www.construction.murrob.com KHUSELEKA North-West, Rustenburg PROJECT TYPE: OPENCAST MINING CLIENT: Anglo Platinum Limited VALUE: R109 Million CONSULTANTS: None PROJECT DURATION: 24 Months DATE OF PROJECT: 1 November 2011 PROJECT DESCRIPTION: Opencast Mining of Merensky Reef to a depth of 20m. Approximate volumes mined for the project :- • Topsoil 384,428m³ • Overburden 1,342,440m³ • Ore 169,878m³ • Topsoil Rehab 337,189m³ • Filling Void 1,039,109m³
-
Upload
gert-buitendach -
Category
Business
-
view
60 -
download
6
description
Opencast Contract Mining, Drill, Blast, Load, Haul, Crushing
Transcript of Kuseleka Opencast
![Page 1: Kuseleka Opencast](https://reader033.fdocuments.net/reader033/viewer/2022050802/55962db71a28ab54448b476a/html5/thumbnails/1.jpg)
www.construction.murrob.com
KHUSELEKA North-West, Rustenburg
PROJECT TYPE: OPENCAST MINING
CLIENT:
Anglo Platinum Limited
VALUE:
R109 Million
CONSULTANTS:
None
PROJECT DURATION:
24 Months
DATE OF PROJECT:
1 November 2011
PROJECT DESCRIPTION:
Opencast Mining of Merensky Reef to a depth of
20m.
Approximate volumes mined for the project :-
• Topsoil 384,428m³
• Overburden 1,342,440m³
• Ore 169,878m³
• Topsoil Rehab 337,189m³
• Filling Void 1,039,109m³