7/27/2019 IPIM & Logility.pptx
1/22
2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL1
NIKE IPIM & LOGILITY
SANGEETHA
7/27/2019 IPIM & Logility.pptx
2/22
2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL2
Integrated Planning Information Management
(IPIM)
7/27/2019 IPIM & Logility.pptx
3/22
2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL3
Teradata Overview
Data Flow
Batch Timings
Concept of IPIM
High level planning process
7/27/2019 IPIM & Logility.pptx
4/22
2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL4
Concept of IPIM
IPIM turns on three concepts:
Integration,
Information and
Management
Management is concerned with six functions:
Planning
Organizing
Directing
Controlling
Evaluating
Reporting
7/27/2019 IPIM & Logility.pptx
5/22
2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL5
High Level: Planning Processes
7/27/2019 IPIM & Logility.pptx
6/22
2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL6
Flow from EIS to PCS
EIS
PCS
Line Plan View
PlanningRelevancyflag = Y
7/27/2019 IPIM & Logility.pptx
7/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL7
Conceptual overview of Teradata
S
TAGING
CORE
REPOSITORY
L1
CORE
REPOSITORY
L2
PRE
SENTATION
AREA
EIS
STAGING
CORE
REPOSITOR
Y
L1
CORE
REPOSITOR
Y
L2
PRESENTATION
AREA
PCS
LOGILITY
APO-DP
APO-SNP
FLAT
FILE FOR
DP
BW-BMP
USER
ENTERED
DATA
TERADATA
R/3
Reporting &
Analysis
7/27/2019 IPIM & Logility.pptx
8/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL8
Reporting and Analytics
Teradata Information Store
Enterprise Information Store
Source
Systems
Planning Capability Data Store
R/3
GPI
SCM
BW-BMP
Transactional
& Reference
APO-SNP
Informatica
BAPIs
SCA
BW Extractors
Informatica
Information Management Conceptual
Overview
Other
Informatica
UserEntered
DataStaging-Landthedatain
Teradataforusein
updatingcoredata
repositorybasetables
CoreDataRepository
Level1
Createandmaintain
Planningdata
CoreDataRepository
Level2
Createandmaintain
summarizeddata,
snapshotsand
aggregateddatatables
PresentationViews
Createandmaintain
viewsnecessaryforthe
applications,
reporting,
andanalytics
SCA
Informatica
BAPIs
APO-BW
APO-DP
Livecache
Staging-Landthedatain
Teradataforuseinupdatingcore
datarepositorybaseta
bles.
Performp
artitioningbasedon
requirements
CoreDataRepositoryLevel1
Createandmaintaindetailed
transactionandreferencedata.
CoreDataRepository
Level2
Createandmaintain
summarizedandaggregated
datatables
PresentationViews
Createandmaintain
views
necessaryforthe
applications,
reporting,
and
analytics.
Alltables
incore
datarepositorywill
have
views.
Theviewsw
illbeused
foraccess.
AuxiliaryCreate and maintain temp tables to enable data
transforming and integrating the different areas.
Auxili aryCreate a nd m aintain temp tables to enable d ata transforming
Cognos
Pull transactional and reference
data from the EDW
DP to SNP
Release
Informatica
JCAPS
1
Flat Files for SP
Files for Apparel
Files for Footwear
Informatica
2
4
5
6
7
8
10
11
12
13
14
15
16
17
20
7
Informatica 9
Files for Equipment
CIF
CIF
Informatica
Flat Files
Files for FRF
18
Informatica
IPP
3
19
Informatica
GFP
Logility
Informatica21
Teradata Architecture
7/27/2019 IPIM & Logility.pptx
9/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL9
FLAT FILE CREATION
Generate CVC File
- nscpin 1083 Obsolete CVC marking for deletion
- nscpin 1087 Create CVC flat file from product table
Transfer CVC file transfer from PCS to SAP-SCM Server using
FTP
- nscpin 0101 ( Transfer to apparel Server )- nscpin 0102 ( Transfer to FW/EQP Server )
7/27/2019 IPIM & Logility.pptx
10/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL10
Batch runs from Sunday to Friday (WHQ)
Batch Timings
Regions IST(Start)
ASIA 3:00 PM
EMEA 8:00 PM
USA 6:50 AM
7/27/2019 IPIM & Logility.pptx
11/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL11
LOGILITY
7/27/2019 IPIM & Logility.pptx
12/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL12
LOGILITY DATA FLOW
AA Countries
Batch Timings
Nike Supply Chain
Always Available Planning
7/27/2019 IPIM & Logility.pptx
13/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL13
NIKE SUPPLY CHAIN
Product
Regular
(Seasonal,Promo,Inline)Always Available
7/27/2019 IPIM & Logility.pptx
14/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL14
Regular
ConsensusForecast
APO DP
Forecast Model
DP Tool
Regular
7/27/2019 IPIM & Logility.pptx
15/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL15
Always Available
Always Available
StatisticalForecast
Logility Voyager
Forecast Model
DP Tool
7/27/2019 IPIM & Logility.pptx
16/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL16
Always Available Planning
7/27/2019 IPIM & Logility.pptx
17/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL17
Pyramid Forecast at Nike
*Style/Color
*Customer, Style/Color/Size
*Style/Color/Size
*Style
2 Aggregate historyup the pyramid toreduce demand error
1 Load historicaldemand atlowest level
3 Automaticallycalculate forecastsat each level
4 Disaggregateforecasts downthe pyramid formore accurateforecasts
*Div
The primary purpose of the pyramid is to generate the best possible forecast;
therefore, levels in the hierarchy are set up to facilitate this goal
Forecasts are generated at each level of the pyramid to help derive the optimal
demand plan.
*EntirePyramid is at Plan-Country level17
7/27/2019 IPIM & Logility.pptx
18/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL18
Cont. . .
7/27/2019 IPIM & Logility.pptx
19/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL19
LOGILITY DATA FLOW
7/27/2019 IPIM & Logility.pptx
20/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL20
Countries Configured for AA
Asia Pacific:
China
Japan
Australia
Korea
Malaysia
EMEA:
EMEA
GLOBAL:
USA
Argentina
Brasil
Chile
Mexico
7/27/2019 IPIM & Logility.pptx
21/22 2012 WIPRO LTD | WWW.WIPRO.COM | CONFIDENTIAL21
Batch Timings
Regions IST PST
ASIA 4:30 PM 3:00 AM
EMEA 11:30 PM 10:00 AM
GLOBAL 7:30 AM 6:00 PM
7/27/2019 IPIM & Logility.pptx
22/22
THANK YOU
Top Related