 – Overall Floor Plan
17.1. Detail 1 – Overall Floor Plan
Revised detail reference at PXTRA MPA 2
Added revised layout for subway
Added layout for Starbucks
17.2. Floor Plan Legend
Add FE symbol and remove tactile sign symbol
18. Sheet A-111 – Enlarged PX Plan
18.1. Detail 1 – Enlarged PX Floor Plan
Revised dimensions and detail references at PXTRA MPA 2
Add details at PXTRA MPA 2
Added notes for clarification at relocated gun vault.
18.2. Detail 2 – Expansion Joint Detail
Added detail to sheet
18.3. Floor Plan Legend
Add FE symbol and remove tactile sign symbol
19. Sheet A-112 – Enlarged Food Court / Mall Plan
19.1. Detail 1 – Enlarged Food Court / Mall Plan
Added new layout for Subway
Added reference callout for Starbucks
Add note to patch and repair existing mechanical yard screen wall
19.2. Floor Plan Legend
Add FE symbol and remove tactile sign symbol
20. Sheet A-113 – Enlarged Exchange Plan
20.1. Detail 1 – Enlarged Exchange Floor Plan
Graphically show extent of trench infill in mechanical room
Adjust graphics for hatch in no work areas
20.2. General Notes
Revised/combined General Notes Legend 11 through 18.
21. Sheet A-121 – Reflected Ceiling Plan - PX
21.1. Detail 1 – Reflected Ceiling Plan - PX
Add general note
21.2. Reflected Ceiling Plan Legend
Added symbols to legend.
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 5 OF 15
21.3. General Notes
Add note 4
22. Sheet A-122 – Reflected Ceiling Plan – Food Court / Mall
22.1. Detail 1 – Reflected Ceiling Plan – Food Court / Mall
Revised ceiling at Subway.
Add Starbucks layout and revised ceiling
Add general note
22.2. Reflected Ceiling Plan Legend
Added symbols to legend.
22.3. General Notes
Add note 4
23. Sheet A-123 – Reflected Ceiling Plan - Exchange
23.1. Detail 1 – Reflected Ceiling Plan – Exchange
Added general note
23.2. Reflected Ceiling Plan Legend
Added symbols to legend.
23.3. General Notes
Add note 4
24. Sheet A-130 – Roof Plan
24.1. Detail 1 – Roof Plan
Add sections and expansion joint reference at building expansion
25. Sheet A-201 – Exterior Elevations
25.1. Detail 1 – East Elevation
Added information for Starbucks signage.
25.2. Detail 2 – South Elevation
Added detail at building expansion
25.3. Detail 4 – West Elevation
Added expansion joint reference
26. Sheet A-202 – Exterior Elevations
Issued with change
27. Sheet A-203 – Exterior Elevations
27.1. Details 1 – Enlarged Entry Tower Plan
Added jamb detail reference at door
27.2. Detail 3 – Main Entry Section
Added head and sill details reference at door
Revised graphics and annotation for canopy
28. Sheet A-301 – Wall Sections
28.1. Detail 1 – MPA Stockroom Expansion Section
Extended section
28.2. Detail 2 – Wall Section
Revised detail reference
28.3. Detail 3 – Freezer/Cooler Section
Extended section
28.4. Detail 6A – Stockroom Expansion Joint
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 6 OF 15
Add detail
28.5. Detail 7 – Cooler Closure Detail
Revised blocking information at cooler panel
28.6. Detail 6B – Roof Expansion Joint @ Fascia Overhang
29. Sheet A-302 – Wall Sections
29.1. Detail 1 – Secondary Entrance Section Detail
Show signage
30. Sheet A-400 – Enlarged Restroom Plans
30.1. Detail 1 – Enlarged Mall Restroom Plan
Add child safety seat
30.2. Detail 2 – Enlarged Mall Restroom Equipment Plan
Add child safety seat
30.3. Detail 3 – Womens Elevation
Add recessed trash receptacles
30.4. Detail 5 – Womens Elevation
Add child safety seat
30.5. Detail 6 – Womens Elevation
Add trash receptacle
30.6. Detail 7 – Mens Elevation
Add child safety seat
30.7. Detail 9 – Mens Elevation
Add trash receptacle
30.8. Detail 10 – Mens Elevation
Add trash receptacle
30.9. Mounting Heights and ADA Clearance
Add clearance height for child safety seat and recessed trash
30.10. Restroom Equipment
Add surface mount trash receptacle
31. Sheet A-401 – Enlarged Restroom Plans
31.1. Detail 1 – Enlarged Exchange Restroom Plan
Add child safety seat
Removed existing wall and replaced for new
31.2. Detail 2 – Enlarged Exchange Restroom Equipment Plan
Add child safety seat
31.3. Detail 3 – Mens Elevation
Add trash receptacle
31.4. Detail 4 – Mens Elevation
Add trash receptacle
31.5. Detail 6 – Mens Elevation
Add child safety seat
31.6. Detail 7 – Womens Elevation
Add trash receptacle
31.7. Detail 8 – Womens Elevation
Add child safety seat
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 7 OF 15
31.8. Detail 10 – Womens Elevation
Add trash receptacle
31.9. Restroom Equipment
Add surface mount trash receptacle
32. Sheet A-402 – Enlarged Restroom Plans
32.1. Detail 1 – Enlarged Admin Restroom Plan
Add child safety seat
32.2. Detail 2 – Enlarged Admin Restroom Equipment Plan
Add child safety seat
Revise trash receptacle type to surface mount
32.3. Detail 3 – Mens Elevation
Add trash receptacle
32.4. Detail 4 – Mens Elevation
Add child safety seat
32.5. Detail 6 – Mens Elevation
Add trash receptacle and revise type to surface mount
32.6. Detail 7 – Womens Elevation
Add trash receptacle and revise type to surface mount
32.7. Detail 8 – Womens Elevation
Add trash receptacle and revise type to surface mount
32.8. Detail 10 – Womens Elevation
Add child safety seat
32.9. Restroom Equipment
Add surface mount trash receptacle
33. Sheet A-403 – Enlarged Plans
33.1. Detail 1 – Enlarged New Drink Station Plan
Add room tag
33.2. Detail 2 – Enlarged Relocated Drink Station Plan
Add room tag
33.3. Detail 3 – Enlarged Relocated Drink Station Plan
Revised entire plan.
33.4. Detail 5 – Enlarged Qdoba Plan
Moved enlarged plan to KA101
34. Sheet A-501 – Details
34.1. Detail 1 – Head Detail (Air Curtain)
Add detail
34.2. Detail 2 – Louver Detail
Add detail
35. Sheet A-502 – Details
35.1. Detail 8 – Corner Window Detail
Revised detail.
35.2. Detail 11 - Typ. Penetration Detail
Revised detail.
36. Sheet A-601 – Door Schedule, Door and Frame Elevations
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 8 OF 15
36.1. Revised sheet in its entirety
37. Sheet A-602 – Finish Schedules and Details
37.1. Issued with change
38. Sheet A-603 – Partition Types
38.1. Partition Types
Added Type G
Revised Type B and C
Removed Detail.
39. Sheet A-701 – Finish Plan - PX
Issued with change
40. Sheet A-702 – Finish Plan – Food Court / Mall
40.1. Detail 1 – Finish Plan - Food Court / Mall
Add Subway and Starbucks references
41. Sheet A-703 – Finish Plan - Exchange
41.1. Detail 1 – Finish Plan - Exchange
Issued with change
42. Sheet A-704 – Floor Finish Plan – PX
42.1. Detail 1 – Floor Finish Plan – PX
Show capped floor clean outs and drains
42.2. Floor Pattern Plan
Revise graphics and wording for polished concrete over new concrete topping
43. Sheet A-705 – Floor Finish Plan – Food Court / Mall
43.1. Detail 1 – Floor Finish Plan – Food Court / Mall
Added references to Subway and Starbucks finish plans
Revised graphics for mudbed infill area
43.2. Floor Pattern Plan
Revise graphics and wording for polished concrete over new concrete topping
44. Sheet A-706 – Floor Finish Plan – Exchange
44.1. Floor Pattern Plan
Revise graphics and wording for polished concrete over new concrete topping
45. Sheet A-800 – Interior Elevations
45.1. Detail 1 – Food Court Interior Elevation
Add reference for Starbucks interior elevation
45.2. Detail 3 – Mall Interior Elevation
Revised elevation at Subway.
46. Sheet A-801 – Interior Elevations
Issued with change
47. Sheet A-802 – Interior Elevations
Issued with change
48. Sheet A-803 – Entry Portal Details
48.1. Detail 5 – Blade Sign Detail
Add detail
QDOBA
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 9 OF 15
49. Sheet KA101 – Qdoba Plans and Elevations
49.1. Detail 1 – Qdoba Floor Plan
Graphically extent of floor trench infill
49.2. Detail 2 – Qdoba Reflected Ceiling Plan.
Graphically show light fixtures
49.3. Reflected Ceiling Plan Legend
Add linear diffuser to legend.
STARBUCKS
50. Sheet KB101 - Starbucks Floor and Reflected Ceiling Plan
50.1. Added in its entirety.
51. Sheet KB102 – FF & E Plan and Schedules
51.1. Added in its entirety.
52. Sheet KB103 – Casework Plan and Schedules
52.1. Added in its entirety.
53. Sheet KB201 – Interior Elevations
53.1. Added in its entirety.
54. Sheet KB501 – Interior and Casework Details
54.1. Added in its entirety.
55. Sheet KB502 – Casework Details
55.1. Added in its entirety.
56. Sheet KB503 – Casework Details
56.1. Added in its entirety.
57. Sheet KB600 – Casework, Finishes, and Lighting Schedules
57.1. Added in its entirety.
58. Sheet KB701 – Interior Floor Finish Plan
58.1. Added in its entirety.
59. Sheet KB801 – Interior Finish Elevations
59.1. Added in its entirety.
60. Sheet KBP101 - Starbucks Plumbing Design Plan
60.1. Added in its entirety.
61. Sheet KBP501 - Starbucks Plumbing Details
61.1. Added in its entirety.
SUBWAY
62. Sheet KC101 – Subway Floor Plan, Equipment Plan, and Floor Finish Plan
62.1. Added in its entirety.
STRUCTURAL
63. Sheet S-001 – General Notes and Typical Details
63.1. Cold-formed Metal Framing Notes
Added note for openings in roof
63.2. Detail 3 – Equipment Housekeeping Pad
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 10 OF 15
Clarified Slab Depth
Clarified Pad Locations
64. Sheet S-101 - Keyplan
64.1. Detail 1 – Keyplan
Added additional Equipment Pad locations
65. Sheet S-112 – Enlarged Plans
65.1. Detail 1 – MPA2 – 1012 Roof Framing Plan
Added blocking at near Grid E
66. Sheet S-113 – Enlarged Plans
66.1. Detail 1 – Enlarged Framing Plan at Mech 1 – Option 1
Added notation for diagonals at MAU
Added notation for coordination of structure and equipment
67. Sheet S-114 – Enlarged Plans
67.1. Detail 1 – Vestibule 209 - Wall and Canopy Foundation Plan
Added section at threshold
Added dimension
67.2. Detail 2 – Vestibule 209 – Wall and Canopy Framing Plan
Revised parapet shape to match elevation
68. Sheet S-501 – Details
68.1. Detail 1 – Freezer/Cooler Plan
Added note for subbase
68.2. Detail 2 – Freezer/Cooler Plan
Added note for subbase
69. Sheet S-502 – Details
69.1. Detail 1 – Canopy at Vestibule 209
Revised section at hanger
Added clip to existing roof structure
69.2. Detail 1A – Canopy at Vestibule 209 Opening
New detail at threshold
70. Sheet S-503 – Details
70.1. Detail 1 – Framing Detail at MPA 2
Added note for backfill against retaining wall
70.2. Detail 7 – Detail at Interior Storefront/Coiling Door
Revised detail title to include coiling doors.
Revised header to include coiling doors.
70.3. Detail 8 – Framing at Interior Storefront/Coiling Door
Revised detail title to include coiling doors.
FIRE PROTECTION
71. Sheet FA001 Fire Alarm Notes and Details
71.1. Revised notes.
72. Sheet FA101 Enlarged Fire Alarm Plan-Northwest- Option 3
72.1. Detail 1 - Enlarged Fire Alarm Plan-Northwest- Option 3
Revised FDC note
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 11 OF 15
73. Sheet FA102 Enlarged Fire Alarm Plan-Northeast- Option 3
73.1. Detail 1 - Enlarged Fire Alarm Plan-Northeast- Option 3
Revised for fire alarm for new architectural plan
74. Sheet FA103 Enlarged Fire Alarm Plan-South- Option 3
74.1. Detail 1 - Enlarged Fire Alarm Plan-South- Option 3
Revised FDC note
75. Sheet FA104 Enlarged Fire Alarm Plan-Northwest- Option 7
75.1. Detail 1 - Enlarged Fire Alarm Plan-Northwest- Option 7
Revised FDC note
76. Sheet FA105 Enlarged Fire Alarm Plan-Northeast- Option 7
76.1. Detail 1 - Enlarged Fire Alarm Plan-Northeast- Option 7
Revised for fire alarm for new architectural plan
77. Sheet FA106 Enlarged Fire Alarm Plan-South- Option 7
77.1. Detail 1 - Enlarged Fire Alarm Plan-South- Option 7
Revised FDC note
78. Sheet FX001 Fire Suppression Notes
Revised notes.
79. Sheet FX101 Enlarged Fire Suppression Plan-Northwest
79.1. Fire Sprinkler Legend
Revised sprinkler head count
80. Sheet FX102 Enlarged Fire Suppression Plan-Northeast
80.1. Detail 1 - Enlarged Fire Suppression Plan-Northeast
Revised for fire sprinklers for new architectural plan
PLUMBING
81. Sheet P-001 Notes, Legends, and Abbreviations
81.1. Added note clarifying Bid Option #5.
82. Sheet P-102 Plumbing DWV Plan - Northeast
82.1. Detail 1 – Plumbing DWV Plan - Northeast
Added Grease Waste, Sanitary Sewer, Grease Vent, and Vent systems for Starbucks plumbing.
Added and revised estimated trenching area.
82.2. Keynotes
Added keynotes 12-15 for Starbucks plumbing.
83. Sheet P-112 Plumbing WAG Plan - Northeast
83.1. Detail 1 – Plumbing WAG Plan - Northeast
Added Domestic Cold Water, Domestic Hot Water, Domestic Hot Water Return, and Filtered Water
systems for Starbucks plumbing.
83.2. Keynotes
Added keynotes 8-13 for Starbucks plumbing.
84. Sheet P-401 Enlarged Plumbing DWV Plans
84.1. Detail 1 – Enlarged DWV Plan - Northeast Tenant Area
Added keynote 8 for coordination with existing structural grade beam.
84.2. Detail 2 – Enlarged DWV Plan - South Food Tenant Area
Added Sanitary Sewer and Vent plumbing for the Subway handsink.
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 12 OF 15
Added and revised estimated trenching area.
Added keynote 8 for coordination with existing structural grade beam.
Added keynote 3 to Starbucks’ Water Tower for Sanitary Sewer.
84.3. Keynotes
Added keynote 8 for coordination with existing structural grade beam.
Added keynote 25 for Subway plumbing.
85. Sheet P-411 Enlarged Plumbing WAG Plans
85.1. Detail 2 – Enlarged WAG Plan - South Food Tenant Area
Added water tower, Domestic Cold Water, Domestic Hot Water, and Filtered Water line for Starbucks
plumbing.
Added Domestic Cold Water, Domestic Hot Water, and Domestic Hot Water Return plumbing for the
Subway handsink.
Added WB-1 and Domestic Cold Water plumbing for the Subway oven.
85.2. Keynotes
Added keynotes 26-29 for Starbucks and Subway plumbing.
86. Sheet P-601 Plumbing Schedules
86.1. Hydromechanical Grease Interceptor Sizing Calculation
Revised calculation for Starbucks plumbing fixtures.
MECHANICAL
87. Sheet M-001 Notes, Legends, and Abbreviations
87.1. Scope of Work Option 1
Revised and expanded to clarify Option 1.
87.2. Temporary HVAC
Added note to clarify temporary HVAC requirements.
88. Sheet MD102 Mechanical Demolition Plan - Northeast
88.1. Detail 1 – Mechanical Demolition Plan – Northeast
Revised ductwork and diffuser layout in main restrooms to reflect current conditions.
89. Sheet MD103 Mechanical Demolition Plan - South
89.1. Detail 1 – Mechanical Demolition Plan – South
Added keynote 12 to indicate relocation of a diffuser.
89.2. Keynotes
Added keynote 12 to indicate relocation of a diffuser.
90. Sheet MD401 Mechanical Demolition Plans - Enlarged
90.1. Detail 1 – Enlarged Mechanical Demolition Plan – Northeast
Added keynotes 23 and 24 to indicate temporary chiller tie-in points.
90.2. Keynotes
Added keynotes 23 and 24 to indicate temporary chiller tie-in points.
91. Sheet M-102 Mechanical HVAC Plan - Northeast
91.1. Detail 1 – Mechanical HVAC Plan – Northeast
Revised ductwork and diffusers in Subway to accommodate new layout.
Revised ductwork and diffuser in Popeyes.
Revised ductwork and diffuser in Back of House.
92. Sheet M-103 Mechanical HVAC Plan - South
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 13 OF 15
92.1. Detail 1 – Mechanical HVAC Plan – South
Relocated existing diffuser to avoid conflict with new light.
Added keynote 9 for relocated diffuser.
92.2. Keynotes
Added keynote 9 for relocated diffuser.
93. Sheet M-703 Controls
93.1. Detail 2 – Fan Coil Unit Controls (FCU-4.05)
Revised to remove some unnecessary items.
93.2. Detail 3 – Fan Coil Unit Controls (FCU-4.19)
Added in its entirety.
ELECTRICAL
94. Sheet E-001 Notes, Legends, and Abbreviations
94.1. Electrical Symbols Legend
Added symbols for USB receptacle
94.2. Bid Option Notes
Added Bid Option Notes
95. Sheet ED102 – Partial Lighting Demolition Plan - Northeast
95.1. Detail 1 – Partial Lighting Demolition Plan - Northeast
Revised lighting demolition at Subway restaurant area
Revised lighting demolition at canopy removal at outside of Optical
96. Sheet ED112 – Partial Power Demolition Plan - Northeast
96.1. Detail 1 – Partial Power Demolition Plan - Northeast
Revised power demolition at Subway restaurant area
97. Sheet ED501 – Demolition One- Line Diagram
97.1. Plan Notes
Added Plan Notes regarding bid options.
98. Sheet E102 – Partial Lighting Plan - Northeast
98.1. Detail 1 – Partial Lighting Plan - Northeast
Revised lighting at Subway restaurant area
Revised lighting at Starbucks area
Revised controls for signage at new tenants
Revised location of light switches for food court area
Added exterior wall mount light outside of Optical
98.2. Keynotes
Added keynotes 10 and 11
99. Sheet E102A – Partial Lighting Plan – Northeast – Bid Option 8
99.1. Detail 1 – Partial Lighting Plan – Northeast – Bid Option 8
Revised crosshatching at Subway restaurant area
Removed exterior downlight outside of Optical.
100. Sheet E111 – Partial Power Plan - Northwest
100.1. Detail 1 – Partial Power Plan - Northwest
Add power for fire alarm LOC at room 1013
101. Sheet E112 – Partial Power Plan - Northeast
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 14 OF 15
101.1. Detail 1 – Partial Power Plan - Northeast
Added enlarge plan callout for Subway restaurant area
Add power for fire alarm LOC at mall entries
Revised electrical at food court low walls
Revised electrical at ice machine at drink stations
Revised location of light switches for food court area
101.2. Keynotes
Revised keynotes 4 and 5
Added keynote 18
102. Sheet E113 – Partial Power Plan - South
102.1. Detail 1 – Partial Power Plan - South
Add power for fire alarm LOC at room 101
103. Sheet E401 – Enlarged Plans
103.1. Detail 1 – Enlarged Power Plan – Qdoba, North Power/Mech Plan
Added switch at hood for local manual control of exhaust fan at Qdoba
103.2. Detail 2 – Enlarged South Power/Mechanical Plan - Starbucks
Added existing circuit for fire alarm control panel.
103.3. Detail 3 – Enlarged Power Plan - Starbucks
Revised electrical layout at Starbucks
103.4. Detail 4 – Enlarged Power Plan - Subway
Added enlarged power plan for Subway
103.5. Keynotes
Added keynotes 15, 16, 17, and 18
104. Sheet ED501 – One- Line Diagram
104.1. Detail 1 – One-Line Diagram
Added keynote 12 callout to equipment related to Starbucks
104.2. Plan Notes
Added Plan Notes regarding bid options
104.3. Keynotes
Added keynote 12
105. Sheet E601 – Panelboard Schedules
105.1. Panel LA7
Revised circuit(s) indicated
105.2. Plan Notes
Added Plan Notes regarding bid options
106. Sheet E602 – Panelboard Schedules
106.1. Panel LB3A
Revised circuit(s) indicated
106.2. Plan Notes
Added Plan Notes regarding bid options
107. Sheet E603 – Panelboard Schedules
107.1. Panel LB6, LB10, LB11, SB
Revised circuit(s) indicated
107.2. Plan Notes
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 15 OF 15
Added Plan Notes regarding bid options
SPECIFICATIONS
1. Section 01 51 00 – Temporary Utilities
Revised Sections 1.4 through 1.6 to clarify Temporary HVAC requirements.
2. Section 22 13 19 – Sanitary Waste Piping Specialties (re-issue in its entirety)
Revised Section 2.7 to reflect scheduled grease interceptor.
3. Section 22 13 19.23 – Grease Traps
Removed from project as no longer relevant.
4. Section 22 40 00 – Plumbing Fixtures (re-issue in its entirety)
Removed Section 1.4.H as it was not applicable.
5. Section 23 09 00 – Instrumentation and Controls for HVAC (re-issue in its entirety)
Revised Section 3.2 to include conduit.
END OF NARRATIVE