Page 1: Impala Opencast Mining

www.construction.murrob.com

IMPALA North-West, Rustenburg

PROJECT TYPE: OPENCAST MINING

CLIENT:

Impala Platinum Mine

VALUE:

R340 Million

CONSULTANTS:

None

PROJECT DURATION:

Contract renewable annually

DATE OF PROJECT:

1 April 1998

PROJECT DESCRIPTION:

Opencast Mining of both Merensky and UG2

Reef to a depth of 35m. Contract is renewed on

annual basis.

Approximate volumes mined for the project :-

• Blasted over burden 37,438,859m³

• Topsoil 5,841,186m³

• Ore 2,347,362m³

• Topsoil Rehab 5,695,638m³

• Filling Void 12,724,866m³