RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation ....

15
810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 1 OF 15 RE-SOLICITATION CLARIFICATION ISSUE NO. | RS ISSUE DATE | 6/5/2020 PROJECT | Fort Rucker Shopping Center Image Update Fort Rucker, AL Building 9214 0843-18-000002 OWNER | Army and Air Force Exchange Service 3911 S. Walton Walker Blvd. Dallas, TX 75236 ARCHITECT | Cyntergy AEC, LLC 810 S. Cincinnati Ave., Ste 200 Tulsa, OK 74119 This re-solicitation clarification forms a part of the contract documents and modifies previous documents, specifications and drawings pertaining to these items dated 11/22/2019. The General Contractor shall notify the architect immediately with any discrepancies or errors found in these documents. DESCRIPTION This drawing change covers drawing clarifications based on owner and general contractor feedback and the addition of Subway and Starbucks tenants. GENERAL 1. Sheet G-101 – Sheet Index, General Notes 1.1. General Contractor Bid Information Add bid option #5 Rename bid options 8-12 to be bid alternate Reword bid options for clarity 1.2. Sheet Index Added sheets G-106, G107, KB101, KB102, KB103, KB201, KB501, KB502, KB503, KB600, KB701, KB801, KBP101, KBP501 and KC101 1.3. Starbucks Project Contact and General Notes Add to sheet 2. Sheet G-103 – Life Safety Plan 2.1. Detail 1 – Life Safety Plan Added occupancy hatches for added Starbucks and Subway tenants 3. Sheet G-104 – General Information 3.1. Builder Staging Map Moved staging area to avoid FDC and existing canopy 3.2. Base Map Revised map image for clarification.

Transcript of RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation ....

Page 1: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 1 OF 15

RE-SOLICITATION CLARIFICATION ISSUE NO. | RS

ISSUE DATE | 6/5/2020

PROJECT | Fort Rucker Shopping Center Image Update

Fort Rucker, AL

Building 9214

0843-18-000002

OWNER | Army and Air Force Exchange Service

3911 S. Walton Walker Blvd.

Dallas, TX 75236

ARCHITECT | Cyntergy AEC, LLC

810 S. Cincinnati Ave., Ste 200

Tulsa, OK 74119

This re-solicitation clarification forms a part of the contract documents and modifies previous documents, specifications and drawings pertaining to these items dated 11/22/2019. The General Contractor shall notify the architect immediately with any discrepancies or errors found in these documents.

DESCRIPTION

This drawing change covers drawing clarifications based on owner and general contractor feedback and the

addition of Subway and Starbucks tenants.

GENERAL

1. Sheet G-101 – Sheet Index, General Notes

1.1. General Contractor Bid Information

Add bid option #5

Rename bid options 8-12 to be bid alternate

Reword bid options for clarity

1.2. Sheet Index

Added sheets G-106, G107, KB101, KB102, KB103, KB201, KB501, KB502, KB503, KB600, KB701,

KB801, KBP101, KBP501 and KC101

1.3. Starbucks Project Contact and General Notes

Add to sheet

2. Sheet G-103 – Life Safety Plan

2.1. Detail 1 – Life Safety Plan

Added occupancy hatches for added Starbucks and Subway tenants

3. Sheet G-104 – General Information

3.1. Builder Staging Map

Moved staging area to avoid FDC and existing canopy

3.2. Base Map

Revised map image for clarification.

Page 2: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 2 OF 15

4. Sheet G-105 – Construction Phasing Plan

4.1. Phasing Schedule

Revised phasing schedule for an 18-month duration.

4.2. Phasing Plan

Add location for temporary HVAC

4.3. General Notes

Add general note 24

5. Sheet G-106 – Signage Keyplan

5.1. Added in its entirety.

6. Sheet G-107 – Signage Schedule

6.1. Added in its entirety.

CIVIL

7. Sheet CD402 – Enlarged Site Demolition Plan

7.1. Detail 1 – Enlarged Site Demolition Plan

Removed Bid Option #10

8. Sheet CS-101 – Overall Site Plan

8.1. Detail 1 – Overall Site Plan

Removed Bid Option #10

9. Sheet CS-402 – Enlarged Site Plan

9.1. Detail 1 – Enlarged Site Plan

Removed Bid Option #10

Add a transformer for Starbucks

ARCHITECTURAL

10. Sheet AD111 – Demo Area Plan - PXTRA

10.1. Detail 1 – Demo Area Plan – PXTRA

Add keynote 60 at gun vault relocation

Show floor drains and cleanouts for clarity

Revise keynotes and graphics at exterior door on west side

10.2. Demolition Plan Legend

Add to sheet

10.3. Demolition Keynotes

Added Keynotes 59 and 60

10.4. Demolition General Notes

Revise note 20 and 21

11. Sheet AD112 – Demo Area Plan – Food Court / Mall

11.1. Detail 1 – Demo Area Plan – Food Court / Mall

Revised Subway plan for extents of work.

Revised keynotes for clarity in food court back of house

Added demo keynotes for canopy demo on north side of building

Clarify notes and graphics for mudbed removal under tile

Removed keynotes for asbestos removal for clarification

Revise keynote at mechanical room door

Page 3: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 3 OF 15

11.2. Demolition Plan Legend

Add to sheet

11.3. Demolition Keynotes

Added Keynotes 59 and 60

11.4. Demolition General Notes

Revise note 20 and 21

12. Sheet AD-113 – Demo Area Plan – Exchange

12.1. Detail 1 – Enlarged Exchange Demo Plan

Revised keynotes at flooring transition

Added demo of existing wall at Office 3

Add keynotes at storage 1034 for clarification

12.2. Demolition Keynotes

Added Keynotes 59 and 60

12.3. Demolition General Notes

Revise note 20 and 21

13. Sheet AD121 – Demo RCP - PXTRA

13.1. Detail 1 – Demo RCP - PXTRA

Revised keynote for asbestos remove to a general note

Added keynotes at gun vault relocated area for clarity

13.2. Demolition Keynotes

Revised keynote 9

13.3. Demolition General Notes

Revise note 20 and 21

14. Sheet AD122 – Demo RCP - Food Court / Mall

14.1. Detail 1 – Demo RCP - Food Court / Mall

Revised removed ceiling areas to reflect Subway changes.

Remove ceiling at mechanical room

14.2. Demolition Keynotes

Revised keynote 9

14.3. Demolition General Notes

Revise note 20 and 21

15. Sheet AD123 – Demo RCP - Exchange

15.1. Demolition Keynotes

Revised keynote 9

15.2. Demolition General Notes

Revise note 20 and 21

16. Sheet AD201 – Demo Elevations

16.1. Detail 1 – Demo East Elevation

Renamed detail

Added keynote for louver removal

16.2. Detail 2– Demo South Elevation

Renamed detail

Added keynote for mechanical unit removal

16.3. Detail 3 – Demo North Elevation

Page 4: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 4 OF 15

Renamed detail

Revised keynote for exhaust louver

Added keynote for louver

16.4. Detail 4 – Demo West Elevation

Renamed detail

Added keynote for canopy removal

16.5. Detail 5 – Demo Northeast Elevation

Renamed detail

Add keynote at front elevation for stucco prep

Add keynote for canopy removal

17. Sheet A-101 – Overall Floor Plan

17.1. Detail 1 – Overall Floor Plan

Revised detail reference at PXTRA MPA 2

Added revised layout for subway

Added layout for Starbucks

17.2. Floor Plan Legend

Add FE symbol and remove tactile sign symbol

18. Sheet A-111 – Enlarged PX Plan

18.1. Detail 1 – Enlarged PX Floor Plan

Revised dimensions and detail references at PXTRA MPA 2

Add details at PXTRA MPA 2

Added notes for clarification at relocated gun vault.

18.2. Detail 2 – Expansion Joint Detail

Added detail to sheet

18.3. Floor Plan Legend

Add FE symbol and remove tactile sign symbol

19. Sheet A-112 – Enlarged Food Court / Mall Plan

19.1. Detail 1 – Enlarged Food Court / Mall Plan

Added new layout for Subway

Added reference callout for Starbucks

Add note to patch and repair existing mechanical yard screen wall

19.2. Floor Plan Legend

Add FE symbol and remove tactile sign symbol

20. Sheet A-113 – Enlarged Exchange Plan

20.1. Detail 1 – Enlarged Exchange Floor Plan

Graphically show extent of trench infill in mechanical room

Adjust graphics for hatch in no work areas

20.2. General Notes

Revised/combined General Notes Legend 11 through 18.

21. Sheet A-121 – Reflected Ceiling Plan - PX

21.1. Detail 1 – Reflected Ceiling Plan - PX

Add general note

21.2. Reflected Ceiling Plan Legend

Added symbols to legend.

Page 5: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 5 OF 15

21.3. General Notes

Add note 4

22. Sheet A-122 – Reflected Ceiling Plan – Food Court / Mall

22.1. Detail 1 – Reflected Ceiling Plan – Food Court / Mall

Revised ceiling at Subway.

Add Starbucks layout and revised ceiling

Add general note

22.2. Reflected Ceiling Plan Legend

Added symbols to legend.

22.3. General Notes

Add note 4

23. Sheet A-123 – Reflected Ceiling Plan - Exchange

23.1. Detail 1 – Reflected Ceiling Plan – Exchange

Added general note

23.2. Reflected Ceiling Plan Legend

Added symbols to legend.

23.3. General Notes

Add note 4

24. Sheet A-130 – Roof Plan

24.1. Detail 1 – Roof Plan

Add sections and expansion joint reference at building expansion

25. Sheet A-201 – Exterior Elevations

25.1. Detail 1 – East Elevation

Added information for Starbucks signage.

25.2. Detail 2 – South Elevation

Added detail at building expansion

25.3. Detail 4 – West Elevation

Added expansion joint reference

26. Sheet A-202 – Exterior Elevations

Issued with change

27. Sheet A-203 – Exterior Elevations

27.1. Details 1 – Enlarged Entry Tower Plan

Added jamb detail reference at door

27.2. Detail 3 – Main Entry Section

Added head and sill details reference at door

Revised graphics and annotation for canopy

28. Sheet A-301 – Wall Sections

28.1. Detail 1 – MPA Stockroom Expansion Section

Extended section

28.2. Detail 2 – Wall Section

Revised detail reference

28.3. Detail 3 – Freezer/Cooler Section

Extended section

28.4. Detail 6A – Stockroom Expansion Joint

Page 6: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 6 OF 15

Add detail

28.5. Detail 7 – Cooler Closure Detail

Revised blocking information at cooler panel

28.6. Detail 6B – Roof Expansion Joint @ Fascia Overhang

29. Sheet A-302 – Wall Sections

29.1. Detail 1 – Secondary Entrance Section Detail

Show signage

30. Sheet A-400 – Enlarged Restroom Plans

30.1. Detail 1 – Enlarged Mall Restroom Plan

Add child safety seat

30.2. Detail 2 – Enlarged Mall Restroom Equipment Plan

Add child safety seat

30.3. Detail 3 – Womens Elevation

Add recessed trash receptacles

30.4. Detail 5 – Womens Elevation

Add child safety seat

30.5. Detail 6 – Womens Elevation

Add trash receptacle

30.6. Detail 7 – Mens Elevation

Add child safety seat

30.7. Detail 9 – Mens Elevation

Add trash receptacle

30.8. Detail 10 – Mens Elevation

Add trash receptacle

30.9. Mounting Heights and ADA Clearance

Add clearance height for child safety seat and recessed trash

30.10. Restroom Equipment

Add surface mount trash receptacle

31. Sheet A-401 – Enlarged Restroom Plans

31.1. Detail 1 – Enlarged Exchange Restroom Plan

Add child safety seat

Removed existing wall and replaced for new

31.2. Detail 2 – Enlarged Exchange Restroom Equipment Plan

Add child safety seat

31.3. Detail 3 – Mens Elevation

Add trash receptacle

31.4. Detail 4 – Mens Elevation

Add trash receptacle

31.5. Detail 6 – Mens Elevation

Add child safety seat

31.6. Detail 7 – Womens Elevation

Add trash receptacle

31.7. Detail 8 – Womens Elevation

Add child safety seat

Page 7: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 7 OF 15

31.8. Detail 10 – Womens Elevation

Add trash receptacle

31.9. Restroom Equipment

Add surface mount trash receptacle

32. Sheet A-402 – Enlarged Restroom Plans

32.1. Detail 1 – Enlarged Admin Restroom Plan

Add child safety seat

32.2. Detail 2 – Enlarged Admin Restroom Equipment Plan

Add child safety seat

Revise trash receptacle type to surface mount

32.3. Detail 3 – Mens Elevation

Add trash receptacle

32.4. Detail 4 – Mens Elevation

Add child safety seat

32.5. Detail 6 – Mens Elevation

Add trash receptacle and revise type to surface mount

32.6. Detail 7 – Womens Elevation

Add trash receptacle and revise type to surface mount

32.7. Detail 8 – Womens Elevation

Add trash receptacle and revise type to surface mount

32.8. Detail 10 – Womens Elevation

Add child safety seat

32.9. Restroom Equipment

Add surface mount trash receptacle

33. Sheet A-403 – Enlarged Plans

33.1. Detail 1 – Enlarged New Drink Station Plan

Add room tag

33.2. Detail 2 – Enlarged Relocated Drink Station Plan

Add room tag

33.3. Detail 3 – Enlarged Relocated Drink Station Plan

Revised entire plan.

33.4. Detail 5 – Enlarged Qdoba Plan

Moved enlarged plan to KA101

34. Sheet A-501 – Details

34.1. Detail 1 – Head Detail (Air Curtain)

Add detail

34.2. Detail 2 – Louver Detail

Add detail

35. Sheet A-502 – Details

35.1. Detail 8 – Corner Window Detail

Revised detail.

35.2. Detail 11 - Typ. Penetration Detail

Revised detail.

36. Sheet A-601 – Door Schedule, Door and Frame Elevations

Page 8: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 8 OF 15

36.1. Revised sheet in its entirety

37. Sheet A-602 – Finish Schedules and Details

37.1. Issued with change

38. Sheet A-603 – Partition Types

38.1. Partition Types

Added Type G

Revised Type B and C

Removed Detail.

39. Sheet A-701 – Finish Plan - PX

Issued with change

40. Sheet A-702 – Finish Plan – Food Court / Mall

40.1. Detail 1 – Finish Plan - Food Court / Mall

Add Subway and Starbucks references

41. Sheet A-703 – Finish Plan - Exchange

41.1. Detail 1 – Finish Plan - Exchange

Issued with change

42. Sheet A-704 – Floor Finish Plan – PX

42.1. Detail 1 – Floor Finish Plan – PX

Show capped floor clean outs and drains

42.2. Floor Pattern Plan

Revise graphics and wording for polished concrete over new concrete topping

43. Sheet A-705 – Floor Finish Plan – Food Court / Mall

43.1. Detail 1 – Floor Finish Plan – Food Court / Mall

Added references to Subway and Starbucks finish plans

Revised graphics for mudbed infill area

43.2. Floor Pattern Plan

Revise graphics and wording for polished concrete over new concrete topping

44. Sheet A-706 – Floor Finish Plan – Exchange

44.1. Floor Pattern Plan

Revise graphics and wording for polished concrete over new concrete topping

45. Sheet A-800 – Interior Elevations

45.1. Detail 1 – Food Court Interior Elevation

Add reference for Starbucks interior elevation

45.2. Detail 3 – Mall Interior Elevation

Revised elevation at Subway.

46. Sheet A-801 – Interior Elevations

Issued with change

47. Sheet A-802 – Interior Elevations

Issued with change

48. Sheet A-803 – Entry Portal Details

48.1. Detail 5 – Blade Sign Detail

Add detail

QDOBA

Page 9: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 9 OF 15

49. Sheet KA101 – Qdoba Plans and Elevations

49.1. Detail 1 – Qdoba Floor Plan

Graphically extent of floor trench infill

49.2. Detail 2 – Qdoba Reflected Ceiling Plan.

Graphically show light fixtures

49.3. Reflected Ceiling Plan Legend

Add linear diffuser to legend.

STARBUCKS

50. Sheet KB101 - Starbucks Floor and Reflected Ceiling Plan

50.1. Added in its entirety.

51. Sheet KB102 – FF & E Plan and Schedules

51.1. Added in its entirety.

52. Sheet KB103 – Casework Plan and Schedules

52.1. Added in its entirety.

53. Sheet KB201 – Interior Elevations

53.1. Added in its entirety.

54. Sheet KB501 – Interior and Casework Details

54.1. Added in its entirety.

55. Sheet KB502 – Casework Details

55.1. Added in its entirety.

56. Sheet KB503 – Casework Details

56.1. Added in its entirety.

57. Sheet KB600 – Casework, Finishes, and Lighting Schedules

57.1. Added in its entirety.

58. Sheet KB701 – Interior Floor Finish Plan

58.1. Added in its entirety.

59. Sheet KB801 – Interior Finish Elevations

59.1. Added in its entirety.

60. Sheet KBP101 - Starbucks Plumbing Design Plan

60.1. Added in its entirety.

61. Sheet KBP501 - Starbucks Plumbing Details

61.1. Added in its entirety.

SUBWAY

62. Sheet KC101 – Subway Floor Plan, Equipment Plan, and Floor Finish Plan

62.1. Added in its entirety.

STRUCTURAL

63. Sheet S-001 – General Notes and Typical Details

63.1. Cold-formed Metal Framing Notes

Added note for openings in roof

63.2. Detail 3 – Equipment Housekeeping Pad

Page 10: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 10 OF 15

Clarified Slab Depth

Clarified Pad Locations

64. Sheet S-101 - Keyplan

64.1. Detail 1 – Keyplan

Added additional Equipment Pad locations

65. Sheet S-112 – Enlarged Plans

65.1. Detail 1 – MPA2 – 1012 Roof Framing Plan

Added blocking at near Grid E

66. Sheet S-113 – Enlarged Plans

66.1. Detail 1 – Enlarged Framing Plan at Mech 1 – Option 1

Added notation for diagonals at MAU

Added notation for coordination of structure and equipment

67. Sheet S-114 – Enlarged Plans

67.1. Detail 1 – Vestibule 209 - Wall and Canopy Foundation Plan

Added section at threshold

Added dimension

67.2. Detail 2 – Vestibule 209 – Wall and Canopy Framing Plan

Revised parapet shape to match elevation

68. Sheet S-501 – Details

68.1. Detail 1 – Freezer/Cooler Plan

Added note for subbase

68.2. Detail 2 – Freezer/Cooler Plan

Added note for subbase

69. Sheet S-502 – Details

69.1. Detail 1 – Canopy at Vestibule 209

Revised section at hanger

Added clip to existing roof structure

69.2. Detail 1A – Canopy at Vestibule 209 Opening

New detail at threshold

70. Sheet S-503 – Details

70.1. Detail 1 – Framing Detail at MPA 2

Added note for backfill against retaining wall

70.2. Detail 7 – Detail at Interior Storefront/Coiling Door

Revised detail title to include coiling doors.

Revised header to include coiling doors.

70.3. Detail 8 – Framing at Interior Storefront/Coiling Door

Revised detail title to include coiling doors.

FIRE PROTECTION

71. Sheet FA001 Fire Alarm Notes and Details

71.1. Revised notes.

72. Sheet FA101 Enlarged Fire Alarm Plan-Northwest- Option 3

72.1. Detail 1 - Enlarged Fire Alarm Plan-Northwest- Option 3

Revised FDC note

Page 11: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 11 OF 15

73. Sheet FA102 Enlarged Fire Alarm Plan-Northeast- Option 3

73.1. Detail 1 - Enlarged Fire Alarm Plan-Northeast- Option 3

Revised for fire alarm for new architectural plan

74. Sheet FA103 Enlarged Fire Alarm Plan-South- Option 3

74.1. Detail 1 - Enlarged Fire Alarm Plan-South- Option 3

Revised FDC note

75. Sheet FA104 Enlarged Fire Alarm Plan-Northwest- Option 7

75.1. Detail 1 - Enlarged Fire Alarm Plan-Northwest- Option 7

Revised FDC note

76. Sheet FA105 Enlarged Fire Alarm Plan-Northeast- Option 7

76.1. Detail 1 - Enlarged Fire Alarm Plan-Northeast- Option 7

Revised for fire alarm for new architectural plan

77. Sheet FA106 Enlarged Fire Alarm Plan-South- Option 7

77.1. Detail 1 - Enlarged Fire Alarm Plan-South- Option 7

Revised FDC note

78. Sheet FX001 Fire Suppression Notes

Revised notes.

79. Sheet FX101 Enlarged Fire Suppression Plan-Northwest

79.1. Fire Sprinkler Legend

Revised sprinkler head count

80. Sheet FX102 Enlarged Fire Suppression Plan-Northeast

80.1. Detail 1 - Enlarged Fire Suppression Plan-Northeast

Revised for fire sprinklers for new architectural plan

PLUMBING

81. Sheet P-001 Notes, Legends, and Abbreviations

81.1. Added note clarifying Bid Option #5.

82. Sheet P-102 Plumbing DWV Plan - Northeast

82.1. Detail 1 – Plumbing DWV Plan - Northeast

Added Grease Waste, Sanitary Sewer, Grease Vent, and Vent systems for Starbucks plumbing.

Added and revised estimated trenching area.

82.2. Keynotes

Added keynotes 12-15 for Starbucks plumbing.

83. Sheet P-112 Plumbing WAG Plan - Northeast

83.1. Detail 1 – Plumbing WAG Plan - Northeast

Added Domestic Cold Water, Domestic Hot Water, Domestic Hot Water Return, and Filtered Water

systems for Starbucks plumbing.

83.2. Keynotes

Added keynotes 8-13 for Starbucks plumbing.

84. Sheet P-401 Enlarged Plumbing DWV Plans

84.1. Detail 1 – Enlarged DWV Plan - Northeast Tenant Area

Added keynote 8 for coordination with existing structural grade beam.

84.2. Detail 2 – Enlarged DWV Plan - South Food Tenant Area

Added Sanitary Sewer and Vent plumbing for the Subway handsink.

Page 12: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 12 OF 15

Added and revised estimated trenching area.

Added keynote 8 for coordination with existing structural grade beam.

Added keynote 3 to Starbucks’ Water Tower for Sanitary Sewer.

84.3. Keynotes

Added keynote 8 for coordination with existing structural grade beam.

Added keynote 25 for Subway plumbing.

85. Sheet P-411 Enlarged Plumbing WAG Plans

85.1. Detail 2 – Enlarged WAG Plan - South Food Tenant Area

Added water tower, Domestic Cold Water, Domestic Hot Water, and Filtered Water line for Starbucks

plumbing.

Added Domestic Cold Water, Domestic Hot Water, and Domestic Hot Water Return plumbing for the

Subway handsink.

Added WB-1 and Domestic Cold Water plumbing for the Subway oven.

85.2. Keynotes

Added keynotes 26-29 for Starbucks and Subway plumbing.

86. Sheet P-601 Plumbing Schedules

86.1. Hydromechanical Grease Interceptor Sizing Calculation

Revised calculation for Starbucks plumbing fixtures.

MECHANICAL

87. Sheet M-001 Notes, Legends, and Abbreviations

87.1. Scope of Work Option 1

Revised and expanded to clarify Option 1.

87.2. Temporary HVAC

Added note to clarify temporary HVAC requirements.

88. Sheet MD102 Mechanical Demolition Plan - Northeast

88.1. Detail 1 – Mechanical Demolition Plan – Northeast

Revised ductwork and diffuser layout in main restrooms to reflect current conditions.

89. Sheet MD103 Mechanical Demolition Plan - South

89.1. Detail 1 – Mechanical Demolition Plan – South

Added keynote 12 to indicate relocation of a diffuser.

89.2. Keynotes

Added keynote 12 to indicate relocation of a diffuser.

90. Sheet MD401 Mechanical Demolition Plans - Enlarged

90.1. Detail 1 – Enlarged Mechanical Demolition Plan – Northeast

Added keynotes 23 and 24 to indicate temporary chiller tie-in points.

90.2. Keynotes

Added keynotes 23 and 24 to indicate temporary chiller tie-in points.

91. Sheet M-102 Mechanical HVAC Plan - Northeast

91.1. Detail 1 – Mechanical HVAC Plan – Northeast

Revised ductwork and diffusers in Subway to accommodate new layout.

Revised ductwork and diffuser in Popeyes.

Revised ductwork and diffuser in Back of House.

92. Sheet M-103 Mechanical HVAC Plan - South

Page 13: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 13 OF 15

92.1. Detail 1 – Mechanical HVAC Plan – South

Relocated existing diffuser to avoid conflict with new light.

Added keynote 9 for relocated diffuser.

92.2. Keynotes

Added keynote 9 for relocated diffuser.

93. Sheet M-703 Controls

93.1. Detail 2 – Fan Coil Unit Controls (FCU-4.05)

Revised to remove some unnecessary items.

93.2. Detail 3 – Fan Coil Unit Controls (FCU-4.19)

Added in its entirety.

ELECTRICAL

94. Sheet E-001 Notes, Legends, and Abbreviations

94.1. Electrical Symbols Legend

Added symbols for USB receptacle

94.2. Bid Option Notes

Added Bid Option Notes

95. Sheet ED102 – Partial Lighting Demolition Plan - Northeast

95.1. Detail 1 – Partial Lighting Demolition Plan - Northeast

Revised lighting demolition at Subway restaurant area

Revised lighting demolition at canopy removal at outside of Optical

96. Sheet ED112 – Partial Power Demolition Plan - Northeast

96.1. Detail 1 – Partial Power Demolition Plan - Northeast

Revised power demolition at Subway restaurant area

97. Sheet ED501 – Demolition One- Line Diagram

97.1. Plan Notes

Added Plan Notes regarding bid options.

98. Sheet E102 – Partial Lighting Plan - Northeast

98.1. Detail 1 – Partial Lighting Plan - Northeast

Revised lighting at Subway restaurant area

Revised lighting at Starbucks area

Revised controls for signage at new tenants

Revised location of light switches for food court area

Added exterior wall mount light outside of Optical

98.2. Keynotes

Added keynotes 10 and 11

99. Sheet E102A – Partial Lighting Plan – Northeast – Bid Option 8

99.1. Detail 1 – Partial Lighting Plan – Northeast – Bid Option 8

Revised crosshatching at Subway restaurant area

Removed exterior downlight outside of Optical.

100. Sheet E111 – Partial Power Plan - Northwest

100.1. Detail 1 – Partial Power Plan - Northwest

Add power for fire alarm LOC at room 1013

101. Sheet E112 – Partial Power Plan - Northeast

Page 14: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 14 OF 15

101.1. Detail 1 – Partial Power Plan - Northeast

Added enlarge plan callout for Subway restaurant area

Add power for fire alarm LOC at mall entries

Revised electrical at food court low walls

Revised electrical at ice machine at drink stations

Revised location of light switches for food court area

101.2. Keynotes

Revised keynotes 4 and 5

Added keynote 18

102. Sheet E113 – Partial Power Plan - South

102.1. Detail 1 – Partial Power Plan - South

Add power for fire alarm LOC at room 101

103. Sheet E401 – Enlarged Plans

103.1. Detail 1 – Enlarged Power Plan – Qdoba, North Power/Mech Plan

Added switch at hood for local manual control of exhaust fan at Qdoba

103.2. Detail 2 – Enlarged South Power/Mechanical Plan - Starbucks

Added existing circuit for fire alarm control panel.

103.3. Detail 3 – Enlarged Power Plan - Starbucks

Revised electrical layout at Starbucks

103.4. Detail 4 – Enlarged Power Plan - Subway

Added enlarged power plan for Subway

103.5. Keynotes

Added keynotes 15, 16, 17, and 18

104. Sheet ED501 – One- Line Diagram

104.1. Detail 1 – One-Line Diagram

Added keynote 12 callout to equipment related to Starbucks

104.2. Plan Notes

Added Plan Notes regarding bid options

104.3. Keynotes

Added keynote 12

105. Sheet E601 – Panelboard Schedules

105.1. Panel LA7

Revised circuit(s) indicated

105.2. Plan Notes

Added Plan Notes regarding bid options

106. Sheet E602 – Panelboard Schedules

106.1. Panel LB3A

Revised circuit(s) indicated

106.2. Plan Notes

Added Plan Notes regarding bid options

107. Sheet E603 – Panelboard Schedules

107.1. Panel LB6, LB10, LB11, SB

Revised circuit(s) indicated

107.2. Plan Notes

Page 15: RE-SOLICITATION CLARIFICATION Rucker Image... · 2020-06-30 · Detail 3 – Demo North Elevation . 810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE

810 S CINCINNATI AVE, STE 200, TULSA, OK 74119 | 918.877.6000 | CYNTERGY.COM PAGE 15 OF 15

Added Plan Notes regarding bid options

SPECIFICATIONS

1. Section 01 51 00 – Temporary Utilities

Revised Sections 1.4 through 1.6 to clarify Temporary HVAC requirements.

2. Section 22 13 19 – Sanitary Waste Piping Specialties (re-issue in its entirety)

Revised Section 2.7 to reflect scheduled grease interceptor.

3. Section 22 13 19.23 – Grease Traps

Removed from project as no longer relevant.

4. Section 22 40 00 – Plumbing Fixtures (re-issue in its entirety)

Removed Section 1.4.H as it was not applicable.

5. Section 23 09 00 – Instrumentation and Controls for HVAC (re-issue in its entirety)

Revised Section 3.2 to include conduit.

END OF NARRATIVE