8/3/2019 LAPS Arg Sunset Review
1/2
Name of Project
+/Delta Sunset Review
Date
ParticipantsIleana Bonanni Argentina Branch Bill Borst - WINS Ana Lasher LAZ ZoneAlejandra Paesani Argentina Branch Felicia Horton WINS
Carlos Sivori Argentina Branch Marilyn Foushee WINSAxel Trautenmiller Argentina Branch Adrienne Taub Weber - WINS
Design Estimation
+ (What went well) (Areas for improvement) Owner Next Steps (If no action, why?)Test case document prepared by Marilynwas thorough
Good Teamwork in day to day activities
The right people were on the daily calls
Ileana learned a lot from working withAxel who was experienced in WINS
Good response time when issues wereidentified.
Agile methodology user testing eachpiece as it was built vs. building it all andthen testing it.
Walkthroughs on analysis and code savedrework.
Dedicated resources to the project
Recap of the to dos from Felicia afterdaily meetings
Ana being involved with the testing and inhelping the branch understand what
1- Educate the new branch on the project andexpected changes WIP cedeback, otherchanges.
2 - Train new resources (if necessary) in WINSoperations analysis
3- Obtain a better understanding up front of thetype of business the branch writes so that WINS
and WIP test cases are more specific to thebranch.
4. Create a questionnaire that gives moreinformation on the type of policies that the branchsends. Clarify what is done online vs. through thecurrent bridge
5. Allow more time for testing
Ana / Bill
Ana / Branch personnel
3. Ana / Bill Borst
4. Bill / Ana
5. Adrienne
6. Branch contact
1 This should be addressed at thebeginning of a conversion project. Arequirements questionnaire will bedeveloped to identify practices,procedures and issues in order to
develop a better project plan forthe next country. Ana and Bill willwork on developing thequestionnaire with an expecteddelivery date of 07/10/08.
2 The LAPS project and WIPCedeback documentation will besent to each country when theyreceive the requirementsquestionnaire.
3 Same as #1
4. Same as #1
5. Additional testing time will be
Page 1
8/3/2019 LAPS Arg Sunset Review
2/2
Name of Project
+/Delta Sunset Review
Date
needed to change.
Buy in and participation from Carlos (ITmanager) at the user testing stage wasessential.
6. Obtain more test policies from the branchwhen doing the initial / piece-at-a-time testing
7. Incorporate a bigger system test before theuser test
8. Review the common rejections with the currentbridge to identify branch-needed changes earlier
9. Get commitment from users for testing time
10. Establish regular weekly meetings with theusers
11. Need to set up JCL and files for new jobsfurher in advance
12. Have Argentina share information with thenew branch on what to expect and how to
prepare.
7. Adrienne
8. Branch personnel /Ana / Bill
9. Ana/Marilyn, Bill
10. Felicia
11. Felicia
12. Ana / Argentina
addressed in the next project plan.
6. WIP testing, specifically thedownloading of data fromproduction to the test regions, isstill a concern, but it cannot beaddressed in the scope for theLAPS conversion project. LAPS WIPtesting will be greatly improved bythe availability of the LAPS code.
7. This will be included in the projectplan and coordinated with the teamsand with QA.
8. Same as #1
9. This will be addressed as in #1 andwith a review of the project plan
10. WINS will hold weekly meeting withbranch contact & should include branchIT contact during milestone testing.
11. WINS will perform system testingwith production ready JCL and includethis in the project plan.
12. Argentina personnel willproduce documentation includinglearning points as a guide for thenext countries. This documentationwill be reviewed with Anaapproximately 07/10/08 - 07/11/08.
Page 2