Vietnam and Siemens Vietnam at a GlancePress Meeting, Vietnam, 19th November 2014
Dr. Thai-Lai PhamPresident & CEO – Siemens Vietnam
November 19, 2014 Press Meeting 2014Page 2 Executive Management
Vietnam – 5000 years of glorious history
Chinese control1,100 years of Chinese control (111 BC – 938 AD)Chinese culture and language adapted
Phase 1 (2789-100 BC)
Birth of VietnamKinh Duong Vuong creates the first Vietnamese states (2879 BC)A long independent and self-contained state under Hung King (2879-258 BC)
Phase 2 (101BC - 938 AD)
Phase 4 (1858 - now)
Independence from Chinese & Territory ExpansionNgo Quyen earned independence (938)Ly Dynasty moved capital to Thang Long (Hanoi now) (1010)Quang Trung moved capital to Hue (1789). Gia Long unified the country (1802)
Gain independence as a unified VietnamFrench control (1858-1945)Vietnam separated into Communist North & Capitalist South (1945-1975)Reunification : Socialist Republic of Vietnam (1975 – now)
1225Phase 3
(938 – 1858)
November 19, 2014 Press Meeting 2014Page 3 Executive Management
Vietnam’s expansion in territory
Birth of Vietnam (2879 BC)
Van Langthe original name of Vietnam
Vietnam’s expansion Vietnam today
Conquering the south over hundreds of years
Vietnam today consists of 63 provinces, 2000 km of length and
more than 3000km of coast.
November 19, 2014 Press Meeting 2014Page 4 Executive Management
Key facts: Vietnam vs. Germany (2013)
Source: WB, Global Insight, Vietnam GSONote: (*) data of 2012
GermanyVietnam
Area thousand km2 310.070 348.770
Capital Hanoi Berlin
Population million 90.00 80.62
Population Growth Rate % 1.05 -1.4
Population Density capita/km2 289 231
Literacy rate % 93.6 100.0
GDP USD bn 149.3 3,635
Growth vs. previous year % 5.42 0.0
GDP/Capita USD/capita 1,664 45,088
Inflation % 6.6 1.5
Electricity consumption per capita * KWh/capita 1,312 6,697
Unemployment rate % 1.9 5.1
Hanoi
HCMC
Berlin
HueHoi An
Can Tho
Sapa
November 19, 2014 Press Meeting 2014Page 5 Executive Management
Energy supply does not match current demand –Aged transmission grid
Energy demand grows 2xGDPCoal and gas as primary feedstock are not enough for future demandGovernment’s strategy is to add 40 GW generation capacity until 2020However, strong focus on coal fired power plantsOutdated grid leads to a 10% loss of power transmission & distribution
Vietnam
November 19, 2014 Press Meeting 2014Page 6 Executive Management
Insufficient healthcare infrastructure and supply
Investments in healthcare infrastructure behind the demand in rural and urban areasOverloaded hospitals: 2-3 patients per one bedEvery year, wealthy Vietnamese spend about USD 2 billion for healthcare services abroadIncreasing chronic diseases
November 19, 2014 Press Meeting 2014Page 7 Executive Management
Vietnam’s vision is to become an industrialized nation by 2020
90 million people need high quality food products and need to invest in food processing
Need for more efficient and innovative products for higher quality of life
Lack of capital for renovation of existing facilities and for investment in new facilities
November 19, 2014 Press Meeting 2014Page 8 Executive Management
Urbanization is taking place rapidly challenging current city infrastructures
34% of the population is living in cities, 45% in 2030Current public transportation only covers 5% of total needs.Old and inefficient buildings and 40% of energy are consumed by buildingsEmerging need for building more airports and ports for economic development
November 19, 2014 Press Meeting 2014Page 9 Executive Management
Branch Office
Today Siemens Vietnam is an integral part of Vietnam’s economy
Today
Siemens AG Representative Office in HN: Licensed: 26-Feb-1993 Address: 18 Phan Boi ChauNo. of employees: 20 (3 foreigners & 17 Vietnamese)
Siemens AG Representation Office in HCMC:Licensed: 21-Aug-1993Address: 5B Ton Duc ThangNo. of employees: 10 (3 foreigners & 7 Vietnamese)
Scope of operations: Liaison office and market researchesFacilitating the implementation of commercial and technical contractsPromoting the development/building of business and technical projects between Siemens & Vietnam
1993
Factory Binh DuongSiemens Automation
System
Hanoi
Branch OfficeOcean Park Bld.
Danang
Head Office in HCMCLandmark Bld.
HCMC
Presence in 3 locations: Hanoi, HCMC & Da NangAbout 270 employees with almost 100% localsOne manufacturing site in Binh DuongMarket leader in Power & Gas, Energy Management, Healthcare, Industry, Building Technologies & MobilityTop company for CSR (Saigon Times Top 40 Award 2009)“Top Trade Service Award 2013” by Ministry of Industry and Trade
November 19, 2014 Press Meeting 2014Page 11 Executive Management
Power & Gas The market leader of Combine-Cycle Power Plant (CCPP) in Vietnam
Project: Phu My 3 - 750 MW CCPPOperation Year: 2004Customer: Phu My 3 BOT PowerDescription:• The plant EPC contractor• Scope of supply: 2 on 1 multishaft
power plant with two SGT5-4000F gas turbines
• Highlights: the first successful foreign BOT power project in Vietnam
• The long term maintenance contract for the plant major equipment.
Project: Ca Mau 1&2 - 1,500MW CCPP Operation Year: 2008Customer: Petro Vietnam Description:• The turnkey contractor for the Power
Island • Scope of supply: four SGT5-4000F gas
turbines, two SST5-5000 steam turbines and six SGen5-1000A generators, four heat recovery steam generators, related electrical & instrumentation & control equipment.
• The long term maintenance contract for the plant major equipment.
Project: Nhon Trach 2 - 750MW CCPPOperation Year: 2011Customer: PV Power Nhon Trach 2Description:• The turnkey contractor for the Power
Island• Scope of supply: two SGT5-4000F gas
turbines, two heat-recovery steam generators, one SST5-5000 steam turbine, three SGen-1000A generators, related electrical, instrumentation & control system.
• The long term maintenance contract for the plant major equipment.
November 19, 2014 Press Meeting 2014Page 12 Executive Management
Energy ManagementPioneer in bringing best-in-class technology for power transmission & distribution projects across Vietnam
Project: 500kV Pho Noi Substation
Contract signing year: 2013
Customer: Northern Power Project Management Board, NPT
Description: Siemens supplies 500kV transformer, primary, secondary package and supervision
Project: National Assembly House
Contract Signing Year: 2013
Customer: Vietnamese Government
Description:
Siemens is the sole-provider of the entire medium and low voltage components for NAH.Diversified range of products includes GIS MV Switchgear, Busduct system LDC, Sivacon LVSB, Power Management System
scada
Energy Transmission Energy Automation & Smart Grid Solutions Low & Medium Voltage Distribution
Project: Scada system & 110kV Unmanned s/s
Contract signing year: 2014
Customer: Southern Power Company (SPC)
Description: Siemens supplies a complete solution for Control center, RTU, UPS, Telecommunication system….This is also the first project of its type to be implemented in Vietnam and EVN SPC is the pioneer in application.
November 19, 2014 Press Meeting 2014Page 13 Executive Management
Digital Factory & Process Drives Increasing the productivity, efficiency & flexibility for Vietnam
Project: ELFA Hybrid Bus PrototypeContract signing year: 2012Customer: Vietnam Motors Industry Corporation (Vinamotor)Description: Siemens and Vinamotor jointly apply Siemens’ ELFA hybrid technology for city buses in Vietnam. Siemens supplies ELFA components and provides technical support while Vinamotorprepares the platform and manufactures the remaining parts of the prototype. This ELFA hybrid bus can reduce fuel consumption up to 50%.
Project: Upgrade Control & Monitoring System for Central Processing Platform No.2 Contract singing year: 2014Customer: Vietsopetro (VSP)Description: Siemens supplied PCS7 process control system (including 02 redundancy controllers + 02 single controllers + 3500 Input/Output points + PCS7 software V7.1)
Project: Cai Lan Port Operation year: 2012Customer: Cai Lan Port (Quang Ninh)Description: Siemens VN joined with Hai Anh (Crane Partner) and Bremen Project House (Headquarter) to modernize the 40 tone STS crane. Scope is replacing the whole e-room with fully containerized solution, Profibus and SIMATIC S7 PLC, that helps to increase the crane efficiency about 20%.
November 19, 2014 Press Meeting 2014Page 14 Executive Management
MobilityBringing efficient and integrated mobility to help Vietnam create an attractive, competitive and sustainable future
Project: Truckdock for cargo terminal
Operation Year: 2011
Customer: Noi Bai Cargo Terminal Services (NCTS)
Description: Siemens has supplied 4 truck docks to NCTS who is the major cargo handler at Noi Bai International Airport in Hanoi. The truck docks have helped NCTS in improving their operational efficiency
Project: Asia Runner Diesel Locomotive
Operation Year: 2007
Customer: Vietnam Railways (VNR)
Description: Siemens has designed and supplied 16 diesel-electric locomotives to Vietnam Railways. This is only and 1st serial Siemens locomotive for 1.000mm gauge and for Asia environment. The locos have helped the VNR to increase capacity in mainline transport significantly
Project: Elevated Transfer Vehicle System
Operation Year: 2012
Customer: Tan Son Nhat Cargo Services Co.Ltd (TCS)Description: Siemens has supplied an automated cargo handling system to TCS who is the major cargo handler at Tan Son Nhat International Airport in Ho Chi Minh city. The scope includes ETV, workstations, Inventory control system (ICS), cold rooms for perishable handling. The TCS’ capacity has increased 5 times with our system
November 19, 2014 Press Meeting 2014Page 15 Executive Management
Building Technology Improve the safety and energy-efficiency for buildings in Vietnam
Project: Royal City & Times City
Operation Year: 2013
Customer: Vingroup
Description: Siemens supplied - Largest ever in Vietnam Fire Alarm
system, each of project with more than 20.000 devices at this stage.
- Building Management System- Sivacon 8PS Busbar Trunking System
for the Times City project- Low Voltage Distribution Products to the
Royal City project
Project: Bitexco Financial Tower
Operation Year: 2011
Customer: Hyundai E&C, & Bitexco Group
Description: Siemens provided a Total Building Solution included the Apogee Building Management system, Sipass and Sistore MX Integrated Security system and XLS Fire Alarm and Voice evacuation system for this project. As the Landmark Building in the financial district of Ho Chi Minh City, Bitexco Tower with 68 floors and 265 meter high is considered as one of the most impressive buildings in Asia
Project: Indochina Plaza Hanoi
Operation Year: 2012
Customer: Bintai Pte Ltd Singapore
Description: Siemens provided the Building Management System, Fire Detection and Total Building Solution for this project.Indochina Plaza Hanoi - a three-tower residential, retail and office complex in Hanoi capital – is one of the most significant commercial developments to be launched in Vietnam to date.
November 19, 2014 Press Meeting 2014Page 16 Executive Management
Healthcare DivisionPioneer in bringing new Healthcare technologies to Vietnam
Project: The first Dual Source CT scanner at Bach Mai Hospital
Operation year: 2012
Customer: Bach Mai Hospital
Description:Siemens completed to supply and install the first SOMATOM Definition Flash Dual Source CT scanner early 2012. This is Siemens most advanced CT imaging system that makes heart-scanning without beta-blockers possible, even in patients with high and irregular heart rates.
Project: VINMEC- Vietnam’s first five star hospital in Hanoi
Operation year: 2011
Customer: Vingroup
Description:A diversified spectrum of imaging systems provided by Siemens end of 2011 incl. 3T MRI system, a bi-plane angiography system, advanced CT scanners, a syngo. plaza PACS, a mammography system, Digital Radiology & Fluoroscopy systems, C-arm and hi-end ultrasound system.
Project: MEDIC Diagnostics Center
Operation year: 2013
Customer: MEDIC Diagnostics Center
Description:Siemens offered the latest AptioAutomation system with 2 Centaur, 2 Advia1800 instruments.This system allows a workflow up to 25,000 tests/day.
November 19, 2014 Press Meeting 2014Page 17 Executive Management
Education & Training
Corporate Social Responsibility
Disaster Relief & Employee Volunteering
Public Welfare& Healthcare
Committed to good corporate citizenship in Vietnam!
November 19, 2014 Press Meeting 2014Page 18 Executive Management
Our Siemens Vietnam commitment and mission is …
“… to be a long-term and trusted
partner providing Vietnam with
innovative and affordable world-
class infrastructure portfolio”
November 19, 2014 Press Meeting 2014Page 19 Executive ManagementCorporate Communications
Thank you for your attention & welcome to VIETNAM!
Top Related