Page 1: Northern Return Wall Elevation 2 - Planning Inspectorate · 1:500 @A1 Northern Return Wall Elevation PRELIMINARY A 07.01.11 ASS SVF HTA Northern Return Wall Elevation 2 EIA Masterplan

METRESScale 1:500 (A1)Scale 1:1000 (A3)

0 5 10 15 20 30 50

Existingsea defence wall

MHWS

Quay areaManufacturing area

98.26

138.0 mNorthern revetment

Existing ground level

-3.80m CD -3.30m CD

±0.00m CD+0.90m CD

+2.80m CD+4.30m CD

+7.30m CD

+10.00m CD +10.00m CD+11.00m CD +11.00m CD

Chalk level

MHWN

MLWS

MHWS

MLWN

Quay

Harbour bedApproach channel

28.305 33.435 98.26

61.5 mBerthing pocket

160.0 mNorthern return wall

Existing ground level

Approach channel

-11.00m CD-9.00m CD -8.50m CD

-6.90m CD-5.80m CD

-3.90m CD

-1.80m CD-1.00m CD -0.20m CD±0.00m CD

+0.90m CD +0.90m CD+2.60m CD

+5.80m CD+7.30m CD

+10.00m CD

1:2

1:4

Able UK LtdAble HouseBillinghamTeesside UKTS23 1PX

Tel: +44-(0)1642 806080Fax: +44-(0)1642 655655email: [email protected]

Project:

Client:

Title:

ABLE Marine Energy Park

ABLE UK Ltd

Civil Engineering and Marine WorksLübeckertordamm 120099 Hamburg / GermanyTel. 0049-40/ 21986-0Fax. 0049-40/ 21986-200

Scale:

Drawing No. Revision:

Drawn By Checked By Approved By

Date:

BKY

0 Preliminary IssueRev Date Description By Chk App

SVF17.09.2010 17.09.2010

HTA17.09.2010

17.09.10 BKY SVF HTA

AMEP_P1D_D_006

1:500 @A1

Northern Return Wall Elevation

PRELIMINARY

SVF HTAA ASS07.01.11

Northern Return Wall Elevation 2

EIA Masterplan Revision

Revision of Northern Revetment/ Breakwater SVF HTAASSB 19.01.2011

SOLUTIONS AG

SVF HTAC 30.08.11 Revision IPC ApplicationSVF HTARevision IPC Application

BKYBKY31.08.11D

SVF HTARevision IPC Application BKYE 19.09.11SVF HTARevision IPC Application BKYF 21.10.11

G

KEY

- Levels to Chart Datum- Details based on preliminary design- Levels given for the Approach Channel and the Harbour Bed are the maximum maintained levels.

Changed batterNorthern Revetment SVF HTAASSG 05.12.11