Howard Thomas Head of Building Surveying
Richard Jessup Building Surveying
Innovative practice
Westfield Academy school. Phase 3
Construction details: Steel frame, timber frame concrete deck
External cladding materials: hanging tiles, cavity brick panels, single glazing, timber spandrel panels
Defects: rot to timber elements, poor detailing around windows, broken elements
Improve thermal performance - insulation to walls & roof; double glazingImprove user experience - solar glazing.
Aim:
Roof level connection & material build-up details:
Window detail - risk of thermal bridge
Voilaopa listolisto opaVoila
Project completion
BREEAM: Building Research Establishment
Environmental Assessment Method