15
Howard Thomas Head of Building Surveying Richard Jessup Building Surveying Innovative practice
Transcript of Innovative practice Howard Thomas Head of …...Howard Thomas Head of Building Surveying Richard...
Howard Thomas Head of Building Surveying
Richard Jessup Building Surveying
Innovative practice
Westfield Academy school. Phase 3
Construction details: Steel frame, timber frame concrete deck
External cladding materials: hanging tiles, cavity brick panels, single glazing, timber spandrel panels
Defects: rot to timber elements, poor detailing around windows, broken elements
Improve thermal performance - insulation to walls & roof; double glazingImprove user experience - solar glazing.
Aim:
Roof level connection & material build-up details:
Window detail - risk of thermal bridge
Voilaopa listolisto opaVoila
Project completion
BREEAM: Building Research Establishment