Download - Gridlock Avoidance System (G.A.S.)

Transcript
Page 1: Gridlock Avoidance System (G.A.S.)

Gridlock Avoidance System Gridlock Avoidance System (G.A.S.)(G.A.S.) David Grant

Chuck Askin

Carl Craft

Taylor Frith

Geoff Weller

Nhu Nguy

David Graham

Page 2: Gridlock Avoidance System (G.A.S.)

Project OverviewProject Overview

Gridlock Avoidance System (G.A.S.)

ODU CS 410/411

presented by David Grant PM

Page 3: Gridlock Avoidance System (G.A.S.)

Project GoalProject Goal

Our main goal is to develop a computer-based simulation model to mimic the behavior of the Hampton Roads Interstate System south of the Mercury Blvd. Interchange to the Battlefield Blvd. Interchange.

Page 4: Gridlock Avoidance System (G.A.S.)

Project Sub-goalsProject Sub-goals

We intend to provide city planners and transportation professionals with results that describe their system’s operations at current and modified vehicle flow rates in two formats: statistical and graphical.

This tool is necessary to support the interstate highway system in Hampton Roads which is a critical element to the infrastructure of society in the area.

Page 5: Gridlock Avoidance System (G.A.S.)

Project Sub-goals (cont.)Project Sub-goals (cont.)

Demonstration simulation of a small segment of the Hampton Roads interstate system for project validation and verification.

Market the project on a consultant basis (what ifs).

Completion by the end of the calendar year 2001

Y2K compliant software and hardware

Page 6: Gridlock Avoidance System (G.A.S.)

Competitive AnalysisCompetitive Analysis

Competitors – Other Traffic Simulation products

Strengths – Currently not being used by the local

governments or VDOT Weaknesses

– Data must be in a usable format– Different localities maintain their data

differently

Page 7: Gridlock Avoidance System (G.A.S.)

General ApproachGeneral Approach

N h u N g uyS im u la tio n A ss ista n t

R e sea rchIm p lem e nta tion

C a r l C ra ftS im u la tionR e sea rchF ea sib i li ty

G e o ff W e lle rIn fo rm a tio n S p ec ia list

W eb P a ge M a in te ne an ceIn fo rm a tio n R e p os ito ry

C h u ck A sk inW eb D e s ign er

D e signT ra in ing

D a v id G rah amIn pu t D a ta

D a ta R e sou rcesD a ta F orm at

T ay lo r Fr i thIn p u t/O u tp u tD a ta F orm at

D ata M ig ra tion

D a v id G ra n tP ro jec t M an ag er

C o ord in a tio n o f R e so urcesA dm in istra tion

Page 8: Gridlock Avoidance System (G.A.S.)

Contractual AspectsContractual Aspects

CS 250

Collect and format data for input

CS 300u

Survey of real-life traffic patterns

Marketing research (purse strings)

Page 9: Gridlock Avoidance System (G.A.S.)

SchedulesSchedules

Fall Semester 1998

Spring Semester 1999

Implementation and Completion Phase

Page 10: Gridlock Avoidance System (G.A.S.)

Fall Semester 1998Fall Semester 1998

MILESTONE DESCRIPTION STATUSPresentation II Project Feasibility Completed

Organization OrganizationalDiagram

Completed

Cost/ResourcePlan

Costs and ResourceUsage

Completed(updated)

ProposedSchedule

Schedule per ProjectPhase

Completed(updated)

Presentation III Milestone Planning Completed

Diagram ofInterstateHighway System

Detailed Map 5%

Page 11: Gridlock Avoidance System (G.A.S.)

Fall Semester 1998 (cont.)Fall Semester 1998 (cont.)

MILESTONE DESCRIPTION STATUSProject Data VDOT Highway Flow 5%

Pick DemoHighway Segment

Determine maximumflow rate, engine,C/C++

0%

Project Scope Determine number ofvariables

0%

Pick SimulationEngine (ForEvaluation)

Lane changes, laneclosures, HOV

15%

Presentation IV Project Approval 5%

ProjectSpecification

Deliverable 5%

Page 12: Gridlock Avoidance System (G.A.S.)

Spring Semester 1999Spring Semester 1999MILESTONE DESCRIPTION STATUS

ContractualAspects

CS 300u and CS250

0%

Presentation V PreliminaryProject PrototypeSpecifications

0%

Demo I Project HomePage

0%

Demo II Project Prototype 0%

Presentation VI Grant Proposal 0%

Page 13: Gridlock Avoidance System (G.A.S.)

Implementation and CompletionImplementation and CompletionMILESTONE DESCRIPTION STATUS

Office Lease and furnishoffice

0%

Hire and beginoperations

Interview and selectcandidates andbegin project work

0%

Data Readiness Format and preparedata for migrationto simulator

0%

Unit testing Testing ofindividual nodes

0%

System Testing Testing of allsystem nodes

0%

ProductDelivery

Demo andCustomeracceptance

0%

Page 14: Gridlock Avoidance System (G.A.S.)

ResourcesResources

Personnel

Office

Equipment

Page 15: Gridlock Avoidance System (G.A.S.)

Personnel (annual costs)Personnel (annual costs)

Faculty Advisor

12 Graduate students working 20 hr. @ $15 per hr.

$ 46,000

$180,000

Page 16: Gridlock Avoidance System (G.A.S.)

Office (annual costs)Office (annual costs)

Office Space ($1500 per month)

Office Furniture ($500 per month)

Office Supplies and Utilities ($600 per month)

$ 18,000

$ 6,000

$ 7,200

Page 17: Gridlock Avoidance System (G.A.S.)

Equipment (purchase costs)Equipment (purchase costs)

Gateway E-5200 Computers (6)

Lexmark OPTRA 3455 network printer

HP OfficeJet Pro 1175C all-in-one

Statistical Software Package

$ 15,600

$ 2,600

$ 1,000

$ 200

Page 18: Gridlock Avoidance System (G.A.S.)

Equipment (purchase costs cont.)Equipment (purchase costs cont.)

HP DesignJet 2500C Plotter

IBM Fast Ethernet LAN Switch 1100

Simulator Engine (several single purchase to evaluate)

$ 9,400

$ 1,900

$ 4,300

Page 19: Gridlock Avoidance System (G.A.S.)

Project Total CostsProject Total Costs

Personnel Office Equipment ODU Research

Foundation

Total Project Cost

$ 565,000 $ 78,000 $ 35,000 $ 340,000

$1,018,000

Page 20: Gridlock Avoidance System (G.A.S.)

Evaluation MethodsEvaluation Methods

During Fall Semester 1998 and Spring Semester 1999, there will be regular status and brainstorming session of the group and sub-groups.

During the implementation and Completion phase we will use accepted SEI standards (formal and one-on-one peer reviews, Test Readiness Reviews, Team Advisory Groups for customer acceptance).

Page 21: Gridlock Avoidance System (G.A.S.)

Potential ProblemsPotential ProblemsNot possible to model current/historical

trafficNot possible to complete in timeInadequate or unavailable dataToo expensiveNo buyersAlready on marketSpending cutback

Page 22: Gridlock Avoidance System (G.A.S.)

BibliographyBibliography

Experts:- Dr. Leathrum (ECE)- Dr. Overstreet (CS)- Mr. Dennis Watson (VDOT)