• Acronym of Open PLC European Research Alliance for New
Generation PLC Integrated Systems : OPERA.
• Integrated Project (IP) based in the Power Line Communication (PLC)
technology.
• Receiving funds from the European Community (EC) Six Frame Work
Programme (FP6).
• Area “Broad Band for all” in the Internet Society Technologies (IST)
Priority.
IBERDROLA INGENIERÍA Y CONSULTORÍA 4
INTRODUCTIONINTRODUCTION
• IBERINCO (IBERDROLA Ingeniería) will be in charge of the co-ordination and management of the Project.
• OPERA Project has an estimated duration of 48 months.
The project is divided into two phases. Each phase lasts 24 months. The first phase (2004-2005) is funded by the European Commission and has clearly defined objectives.
• OPERA Project has a 20,2 M� presupposed cost, with a financial aid from EC.
IBERDROLA INGENIERÍA Y CONSULTORÍA 5
PARTICIPANTS
PROJECT MAIN GOALSPROJECT MAIN GOALS
RELEVANCE TO THE IST OBJECTIVESRELEVANCE TO THE IST OBJECTIVES
POTENTIAL IMPACTPOTENTIAL IMPACT
CONCLUSIONSCONCLUSIONS
INTRODUCTIONINTRODUCTION
CONTENTSCONTENTS
IBERDROLA INGENIERÍA Y CONSULTORÍA 6
PARTICIPANTSPARTICIPANTS
Consortium of 35 Partners that brings together the main stakeholders in PLC
Fostering knowledge sharing and the development of an integrated European Research Area in PLC
Major Electric Utilities
Manufacturers
Engineering & Consultancy Companies
Universities and Technologic
Institutes
Top PLC Technology Providers
Telecom Operators
9 European Countries + Israel
IBERDROLA INGENIERÍA Y CONSULTORÍA 7
PARTICIPANTSPARTICIPANTS
These utilities, together with UNIÓN FENOSA (Spain), Linz Strom (Austria) and MVV (Germany), cover more than 35 % of the European Electrical Market.
The ELECTRIC UTILITIES participating in this proposal are leaders in Europe
Source: “Expansion” financial newspaper.
• EDF (France) is the largest electric utility in Europe and one of the world largest with over 35 million customers.
• ENEL (Italy) second European and one of the world largest with around 25 million customers.
• ENDESA (Spain) sixth European electric utility and leader in South America with around 20 million customers.
• IBERDROLA (Spain) seventh European electric utility with around 16 million customers and third European in market value.
(Others)
( European Leaders)
IBERDROLA INGENIERÍA Y CONSULTORÍA 8
PARTICIPANTSPARTICIPANTS
Telecom Operators
• Auna (Spain)• ONI (Portugal)• PPC (Germany)
Utilities
• EDF (France)• ENDESA (Spain)• ENEL (Italy)• IBERDROLA (Spain)• LinzAG Strom (Austria)• MVV (Germany)• Unión Fenosa (Spain)
Technology Providers
• Ascom (Switzerland)• DS2 (Spain)• Itran (Israel)
Main.net (Israel)
Universities
• Open University(England)
• Swiss Federal Instituteof Technology(Switzerland)
• University of Dresden(Germany)
• University of Duisburg-Essen (Germany)
• University of Karlsruhe(Germany)
• University ofThessaloniki (Greece)
• University PolitécnicaMadrid (Spain)University of Comillas(Spain)
Developers andManufactures
• ADD (Spain)• Dimat (Spain)• Schneider Electric
Powerline Communications(France)Eichhoff (Germany)
• Elsys Design (France)• Mitsubishi (Japan)• Robotiker (Spain)• Telvent (Spain)
Engineering andConsultancy Companies
• Eutelis Italia (Italy)• Enditel (Spain)• IBERINCO (Spain)
• Inesc / Nov (Portugal)
Other Organisations
• PLCForumAssociation
•
•
•
IBERDROLA INGENIERÍA Y CONSULTORÍA 9
PROJECT MAIN GOALS
PARTICIPANTSPARTICIPANTS
RELEVANCE TO THE IST OBJECTIVESRELEVANCE TO THE IST OBJECTIVES
POTENTIAL IMPACTPOTENTIAL IMPACT
CONCLUSIONSCONCLUSIONS
INTRODUCTIONINTRODUCTION
CONTENTSCONTENTS
IBERDROLA INGENIERÍA Y CONSULTORÍA 10
PROJECT MAIN GOALSPROJECT MAIN GOALS
To offer low-cost broadband access service to ALL
European citizens using the most ubiquitous
infrastructure, Power Lines
STRATEGIC OBJECTIVE OF OPERA PROJECT
To have an operative PLC Integrated Network suitable for being commercialised, where all current needs for PLC
improvements will be properly solved and where interconnection to the most important backbone technologies
is feasible in order to reach all end users wherever they are
To have an operative PLC Integrated Network suitable for being commercialised, where all current needs for PLC
improvements will be properly solved and where interconnection to the most important backbone technologies
is feasible in order to reach all end users wherever they are
IBERDROLA INGENIERÍA Y CONSULTORÍA 11
PROJECT MAIN GOALSPROJECT MAIN GOALS
CCoonncceepptt TTooddaayy TToommoorrrrooww
Speed Up to 45 Mbps Up to 200 Mbps
Installation Not suitable enough Easy, low-cost
System Proprietary solutions Standard plug&play, multivendor
Mass deployment Some areas Widespread
End-users covered (in cell) 80 -90% 100%
Multi-Media Services over PLC Initially tested Ready to sell
EMC Standard & compliance National level European level
Standard Not existing International
In-home compatibility Not guaranteed Guaranteed
Broadband market share <<1% >10%
Degree of Backbone Integration Not efficient enough Efficient
IBERDROLA INGENIERÍA Y CONSULTORÍA 12
PROJECT MAIN GOALSPROJECT MAIN GOALS
OBJECTIVES RELATED TOPLC SYSTEM
- Improvements PLC components and function
- Improvements in couplers, filters and line conditioning
- Channel modelling and analysis. Development of service provisioning system
- Analysis and minimisation of interferences
- Coexistence access/in-home- Direct interconnection PLC access network - backbone optical fibre network
OBJECTIVES RELATED TOREADY TO SELL SERVICES
AND LOW COST USER’S TERMINALS
- Development of low cost PLC modem with sufficient abilities to support telephony
- Development of PLC gateway to TV terminal
- Specification of technical and operative components for services over PLC (Telephony, tele-surveillance, automatic meter reading, E-health...)
OBJECTIVES RELATED TOBACKBONE NETWORK
- Optimisation integration PLC access network -backbone network
- Improvement of interconnection PLC -satellite links
- Network Management System (NMS) and a Service Management System (SMS) capable of integrating the particularities of a PLC
access network
SCIENTIFIC AND TECHNOLOGICAL OBJECTIVES OF OPERA PROJECT
WORK PACKAGE 1: Network Infrast. EMC
WORK PACKAGE 3:PLC System & Components
WORK PACKAGE 2: Network Infrast. Field Test
WORK PACKAGE 4:Services over PLC Network
IBERDROLA INGENIERÍA Y CONSULTORÍA 13
PROJECT MAIN GOALSPROJECT MAIN GOALS
OBJECTIVES RELATED TO STANDARDISATION OF PLC
SYSTEM
•To obtain a PLC de facto standard to be proposed to the standardisation bodies
•PLC System
•PLC Equipment
•PLC EMC aspects: measurements, disturbance, voltage, radiation, inmunity,etc.
OBJECTIVES DISEMINATION AND INTELLECTUAL PROPERTY RIGHTS
•To disseminate the Project Results respecting the Intellectual Property Rights
OTHER OBJECTIVES OF OPERA PROJECTOBJECTIVES RELATED
BUSINESS DEPLOYMENT
•To define the market requirement for PLC
•To develop business plan and new business model based on PLC
•To define the process for operation and maintenance of PLC network
WORK PACKAGE 5:Standardisation & Specification
WORK PACKAGE 6:Business Deployment
WORK PACKAGE 8: Intellectual Property Rights
WORK PACKAGE 7:Dissemination Activities
IBERDROLA INGENIERÍA Y CONSULTORÍA 14
RELEVANCE TO THE IST OBJECTIVES
PARTICIPANTSPARTICIPANTS
PROJECT MAIN GOALSPROJECT MAIN GOALS
CONCLUSIONSCONCLUSIONS
INTRODUCTIONINTRODUCTION
CONTENTSCONTENTS
POTENTIAL IMPACT
IBERDROLA INGENIERÍA Y CONSULTORÍA 15
RELEVANCERELEVANCE
OPERA addresses the objectives of the work programme in the area“Broadband for All” OPERA addresses the objectives of the work programme in the area“Broadband for All”
“To develop the network technologies and architectures allowing a generalised availability of broadband access to European users, including those in less developed regions. This is a key enabler to the wider deployment of the information and knowledge-based society and economy”
“To develop the network technologies and architectures allowing a generalised availability of broadband access to European users, including those in less developed regions. This is a key enabler to the wider deployment of the information and knowledge-based society and economy”
OPERA Strategic Objectives:Improvements of Power Line Communication (PLC) technology not only will position it as the one that gives the best broadband performance at low costs, but the broadband will be indeed for all, because it will enable to coverage for all areas, including less developed ones
OPERA Strategic Objectives:Improvements of Power Line Communication (PLC) technology not only will position it as the one that gives the best broadband performance at low costs, but the broadband will be indeed for all, because it will enable to coverage for all areas, including less developed ones
IBERDROLA INGENIERÍA Y CONSULTORÍA 16
POTENTIAL IMPACTPOTENTIAL IMPACT
OPERA will contribute to develop the European Information
Society according to the proposed objectives in the Plan
eEurope 2005 through:
• «Stimulating the deployment of a secure broadband
infrastructure, creating a positive environment for private
investment»
• «Promoting services, applications and content in key areas such
as e-government, e-learning, e-health and e-business»
IBERDROLA INGENIERÍA Y CONSULTORÍA 17
POTENTIAL IMPACTPOTENTIAL IMPACT
Increase of Competition in Access Network
Increase of Competition in Access Network
OPERA POTENTIAL IMPACTOPERA POTENTIAL IMPACT BENEFITBENEFIT
Lower prices, higher quality and newservices
Lower prices, higher quality and newservices
Services in Low-Density and LessDeveloped Areas
Services in Low-Density and LessDeveloped Areas Broadband for allBroadband for all
Leadership of European IndustryLeadership of European IndustryEmployment, competitiveness and
investmentEmployment, competitiveness and
investment
Foster Mass Services Take-offFoster Mass Services Take-off Promoting useful services for the citizensPromoting useful services for the citizens
Gender IssuesGender Issues
Reduction of the housework, higher opportunities of job for women in
rural areas
Reduction of the housework, higher opportunities of job for women in
rural areas
New applications/services notimaginable yet
New applications/services notimaginable yet Quality of lifeQuality of life
IBERDROLA INGENIERÍA Y CONSULTORÍA 18
CONCLUSIONS
PARTICIPANTSPARTICIPANTS
PROJECT MAIN GOALSPROJECT MAIN GOALS
RELEVANCE TO THE IST PRIORITYRELEVANCE TO THE IST PRIORITY
POTENTIAL IMPACTPOTENTIAL IMPACT
INTRODUCTIONINTRODUCTION
CONTENTSCONTENTS
IBERDROLA INGENIERÍA Y CONSULTORÍA 19
CONCLUSIONSCONCLUSIONS
OPERA Project is a four years project (divided in
two phases of 24 months) where the main
actors in PLC area are participating and that
improve and standardise the PLC Technology
in order to reduce costs and to be able to use
it as a broadband technology in a massive deployment
IBERDROLA INGENIERÍA Y CONSULTORÍA 20
��������������� ����������������� ���
����� ����� �� �����������������������������
����� ����������� ���� ������� �����
����������� ���������� ������������ ������
��������
������������������
����������������� ���� ��������� ����������
���� � ��������������������� ��� �����
����������������� ����������������� � ��
���������
IBERINCOIBERINCO
IBERDROLA INGENIERÍA Y CONSULTORÍA 21
OFFICES
MEXICO
BRAZIL
Mexico
Guatemala
Nicaragua
Costa Rica
Cuba
Dominican R.
Venezuela
Colombia
Brazil
Peru
Bolivia
Argentina
Chile
Uruguay
PortugalFrance
ItalyUE
SlovakiaBiH
SerbiaUkraineRussia
GeorgiaArmenia
AzerbaijanMongolia
ChinaJapanTúnez
Senegal
IBERINCOIBERINCO
IBERDROLA INGENIERÍA Y CONSULTORÍA 22
ENDEND
• IBERINCO is interested in receiving initiatives that contribute to the development of the technology PLC.
• Contact with: Jorge Juan Nieto [email protected]. de Burgos 828036 Madrid (Spain)+34 91 767 51 52
• Thank you very much for your attention
• I will be glad to answer any question
Top Related