KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8....

17
~ - ~~Cl{ Co~ i Cl,i i< . , . PlORl~~ Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, FL 33416-1229 (561) 684-4000 FAX: (561) 684-4050 www.pbcgov.com Palm Beach County Board of County Commissioners Mack Bernard, Mayor Dave Kerner, Vice Mayor Hal R. Valeche Gregg .K. Weiss Robert S. Weinroth Mary Lou Berger Melissa McKinlay County A.dministrator Verdenia C. Baker "An Equal Opportunity Affinnative Action Employer" DATE: TO: THRU: FROM: RE: INTER-OFFICE COMMUNICATION November 21, 2019 Dave Kerner, Mayor Members, Board of County Commissioners . tt[Z!Ul'/ Tanya N. McConnell, P .. , u y ounty Engmeer Holly B. Knight, P .E . ., Contracts Sect 1,1 anager Roadway ProductiOI) Division //£~ November 20, 2019, Selection Committee Results Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway Project No.: 2019601 This Inter-Office Communication serves to advise you of the results of the above referenced Selection Committee meeting. The Committee's evaluation of the presenting firms (see Attachment 2) resulted in the following ranking for the identified project: 1. 2. 3. American Consulting Engineers of Florida, LLC Brown & Phillips, Inc. Constructive Engineering, Inc. GCME, Inc. Smith Engineering Consultants, Inc. Wantman Group, Inc. Propel Engineering, Inc. RADISE International, LC Ritzel-Mason, Inc. Smith Engineering Consultants, Inc. Mock, Roos & Associates, Inc. Brown & Phillips, Inc. Nutting Engineers of Florida, Inc. Electrical Design Associates, Inc. Page 1 F :\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Results_BCC.docx printed on sustainable '6<;) and recycled paper

Transcript of KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8....

Page 1: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

~-~~Cl{ Co~ ~ i Cl,i i< . , .

PlORl~~

Department of Engineering and Public Works

P.O. Box 21229

West Palm Beach, FL 33416-1229

(561) 684-4000

FAX: (561) 684-4050

www.pbcgov.com

• Palm Beach County

Board of County Commissioners

Mack Bernard, Mayor

Dave Kerner, Vice Mayor

Hal R. Valeche

Gregg .K. Weiss

Robert S. Weinroth

Mary Lou Berger

Melissa McKinlay

County A.dministrator

Verdenia C. Baker

"An Equal Opportunity Affinnative Action Employer"

DATE:

TO:

THRU:

FROM:

RE:

INTER-OFFICE COMMUNICATION

November 21, 2019

Dave Kerner, Mayor Members, Board of County Commissioners

. tt[Z!Ul'/ Tanya N. McConnell, P .. , u y ounty Engmeer

Holly B. Knight, P .E. ., Contracts Sect1,1anager Roadway ProductiOI) Division //£~ November 20, 2019, Selection Committee Results Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway Project No.: 2019601

This Inter-Office Communication serves to advise you of the results of the above referenced Selection Committee meeting. The Committee's evaluation of the presenting firms (see Attachment 2) resulted in the following ranking for the identified project:

1.

2.

3.

American Consulting Engineers of Florida, LLC Brown & Phillips, Inc. Constructive Engineering, Inc. GCME, Inc. Smith Engineering Consultants, Inc.

Wantman Group, Inc. Propel Engineering, Inc. RADISE International, LC Ritzel-Mason, Inc. Smith Engineering Consultants, Inc.

Mock, Roos & Associates, Inc. Brown & Phillips, Inc. Nutting Engineers of Florida, Inc. Electrical Design Associates, Inc.

Page 1

F :\ROADWA Y\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Results_BCC.docx

~ printed on sustainable '6<;) and recycled paper

Page 2: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

November 21, 2019

Re: November 20, 2019, Selection Committee Results Westgate Avenue from Wabasso Drive to Congress Avenue #2019601

• In accordance with PPM# CW-O-048, the results of the referenced Selection Committee meeting are being sent to you for your information. Also, as prescribed in PPM # CW-O-048, negotiations will commence with the top ranked firm unless a request to review the results is received within ten (10) business days of the date of this communication.

Attachments: 1- Selection Committee Meeting Minutes 2- Compilation of Selection Committee Voting Ballots

ec: with Attachments: Verdenia Baker, County Administrator Patrick Rutter, Assistant County Administrator David Ricks, P .E., County Engineer Tanya N. McConnell, P .E., Deputy County Engineer Steve Carrier, P .E., Assistant County Engineer Hassan Hadjimiry, Deputy Director, Water Utilities Irwin Jacobowitz, Director, Contract Development and Control Tonya Johnson, Director, Office of Equal Business Opportunity Omelio A. Fernandez, P.E., Director, Roadway Production Morton Rose, P.E., Assistant Director, Roadway Production David Young, P .E., Special Projects Manager, Roadway Production Holly Knight, P .E., Contracts Section Mgr, Roadway Production JaeAnn Dean, Technical Assistant II, Roadway Production Anthony Montero, Office of the Inspector General Y elizaveta B. Herman, Assistant County Attorney Fay Reynolds, Legal Secretary, County Attorney Elizee Michel, Executive Director, Westgate Belvedere Homes CRA,

Housing and Economic Sustainability Committee Members

Page2

F:\ROADWA Y\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Results_BCC.docx

Page 3: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

F:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Minutes.doc.docx

MINUTES OF SELECTION COMMITTEE MEETING November 20, 2019, Commencing: 10:05 A.M., Ending: 12:25 P.M.

Engineering & Public Works Department, 2300 N. Jog Road, 3rd Floor Conference Room, #3W-12

MEMBERS PRESENT:

Morton Rose, P.E.* - Assistant Director, Roadway Production Dorritt Miller - Assistant County Administrator Irwin Jacobowitz - Director, Contract Development & Control David Young, P.E.** - Special Projects Manager, Roadway Production Allen Gray*** - Sm. Business Dev. Mgr., Office of Equal Business Opportunity Maroun Azzi, P.E. - Project Engineer, Roadway Production * denote any delegated votes here:

*David Ricks, P.E., - County Engineer **Omelio Fernandez, P.E. - Director, Roadway Production ***Tonya Johnson - Director, Office of Equal Business Opportunity

DISCUSSION: Quorum is present represented by a minimum of four members at least two of which are engineers. The Selection Committee was called to order by Morton Rose, P.E., Assistant Director, Roadway Production. It was stated that the committee would be selecting a firm for Professional Engineering Consulting Services for:

Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway

Project No. 2019601

The meeting was opened up for Public Comments, the public was present and Denise Pennell and Elizee Michel from the Westgate CRA made comments. Denise Pennell expressed the interest the presenters had of pursuing this project and wished everyone good luck. Elizee Michel discussed the community re-development improvements to the Westgate Avenue Corridor. Opening discussion identifying and outlining the project requirements was given by David Young, P.E., Special Projects Manager, Roadway Production. The outline stated what the work entailed, and what the committee should be looking for in the presentations by the firms. The order of business was to select one consultant. Each was invited to make a presentation of their qualifications before the Selection Committee.

Page 1

Page 4: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

F:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Selection Minutes.doc.docx

RESULTS: The Selection Committee voting resulted in the following ranking order of the consulting firms:

1. American Consulting Engineers of Florida, LLC 2. Wantman Group, Inc. 3. Mock, Roos & Associates, Inc.

At the end of the Presentations Morton Rose, P.E., Assistant Director, Roadway Production stated that the Public is welcome to make comments or sit and observe the discussions. Jagan Katkuri of American Consulting Engineers of Florida, LLC and Dennis Thomas of Mock, Roos & Associates, Inc. were present.

Page 2

Page 5: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

SELECTION COMMITTEE TALLY SHEET -- -- -- -- -- ---- - - ---- ---- -- --

- - - ----- - -- -- -- ---- - - - -ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:

-- -- -- -- ---- - - ---Westgate Avenue from Wabasso Drive to Congress Avenue

-- -- -- ---- ---- ---- -- --PROJECT NO: 2019601 -- ---- -- -- - -- - - ---- -

-- -- -- -- ----- -- ---- -- --MEETING DATE: Wednesday, November 20, 2019

-- -- -- - -- -- ---- -MEETING TIME: 10:00 A.M.

-- -- -- -- ---- - -- -- -- ---- -

American Mock, Roos &

Wantman Consulting Selection Committee Associates,

Group, Inc. Engineers of Inc.

FL, LLC

County Engineer * Morton Rose 1 3 2 - -- -- -- -- -- -- --County Administrator * Dorritt Miller 2 1 3

-- -- -- - --- -- -- -- ---- -Director of Contracts Development & Control Irwin Jacobowitz 2 1 3

-- -- - --Director of Division to which project belongs * David Young 2 H -3 -- -- -- --Director of OSBA * Allen Grey 3 2

-- -- - - -Project Manager for project * I Maroun Azzi 2 1 3

Total 12 8 16

Rank 2 1 3

* - Denotes a delegate for a committee member

-- -- -- -- -- - ----- - - ----

JaeAnn Dean t 1 u -.r =-.,,, \ ~ '-- r -Secretary's Printed Name I \ \ Secretary's Signature

-~

Page 6: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

COMPILATION OF SELECTION COMMITTEE VOTING BALLOTS

ONE {1} FIRM TO PROVIDE: All Engineering Services Required for:

Westgate Avenue from Wabasso Drive to Congress Avenue PROJECT NO: 2019601

MEETING DATE: Wednesday, November 20, 2019

MEETING TIME: 10:00 A.M. TOTALS/ RANKINGS

Total points from each voting member and associated rank of firm.

Selection Committee Wantman Group, Inc. American Consulting

Engineers of FL, LLC

Morton Rose 91 1 87 3 -- --Dorritt Miller 87 2 91 1

-- -- --Irwin Jacobowitz 90 2 92 1

-- --David Young 90 2 93 1

-- -- --Allen Grey 91 3 93 1

-

Mock, Roos&

Associates, Inc.

89 2 -- --83 3

--89 3

--85 3

92 2 -- -- - -- -- - -- --

Maroun Azzi 90 2 93 1 85 3

TOTAL 12 8

-

16 -- - -RANK 2 1 3

-

JaeAnn Dean

Secretary Name Printed

I

Page 7: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

MAX SCORE

Selection CommitteeWantman Group,

Inc.

American

Consulting

Engineers of FL, LLC

Mock, Roos &

Associates, Inc.

Morton Rose 33 32 32

Dorritt Miller 32 35 28

Irwin Jacobowitz 34 34 32

David Young 35 35 30

Allen Grey 32 35 32

Maroun Azzi 32 35 30

MAX SCORE

Selection CommitteeWantman Group,

Inc.

American

Consulting

Engineers of FL, LLC

Mock, Roos &

Associates, Inc.

Morton Rose 33 32 32

Dorritt Miller 30 33 30

Irwin Jacobowitz 31 35 32

David Young 30 35 30

Allen Grey 34 35 35

Maroun Azzi 33 35 30

MAX SCORE

Selection CommitteeWantman Group,

Inc.

American

Consulting

Engineers of FL, LLC

Mock, Roos &

Associates, Inc.

Morton Rose 3 3 3

Dorritt Miller 3 3 3

Irwin Jacobowitz 3 3 3

David Young 3 3 3

Allen Grey 3 3 3

Maroun Azzi 3 3 3

CRITERIA:

Location of the firm's offices where work will be accomplished.

3

CRITERIA:

Approach to the project, understanding of the project and quality of written response, including

meeting schedule requirements.

35

CRITERIA:

Ability, knowledge of design criteria and past performance of firm and the designated project

team to satisfy the requirements of the project.

35

Page 8: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

MAX SCORE

Selection CommitteeWantman Group,

Inc.

American

Consulting

Engineers of FL, LLC

Mock, Roos &

Associates, Inc.

Morton Rose 2 2 2

Dorritt Miller 2 2 2

Irwin Jacobowitz 2 2 2

David Young 2 2 2

Allen Grey 2 2 2

Maroun Azzi 2 2 2

MAX SCORE

Selection CommitteeWantman Group,

Inc.

American

Consulting

Engineers of FL, LLC

Mock, Roos &

Associates, Inc.

Morton Rose 15 10 15

Dorritt Miller 15 10 15

Irwin Jacobowitz 15 10 15

David Young 15 10 15

Allen Grey 15 10 15

Maroun Azzi 15 10 15

MAX SCORE

Selection CommitteeWantman Group,

Inc.

American

Consulting

Engineers of FL, LLC

Mock, Roos &

Associates, Inc.

Morton Rose 5 8 5

Dorritt Miller 5 8 5

Irwin Jacobowitz 5 8 5

David Young 5 8 5

Allen Grey 5 8 5

Maroun Azzi 5 8 5

10

CRITERIA:

EBO Program Evaluation preference as applied by the GSC. APIs for this contract are: 20%

mimimum mandatory SBE and SBE Evaluation Preference Option 2

15

CRITERIA:

Volume of previous work awarded by the County over the past 4 years. (The firm with the most

work receives the lowest score.)

2

CRITERIA:

State Certified MBE (2 points for state certified MBE primes and/or subconsultants)

Page 9: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

/ SELECTION EVALUATION FORM

ONE (1) FIRM TO PROVIDE:

PROJECT NO:

SELE~ ON COMMITTEE DATE: !

SELECTION COMMITTEE TIME:

Criteria

Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the

requirements of the project.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule

requirements.

Subtotal

Location of the firm's offices where work will be

accomplished.

State Certified MBE (2 points for state certified MBE primes

and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: SBE Evaluation Preference for

Respondents and mandatory minimum SBE Subcontracting

Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)

Option 2 and Ord. 2-80.27(3)(e)).

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the

lowest score.)

Subtotal

Total

M ~ N ~ Member's Name:

Max Score

35

35

70

3

2

15

10

30

100

Rank

I

All Engineering Services Required for:

Westgate Avenue from Wabasso Drive to Congress Avenue

2019601

Wednesday, November 20, 2019

10:00A.M.

American Consulting Wantman Group, Inc.

Engineers of FL, LLC

~~ ?2-

1)67; "'J 2-

3

~ 2

15 10

5 8

25 23

I

Mock, Roos& Associates, Inc.

;2

31--

3

2

15

5

25

2-

Page 10: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

J SELECTION EVALUATION FORM

ONE (1) FIRM TO PROVIDE: t -All Engineering Services Required for: _j_ Westgate Avenue from Wabasso Drive to Congress Avenue

PROJECT NO: 2019601 - -, --

SELECTION COMMITTEE DATE: I Wednesday, November 20, 2019

---SELECTION COMMITTEE TIME: 10:00A.M.

-

Criteria Max

Wantman Group, Inc. American Consulting Mock, Roos &

Score Engineers of FL, LLC Associates, Inc.

Ability, knowleQge of design criteria and past performance of ---- _,._ firm and the designated project team to satisfy the 35 3 t_ .3..R requirements of the project. ).r;

- -- - - -

Approach to the project, understanding of the project and

quality of written response, including meeting schedule 35 JJ SD

requirements. 10

Subtotal I 70 t 2.. b i(' rf Location of the firm's offices where work will be 3 3 3 3 accomplished.

State Certified MBE (2 points for state certified MBE primes 2 2 2 2 and/or subconsultants)

--EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: SBE Evaluation Preference for

Respondents and mandatory minimum SBE Subcontracting 15 15 10 15

Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)

Option 2 and Ord. 2-80.27(3)(e)). - -

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the 10 5 8

I 5

lowest score.)

Subtotal 30 25 23 25

Total 100 'K7 I

Cfl I 8.3

Rank L 1 1

-- ,£[;✓ /2_ I ;4L1z Member's Name:

Member's Signature: Vo ll.ll• r 1 /1,'t{L(t:A..

Page 11: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

j SELECTION EVALUATION FORM

ONE (1) F~M TO PROVIDE:

PROJECT NO:

SELECTION COMMITTEE DATE: \ SELECTION COMMITTEE TIME:

Criteria

Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the

requirements of the project.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule

requirements.

Subtotal

Max Score

35

35

70

Location of the firm's offices where work will be 3 accomplished. _______ __j_ State Certified MBE (2 points for state certified MBE primes j 2 and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: SBE Evaluation Preference for

Respondents and mandatory minimum SBE Subcontracting

Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)

Option 2 and Ord. 2-80.27(3)(e)).

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the

lowest score.)

Subtotal

15

10

30

Total 100

Rank

Member's Signature:

JAIi Engine~ring Services Required f~

Westgate Avenue from Wabasso Drive to Congress Avenue

2019601

Wednesday, November 20, 2019 ----

10:00A.M.

American Consulting Wantman Group, Inc.

Engineers of FL, LLC

~r 3 3

2 2 t 15

1-10

5 8

25 23

\

----

Mock, Roos& Associates, Inc.

3

2

15

5

25

Page 12: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

/ SELECTION EVALUATION FORM

All Engineering Services Required for: j - _ ONE (1) FIRM TO PROVIDE: -----------+-----+W_ e_st..;::g~ate Avenue from Wabasso Drive to Congress Ave~

PROJECT NO: 2019601

SELECTION COMMITTEE TIME: 10:00 A.M.

S-EL_E_CT_ I_O_N_C_O_M_MITTEE DATE: _W_ednes_da_y, November 2- 0-, -20_1_9 ___ ~ -- i --

Criteria

Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the

requirements of the project.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule

requirements.

Subtotal

Location of the firm's offices where work will be

accomplished.

State Certified MBE (2 points for state certified MBE primes and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC.

APls for this contract are: SBE Evaluation Preference for

Respondents and mandatory minimum SBE Subcontracting

Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)

Option 2 and Ord. 2-80.27(3)(e)).

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the

lowest score.)

Subtotal

Max Score

35

35

I 10

3

2

15

10

30

Total 100

Ronk

Member's Name:

Member's Signature:

American Consulting Wantman Group, Inc.

Engineers of FL, LLC

3y-

3a 3s

·'

3

2

10

5 8

25 23

10 ,2 I

,,

t

I

Mock, Roos& Associates, Inc.

3o

3

2

15

5

25

3

Page 13: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

I SELECTION EVALUATION FORM

---ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:

Westgate Avenue from Wabasso Drive to Congress Avenu-;--

PROJECT NO: 2019601 -- - - -

-- \

SELECTION COMMITTEE DATE: Wednesday, November 20, 2019 - -

110:00A.M. -

SELECTION COMMITTEE TIME:

t

Criteria Max

Wantman Group, Inc. American Consulting Mock, Roos&

Score Engineers of FL, LLC Associates, Inc.

I Ability, knowledge of design criteria and past performance of

firm and the designated project team to satisfy the 35

requirements of the project. 3 ;2... ,;)~-t 3.;l.

Approach to the project, understanding of the project and

quality of written response, including meeting schedule 35

requirements.

.Jt./ ~-s- ~':!" Subtotal 70

Location of the firm's offices where work will be 3 3 3 3 accomplished. I

- I

State Certified MBE (2 points for state certified MBE primes 2 2 2 2 and/or subconsultants)

EBO Program Evaluation preference as applied by the GSC. l APls for this contract are: SBE Evaluation Preference for

i Respondents and mandatory minimum SBE Subcontracting 15 15 10 15

Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)

Option 2 and Ord. 2-80.27(3)(e)).

Volume of previous work awarded by the County over the

past 4 years. (The firm with the most work receives the 10 5 8

I 5

lowest score.)

Subtotal 30 25 23 25

Total 100 9 I c;; 2 I 'I J. I ' Rank ? I I I 2-

-

Member's Name: J+l/1 t~ ~tlµt--/

. !dtc~ \ , I

--- -- ol-1d,La x - -Member's Signature: - u

Page 14: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

.J SELECTION EVALUATION FORM

--ONE (1) FIRM TO PROVIDE: All Engineering Services Required for:

-- -Westgate Avenue from Wabasso Drive to Congress Avenue

-

f -- -

PROJECT NO: 2019601 -

SELECTION COMMITTEE DATE: Wednesday, November 20, 2019 --

SELECTION COMMITTEE TIME: 110:00A.M. - - · f

- --I I

Criteria Max

Wantman Group, Inc. American Consulting Mock,Roos&

Score Engineers of FL, LLC Associates, Inc.

Ability, knowledge of design criteria and past performance of

3S firm and the designated project team to satisfy the 35

32. requirements of the project. 30 -

Approach to the project, understanding of the project and

quality of written response, including meeting schedule 35 3J 35 3 0 requirements.

Subtotal 70 I Location of the firm's offices where work will be 3 3 3 3 accomplished.

--

State Certified MBE (2 points for state certified MBE primes 2 2 2 2 and/or subconsultants) - -EBO Program Evaluation preference as applied by the GSC.

I APls for this contract are: SBE Evaluation Preference for

Respondents and mandatory minimum SBE Subcontracting 15 15 10 15

Goal of 20% for Professional Services (Ord. 2-80.27(3)(d)

I Option 2 and Ord. 2-80.27(3)(e)).

Volume of previous work awarded by the County over the

I I past 4 years. (The firm with the most work receives the 10 5 8 5

lowest score.)

Subtotal 30 25 23 25

Total 100 9o I q~ I "65 Rank 2. I 3 I

-- MA f2nuJ...J A2'2, l Member's Name:

- -- - ~~ ~ Member's Signature:

Page 15: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

One Firm to Provide:

Project No:

EBO API's:

Meeting Date:

Meeting Time:

PBC

M/WBE

FL

M/WBE

American Consulting Engineers of Florida, LLC 3.02 77% 1 77% $277,037 $213,318

Brown & Phillips, Inc. 5.02 8% 8% 8.0 8.0 8.0 $647,570 $51,806

Constructive Engineering, Inc. 3.02 5% 1 5% 5.0 5.0 $0 $0

GCME, Inc. 6.01 5% 5% 5.0 5.0 5.0 $106,074 $5,304

Smith Engineering Consultants, Inc. 9.05 5% 5% 5.0 $388,246 $19,412

23.0% 18.0% 13.0%

10 2

Mock, Roos & Associates, Inc. 3.02 65% 65% $1,342,153 $872,399

Brown & Phillips, Inc. 5.02 15% 15% 15.0 15.0 15.0 $647,570 $97,136

Nutting Engineers of Florida, Inc. 6.01 7% 7% 7.0 $176,941 $12,386

Electrical Design Associates, Inc. 9.05 13% 13% 13.0 13.0 13.0 $103,336 $13,434

35.0% 28.0% 28.0%

15 2

Wantman Group, Inc. 3.02 65% 65% $1,321,039 $858,675

Propel Engineering, Inc. 3.02 12% 12% 12.0 12.0 12.0 $148,091 $17,771

RADISE International, LC 6.01 8% 8% 8.0 8.0 8.0 $432,933 $34,635

Ritzel-Mason, Inc. 5.02 12% 12% 12.0 $0 $0

Smith Engineering Consultants, Inc. 9.05 3% 3% 3.0 $388,246 $11,647

35.0% 20.0% 20.0%

15 2

3 17 5

100% 100% $922,728

EBO VOLUME OF PREVIOUS WORK ($)

Points

(17 max)

Fee

Considered

Pro-Rated

Fee*

Points

(10 max)SBE

% Work in

PBC

Points

(3 max)Team Members

LOCATIONTEAM

Services Provided

SBE Evaluation Preference for Respondents and mandatory minimum SBE Subcontracting Goal of 20%

2019601

Wednesday, November 20, 2019

10:00 A.M.

8

% Work on

ProjectNotes

SELECTION CONSULTANT SUMMARY

Professional Engineering Consulting Services for

Westgate Avenue from Wabasso Drive to Congress Avenue

estimated 0.9 miles, 3 lane roadway

$289,840100%100%

3 12

3 17 5

100% 100% $995,355

N:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Summary Spreadsheet of Teams Page 1 of 4 11/26/2019 9:22 AM

Page 16: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

One Firm to Provide:

Project No:

EBO API's:

Meeting Date:

Meeting Time:

PBC

M/WBE

FL

M/WBE

EBO VOLUME OF PREVIOUS WORK ($)

Points

(17 max)

Fee

Considered

Pro-Rated

Fee*

Points

(10 max)SBE

% Work in

PBC

Points

(3 max)Team Members

LOCATIONTEAM

Services Provided

SBE Evaluation Preference for Respondents and mandatory minimum SBE Subcontracting Goal of 20%

2019601

Wednesday, November 20, 2019

10:00 A.M.

% Work on

ProjectNotes

SELECTION CONSULTANT SUMMARY

Professional Engineering Consulting Services for

Westgate Avenue from Wabasso Drive to Congress Avenue

estimated 0.9 miles, 3 lane roadway

Prime Categories

3.02 (General Hwy. Design w/Curb & Gutter, Access & Drainage) 5.02 (Engineering Surveying)

6.01 (Gelogical & Geographic Studies)

9.05 (Highway Lighting)

8 - Did not provide SF 330 Forms

7 - Filled out questionnaire wrong or left blanks

3 - Incomplete Team

4 - Did not meet mandatory EBO requirement

5 - Prime is doing less than 50% of the work

2 - Unrequested Service

6 - Prime does not have at least one prime category

Notes

* - Pro Rated Fee = Previous Work Amount multiplied by the % of work on the project

1 - Prime and Sub on different teams

Subcategories

N:\ROADWAY\CCNA\2019\2019601 Westgate Avenue\Selections\Selection Meeting\Summary Spreadsheet of Teams Page 2 of 4 11/26/2019 9:22 AM

Page 17: KM C458-20191125083846discover.pbcgov.org/engineering/roadwayproduction/Links... · 2020. 8. 13. · Engineers of FL, LLC Mock, Roos & Associates, Inc. Morton Rose 33 32 32 Dorritt

SELECTION COMMITTEE MEETING

Palm Beach Co11nty En2U1eerin2 Department

One (1) Finn - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:

Westgate Avenue from Wabasso Drive to Congress Avenue Estimated 0.9 miles, 3 lane roadway

Project No. 2019601

Wednesday, November 20, 2019

Name Phone

F :\ROADWAY\CCNA\2019\~019601 Westgate Avenue\Selections \Selec tion Meeting\SelectionMeetingSigninSheeet .docx

Email