    HSE DIRECTIVE 8ELECTRICAL PLANTS

  • 8/6/2019 HSE Directive 8 Electrical Plants

    2/28

    265HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    1. GENERAL

    Purpose

    The purpose o this directive is to ensure that

    electricalinstallationsareoperatedandmaintainedinaccordancewith

    current regulations and internal requirements

    electricalinstallationsareinstalledinasafewayandinaccordancewithcurrent regulations and internal requirements

    Domain

    This directive applies to

    allBP-operatedinstallationsandcontractedinstallations/vessels

    on the Norwegian continental shel including onshore plants or the

    petroleums activities.

    OnshorefacilitiesorprojectswhereBPNorgeAShaveaparticularresponsibility and which are assessed being part o the petroleum

    activities

    allinstallations/projectsforwhichBPNorgeisthedeveloper

    Reerences

    Lovomtilsynmedelektriskeanleggogelektriskutstyr(El-tilsynsloven)

    For oshore installations reerence to:

    TheActivitiesRegulations:

    Section 91 Work on and operation o electrical installations

    TheFacilitiesRegulations:

    Section 47 Electrical installations

    Section 38 Emergency power and emergency lighting

    Section77EMC

    Section 78 ATEX

    Technicaloperationalregulationsforthepetroleumspartof

    onshoreplantsSection 15 Electrical installations

    Section 38 Emergency power and emergency lighting

    The Norwegian Petroleum Saety Authoritys (PSA) regulations

    Regulationsrelatingtosafetyinworkonelectricalinstallations(FSE)

    The Directorate or Fire and Electrical Saetys regulations

    Regulationsrelatingtoqualicationsforprofessionalelectricalpersonnel

    The Directorate or Fire and Electrical Saetys regulations 059Recommendedguidelinesforthecompetenceandtrainingof

    electrical personnel

    The Norwegian Oil Industry Associations guidelines

    NorsokstandardZ-015NTemporaryequipment

    1.70.007Controlofcontractorequipment

    RequirementstipulatormatrixBPNorge

    HSEDirectiveno.1-Workpermits

    HSEDirectiveno.5-Energyisolation

  • 8/6/2019 HSE Directive 8 Electrical Plants

    3/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011266

    Defnitions and abbreviations

    Warning sign is a warning sign with black text on a yellow background

    that warns o the danger o getting too close to or touching live parts o

    the apparatus that can be dangerous

    Work permit (WP) is a written permit to carry out a dened task in a

    given place on an installation under given preconditions in a sae manner

    Responsible or operations imply overall proessional supervision oelectrical installations, and ensuring that electrical installations are

    planned, executed and operated in accordance with the regulations

    High voltage installations are electrical installations with a nominal

    voltage above 1000V alternate current or 1500V direct current

    Earthed means that the electrical installation is short-circuited andconnected to the installations main earth so that electrical energy is

    discharged quickly and saely in the event o short-circuiting

    Condemned equipment is equipment that has been removed rom

    operations permanently. The equipment has been electrically secured

    (disconnected and earthed) and all labels have been removed.

    Condemnedequipmentisnotbeingmaintainedasitisnolonger

    consideredelectricalequipment.Condemnedequipmentismarked

    Kondemnert(Condemned)

    Low voltage installations are electrical installations with a nominalvoltage up to and including 1000V alternate current or 1500V direct

    current

    Preserved equipment is equipment that is out o operation temporarily,but which is expected to be used at a later date. Preserved equipment

    is connected to the electrical distribution system. This equipment shall

    be maintained to ull saety requirements according to the regulations.

    Preserved equipment is marked Preservert

    Saety card is a personal card issued by the responsible person

    electrical installation, showing authorisation, access permit and

    limitations or the individual. The responsible person electrical

    installationskeeps an updated list o all saety cards Live equipment means that the equipment is electrically charged

    Roles

    Responsible person electrical systems has been appointed by BP

    Norge to ensure that electrical installations at all times comply with

    current regulations, including design/building o new installations and

    contracting o installations and vessels

    The deputy responsible person electrical installations is a BPemployee appointed by the responsible person electrical installation to

    carry out the responsible personstasks when he or she is absent

    An authorised person electrical is a BP employee appointed by

    the responsible person electrical installation to ensure that electrical

    installations and equipment are carried out in accordance with current

    regulations within one installation

    A deputy authorised person electrical is a BP employee appointed

    by the responsible person electrical installation to carry out theauthorised persons tasks when he or she is absent

  • 8/6/2019 HSE Directive 8 Electrical Plants

    4/28

  • 8/6/2019 HSE Directive 8 Electrical Plants

    5/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011268

    2. RESPONSIBILITIES

    Person responsible or electrical system

    is responsible or

    technicalintegrity,operation,installationandmaintenanceofelectrical

    installations belonging to BP Norge

    ensuringthattherigownercomplieswithregulatoryrequirementsregarding electrical installations when rigs are contracted

    ensuringthatallpersonnelinvolvedinoperationandmaintenance

    o and modications to electrical installations are qualied according to

    regulations and internal requirements

    ensuringinternalcontrolofoperation,maintenance,documentation,

    personnel qualications and electrical systems

    beingupdated/involvedindesign,engineeringandinstallationofnew

    electrical installations/systems beingupdatedregardingtheuseofelectricalinstallations/systemson

    contracted vessels

    Authorised person electrical

    is responsible or

    ensuringthatdailyoperationandmaintenanceofandmodicationsto

    electrical installations in the eld are carried out saely and in

    accordance with the current regulations and internal requirements reportingstatusandincidentsinelectricalinstallationsontheeldto

    the responsible person electrical installation

    clarifyingnon-conformancevis--visthesetrequirementswiththe

    responsible person or the operations engineer, electrical

    Area authority or electrical installations

    is responsible or

    ensuringthatdailyoperationandmaintenanceofandmodicationstoelectrical installations on a specic acility and/or in a delimited area are

    carried out saely and in accordance with current regulations and

    internal requirements

    reportingstatusandincidentsinelectricalinstallationsintheareatothe

    authorised technician

    Operations engineer, electrical

    is responsible or

    providingprofessionaloperationssupporttothefacilities,suchas

    controlofdocumentationandelectricalequipmenttobesenttothe

    acilities

    follow-upofdailyoperationofelectricalinstallationsandequipment

    preparationandfollow-upofmeasuresthatensuretheintegrityofthe

    installations in the short and the long term

    performingtheinstallerfunctionfortheresponsible person electrical

    installation in the case o minor modications o electrical installations

    reportingundesiredconditionsandincidentsandclarifynon-conormances rom internal requirements and regulations concerning

    electrical installations to the responsible person electrical installation

  • 8/6/2019 HSE Directive 8 Electrical Plants

    6/28

    269HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    verifyingandreportingactivitiesconcerningelectricalinstallationstothe

    responsible person electrical installation

    Lead electro engineer project

    is responsible or

    toprovideelectricalsupporttoprojectphaseslike:

    o Design, choice o equipment and electrical installations conorm tostipulated requirements set ourth in the req. matrix

    o electrical personnel involved in projects have the necessary

    competencies

    o Facilitate pre- and completion documentation rom designer and

    installation personnel

    o Maintain dialogue and clariy special topics aecting electrical and

    re saety in liaison with Person responsible or electrical system

    Qualitycontrolthatrentedequipmenttotheprojectconformto

    prevailing requirements

    Clarifyanddocumentareasofresponsibilitiesrelatedtoelectrical

    systems during test and operational stages in the project

    Reportseriousincidents,incidentsrelatedtoelectricalcurrentduring

    project stages to Person responsible or electrical system

    InformPersonresponsibleforelectricalsystemaboutactions,including

    all meetings with the PSA / clarications / verications in advance to

    such activities

    Oshore installation manager (OIM)

    is responsible or

    directivesregardingelectricalinstallationsbeingknownandfollowed

    within his area o responsibility

  • 8/6/2019 HSE Directive 8 Electrical Plants

    7/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011270

    3. AUTHORITY AND COMPETENCE

    Requirements or reviewing this document

    All personnel involved in the operation o and/or work on electrical power

    production, distribution and battery system

    and

    all personnel contracted or repairs and maintenance o electrical

    installations

    mustsignastatementtotheeffectthattheprovisionsinthisdirective

    have been received, read and understood beore they can start the work

    Authority

    Aresponsiblepersonelectricalinstallationsmustbeappointedinaccordance with the regulations. The responsible person electrical

    installations has overall responsibility and authority or operation,

    installation and maintenance o electrical installations on all acilities and

    contracted acilities/vessels on the Norwegian continental shel

    operated by BP Norge

    Theresponsiblepersonelectricalsystemmaydelegateauthority

    in accordance with the regulations, by using saety cards. The person

    responsible keeps a list o delegated authority

    Theresponsiblepersonforelectricalinstallationswillifnothingelse

    is stated be sakkyndig dritsleder or all BP Norge owned high voltage

    installations and dritsansvarlig or all low voltage installations related

    to the BP Norge petroleums activities.

    Foroperationofthe300kVelectricalplantatListatheAlcoa

    dritsleder is appointed as sakyndig dritsleder or the BP Norge

    owned part inclusive the secondary transormer breaker supplying

    the ABB Power rom shore building. The 300kV part shall be operated

    according to the ollowing Alcoa instruksjons ( in Norwegian only) : Lederforkobling:Dokreferanser-0352VerkshndbokEAL-00.25.03

    part 27, 01,16, 26, 25 .

    Lederforsikkerhet:Dokreferanse-0352Verkshndbok

    EAL -00.25.03.17

    Ukentligkontrollrundehyspenningsvakt:Dokreferanser-0352

    Verkshndbok EAL -00.25.03.part 15 og 01.

    Personnelwithdelegatedauthoritymustcarrytheirsafetycardwhen

    perorming the work Employeesofcontractorcompaniescarryingoutworkonelectrical

    installations are under proessional supervision and report to the

    authorised person electrical. The exception is personnel working under

    an approved installer in connection with modications

  • 8/6/2019 HSE Directive 8 Electrical Plants

    8/28

    271HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    Automation technician

    Anautomationtechnicianisauthorisedtocarryout,onhisown,

    maintenance and simpler repairs in the low voltage installations/circuits

    installations that orm part o automated and similar installations.

    The authorisation does not apply to work on the electrical distribution

    system. The distribution system includes also battery systems as ar

    as circuit saety. I in doubt on borderline cases, consult the authorisedperson electrical

    Generel competence requirements

    Allpersonnelthataretocarryouttasksrelatedtooperation,

    maintenance, repairs and modications o electrical installations and

    equipment must be amiliar with the installation where the work will be

    done and be competent according to

    o Regulatons relating to proessional qualications or electrical

    technicians

    o OLF - 059 Recommended guidelines or the competence and

    training o electrical personnel

    BPpersonnelinvolvedinoperationofelectricalinstallationsmust

    bequaliedinaccordancewithCompetencedescriptionforoffshore

    personnel

    Contractedpersonnelmusthaveundergonetraininginaccordancewith

    Training plan or contractor employees

    Non-competent personnel

    Personswithoutthenecessarycompetencemustunderno

    circumstances

    o carry out repairs o electrical equipment

    o correct aults on electrical equipment

    o perorm any connections in the electrical distribution system,

    reset electrical relays or operate switches which is part o the

    electrical distribution system, except when special acceptance isgiven

    performanyconnectionsintheelectricaldistributionsystem,reset

    electrical relays or operate switches which is part o the electrical

    distribution system, except when special acceptance is given

    The denition competent is not valid or automation personal working on

    automation plants- competency requirement or this should be claeried

    by relevant disipline responible -instrument, meetering, kommunicationetc. The denition competent person does not cover repair o 3 party

    equipment taken care o by the equipment owner.

    First aid

    Alloperationandmaintenancepersonnelwhomaybeexposedto

    receiving an electrical injury must have undergone the necessary

    training to give rst aid in such situations

    Firstaidtrainingforelectricalinstallationaccidentsmustberefreshedevery year in accordance with Regulations relating to saety in work on

    electrical installations (FSE)

  • 8/6/2019 HSE Directive 8 Electrical Plants

    9/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011272

    4. OPERATION AND MODIFICATIONS

    General requirements

    Alloperationofandworkonelectricalinstallationsmustbecarriedout

    in accordance with Regulations relating to saety in work on electrical

    installations (FSE)

    In all new hiring o electrical personnel, the electrical responsible personor electrical competent person given delegated authority rom

    responsible person, shall be involved in the hiring process. The reason is

    based on the responsibility o the electrical responsible person.

    Approval o work

    Allworkonelectricalinstallationsrequiresanapproved work permit

    level 2except or

    o work on live equipment (AUS work) where an approved work permitlevel 1 is required

    o reconnection ater a blackout, where an approved operations

    procedure is required

    o connection o high and low voltage power and isolating switches in

    relation to an accident where no work permit is required

    o operation o remote-controlled stations or control o high and low

    voltage motors, where no work permit is required

    o work not requiring a work permit according to the HSE directive or

    work permits

    Opening o enclosures in a classifed area

    Openingofenclosurestoliveequipmentinclassiedareasrequire

    o an approved work permit level 1

    except or

    o opening o enclosures that cannot cause the ignition o any gas

    mixturepresent.Ref.IEC60079-17

    Work on explosion-proo equipment

    Maintenanceofexplosion-proofandintrinsicallysafeequipmentmust

    only be carried out by a qualied person with the necessary knowledge

    and inormation about the equipment and its protection

    Reporting o aults and incidents

    Allelectricalfaultsandincidentsmustbereportedtothe authorised

    person electrical on the acility The authorised person electricalmust immediately inorm the

    responsible person electricalinstallationsor his deputy o serious

    accidents and undesirable incidents in the electrical installation,

    including incidents where a person receives an electric shock

    Modifcation / new installation

    Forbuildingnewinstallations,andformodicationstoexistingelectrical

    installations or equipment when there is an obligation to report, theinstallermust give notice o this in advance on the orm Notication o

    electrical installation beore the work and purchases begin

  • 8/6/2019 HSE Directive 8 Electrical Plants

    10/28

    273HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    Responsiblepersonfordesignofplantsdescibedaboveshallalsosend

    Notication or approval prior to purchace o equipment starts when the

    design o is extension or redesign o electrical plant under operation.

    Locationofnewequipmentinelectricalswitchgearroomsshallbe

    approved by responsible electrical engineer.

    TheinstallationsauthorisedPersonElectroshallbeinvolvedinthe

    approval process and issue written acceptance prior to use o new /modied electrical installations

    Approvalforcommencementofoperationsfornewelectrical

    installations in major projects shall be issued by Person responsible or

    electrical system. Basis or subject approval is a compliance document

    issued and signed by competent engineering / installation personnel.

    The installation shall conorm to BPs requirements related to electrical

    design and installations

    Accident precautions

    Inallareaswithelectricalequipment,instructionsapprovedbythe

    Directorate or Fire and Electrical Saety must be posted on the walls,

    giving instructions or what to do regarding accidents caused by

    electricity

    Switchboard rooms and switch systems

    Allelectricalswitchboardroomsroomsmustbelockedwheneverno

    work is taking place. Exemptionsfromtheruleregardinglockingoflowvoltageroomscan

    be made on old installations where there is a combined switchboard

    and a LER room i there is an instructed (not authorised) person

    onboard the platorm/ installation concerned.

    SwitchboardroomscontainingonlyLVinstallationsorHVinstallations

    which are secured separately (enced in and equipped with a separate

    locked gate) are dened as low voltage switchboard rooms. I the room

    only contains a transormer with an IP degree o IP44 or more, theroom can also be dened as a LV room.

    Roomswithelectricalinstallationspoweredby3phase400Vsystems

    with series-connected protection up to and including 63A or single-

    phase 230 supply are not regarded as electrical switchboard rooms and

    do not need to be locked.

    Keystotheswitchboardroomareonlyhandedouttopersonswhohave

    an access permit according to their saety card

    Onlypersonnelwithanaccesspermittohighvoltageroomshaveaccess to high voltage rooms on their own

    Onlypersonnelwithanaccesspermittolowvoltageroomshave

    access to low voltage rooms on their own

    Switchboardrooms,transformerroomsetc.mustnotbeusedas

    secondary storerooms. The foor and the space above/behind the

    switchboard must be clean and ree o requisites and other obstructions

    Allentrancestoswitches,fusesandotherequipmentnotinusemust

    be blocked or closed o. All covers, cover bolts and nuts must be put intheir correct position and tightly secured

  • 8/6/2019 HSE Directive 8 Electrical Plants

    11/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011274

    5. SECURING HIGH VOLTAGE SYSTEMS

    General operation

    Alloperationofhighvoltageinstallationsmustbecarriedoutin

    accordance with the Regulations relating to saety in work on electrical

    installations (FSE)

    Onlytheauthorised person electricalhas the authority to carry outconnections in a high voltage installation on the relevant acility

    Connectionofhighvoltagepowerandisolatingswitchesrequires

    detailed instructions and a permit rom the authorised person electrical

    expect in an emergency (arc re/injuries )

    Normaloperation(start/stop)ofremote-controlledelectricalhighvoltage

    users (pumps, compressors, etc.) may be carried out by Instructed,

    non-authorisedpersonnel.Checkbeforestartthatthenecessary

    generator capacity is available

    Precautions, work on high voltage systems

    Allworkonhighvoltageinstallationsmustbecarriedoutinaccordance

    with the Regulations relating to saety in work on electrical installations

    (FSE)

    Forworkonahighvoltagesystem,the authorised person must appoint

    a person to be in charge o connection and a person to be in charge o

    saety. The appointment may take place by word or mouth. The

    authorised person may appoint himsel as the person in charge o

    connection or the person in charge o saety

    Personnelappointedtobeinchargeofconnectionorsafetymustbe

    approved by the Operations manager or high voltage installations (the

    responsible person electrical installation)

    Forworkonhighvoltageinstallations,thepersoninchargeof

    connection must ollow the Instructions or person in charge o

    connection

    Forworkonhighvoltageinstallations,thePersoninchargeofsafetymust ollowing Instructions or person in charge o saety

    Iftheworkrequiresmorethanonehighvoltageswitchtobeisolated,a

    connection order must be used

    Whenatelephoneorradioisusedforoperationoforworkonahigh

    voltage installation, all messages must be conrmed by repeating the

    message. The messages should be logged i this is possible

    Planning the work Allworkonhighvoltagesystemsmustbeplannedinaccordancewith

    the Regulations relating to saety in work on electrical installations

    (FSE). I installation is preparred or remote operation this shall

    preerrable be used.

    Consequence-reducingmeasuressuchasthosebelowmustbe

    considered:

    o inspection o and availability o rst aid equipment

    o having an isolated rescue hook ready at the work placeo identiying all switches that must be taken out in the event o an

    accident

    o inspection o and availability o a hand-held re extinguisher

  • 8/6/2019 HSE Directive 8 Electrical Plants

    12/28

    275HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    Everyoneinvolvedintheworkmustbeinformedoftheimplemented

    measures beore the work begins

    Work on cables and conductors

    The person in charge o saetyshall ensure that the cable is not live,

    and that it has been insulated, short-circuited, earthed and identied

    beore the work is started that will lead to cutting into the high voltagecable

    Ifthereisanyuncertaintyinidentifyingthecorrectcable,witheither

    high or low voltage, the cable must be shot and pigged with an

    approved apparatus

  • 8/6/2019 HSE Directive 8 Electrical Plants

    13/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011276

    6. SECURING LOW VOLTAGE SYSTEMS

    General operation

    Alloperationoflowvoltageinstallationsmustbecarriedoutin

    accordance with the Regulations relating to saety in work on electrical

    installations (FSE)

    Theauthorisedpersonelectricalhasswitching authority or connectionsin the low voltage systems on the installation

    Connectionoflowvoltagepowerandisolatingswitchesrequires

    detailed instructions and a permit rom the authorised person electrical

    expect in an emergency

    Normaloperation(start/stop)ofremote-controlledusers(pumps,

    compressors, etc.) may be carried out by non-authorised personnel.

    Isolation Beforeanyworkisdoneonalowvoltageinstallation,itmustbe

    isolated electrically in accordance with Electrial Isolation in HSE

    directive no. 5 Energy Isolation

    Work on live low voltage equipment

    Allworkonliveequipmentrequiresanapprovedwork permit level 1

    Ifitprovesnecessarytocarryoutworkonlivelowvoltageinstallations

    or equipment, the work must be perormed by a qualifed person

    The person doing the work must protect himsel against direct contact

    with earth through the use o:

    o protective equipment in accordance with Section 14 o the

    Regulations relating to saety in work on electrical installations (FSE)

    o AUS tools

    Forworkon

    o live installations above 250V

    or

    o live installations below 250V and series-connected protection above63A

    there must be at least two persons with qualications within electrical

    saety (FSE) and the necessary amiliarity with the installation

    In case the circuit is secured with series-connected protection o no more

    than 30mA current trip or earth aults.

    o saety goggles may be used instead o a ace shield

    o the assistant does not need electrical qualications, but shall beinstructed and have rst aid competency

  • 8/6/2019 HSE Directive 8 Electrical Plants

    14/28

    277HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    Planning the work

    Allworkoflowvoltageinstallationsmustbeplannedinaccordancewith

    the Regulations relating to saety in work on electrical installations (FSE)

    Inaddition,consequence-reducingmeasuressuchasthosebelowmust

    be considered

    o inspection and availability o rst aid equipment

    o having an isolated rescue hook ready at the work placeo identiying all switches that must be taken out in the event on

    accident

    o inspection and availability o a hand-held re extinguisher

    Everyoneinvolvedintheworkmustbeinformedoftheimplemented

    measures beore the work begins

    Resetting the overload protection

    Resettingtheoverloadprotectionforoutgoingcircuits,with

    voltage up to and including 690V must be done by a

    competent person. I the circuit(s) is/are part o an

    automation system, the resetting can be done by an

    automation technician

    Resettingtheoverloadprotectionshouldonlybedoneonce.

    I the overload protection alls out repeatedly, the competent

    person electrical shall search or /repair the ault beore

    resetting is repeated. But, i equipment has Auto start, anisolation test shall be done beore the protection relay is

    reset i not special designed to stop /delay the auto start

    until reset relay work

    Allresettingoftheoverloadprotectionmustbereportedto

    the authorised person, who must log the incident

  • 8/6/2019 HSE Directive 8 Electrical Plants

    15/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011278

    7. ENERGIZING ELECTRICAL CIRCUITS

    General rules or energising a system

    Electricalcircuitsorequipmentmustnotbemadelivebeforethe

    person who is appointed to carry out the connection is convinced it can

    be done saely.

    The person who requests the connection shall ensure that the ollowing

    precautions have been taken beore the system is de-isolated and made

    live:

    1. All work on the circuit has been completed, and the isolation

    conrmationcerticate(ICC)hasbeensignedbyaqualiedperson

    2. A notication o electrical installation or a voltage connection certicate

    has been issued or the circuit in question3. Other non-electrical equipment such as pumps, compressors, ans

    etc, connected with the electrical circuit that may be aected by the

    connection to live voltage, have been conrmed by relevant discipline to

    be ready or start-up.

    4. Temporary barriers, warning signs, etc. are put up around or on the

    equipment to be connected

    5. Saety gear and tools are easily accessible

    6. Special consideration has been paid to the area classication (danger o

    explosion)

    7. Fire protection and detection is ready or use

    8. Qualied personnel are available to carry out connections, check

    potential resets and remove saety earthing

    For high voltage, the person in charge o connection and the

    person in charge o saety must both be present

    Making the system live ater modifcations

    Beforethecurrentisreconnectedfollowingmodicationstoelectricalcircuits or equipment, a representative o the electrical installer and the

    electrical Authorised person or his delegation, must sign or completion/

    acceptance on notication o electrical installation. Beore signing

    the authorised person shall ensure that the ollowing documentation is

    available:

    1.CompleteMechanicalcompletion(MC)andcommissioning

    documentation where relevant points have been signed out by a

    competent proessional2. All presented remarks (punch lists), non-conormance lists, dispensation

    lists, acceptances, etc.

    3. Drawings that clearly show the scope and interace or the new

    installation

    4. The notication o electrical installation has been signed by the

    perorming installersresponsible person on the acility

    Nocircuitsmustbemadeliveifthereareregulationnon-conformancesthat have not been accepted by the PSA. Other non-conormances

    should be processed by the responsible person electrical installations

  • 8/6/2019 HSE Directive 8 Electrical Plants

    16/28

    279HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    Oncethesystemislive,theauthorisedpersonmustsubmitadated

    andsignedcopyoftheVoltageConnectionCerticateand/ora

    notication o electrical installation to the responsible person electrical

    installations

    Temporary connection o voltage

    Ifthereisaneedtomakepartsoftheelectricalinstallationlivetemporarily, or a test etc., notication o electrical installation may be

    used

    Whenvoltageisconnectedtemporarily,thecircuitsmustbemarked

    with warning signs reading LIVE in a strategic, easily visible place

    Connecting a heat cable to live voltage

    Priortomeggingandmakingacablelive,the competent person

    electricaltogether with the isolatorshall physically check that all parts

    o the heat cable are suciently covered and protected. End point shall

    be clearly marked and visible.

    Documentation

    Whenvoltageisconnectedfollowingmodications,aprotocolshallbe

    kept that shows status or circuits that have been connected

    The responsible person electrical installationsshall keep a protocol

    or all issued advance/completion notications regarding electrical

    installations,aswellasVoltageConnectionCerticatesforeachinstallation in his le.

    Oshore team leder modifcations (OTLM)/ Oshore team leder

    maintenance (OTLV)shall ensure that the necessary systems and

    protocols have been established beore the work starts oshore.

    Asystemmustbeestablishedthatensuresthenecessaryas-built

    documentation o modications within acceptable deadlines.

    Measuresmustbetakentomakesuretherequiredoperations

    documentation is available until the as-built documentation is in place Electricalisolatorshallissueacompliancedecorationaftercompletion

    o the change.

  • 8/6/2019 HSE Directive 8 Electrical Plants

    17/28

  • 8/6/2019 HSE Directive 8 Electrical Plants

    18/28

    281HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    Modicationsthatmustbereported,mustbenotiedtoandapproved

    by the responsible person electrical installations using the orm

    Notication o electrical installation

    Temporary equipment belonging to a contractor

    Contractorswiththeirowncontainerwith

    o their own electrical equipment ttedor

    o who are connected to electrical eld equipment must ollow the

    instructions in this directive

    Repairs,maintenanceormodicationstothecontractorsown

    equipment must be approved by the operations engineer electrical

    Repairs,maintenanceormodicationstothecontractorsown

    equipment that are carried out oshore must also be approved/veried

    by the authorised person electrical, In addition, such work must be

    registered in Workmate

    Repairs,maintenanceormodicationstothecontractorsown

    equipment that are carried out onshore must be veried by the installer,

    who must report changes to the responsible person electrical

    installations

    9. PORTABLE ELECTRICAL EQUIPMENT AND

    TOOLS

    Approval

    Allportableelectricaltools,equipmentandextensioncordsmustbe

    approved by a competent person electricalbeore use

    Theowneroftheequipmentmustensureanddocumentthatall

    portable electrical equipment is inspected and maintained regularly and

    in accordance with the regulations

    Marking

    Allportableelectricalequipmentmustbelabelledwithausebydate.

    Equipment which is not labelled or past its use-by date, must not be

    used

    Pre-use inspection

    Beforeuse,theusermustcheckthattheequipmentisingoodorder,

    that there is a use-by date and that it has not been exceeded. Do notuse equipment with obvious aults or where deects are suspected

    Damageduetokinkingorcrushing,damagetotheoutercablesheet

    and knotting must be treated as damage requiring repairs

    Equipmentwithfaultsordefectsmustbereportedtothecompetent

    person electrical

    Use o cable

    Themaximumpermittedlengthfor1-phaseextensioncordsis25m

    Themaximumpermittedlengthfor3-phaseextensioncordsis40m

    Extensioncordsmustnotbepulledthroughdoorways

  • 8/6/2019 HSE Directive 8 Electrical Plants

    19/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011282

    Splicingextensioncords,includingwithaplugandsocket,arenot

    permitted

    Whenitisused,thecablemustbehungonplastichooksorsimilarto

    protect it rom mechanical damage and water penetration

    Whenyouleavetheworkplace,plugsmustbepulledoutandacover

    put on the socket

    Battery-run tools

    Battery-runtorchesforgeneralusemustbecertiedforuseinZone1

    Equipmentforuseinzone0shallbeapprovedforzone0.

    Battery-runtoolsthatneedagreatdealofpowershouldnotnormallybe

    used. I there is a need to use such equipment, this must be agreed

    with the authorised person electrical, when equipment is on the

    installation or with the operations engineer electricali the equipment is

    not yet sent oshore.

    Otherequipmentequippedwithbatteries(i.e.batteriesmoreadvanced

    than typical batteries in watches) must be cleared beore brought

    into a classied area. Any charging o such batteries must be done via

    permanent installation and be done in an unclassied area

    Use o portable lamps in tanks

    Beforeanylightsourceisusedinatank,thetankmustbedeclaredfree

    o fammable gases

    Whenusingportablelampsinatank,onlylampsapprovedforusein Zone1mustbeused

    Limitationsonthemaximumvoltagepermittedmustbeconsidered

    during the saety evaluation. Normally, lamps with a higher voltage than

    50V should not be used

    Washing with water

    Equipmentthatisprotectedagainstwaterpenetrationshouldnormally

    be washed by hand Washingonornearelectricalequipmentrequirestheequipmenttobe

    protected against water penetration in accordance with IP 54

    Hosingonornearelectricalequipmentrequirestheequipmenttobe

    protected against water penetration in accordance with IP X6. (IP X7 is

    not sucient.)

    Hosingofhighvoltageequipmentisnotpermitted

  • 8/6/2019 HSE Directive 8 Electrical Plants

    20/28

    Attachment 1:

    Notication o electrical installations

    Attachment 2:

    Connectionorder

    Attachment 3:

    Connectiontopowercerticate

    Attachment 4:

    Connectiontopowerregister

    Attachment 5:Isolation register

    Attachment 6:

    Instructions or connection supervisor

    Attachment 7:

    Instructions or saety supervisor

    HSE DIRECTIVE 8

    ELECTRICAL INSTALLATIONSATTACHMENTS

  • 8/6/2019 HSE Directive 8 Electrical Plants

    21/28

    285HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    ATTACHMENT 1: NOTIFICATION OF

    ELECTRICAL INSTALLATIONS

    PROCEDURE FOR NOTIFICATION OF ELECTRICAL INSTALLATION

    Notication must be submitted to Responsible Person electrical system

    prior to commencement o:

    a) all changes/modications to emergency and UPS power systems.

    b) new installations (modules, major changes and demolition).

    c) any changes to high voltage equipment (always).

    d) motorstarters(MCC),panelsanddistributionboardsnewand

    replacements.

    e) extension o panels and distribution boards.) changes made to the main generator system.

    g) electrical motors, transormers new and replacements.

    Attachment 1 HSE Directive 8 Electrical installationsbp

    Notification of electrical installations

    W.O. mod/AFA nr.

    Project IO GENERAL DATA

    Authorised installer:

    Date: BP Responsible Person:

    Nofific. of commencement Signature: Date:

    Start date: Completion date: Sign.

    Project engineer:

    Other drawings:

    Circuit form:

    Layout drawing:

    Area classification drawing:

    Notification of completion

    DELIVERY/MATERIAL INSPECTION

    El. installer Comments:

    Date:

    Signature:

    Inspection Place Report no. Date/Sign. Place Report no. Date/Sign.

    Delivery 1 Pre-insp. 1

    Delivery 2 Pre-insp. 2

    Delivery 3 Pre-insp. 3

    Delivery 4 Pre-insp. 4

    Date:

    Date:

    Repair deadline:

    Non-conf. accepted:

    Respective discipline:

    Responsible person

    Documentation

    approved

    BP El. inspector

    Signature:

    Date:

    INSTALLATION/MC/COMMISSION Resistance to earth: Ohm Isolation resistance: Mohm Electricity to earth: mA Comments:

    Accepted data

    El. installer

    BP el. techn.

    SignatureName Date

    COMPLETION/APPROVALNotification of completion Name Date Signature Comments:

    Electrical installer (deputy)

    BP electrical deputy

    Inspector

    FINAL APPROVAL/DOCUMENT HANDOVEROnshore, original document updated Name Date Signature Comments

    Electrical installer

    BP Responsible Person:

    Authority:

  • 8/6/2019 HSE Directive 8 Electrical Plants

    22/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011286

    The orm is issued in a set o 4 copies. 1 original, 1 copy to installer,

    1 copy to Responsible Person, 1 copy to job le.

    Notication o commencement (upper part) must be completed and

    submitted to Responsible Person or signature prior to commencement

    o work.

    Notication o completion (lower part) must be completed and submitted

    to Responsible Person on completion o the whole installation.

    For minor installations where drawings are not available the notication

    o commencement shall contain a sketch and a single line diagram o

    the intended work. The installer is responsible or checking the material,

    equipment and installation are checked by a skilled person and delivered

    according to regulations beore system is live.

    All inspection reports a non-conormance reports together with as

    built documentation shall be available shall be available to responsible

    contractor, electrician and responsible BP electrician beore system I, live.

    BP responsible electrician (deputy) will take necessary spot checks o the

    installation and documentation beore permission is given to make system

    live.

    DEFINISJONER/DEFINITIONS

    Ansvarshavende:

    BP responsible person or electrical installations.

    Ansvarshavende or elektriske anlegg.

    Elektrisk kontraktr:

    Contractorcompanysresponsiblefortheelectricalinstallation.Ansvarlig installatr.

    BP elektrisk stedortreder:

    Appointed responsible senior electrician on actual el. distribution

    system (platorm). Ansvarlig BP - /Autorisert person elektro, utpekt som

    stedortreder til ansvarshavende or aktuell anleggsdel (plattorm).

  • 8/6/2019 HSE Directive 8 Electrical Plants

    23/28

    287HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    ATTACHMENT 2: CONNECTION ORDER

    CONN

    ECTION

    ORDER

    INSTALL

    ATION

    WORKDESCRIPTION

    ConnectionSupervisor:

    SafetySupervisor:

    CONNEC

    TIONNO.

    PANELTAG

    NO.

    SWITCHFIELD

    NO.

    GROUND

    ESTABLISHED

    COMMENTS

    Date:

    Issuedby:

    Authorisedperson:

  • 8/6/2019 HSE Directive 8 Electrical Plants

    24/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011288

    ATTACHMENT 3:

    CONNECTION TO POWER CERTIFICATE

    CONNECTION TO POWER CERTIFICATE

    No:

    Construction site/Field:

    Module:

    WON/AFA no:

    Date for connection to

    power:

    Date: Sign:

    Section 1. Mechanical Completion

    To: Representative of person in charge (Authorised Person)From: Offshore Construction Engineer. Project Mgr. El.

    Construction and pre-commissioning of the electrical circuits that are detailedbelow have been completed and the circuit is ready for connection to a powersource.

    COURSE REFERENCE : EQUIPMENT: TAG NO:

    LOCATION: CABLE NO: AUTHORISED PERSON:

    PUNCH LISTS:

    REF. DRAWINGS:(APPENDICES)

    Section 2. Approval

    Til: Offshore Construction Engineer. Project Mgr. El.Fra:. Representative of person in charge (Authorised Person)

    The circuit described above and the associated equipment have beenconnected to a power source and are ready for commissioning.

    Date:

    Authorised person.

    Distribution:

    Original Representative of person in charge (Authorised Person)Copy (1) Central Control Room.Copy (2) Offshore Construction Engineer. Project Mgr. El.

  • 8/6/2019 HSE Directive 8 Electrical Plants

    25/28

    289HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    ATTACHMENT 4:

    CONNECTION TO POWER REGISTER

    INSTRUCTIONS FOR LEAKAGE TESTING

    Before work begins

    Check- that the pressure gauge and other test equipment has been calibrated and will

    withstand the pressure that is to be tested- that the connected equipment will withstand the pressure that is to be tested- that any possible energy reservoirs such as accumulators, pulsation dampers,

    etc. have been isolated

    When using water as a test medium

    - that the foundation and supports for the equipment to be tested will withstand thecombined weight of the equipment and water used during the test

    Performance of pressure testing

    When using water, the equipment shall be filled to 100% first - ensure that the gas is ventedat the highest point.

    1. Increase the pressure to approx. 10% of the test pressure maximum 10 bar.2. Check for possible leaks (flanges, plugs, etc.).3. Increase the pressure gradually to 50% of the test pressure.4. Check for possible leaks (flanges, plugs, etc.).5. Increase the pressure gradually to the test pressure.6. Maintain the pressure for an adequate period of time in order to perform a thorough check

    for leaks

    - Avoid shock loads- Avoid passing in front of possible leakage points- Monitor any possible temperature variations that can influence the pressure

    After pressure testing

    1. Reduce the pressure gradually to atmospheric pressure

    2. In the event of drainage :

    - refill nitrogen at the highest point avoid creating a vacuum

    - check that the drainage system is not overloaded

    3. Check that all parts of the tested system have been depressurised/drained

    low points, check valves, etc

  • 8/6/2019 HSE Directive 8 Electrical Plants

    26/28

    HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011290

    ATTACHMENT 5:

    ISOLATION REGISTER

    ISOLATION REGISTER

    Construction Site

    /Field:

    Module:

    WO/AFA no: Sheet no.: of

    Certificate details Approval details

    Cert. no. Date Description / Tag. No. Date Signature

  • 8/6/2019 HSE Directive 8 Electrical Plants

    27/28

    291HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011

    ATTACHMENT 6: INSTRUCTIONS FOR

    CONNECTION SUPERVISOR

    Applies to:

    All work on high-voltage systems with the exception o the operation o

    switches to start/stop high-voltage motors

    The connection supervisor shall:

    Ensurethatthereismorethanonewrittenconnectionordersignedby

    an authorised person when more than one switch is to be operated.

    Ensurethatthepersonnelperformingtheconnectionsarecompetent.

    The connection supervisor is not required to perorm the connection

    operations himsel.

    Ensurethattheconnectionsareperformedproperlyandinaccordance

    with the current provisions o the HSE directive and regulations.

    Ensurethatvoltagecontrolandestablishmentofterminalgroundingat

    the disconnection sites is perormed. There must be at least 2 persons

    to perorm the voltage control and establishment o terminal grounding.

    GivenoticationinpersontotheSaety Supervisorthat the specieddisconnection, voltage control and grounding have been perormed.

    I this is reported over a radio/telephone, then the recipient must

    conrm the message by repetition.

    Connectthehigh-voltagesystemsuponreceiptofnoticationfromthe

    Saety Supervisorthat the installation is ready or connection

  • 8/6/2019 HSE Directive 8 Electrical Plants

    28/28

    ATTACHMENT 7:

    INSTRUCTIONS FOR SAFETY SUPERVISOR

    Applies to:

    All work on or in the proximity o high-voltage systems with the exception

    o the operation o switches to start/stop high-voltage motors

    The Saety Supervisor shall:

    Informtheworkteamoftheirdutiesandtheactualworktobe

    perormed

    ReceivenoticationinpersondirectlyfromtheConnection Supervisor

    that the necessary disconnection, labelling, saeguards against

    connection have been perormed. I this is reported over a radio/

    telephone, then the recipient must conrm the message by repetition.

    Ensurethatvoltagecontrolandestablishmentofshorting/

    grounding at thedisconnection sites are perormed. There must be at

    least 2 persons to perorm the voltage control and shorting/grounding.

    Establishthenecessarysafetydistanceattheworksiteandinformthe

    work team o the nearest work position that is allowed.

    Ensurethattheworksiteiscordonedoffandshieldedasnecessary

    Monitortheworkandensurethathedoesnotgetinvolvedinthework

    so that it aects his duties as Saety Supervisor. I he must leave the

    work site, he must appoint and instruct a competent person to monitor

    the work.

    Whentheworkisnished,hemustinformallthoseinvolvedinthework that the saety measures will be discontinued

    Ensurethatthesafetymeasuresarediscontinued

    GivenoticationinpersontotheConnection Supervisorwhen the work

    site is ready or connection