HOW WILL GREEN CONNECTIONS BE IMPLEMENTED?
IMPLEMENTING GREEN CONNECTIONS: THE NEXT TWENTY YEARS
G reen Connections is a long-term
planning project that sets high ambitions for 115
miles of our streets. The plan puts forward a goal
of implementing the network over a twenty-
year period. The scale of the Green Connections
network creates opportunities to coordinate with
city projects and private development. Additionally,
community members and neighborhood groups
will play an important role in the Network’s
development.
Green Connections will not create a new
program, rather, it calls for coordinating with
existing initiatives for traffic calming, stormwater
management, and bicycle and pedestrian
improvements.
Leland Avenue Streetscape Improvement Project, San Francisco Department of Public Works, San Francisco Redevelopment Agency, San Francisco Planning Department and San Francisco Public Utilities Commission The project included new street trees, curb ramps, corner bulb-outs, stormwater management facilities, pedestrian-scale lighting, decorative-stamped crosswalks to promote pedestrian safety, sidewalk furniture and public art.
Projects Delivered by the CityGreen Connections could be designed and implemented through a City-led community-based planning processes. In this instance, City agencies would design and build the improvements based on community input. The City’s streetscape projects are generally built by the San Francisco Department of Public Works (DPW), the San Francisco Municipal Transportation Agency (SFMTA) and the San Francisco Public Utilities Commission (SFPUC).
Coordination with Private Development Green Connections projects could be designed and implemented through partnerships between City Agencies and private developers. In this instance, private developers would design and build the improvements based on input from community members and city agencies.
Neighborhood-led ProjectsGreen Connections projects could be initiated by local residents, community groups and/or business owners. These groups could design, implement and/or maintain Green Connections. This approach builds on a number of recent programs designed to leverage the creativity and initiative of individuals in the development of the City’s public spaces. A Community Resources List has been developed as part of the project and provides additional guidance on technical assistance and funding.
Mission Community Market Placemaking and Farmers Market
Spear Street Living Street, Rincon Hill
The Rincon Hill Plan calls for the creation of ‘living streets’ along Spear, Main, and Beale Streets, involving widening one sidewalk from 10 to 30 feet and incorporating landscaping, seating areas, and other public amenities to create linear parks along the sidewalk. The adjacent development at 300 Spear Street was required to construct the first block of the living street on Spear Street between Folsom and Harrison Streets. Additional blocks are expected to be constructed by other private developments as part of their conditions of approval.
Shotwell Street Sidewalk landscaping
Guerrero Planting, San Jose Avenue at Guerrero and 28th Streets Median Greening & Community Stewardship
Need: Basic Signage and Wayfinding
Calculation:
• 115Miles
• $500,000Signdesign,fabrication,andinstallation(1)
• $75,000SignPlanningandGraphicDesign
ProjectedAverageAnnualCosts: MostlikelytheCitywouldinstallthewayfindingandsignageasoneprogramratherthanovera20yearperiod.
ProjectedTotalCosts(20Years): $0.575 Million
Need: Project Coordination Supplemental Fund
ThefundwillallowtheCitytoincludebasicGreenConnectionsstreetscapeelementstoongoingprojectsonthenetworkthatdonothavefundstomeettheprogramsobjectives
Calculation:
• Estimated24milesofpotentialprojectcoordi-nation(20%ofthenetwork)
• Estimated$1.5MpermiletoenhanceongoingprojectsandaddminimumlevelGreenConnectionsinterventions.
ProjectedAverageAnnualCosts:
$1.8 Million
ProjectedTotalCosts(20Years):
$36 Million
Footnotes: 1. Based on SFMTA’s estimate for the bicycle signage program of roughly 8 signs per mile $500 per sign for design, fabrication, and installation. 2. Based on DPW’s average costs for Full Complete Street Enhancements 3. Note that several projects in the City’s existing CIP may fulfill some of this funding goal.
WHAT ADDITIONAL FUNDING IS NEEDED TO COMPLETE THE GREEN CONNECTIONS NETWORK IN TWENTY YEARS?
Funding for core components of the project should be identified and secured. Rough cost estimations have been developed to help articulate funding needs outside of already programmed dollars. Funding for these key Green Connections programs should be secured to implement core components of the plan that may not be part of an existing capital plan.
Need: Showcase Projects
TheCityshouldaimtoinstallaminimumof12showcaseprojectsoverthelifeoftheplan(seeright).ThesemajorprojectswillhavehighercoststhananaverageGreenConnectionproject.Theymaybepartofotherplannedimprovementsandthereforenotentirely“new”fundingneeds.
Calculation:
• 12demonstrationlevelprojectsover20years
• Averaging5blocks
• Averaging$1.8Millionperblock(2)
• Average$9Millionperproject
ProjectedAverageAnnualCosts:
$5.5 Million
ProjectedTotalCosts(20Years):
$110 Million (3)
HOW WILL GREEN CONNECTIONS BE FUNDED?
Implementation of the Network over the 20 year life of the plan will be achieved organically through coordination with existing programs related to traffic calming, bicycle planning, pedestrian safety, stormwater management, sewer repair and street repaving.
WILL EVERY GREEN CONNECTION LOOK AND FEEL THE SAME?
Segments along the network will have a different look and feel. The level of intervention will vary based on existing conditions, coordination opportunities, available funding and community support.
Showcase Intervention
~ Most successfully achieves project goals.
~ May feature reductions in traffic volumes and dedication of space for habitat or community gathering.
~ The Design Toolkit contains elements that could be incorporated into showcase projects such as: Super Bulbs, Intersection Islands, Diverters, Street Parks and Play Streets.
Moderate Intervention
~ Would include the amenities of a light intervention
~ May include minor sidewalk enhancements, curb extensions and stormwater infrastructure, or intersection treatments that help calm traffic.
~ More clearly embody the goals of Green Connections, will involve a greater level of community engagement, and may involve a more holistic streetscape design.
Light Intervention
~ Would include signage and wayfinding, and lower cost improvements like bicycle stencils and street murals.
~ May feature basic greening like sidewalk landscaping gardens and filling in gaps in street trees.
~ May feature basic traffic calming measures.
http://greenconnections.sfplanning.org
IMPLEMENTING GREEN CONNECTIONS: WHAT ROLE CAN YOU PLAY?
A cross San Francisco, dedicated
residents and neighborhood groups have
collaborated with city agencies to organize
street cleanup and beautification events,
create community gardens, advocate for
streetscape and traffic safety improvements,
and initiate other projects that make
our neighborhoods healthier and more
livable. When community members take
the initiative to improve our public spaces,
everyone benefits – participants can help
ensure that projects that meet local needs
and preferences, neighbors get to know
one another, and over time residents may
develop a greater sense of pride in their
neighborhood, paving the way for additional
community-building ideas and projects.
Building on the success of these grassroots
efforts, Green Connections envisions that
neighborhood-led projects will be
one critical mechanism to implement the
Green Connections network, enabling local
residents, business owners, neighborhood
groups and community stakeholders to take a
more active role in building out the network
in close collaboration with the City.
ADDITIONAL INFORMATION
For additional information on
permitting, funding, street design
elements, and other how-to
information, visit
Green Connections Website
Community Resource List
http://greenconnections.sfplanning.org
SF Better Streets website www.sfbetterstreets.org
BUILDING COMMUNITY FROM THE GROUND UP:
Neighborhoods develop vibrant public spaces
San Francisco has countless examples of community members coming together to create new open space projects. For example, through SFDPW’s Sidewalk Landscaping Permit program, residents have replaced swaths of barren concrete with landscaped areas that enliven their streets. Similarly, residents and community groups have organized to create and upgrade over 100 new open spaces through the SFDPW’s Streets Park Program, which allows residents to build gardens on underutilized DPW land, such as medians and utility rights-of-way.
Here are other inspiring examples where community members have organized to contribute creative, attractive, and well-used spaces to our urban landscape.
Shotwell Street
In 2004, a resident on Shotwell Street decided to tear up a portion of sidewalk in front her home to build a garden, but realized that she would first need to learn to navigate the city approvals and permitting process. She ultimately succeeded in creating a beautiful garden in front of her home, inspiring many of her neighbors to follow suit and spawning the local organization PlantSF, which provides information to other interested sidewalk gardeners around the city. In response to growing interest in sidewalk landscaping, SFDPW created a streamlined Sidewalk Landscaping Permit program to encourage other gardeners to develop projects.
1 2
3
4
5
Pennsylvania Street Gardens
In 2008, a few neighbors in Potrero Hill saw potential in a large, trash-strewn lot adjacent to a highway off-ramp, and with the help of many volunteers gradually transformed it into the thriving Pennsylvania Street Garden, which provides walking paths, hundreds of species of native and drought-tolerant plants, seating, and a dog park. In order to obtain permission to use the space, residents worked closely with Caltrans, the SFDPW Street Parks program, and the San Francisco Parks Alliance, and the garden has been such a success that neighbors have started gardens in three other public sites nearby.
1 Guerrero Street
Neighbors on Guerrero Street were concerned about heavy traffic and fast speeds, and partnered with the neighborhood association, San Jose/Guerrero Coalition To Save Our Streets, to advocate for traffic calming solutions that would reduce traffic safety hazards while beautifying the street. The group successfully persuaded the City to pass legislation calling for a street redesign, which included reducing traffic from 6 lanes to 4 lanes, lowering speed limits, adding bike lanes, and greening the median with low-maintenance plants (which neighbors helped implement by raising funds and organizing planting days).
2 3 Visitacion Valley Greenway
Over a period of 16 years, community members worked tirelessly to advocate for and build the Visitacion Valley Greenway, six gardens on formerly vacant SFPUC right of way that form a ribbon of green space across the neighborhood. Each garden has a different theme –a landscaped plaza, herb garden, community garden, agricultural plot, native garden, and children’s garden—and incorporates artwork, recycled materials, and elements such as seating and outdoor classrooms. Among the many partners and supporters of the project are SFPUC, SF Recreation & Parks Department, the Trust for Public Land, and funders SF Beautiful, SF Parks Alliance, and the Community Challenge Grant.
4 Quesada Gardens
The Quesada Gardens Initiative started over a decade ago, when a couple of long-time Bayview Hunters Point residents had the idea to plant flowers and food in the public median along Quesada Avenue, a street then known as a magnet for crime and drug dealing. From this simple action, the initiative has grown to encompass many community-building opportunities, including a thriving network of backyard and community gardens, educational programs, public artwork, and community events. Over the years, the program has enlisted the support of thousands of volunteers and has been able to secure City, private, and philanthropic resources.
5
IMPLEMENTING NEIGHBORHOOD-LED PROJECTS: WHAT ARE THE STEPS?
City approvalsThe types of requirements, permits, and fees will vary depending on the project. The Better Streets website (right) details the process for a range of streetscape improvements.
Neighborhood supportBuilding support - presenting design ideas at neighborhood events or neighborhood group meetings can build goodwill, allow people to voice their ideas and concerns, and encourage longer-term stewardship of the project.
ResourcesFunding is likely to be a challenge to implementation. There are a range of City, philanthropic, and private sources that can provide funding, in-kind donations, and other resources (see Community Resource List, right).
Maintenance & stewardship plan Project organizers should consider maintenance and other ongoing needs early on and integrate them into the design. A group of volunteers or a community benefit district (CBD) could potentially provide long-term maintenance and stewardship of the project.
Community Resource List DECEMBER 2013
http://greenconnections.sfplanning.org
IMPLEMENTING GREEN CONNECTIONS: UPCOMING PROJECTS
A colored dot has been placed next to each project to indicate how the project meets the broader goals of Green
Connections. Some projects have design components that will meet all of the goals of a Green Connection, such as
the Wiggle Neighborhood Green Corridor Project or the Mansell Corridor Improvement Project. Some projects will
need additional funding to fully meet the goals of a Green Connection, such as Safe Routes to School projects and
neighborhood traffic calming projects.
LEGEND Green Connections Project Goals
Public health: Increase active transportation to parks
Sustainability: Enhance urban ecology Livability: Support neighborhood stewardship and placemaking
FULTON ST
17TH ST
CALIFORNIA ST
PINE ST
16TH ST
I-280
SO
UTH
BOU
ND
ULLOA ST
BUSH ST
FOLSOM ST
24TH ST
POST ST
IRVING ST
ANZA ST
JACKSON ST
UNION ST
NO
E S
T
BALBOA ST
OAK ST
SCO
TT ST
FELL STBRYA
NT ST
PACIFIC AVE
BAY ST
HYD
E ST
I-80 E
ASTBOUND
GREEN ST
HARRISON ST
34TH
AVE
35TH
AVE
SUTTER ST
22ND ST
VALLEJO ST
CABRILLO ST
19TH ST18TH ST
HAYES ST
PAGE ST
KIRKHAM ST
21ST ST
EDDY ST
26TH ST
LAG
UN
A ST
TURK ST
04TH S
T
FILBERT ST
I-80 W
ESTBOUND
CLEMENT ST
TARAVAL ST
SACRAMENTO ST
GO
UG
H ST
JON
ES
ST
LAR
KIN
ST
HW
Y 101 SOU
THBO
UN
D
VICENTE ST
STEIN
ER
ST
SILVER AVE
WAWONA ST
CLAY ST
07TH ST
15TH ST
25TH ST
FRAN
KLIN
ST
HOWARD ST
J ST
14TH ST
FILLMO
RE S
T
GR
EAT H
WY
HAIGHT ST
CAS
TRO
ST
GREENWICH ST
PALOU AVE
I-280
NORTH
BOUND
SANTIAGO ST
ELLIS ST
TAYLOR
STPO
WE
LL ST
LYON
ST
MORAGA ST
VALEN
CIA ST
H ST
CAYUGA AVE
ILLINO
IS S
TCAP
P ST
WASHINGTON ST
LIN
CO
LN B
LVD
FLOR
IDA S
T
NAPL
ES S
T
GOLDEN GATE AVE
BROADWAY
25TH AVE
MCALLISTER ST
YOR
K ST
QUINTARA ST
27TH AVE
ATHE
NS S
T
BRANNAN ST
I ST
IOW
A ST
30TH AVE
INGAL
LS S
T
VIEN
NA S
T
DIA
MO
ND
ST
05TH AVE
02ND ST
STANYA
N ST
06TH AVE
24TH AVE
08TH ST
DUNCAN ST
ARG
UELLO
BLV
D
JOHN F KENNEDY DR
28TH ST
08TH AVE
10TH AVE
GIR
ARD
ST
PARI
S ST
LEAVE
NW
OR
TH ST
32ND
AVE
SAN
BRU
NO
AVE
15TH AVE
18TH AVE
29TH AVE
MAD
RID
ST
22N
D A
VE
SHO
TWE
LL ST
17TH AVE
16TH AVE
BRO
DER
ICK
ST
KAN
SAS
ST
11TH AV
E
GEARY ST
LISB
ON S
T
09TH AVE
12TH AVE
MARIPOSA ST
29TH ST
JOOST AVE
FELTON ST
20TH ST
GROVE ST
09TH ST
DE H
AR
O S
T
BACON ST
03RD
AVE04TH
AVE
28TH
AVE
02N
D A
VE
ISLAIS ST
ALABA
MA S
T
SAN JOSE AVE
DO
UG
LASS
ST
10TH ST
SPEAR AVE
SILLIMAN ST
14TH
AVE
MINNA ST
36TH AVE
HEA
D S
T
ROLPH ST
BERRY ST
PARK
BLV
D
07TH
AVE
KING ST
SUNNYDALE AVE
TURK BLVD
30TH ST
UTA
H S
T
REVERE AVE
47TH AVE
SAN
SOM
E ST
PIER
CE S
T
CLAY
TON
ST
LOND
ON S
T
HAM
PSH
IRE
ST
11TH ST
COLUMBUS AVE
19TH
AVE
TENN
ES
SEE
ST
BAKE
R S
T
JOHN MUIR DR
CAP
ITO
L AV
E
GO
ETTING
EN ST
MAIN ST
27TH ST
41ST AV
E
CRISP RD
DUBOCE AVE
INNES AVE
38TH AVE
39TH
AVE
40TH
AVE
44TH AVE
45TH
AVE
33RD
AVE
42N
D A
VE
JAMESTOWN AVE
43R
D A
VE
CHENERY ST
01ST ST
20TH
AVE
HUDSON AVE
23RD STPH
ELPS
ST
FLOOD AVE
03RD
ST
EUCALYPTUS DR
EVANS AVE
LANE
ST
MORSE ST
SWEENY ST
37TH
AVE
GAT
ES
ST
46TH
AVE
PAR
KER
AVE
48TH
AVE
BUC
HA
NAN
ST
SPR
UC
E ST
WALLER ST
EUCLID AVE
MIDDLE WEST DR
ELIZABETH ST
EUR
EKA ST
QUINT
ST
DONNER AVE
MANSELL ST
POPE
STHURON AVE
LELAND AVE
PLY
MO
UTH
AVE
RIVERA ST
EARL S
TCRESCENT AVE
UN
IVERSITY ST
OR
IZA
BA A
VE
VER
NO
N S
T
NEY ST
CLA
REN
DO
N A
VE
THE EMBARCADERO
MASON ST
HILL ST
BRUNSWICK ST
DARIEN WAY
ASH
BUR
Y ST
LAWTON ST
VISITACION AVE
OFARRELL ST
WIS
CO
NS
IN ST
TOLA
ND ST
RU
TLAN
D S
T
PACHECO ST
AVILA S
T
AND
OVE
R S
T
CAM
BRID
GE ST
BYXB
EE
ST
LAU
RE
L ST
BEACH ST
SKYL
INE
BLV
D
PERU
AVE
LEE
AV
E
OW
EN
S ST
INDIA ST
GILMAN AVE
JULE
S A
VE
MARINE DR
MUN
ICH
ST
YOSEMITE AVE
LA P
LAYA
R ST
NEV
AD
A ST
TARA
ST
CIRCULAR AVE
MIS
SISS
IPPI ST
12TH ST
PRAGUE S
T
HARDING RD
NEWCOMB AVE
FAIRFAX AVE
HAH
N S
T
ALAMEDA ST
PHE
LAN
AVE
STATES ST
BOW
DO
IN ST
LOCKWOOD ST
LOO
MIS
ST
JUDAH ST
E ST
ALPHA S
T
ELSI
E ST
YERBA BUENA AVE
GENEVA AVE
NAPOLEON ST
FITZGERALD AVE
WEST PACIFIC AVE
MES
A ST
JUDSON AVE
CO
LON
AVE
DELA
NO A
VE
CARGO WAY
ELLIN
GTON AVE
LAIDLEY ST
HENRY ST
31ST AV
E
HANOVER ST
SHR
AD
ER S
T
LILY ST
VELASCO AVEHARNEY WAY
FRO
NT ST
GEARY BLVD
ELMIR
A ST
SLOAT BLVD
GIAN
TS DR
BEVE
RLY
ST
BRA
DFO
RD
ST
LOC
UST S
T
MIR
AM
AR A
VE
HOW
TH S
T
YACHT RD
PRO
SPEC
T AV
E
PARK ST
HOLLISTER AVE
KISKA RD
AMADOR ST
BLANKEN AVE
CEN
TRA
L AVE
COTTER ST
STEVENSON ST
MA
PLE
ST
RANDALL ST
OTIS ST
ZOO RD
DIVISION STCHANNEL S
T
SEACLIFF AVE
WA
LNU
T ST
WILLAR
D S
T ALMA ST
GORGAS AVE
STR
ATFO
RD
DR
DEWEY BLVD
LUN
AD
O W
AY
21S
T AV
E
BOR
ICA
ST
RICE ST
HO
FFMA
N AV
E
DR
UM
M S
T
DUBL
IN S
T
SKYV
IEW
WAY
MYRA WAY
JOR
DA
N AV
E
23R
D A
VE
RAM
SEL
L S
T
POR
TOLA S
T
26TH
AVE
MAN
OR
DR
EGBERT AVE
TINGLEY ST
CO
LE ST
ANZA
AVE
LUC
KY S
T
VID
AL
DR INA
CT
I-280 S ON RAMP
STEUART ST
MISSI
ON ST
FUN
STON
AVE
INFA
NTR
Y TE
R
CARROLL AVE
LIND
A ST
CH
ATTAN
OO
GA S
T
OR
A WAY
FERN ST
OAKDALE AVE
ORTEGA ST
YORBA ST
DRAKE ST
BEAVER ST
WEST
OLIVE ST
HUNTER ST
FONT BLVD
DIGBY ST
YUK
ON
ST
STATE DR
CARMEL ST
IRWIN ST
JESSIE ST
SICKLES AVE
NORIEGA ST TEXA
S ST
TABER PL
VAN
NE
SS AV
E
MARINA GREEN DR
KEAR
NY
ST
STILLINGS AVE
MAD
RO
NE
AVE
HAWES
ST
POLK
ST
IDORA
AVE
WILSON ST
INGERSON AVE
TIFF
ANY
AVE
BUCARELI DR
AGUA WAY
OC
TAVIA ST
LOIS LN
06TH ST
ERIE ST
MAR
KET
ST
VER
NA
ST
RANKI
N ST
TREAT AV
E
CUSTER AVE
ELM ST
AUTO
DR
BAYVIEW PARK RDSIX
TH S
TCH
UR
CH
ST
MAIN D
R
HO
FF ST
ANNIE ST
DEL
TA S
T
FLO
RA
ST
ESSEX ST
VIRG
IL ST
ALTA ST
RAUSCH ST
THOMAS AVEBURROWS ST
JEFFERSON ST
44TH
AVE
25TH
AVE
11TH
AV
E
25TH
AVE
26TH ST
24TH ST
15TH
AVE
20TH AVE
FONT BLVD
47TH
AVE
34TH AVE
25TH ST
41S
T AV
E
NORIEGA ST
14TH AVE
12TH AVE
38TH
AVE
22N
D A
VE
20TH ST
04TH
AVE
18TH ST
ASH
BUR
Y ST
29TH
AVE
MA
SO
N S
T
36TH
AVE
ELLIS ST
15TH ST
26TH ST
32N
D A
VE
EARL S
T
33R
D A
VE TREA
T AV
E
17TH
AVE
CAP
P ST
19TH AVE
23RD ST
CO
LE ST
10TH
AVE
BAKE
R S
T
MORAGA ST
CLAY
TON
ST
16TH AVE
QUINTARA ST
BAY ST
07TH AVE
18TH
AVE
27TH
AVE
TREAT AV
E
ORTEGA ST
30TH
AVE
19TH ST
GR
EAT H
WY
20TH
AVE
RIVERA ST
PIER
CE S
T
LYON
ST
Green Connections
DRAFThttp://greenconnections.sfplanning.org
D
E
F
GA
B
C
H
I
J
K
L
X
V
U
T
Q
P
O
N
M
W
PROJECT LIST
R
S
Y
This map highlights some of the upcoming projects that overlap with the Green Connections network, scheduled for
implementation over the next 5 years. These projects vary in scale and include: community-led ecological and stewardship
projects, neighborhood traffic calming projects, pedestrian enhancements around schools, and complete streetscape
designs. Implementing these projects is an important first step in developing a citywide network of Green Connections.
UPCOMING PROJECTS
JAMES DENMEN MIDDLE SCHOOL (SR2S)Cayuga Ave, from Niagara and Navajo
LONGFELLOW ELEMENTARY SCHOOL (SR2S)Brunswick St between Oliver and Guttenberg
MANSELL CORRIDOR IMPROVEMENT PROJECTMansell St. from University St. to Dublin St.
OAKDALE AVENUE GREEN CONNECTION Oakdale Ave. from Lane St/ to Quint St.
PAGE STREET GREEN CONNECTIONPage St, from Buchanan St. to Market St.
PERSIA TRIANGLE: PAVEMENT TO PARKSHeart of the Excelsior at Persia, Mission and Ocean Ave.
SAFE PASSAGE ENHANCEMENTSJones St. and Ellis St., exact location to be determined
VICENTE STREETSCAPE ENHANCEMENTSVicente St. from, 14th Ave to 19th Ave
VISITACION VALLEY GREEN NODESExact locations to be determined
WASHINGTON STREET PORTSMOUTH SQUARE ENHANCEMENTSWashington St. from, Kearny St. to Walter U Lum Place
WIGGLE NEIGHBORHOOD GREEN CORRIDOR Various locations along the Wiggle
WEST PORTAL TRAFFIC CALMING PROJECT 14th Ave, from Vicente to Ulloa
2ND STREET IMPROVEMENT PROJECT2nd St., from Market St. to King St.
7TH STREET EN TRIPS 7th Street, from Market St. to 16th St.
28TH AVE CROSSWALK ENHANCEMENTS 28th Ave and to be determined cross-streets
ALAMO ELEMENTARY (SR2S) 23rd Ave, from Geary Blvd to Lake St.
BLUE GREENWAYVarious locations along the southeastern waterfront
BUENA VISTA/17TH/ROOSEVELT TRAFFIC CALMING Buena Vista/17th/Roosevelt
CENTRAL RICHMOND TRAFFIC CALMING Lake St. at 17th, 21st and 24th Avenues; Cabrillo Street at 14th Ave
CESAR CHAVEZ (SR2S) Area around South Van Ness and 22nd St.
EMBARCADERO ENHANCEMENT Embarcadero, from Fort Mason to Mariposa St.
FOLSOM STREETSCAPE IMPROVEMENTSFolsom St., from Embarcadero St. to 12th St.
GREAT HIGHWAY STREETSCAPE IMPROVEMENT PROJECTGreat Highway, Lincoln to Fulton
GREEN HAIRSTREAK CORRIDOR14th Ave/15th Ave, from Moraga St. to Quintara St.
HOLLOWAY BUFFERED BIKE LANE Holloway Ave., from Varela to Font Blvd.
A
B
C
D
E
F
G
H
I
J
K
L
V
U
T
S
R
Q
P
O
N
M
W
X
Y
Top Related