Northern Return Wall Elevation 2 - Planning Inspectorate · 1:500 @A1 Northern Return Wall...
Transcript of Northern Return Wall Elevation 2 - Planning Inspectorate · 1:500 @A1 Northern Return Wall...
METRESScale 1:500 (A1)Scale 1:1000 (A3)
0 5 10 15 20 30 50
Existingsea defence wall
MHWS
Quay areaManufacturing area
98.26
138.0 mNorthern revetment
Existing ground level
-3.80m CD -3.30m CD
±0.00m CD+0.90m CD
+2.80m CD+4.30m CD
+7.30m CD
+10.00m CD +10.00m CD+11.00m CD +11.00m CD
Chalk level
MHWN
MLWS
MHWS
MLWN
Quay
Harbour bedApproach channel
28.305 33.435 98.26
61.5 mBerthing pocket
160.0 mNorthern return wall
Existing ground level
Approach channel
-11.00m CD-9.00m CD -8.50m CD
-6.90m CD-5.80m CD
-3.90m CD
-1.80m CD-1.00m CD -0.20m CD±0.00m CD
+0.90m CD +0.90m CD+2.60m CD
+5.80m CD+7.30m CD
+10.00m CD
1:2
1:4
Able UK LtdAble HouseBillinghamTeesside UKTS23 1PX
Tel: +44-(0)1642 806080Fax: +44-(0)1642 655655email: [email protected]
Project:
Client:
Title:
ABLE Marine Energy Park
ABLE UK Ltd
Civil Engineering and Marine WorksLübeckertordamm 120099 Hamburg / GermanyTel. 0049-40/ 21986-0Fax. 0049-40/ 21986-200
Scale:
Drawing No. Revision:
Drawn By Checked By Approved By
Date:
BKY
0 Preliminary IssueRev Date Description By Chk App
SVF17.09.2010 17.09.2010
HTA17.09.2010
17.09.10 BKY SVF HTA
AMEP_P1D_D_006
1:500 @A1
Northern Return Wall Elevation
PRELIMINARY
SVF HTAA ASS07.01.11
Northern Return Wall Elevation 2
EIA Masterplan Revision
Revision of Northern Revetment/ Breakwater SVF HTAASSB 19.01.2011
SOLUTIONS AG
SVF HTAC 30.08.11 Revision IPC ApplicationSVF HTARevision IPC Application
BKYBKY31.08.11D
SVF HTARevision IPC Application BKYE 19.09.11SVF HTARevision IPC Application BKYF 21.10.11
G
KEY
- Levels to Chart Datum- Details based on preliminary design- Levels given for the Approach Channel and the Harbour Bed are the maximum maintained levels.
Changed batterNorthern Revetment SVF HTAASSG 05.12.11