Northern Return Wall Elevation 2 - Planning Inspectorate · 1:500 @A1 Northern Return Wall...

1
METRES Scale 1:500 (A1) Scale 1:1000 (A3) 0 5 10 15 20 30 50 Existing sea defence wall MHWS Quay area Manufacturing area 98.26 138.0 m Northern revetment Existing ground level -3.80m CD -3.30m CD ±0.00m CD +0.90m CD +2.80m CD +4.30m CD +7.30m CD +10.00m CD +10.00m CD +11.00m CD +11.00m CD Chalk level MHWN MLWS MHWS MLWN Quay Harbour bed Approach channel 28.30 5 33.43 5 98.26 61.5 m Berthing pocket 160.0 m Northern return wall Existing ground level Approach channel -11.00m CD -9.00m CD -8.50m CD -6.90m CD -5.80m CD -3.90m CD -1.80m CD -1.00m CD -0.20m CD ±0.00m CD +0.90m CD +0.90m CD +2.60m CD +5.80m CD +7.30m CD +10.00m CD 1:2 1:4 Able UK Ltd Able House Billingham Teesside UK TS23 1PX Tel: +44-(0)1642 806080 Fax: +44-(0)1642 655655 email: [email protected] www.ableuk.com Project: Client: Title: ABLE Marine Energy Park ABLE UK Ltd Civil Engineering and Marine Works Lübeckertordamm 1 20099 Hamburg / Germany Tel. 0049-40/ 21986-0 Fax. 0049-40/ 21986-200 Scale: Drawing No. Revision: Drawn By Checked By Approved By Date: BKY 0 Preliminary Issue Rev Date Description By Chk App SVF 17.09.2010 17.09.2010 HTA 17.09.2010 17.09.10 BKY SVF HTA AMEP_P1D_D_006 1:500 @A1 Northern Return Wall Elevation PRELIMINARY SVF HTA A ASS 07.01.11 Northern Return Wall Elevation 2 EIA Masterplan Revision Revision of Northern Revetment/ Breakwater SVF HTA ASS B 19.01.2011 SOLUTIONS AG SVF HTA C 30.08.11 Revision IPC Application SVF HTA Revision IPC Application BKY BKY 31.08.11 D SVF HTA Revision IPC Application BKY E 19.09.11 SVF HTA Revision IPC Application BKY F 21.10.11 G KEY - Levels to Chart Datum - Details based on preliminary design - Levels given for the Approach Channel and the Harbour Bed are the maximum maintained levels. Changed batter Northern Revetment SVF HTA ASS G 05.12.11

Transcript of Northern Return Wall Elevation 2 - Planning Inspectorate · 1:500 @A1 Northern Return Wall...

Page 1: Northern Return Wall Elevation 2 - Planning Inspectorate · 1:500 @A1 Northern Return Wall Elevation PRELIMINARY A 07.01.11 ASS SVF HTA Northern Return Wall Elevation 2 EIA Masterplan

METRESScale 1:500 (A1)Scale 1:1000 (A3)

0 5 10 15 20 30 50

Existingsea defence wall

MHWS

Quay areaManufacturing area

98.26

138.0 mNorthern revetment

Existing ground level

-3.80m CD -3.30m CD

±0.00m CD+0.90m CD

+2.80m CD+4.30m CD

+7.30m CD

+10.00m CD +10.00m CD+11.00m CD +11.00m CD

Chalk level

MHWN

MLWS

MHWS

MLWN

Quay

Harbour bedApproach channel

28.305 33.435 98.26

61.5 mBerthing pocket

160.0 mNorthern return wall

Existing ground level

Approach channel

-11.00m CD-9.00m CD -8.50m CD

-6.90m CD-5.80m CD

-3.90m CD

-1.80m CD-1.00m CD -0.20m CD±0.00m CD

+0.90m CD +0.90m CD+2.60m CD

+5.80m CD+7.30m CD

+10.00m CD

1:2

1:4

Able UK LtdAble HouseBillinghamTeesside UKTS23 1PX

Tel: +44-(0)1642 806080Fax: +44-(0)1642 655655email: [email protected]

Project:

Client:

Title:

ABLE Marine Energy Park

ABLE UK Ltd

Civil Engineering and Marine WorksLübeckertordamm 120099 Hamburg / GermanyTel. 0049-40/ 21986-0Fax. 0049-40/ 21986-200

Scale:

Drawing No. Revision:

Drawn By Checked By Approved By

Date:

BKY

0 Preliminary IssueRev Date Description By Chk App

SVF17.09.2010 17.09.2010

HTA17.09.2010

17.09.10 BKY SVF HTA

AMEP_P1D_D_006

1:500 @A1

Northern Return Wall Elevation

PRELIMINARY

SVF HTAA ASS07.01.11

Northern Return Wall Elevation 2

EIA Masterplan Revision

Revision of Northern Revetment/ Breakwater SVF HTAASSB 19.01.2011

SOLUTIONS AG

SVF HTAC 30.08.11 Revision IPC ApplicationSVF HTARevision IPC Application

BKYBKY31.08.11D

SVF HTARevision IPC Application BKYE 19.09.11SVF HTARevision IPC Application BKYF 21.10.11

G

KEY

- Levels to Chart Datum- Details based on preliminary design- Levels given for the Approach Channel and the Harbour Bed are the maximum maintained levels.

Changed batterNorthern Revetment SVF HTAASSG 05.12.11