Department of Engineering and Public Works
P.O. Box 21229
West Palm Beach, FL 33416-1229
(561) 684-4000
FAX: (561) 684-4050
www.pbcgov.com
• Palm Beach County
Board of County Commissioners
Mack Bernard, Mayor
Dave Kerner, Vice Mayor
Hal R. Valeche
Gregg .K. Weiss
Robert S. Weinroth
Mary Lou Berger
Melissa McKinlay
County A.dministrator
Verdenia C. Baker
"An Equal Opportunity Affinnative Action Employer"
DATE:
TO:
THRU:
FROM:
RE:
INTER-OFFICE COMMUNICATION
November 21, 2019
Dave Kerner, Mayor Members, Board of County Commissioners
. tt[Z!Ul'/ Tanya N. McConnell, P .. , u y ounty Engmeer
Holly B. Knight, P .E. ., Contracts Sect1,1anager Roadway ProductiOI) Division //£~ November 20, 2019, Selection Committee Results Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway Project No.: 2019601
This Inter-Office Communication serves to advise you of the results of the above referenced Selection Committee meeting. The Committee's evaluation of the presenting firms (see Attachment 2) resulted in the following ranking for the identified project:
1.
2.
3.
American Consulting Engineers of Florida, LLC Brown & Phillips, Inc. Constructive Engineering, Inc. GCME, Inc. Smith Engineering Consultants, Inc.
Wantman Group, Inc. Propel Engineering, Inc. RADISE International, LC Ritzel-Mason, Inc. Smith Engineering Consultants, Inc.
Mock, Roos & Associates, Inc. Brown & Phillips, Inc. Nutting Engineers of Florida, Inc. Electrical Design Associates, Inc.
Page 1
F :\ROADWA Y\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Results_BCC.docx
~ printed on sustainable '6<;) and recycled paper
November 21, 2019
Re: November 20, 2019, Selection Committee Results Westgate Avenue from Wabasso Drive to Congress Avenue #2019601
• In accordance with PPM# CW-O-048, the results of the referenced Selection Committee meeting are being sent to you for your information. Also, as prescribed in PPM # CW-O-048, negotiations will commence with the top ranked firm unless a request to review the results is received within ten (10) business days of the date of this communication.
Attachments: 1- Selection Committee Meeting Minutes 2- Compilation of Selection Committee Voting Ballots
ec: with Attachments: Verdenia Baker, County Administrator Patrick Rutter, Assistant County Administrator David Ricks, P .E., County Engineer Tanya N. McConnell, P .E., Deputy County Engineer Steve Carrier, P .E., Assistant County Engineer Hassan Hadjimiry, Deputy Director, Water Utilities Irwin Jacobowitz, Director, Contract Development and Control Tonya Johnson, Director, Office of Equal Business Opportunity Omelio A. Fernandez, P.E., Director, Roadway Production Morton Rose, P.E., Assistant Director, Roadway Production David Young, P .E., Special Projects Manager, Roadway Production Holly Knight, P .E., Contracts Section Mgr, Roadway Production JaeAnn Dean, Technical Assistant II, Roadway Production Anthony Montero, Office of the Inspector General Y elizaveta B. Herman, Assistant County Attorney Fay Reynolds, Legal Secretary, County Attorney Elizee Michel, Executive Director, Westgate Belvedere Homes CRA,
Housing and Economic Sustainability Committee Members
Page2
F:\ROADWA Y\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Results_BCC.docx
F:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Minutes.doc.docx
MINUTES OF SELECTION COMMITTEE MEETING November 20, 2019, Commencing: 10:05 A.M., Ending: 12:25 P.M.
Engineering & Public Works Department, 2300 N. Jog Road, 3rd Floor Conference Room, #3W-12
MEMBERS PRESENT:
Morton Rose, P.E.* - Assistant Director, Roadway Production Dorritt Miller - Assistant County Administrator Irwin Jacobowitz - Director, Contract Development & Control David Young, P.E.** - Special Projects Manager, Roadway Production Allen Gray*** - Sm. Business Dev. Mgr., Office of Equal Business Opportunity Maroun Azzi, P.E. - Project Engineer, Roadway Production * denote any delegated votes here:
*David Ricks, P.E., - County Engineer **Omelio Fernandez, P.E. - Director, Roadway Production ***Tonya Johnson - Director, Office of Equal Business Opportunity
DISCUSSION: Quorum is present represented by a minimum of four members at least two of which are engineers. The Selection Committee was called to order by Morton Rose, P.E., Assistant Director, Roadway Production. It was stated that the committee would be selecting a firm for Professional Engineering Consulting Services for:
Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway
Project No. 2019601
The meeting was opened up for Public Comments, the public was present and Denise Pennell and Elizee Michel from the Westgate CRA made comments. Denise Pennell expressed the interest the presenters had of pursuing this project and wished everyone good luck. Elizee Michel discussed the community re-development improvements to the Westgate Avenue Corridor. Opening discussion identifying and outlining the project requirements was given by David Young, P.E., Special Projects Manager, Roadway Production. The outline stated what the work entailed, and what the committee should be looking for in the presentations by the firms. The order of business was to select one consultant. Each was invited to make a presentation of their qualifications before the Selection Committee.
Page 1
F:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Minutes.doc.docx
RESULTS: The Selection Committee voting resulted in the following ranking order of the consulting firms:
1. American Consulting Engineers of Florida, LLC 2. Wantman Group, Inc. 3. Mock, Roos & Associates, Inc.
At the end of the Presentations Morton Rose, P.E., Assistant Director, Roadway Production stated that the Public is welcome to make comments or sit and observe the discussions. Jagan Katkuri of American Consulting Engineers of Florida, LLC and Dennis Thomas of Mock, Roos & Associates, Inc. were present.
Page 2
SELECTION COMMITTEE TALLY SHEET -- -- -- -- -- ---- - - ---- ---- -- --
- - - ----- - -- -- -- ---- - - - -ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:
-- -- -- -- ---- - - ---Westgate Avenue from Wabasso Drive to Congress Avenue
-- -- -- ---- ---- ---- -- --PROJECT NO: 2019601 -- ---- -- -- - -- - - ---- -
-- -- -- -- ----- -- ---- -- --MEETING DATE: Wednesday, November 20, 2019
-- -- -- - -- -- ---- -MEETING TIME: 10:00 A.M.
-- -- -- -- ---- - -- -- -- ---- -
American Mock, Roos &
Wantman Consulting Selection Committee Associates,
Group, Inc. Engineers of Inc.
FL, LLC
County Engineer * Morton Rose 1 3 2 - -- -- -- -- -- -- --County Administrator * Dorritt Miller 2 1 3
-- -- -- - --- -- -- -- ---- -Director of Contracts Development & Control Irwin Jacobowitz 2 1 3
-- -- - --Director of Division to which project belongs * David Young 2 H -3 -- -- -- --Director of OSBA * Allen Grey 3 2
-- -- - - -Project Manager for project * I Maroun Azzi 2 1 3
Total 12 8 16
Rank 2 1 3
* - Denotes a delegate for a committee member
-- -- -- -- -- - ----- - - ----
JaeAnn Dean t 1 u -.r =-.,,, \ ~ '-- r -Secretary's Printed Name I \ \ Secretary's Signature
-~
COMPILATION OF SELECTION COMMITTEE VOTING BALLOTS
ONE {1} FIRM TO PROVIDE: All Engineering Services Required for:
Westgate Avenue from Wabasso Drive to Congress Avenue PROJECT NO: 2019601
MEETING DATE: Wednesday, November 20, 2019
MEETING TIME: 10:00 A.M. TOTALS/ RANKINGS
Total points from each voting member and associated rank of firm.
Selection Committee Wantman Group, Inc. American Consulting
Engineers of FL, LLC
Morton Rose 91 1 87 3 -- --Dorritt Miller 87 2 91 1
-- -- --Irwin Jacobowitz 90 2 92 1
-- --David Young 90 2 93 1
-- -- --Allen Grey 91 3 93 1
-
Mock, Roos&
Associates, Inc.
89 2 -- --83 3
--89 3
--85 3
92 2 -- -- - -- -- - -- --
Maroun Azzi 90 2 93 1 85 3
TOTAL 12 8
-
16 -- - -RANK 2 1 3
-
JaeAnn Dean
Secretary Name Printed
I
MAX SCORE
Selection CommitteeWantman Group,
Inc.
American
Consulting
Engineers of FL, LLC
Mock, Roos &
Associates, Inc.
Morton Rose 33 32 32
Dorritt Miller 32 35 28
Irwin Jacobowitz 34 34 32
David Young 35 35 30
Allen Grey 32 35 32
Maroun Azzi 32 35 30
MAX SCORE
Selection CommitteeWantman Group,
Inc.
American
Consulting
Engineers of FL, LLC
Mock, Roos &
Associates, Inc.
Morton Rose 33 32 32
Dorritt Miller 30 33 30
Irwin Jacobowitz 31 35 32
David Young 30 35 30
Allen Grey 34 35 35
Maroun Azzi 33 35 30
MAX SCORE
Selection CommitteeWantman Group,
Inc.
American
Consulting
Engineers of FL, LLC
Mock, Roos &
Associates, Inc.
Morton Rose 3 3 3
Dorritt Miller 3 3 3
Irwin Jacobowitz 3 3 3
David Young 3 3 3
Allen Grey 3 3 3
Maroun Azzi 3 3 3
CRITERIA:
Location of the firm's offices where work will be accomplished.
3
CRITERIA:
Approach to the project, understanding of the project and quality of written response, including
meeting schedule requirements.
35
CRITERIA:
Ability, knowledge of design criteria and past performance of firm and the designated project
team to satisfy the requirements of the project.
35
MAX SCORE
Selection CommitteeWantman Group,
Inc.
American
Consulting
Engineers of FL, LLC
Mock, Roos &
Associates, Inc.
Morton Rose 2 2 2
Dorritt Miller 2 2 2
Irwin Jacobowitz 2 2 2
David Young 2 2 2
Allen Grey 2 2 2
Maroun Azzi 2 2 2
MAX SCORE
Selection CommitteeWantman Group,
Inc.
American
Consulting
Engineers of FL, LLC
Mock, Roos &
Associates, Inc.
Morton Rose 15 10 15
Dorritt Miller 15 10 15
Irwin Jacobowitz 15 10 15
David Young 15 10 15
Allen Grey 15 10 15
Maroun Azzi 15 10 15
MAX SCORE
Selection CommitteeWantman Group,
Inc.
American
Consulting
Engineers of FL, LLC
Mock, Roos &
Associates, Inc.
Morton Rose 5 8 5
Dorritt Miller 5 8 5
Irwin Jacobowitz 5 8 5
David Young 5 8 5
Allen Grey 5 8 5
Maroun Azzi 5 8 5
10
CRITERIA:
EBO Program Evaluation preference as applied by the GSC. APIs for this contract are: 20%
mimimum mandatory SBE and SBE Evaluation Preference Option 2
15
CRITERIA:
Volume of previous work awarded by the County over the past 4 years. (The firm with the most
work receives the lowest score.)
2
CRITERIA:
State Certified MBE (2 points for state certified MBE primes and/or subconsultants)
/ SELECTION EVALUATION FORM
ONE (1) FIRM TO PROVIDE:
PROJECT NO:
SELE~ ON COMMITTEE DATE: !
SELECTION COMMITTEE TIME:
Criteria
Ability, knowledge of design criteria and past performance of
firm and the designated project team to satisfy the
requirements of the project.
Approach to the project, understanding of the project and
quality of written response, including meeting schedule
requirements.
Subtotal
Location of the firm's offices where work will be
accomplished.
State Certified MBE (2 points for state certified MBE primes
and/or subconsultants)
EBO Program Evaluation preference as applied by the GSC.
APls for this contract are: SBE Evaluation Preference for
Respondents and mandatory minimum SBE Subcontracting
Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)
Option 2 and Ord. 2-80.27(3)(e)).
Volume of previous work awarded by the County over the
past 4 years. (The firm with the most work receives the
lowest score.)
Subtotal
Total
M ~ N ~ Member's Name:
Max Score
35
35
70
3
2
15
10
30
100
Rank
I
All Engineering Services Required for:
Westgate Avenue from Wabasso Drive to Congress Avenue
2019601
Wednesday, November 20, 2019
10:00A.M.
American Consulting Wantman Group, Inc.
Engineers of FL, LLC
~~ ?2-
1)67; "'J 2-
3
~ 2
15 10
5 8
25 23
I
Mock, Roos& Associates, Inc.
;2
31--
3
2
15
5
25
2-
J SELECTION EVALUATION FORM
ONE (1) FIRM TO PROVIDE: t -All Engineering Services Required for: _j_ Westgate Avenue from Wabasso Drive to Congress Avenue
PROJECT NO: 2019601 - -, --
SELECTION COMMITTEE DATE: I Wednesday, November 20, 2019
---SELECTION COMMITTEE TIME: 10:00A.M.
-
Criteria Max
Wantman Group, Inc. American Consulting Mock, Roos &
Score Engineers of FL, LLC Associates, Inc.
Ability, knowleQge of design criteria and past performance of ---- _,._ firm and the designated project team to satisfy the 35 3 t_ .3..R requirements of the project. ).r;
- -- - - -
Approach to the project, understanding of the project and
quality of written response, including meeting schedule 35 JJ SD
requirements. 10
Subtotal I 70 t 2.. b i(' rf Location of the firm's offices where work will be 3 3 3 3 accomplished.
State Certified MBE (2 points for state certified MBE primes 2 2 2 2 and/or subconsultants)
--EBO Program Evaluation preference as applied by the GSC.
APls for this contract are: SBE Evaluation Preference for
Respondents and mandatory minimum SBE Subcontracting 15 15 10 15
Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)
Option 2 and Ord. 2-80.27(3)(e)). - -
Volume of previous work awarded by the County over the
past 4 years. (The firm with the most work receives the 10 5 8
I 5
lowest score.)
Subtotal 30 25 23 25
Total 100 'K7 I
Cfl I 8.3
Rank L 1 1
-- ,£[;✓ /2_ I ;4L1z Member's Name:
Member's Signature: Vo ll.ll• r 1 /1,'t{L(t:A..
j SELECTION EVALUATION FORM
ONE (1) F~M TO PROVIDE:
PROJECT NO:
SELECTION COMMITTEE DATE: \ SELECTION COMMITTEE TIME:
Criteria
Ability, knowledge of design criteria and past performance of
firm and the designated project team to satisfy the
requirements of the project.
Approach to the project, understanding of the project and
quality of written response, including meeting schedule
requirements.
Subtotal
Max Score
35
35
70
Location of the firm's offices where work will be 3 accomplished. _______ __j_ State Certified MBE (2 points for state certified MBE primes j 2 and/or subconsultants)
EBO Program Evaluation preference as applied by the GSC.
APls for this contract are: SBE Evaluation Preference for
Respondents and mandatory minimum SBE Subcontracting
Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)
Option 2 and Ord. 2-80.27(3)(e)).
Volume of previous work awarded by the County over the
past 4 years. (The firm with the most work receives the
lowest score.)
Subtotal
15
10
30
Total 100
Rank
Member's Signature:
JAIi Engine~ring Services Required f~
Westgate Avenue from Wabasso Drive to Congress Avenue
2019601
Wednesday, November 20, 2019 ----
10:00A.M.
American Consulting Wantman Group, Inc.
Engineers of FL, LLC
~r 3 3
2 2 t 15
1-10
5 8
25 23
\
----
Mock, Roos& Associates, Inc.
3
2
15
5
25
/ SELECTION EVALUATION FORM
All Engineering Services Required for: j - _ ONE (1) FIRM TO PROVIDE: -----------+-----+W_ e_st..;::g~ate Avenue from Wabasso Drive to Congress Ave~
PROJECT NO: 2019601
SELECTION COMMITTEE TIME: 10:00 A.M.
S-EL_E_CT_ I_O_N_C_O_M_MITTEE DATE: _W_ednes_da_y, November 2- 0-, -20_1_9 ___ ~ -- i --
Criteria
Ability, knowledge of design criteria and past performance of
firm and the designated project team to satisfy the
requirements of the project.
Approach to the project, understanding of the project and
quality of written response, including meeting schedule
requirements.
Subtotal
Location of the firm's offices where work will be
accomplished.
State Certified MBE (2 points for state certified MBE primes and/or subconsultants)
EBO Program Evaluation preference as applied by the GSC.
APls for this contract are: SBE Evaluation Preference for
Respondents and mandatory minimum SBE Subcontracting
Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)
Option 2 and Ord. 2-80.27(3)(e)).
Volume of previous work awarded by the County over the
past 4 years. (The firm with the most work receives the
lowest score.)
Subtotal
Max Score
35
35
I 10
3
2
15
10
30
Total 100
Ronk
Member's Name:
Member's Signature:
American Consulting Wantman Group, Inc.
Engineers of FL, LLC
3y-
3a 3s
·'
3
2
10
5 8
25 23
10 ,2 I
,,
t
I
Mock, Roos& Associates, Inc.
3o
3
2
15
5
25
3
I SELECTION EVALUATION FORM
---ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:
Westgate Avenue from Wabasso Drive to Congress Avenu-;--
PROJECT NO: 2019601 -- - - -
-- \
SELECTION COMMITTEE DATE: Wednesday, November 20, 2019 - -
110:00A.M. -
SELECTION COMMITTEE TIME:
t
Criteria Max
Wantman Group, Inc. American Consulting Mock, Roos&
Score Engineers of FL, LLC Associates, Inc.
I Ability, knowledge of design criteria and past performance of
firm and the designated project team to satisfy the 35
requirements of the project. 3 ;2... ,;)~-t 3.;l.
Approach to the project, understanding of the project and
quality of written response, including meeting schedule 35
requirements.
.Jt./ ~-s- ~':!" Subtotal 70
Location of the firm's offices where work will be 3 3 3 3 accomplished. I
- I
State Certified MBE (2 points for state certified MBE primes 2 2 2 2 and/or subconsultants)
EBO Program Evaluation preference as applied by the GSC. l APls for this contract are: SBE Evaluation Preference for
i Respondents and mandatory minimum SBE Subcontracting 15 15 10 15
Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)
Option 2 and Ord. 2-80.27(3)(e)).
Volume of previous work awarded by the County over the
past 4 years. (The firm with the most work receives the 10 5 8
I 5
lowest score.)
Subtotal 30 25 23 25
Total 100 9 I c;; 2 I 'I J. I ' Rank ? I I I 2-
-
Member's Name: J+l/1 t~ ~tlµt--/
. !dtc~ \ , I
--- -- ol-1d,La x - -Member's Signature: - u
.J SELECTION EVALUATION FORM
--ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:
-- -Westgate Avenue from Wabasso Drive to Congress Avenue
-
f -- -
PROJECT NO: 2019601 -
SELECTION COMMITTEE DATE: Wednesday, November 20, 2019 --
SELECTION COMMITTEE TIME: 110:00A.M. - - · f
- --I I
Criteria Max
Wantman Group, Inc. American Consulting Mock,Roos&
Score Engineers of FL, LLC Associates, Inc.
Ability, knowledge of design criteria and past performance of
3S firm and the designated project team to satisfy the 35
32. requirements of the project. 30 -
Approach to the project, understanding of the project and
quality of written response, including meeting schedule 35 3J 35 3 0 requirements.
Subtotal 70 I Location of the firm's offices where work will be 3 3 3 3 accomplished.
--
State Certified MBE (2 points for state certified MBE primes 2 2 2 2 and/or subconsultants) - -EBO Program Evaluation preference as applied by the GSC.
I APls for this contract are: SBE Evaluation Preference for
Respondents and mandatory minimum SBE Subcontracting 15 15 10 15
Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)
I Option 2 and Ord. 2-80.27(3)(e)).
Volume of previous work awarded by the County over the
I I past 4 years. (The firm with the most work receives the 10 5 8 5
lowest score.)
Subtotal 30 25 23 25
Total 100 9o I q~ I "65 Rank 2. I 3 I
-- MA f2nuJ...J A2'2, l Member's Name:
- -- - ~~ ~ Member's Signature:
One Firm to Provide:
Project No:
EBO API's:
Meeting Date:
Meeting Time:
PBC
M/WBE
FL
M/WBE
American Consulting Engineers of Florida, LLC 3.02 77% 1 77% $277,037 $213,318
Brown & Phillips, Inc. 5.02 8% 8% 8.0 8.0 8.0 $647,570 $51,806
Constructive Engineering, Inc. 3.02 5% 1 5% 5.0 5.0 $0 $0
GCME, Inc. 6.01 5% 5% 5.0 5.0 5.0 $106,074 $5,304
Smith Engineering Consultants, Inc. 9.05 5% 5% 5.0 $388,246 $19,412
23.0% 18.0% 13.0%
10 2
Mock, Roos & Associates, Inc. 3.02 65% 65% $1,342,153 $872,399
Brown & Phillips, Inc. 5.02 15% 15% 15.0 15.0 15.0 $647,570 $97,136
Nutting Engineers of Florida, Inc. 6.01 7% 7% 7.0 $176,941 $12,386
Electrical Design Associates, Inc. 9.05 13% 13% 13.0 13.0 13.0 $103,336 $13,434
35.0% 28.0% 28.0%
15 2
Wantman Group, Inc. 3.02 65% 65% $1,321,039 $858,675
Propel Engineering, Inc. 3.02 12% 12% 12.0 12.0 12.0 $148,091 $17,771
RADISE International, LC 6.01 8% 8% 8.0 8.0 8.0 $432,933 $34,635
Ritzel-Mason, Inc. 5.02 12% 12% 12.0 $0 $0
Smith Engineering Consultants, Inc. 9.05 3% 3% 3.0 $388,246 $11,647
35.0% 20.0% 20.0%
15 2
3 17 5
100% 100% $922,728
EBO VOLUME OF PREVIOUS WORK ($)
Points
(17 max)
Fee
Considered
Pro-Rated
Fee*
Points
(10 max)SBE
% Work in
PBC
Points
(3 max)Team Members
LOCATIONTEAM
Services Provided
SBE Evaluation Preference for Respondents and mandatory minimum SBE Subcontracting Goal of 20%
2019601
Wednesday, November 20, 2019
10:00 A.M.
8
% Work on
ProjectNotes
SELECTION CONSULTANT SUMMARY
Professional Engineering Consulting Services for
Westgate Avenue from Wabasso Drive to Congress Avenue
estimated 0.9 miles, 3 lane roadway
$289,840100%100%
3 12
3 17 5
100% 100% $995,355
N:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Summary Spreadsheet of Teams Page 1 of 4 11/26/2019 9:22 AM
One Firm to Provide:
Project No:
EBO API's:
Meeting Date:
Meeting Time:
PBC
M/WBE
FL
M/WBE
EBO VOLUME OF PREVIOUS WORK ($)
Points
(17 max)
Fee
Considered
Pro-Rated
Fee*
Points
(10 max)SBE
% Work in
PBC
Points
(3 max)Team Members
LOCATIONTEAM
Services Provided
SBE Evaluation Preference for Respondents and mandatory minimum SBE Subcontracting Goal of 20%
2019601
Wednesday, November 20, 2019
10:00 A.M.
% Work on
ProjectNotes
SELECTION CONSULTANT SUMMARY
Professional Engineering Consulting Services for
Westgate Avenue from Wabasso Drive to Congress Avenue
estimated 0.9 miles, 3 lane roadway
Prime Categories
3.02 (General Hwy. Design w/Curb & Gutter, Access & Drainage) 5.02 (Engineering Surveying)
6.01 (Gelogical & Geographic Studies)
9.05 (Highway Lighting)
8 - Did not provide SF 330 Forms
7 - Filled out questionnaire wrong or left blanks
3 - Incomplete Team
4 - Did not meet mandatory EBO requirement
5 - Prime is doing less than 50% of the work
2 - Unrequested Service
6 - Prime does not have at least one prime category
Notes
* - Pro Rated Fee = Previous Work Amount multiplied by the % of work on the project
1 - Prime and Sub on different teams
Subcategories
N:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Summary Spreadsheet of Teams Page 2 of 4 11/26/2019 9:22 AM
SELECTION COMMITTEE MEETING
Palm Beach Co11nty En2U1eerin2 Department
One (1) Finn - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:
Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway
Project No. 2019601
Wednesday, November 20, 2019
Name Phone
F :\ROADWAY\CCNA\2019\~019601 Westgate Avenue\Selections \Selec tion Meeting\SelectionMeetingSigninSheeet .docx