8/2/2019 Equable DMAIC Template July 2004
1/23
Franck Strub Equable
6 September 2004
DMAIC project template
8/2/2019 Equable DMAIC Template July 2004
2/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting2
Project name
6 sigma steps (DMAIC)
Define
Measure Analyze
Improve
Control
Define your business problem
Measure your process (Y) performance
Find the root causes (Xs) of the problem
Improve, implement new solution
Deliver Y performance over time
8/2/2019 Equable DMAIC Template July 2004
3/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting3
Project name
Description of the problem (what? where? since when? based on which data?Based on which facts?)
Voice Of Customer (Customer perception)Internal perception
Competitors benchmark
1 Pb Statement
Business Problem
Develop Goal statement/opportunity or objective in clear, concise, measurable termsDemonstrate alignment of the project with the company/business strategy
2 Goal Statement
Define
8/2/2019 Equable DMAIC Template July 2004
4/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting4
Project name
Why to do the project?
What if project not done?
Financial Business Case
Business Case
3 Business Case
What Comment Cost
K
Project Labor
Project Materials
Project Contractors
Equipment investment
Yearly operation cost
TOTAL Costs 0
Incremental RevenuesLabor Savings
Material Savings
TOTAL Benefits (1 year) 0
ROI 0
Define
8/2/2019 Equable DMAIC Template July 2004
5/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting5
Project name
Green Belt/Black Belt role:Team members/role:
Black Belt:Master Black Belt:VP Quality / Quality Manager:
Manager:Key stakeholders from Business team:
Customers:Others:
4 Project scope
Project: in scope
D M A I CDates:Gantt
Project: out of scope
Project charter
5 Team
6 Planning
Define
8/2/2019 Equable DMAIC Template July 2004
6/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting6
Project name
7 (SIPOC)
Process map & CTQs
process as felt by the customer
Input Output
Supplier =My Company
Definition Specification Performancelimit targets
CTQ*
Step 2Step 1 Step 3
measurement
*Critical To Quality
My
Customer
Define
8/2/2019 Equable DMAIC Template July 2004
7/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting7
Project name
M-step 1:
Selected CTQs
Selected Project CTQ(s):
Discrete/continuous CTQ?
CTQ Operational Definition(s):
What is it (measurement starting point and end point) ?
How to measure it?
What is a defect?
If applicable to your CTQ, LSL* contractual value or limit defined by customer:
If applicable to your CTQ USL* contractual value or limit defined by customer:
M-step 2:DefinePerformancestandard
MeasureCTQ details
*LSL Lower Specification Limit*USL Upper Specification Limit
8/2/2019 Equable DMAIC Template July 2004
8/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting8
Project name
M-step 3:
MeasurementSystemAnalysis
Measurement systemanalysis
Data Collection plan for Repeatability & Reproductibility study:
Data sample size =Date of data collection:Where data have been collected?How data have been collected?How many operators? How many repeats per operator?
Gage R&R study Continuous data:
-Tolerance (USL-LSL):
-Short method (yes/no):
-Gage R&R as %contribution: Gage R&R as %tolerance: Nb of distinct categories:
Gage R&R study discrete data:If we have a Known sample (a reference), then how was built the known sample?
Conclusion/decision taken (evidence that the measurement of our CTQ is reliable):
MeasureGage R&R
8/2/2019 Equable DMAIC Template July 2004
9/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting9
Project name
M-step 4:
Baselinecurrent (As Is)processcapability
CTQ data collection planData sample size =Date of data collection:Where data have been collected?How data have been collected?
Will you take the opportunity to collect obvious Xs when collecting your CTQmeasurements?
If yes, which Xs:
Display an extract of the data collected:
MeasureCTQ data collection plan
8/2/2019 Equable DMAIC Template July 2004
10/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting10
Project name
Continuous CTQSample size=Short term data or Long term data?Histogram with Normality test result and descriptive statistics:
Type of the distribution (normal, other):
Trend represented by its (m, median, Q1, Q3, other):Variability represented by its (s, P95, Q1/Q3, other):PROCESS CAPABILITY MEASURE:NORMAL DistributionObserved DPMO=Potential DPMO=ZLT=ZST (ZLT+1.5)=
Conclusion
Problem with trend, variability or both?
M-step 4:Baselinecurrent (As Is)processcapability
Photography of current performanceMeasure
Non NORMAL DistributionObserved DPMO=Equivalent ZLT=Equivalent ZST (ZLT+1.5)=
8/2/2019 Equable DMAIC Template July 2004
11/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting11
Project name
Discrete CTQSample size:Short term data or Long term data?Process capability
Yield (%)=%defects=DPMO=Opportunities per unit=DPU=Equivalent ZLT=Equivalent ZST (ZLT+1.5)=
95% confidence interval on DPMO:
MeasurePhotography of current performance
M-step 4:Baselinecurrent (As Is)processcapability
8/2/2019 Equable DMAIC Template July 2004
12/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting12
Project name
Continuous CTQNormal probability plot:
Conclusion (can we detect a true process and an unstable process?):
All type of CTQStability over time/Run chart:
Conclusion:Pb of technology (short term common causes)?Pb of control (long term shift due to special causes)?
Both pbs?
A-step 5:As Is processGraph Analysis
AnalyzeGraph analysis
8/2/2019 Equable DMAIC Template July 2004
13/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting13
Project name
A-step 6:DefinePerformanceObjectives ofTo Be process
Improvement GoalTarget (from benchmark) for:
Trend:Variability:LT DPMO or LT %defects=Yield (%)=ZLT=ZST=(ZLT+1.5)=
Gap (Improvement Actual)DPMO gap or Defect reduction factor:Z gap=
6 Sigma tools necessary to meet performance objectives: Ground fruit: Logic and Intuition Low hanging fruit: Basic tools (Process Map, CE/CNX fishbone diagram, SOP,
FMEA, Pareto, Histogram, Box plot) Bulk of Fruit Process Characterization and Optimization Sweet Fruit: Transform the project into a DFSS project
AnalyzeSet expected performance
8/2/2019 Equable DMAIC Template July 2004
14/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting14
Project name
A-step 7:Identify Xs
(root causes)
Process (AS IS) detail analysis:Detailed process map
Conclusion
CTQ Intermediate distribution plot (continuous CTQ only)
Conclusion
Standard Operation Procedures analysis:Exist:Are applied:Incitation to apply them exist:Training has been given to operators:
Policy analysis:ExistAre applied
AnalyzeProcess analysis
8/2/2019 Equable DMAIC Template July 2004
15/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting15
Project name
List of potential significant Xs
Y/CTQ Output
Men
Machines
Materials
Methods
Measurements
Environment
Fishbone diagram of my Y
Label C/N/X on your fishbone, then rate every X impact vs implementation (table below)
1 2
3 4
Impact
High Low
Implementation
Easy
Hard
AnalyzePotential root causes
A-step 7:Identify Xs
(root causes)
8/2/2019 Equable DMAIC Template July 2004
16/23Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting16
Project name
Results of segmentation (continuous CTQ only) :(Box plots, Scatter plots, Distributions per X)
Conclusion:
AnalyzeSegmentation analysis
A-step 7:Identify Xs
(root causes)
8/2/2019 Equable DMAIC Template July 2004
17/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting17
Project name
Pareto chart of the CTQ categories:
Conclusion:
Pareto chart of the defect categories:
Conclusion:
FMEA:
Conclusion:
AnalyzePareto analysis
A-step 7:Identify Xs
(root causes)
8/2/2019 Equable DMAIC Template July 2004
18/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting18
Project name
Statistical Tests PerformedTest X Factors p value %contribution conclusion
one sample or two sample T-testAnnova one wayHomogeneity of varianceChi square testSimple regressionNon parametric data testANOVA 2 waysGLM
DOE screening
Conclusion/Prioritized list of significant Xs:
Financial benefits confirmation (Update your Business case):
AnalyzeHypothesis testing
A-step 7:Identify Xs
(root causes)
8/2/2019 Equable DMAIC Template July 2004
19/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting19
Project name
I-step 8:Screen potentialcauses.List improvementactions/projects
List of Vital few Xs (screening DOE): Improvement action plan (Who What When):
ImproveImprovement actions
8/2/2019 Equable DMAIC Template July 2004
20/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting20
Project name
I13
X tolerance settings:
I-step 9:DiscoverVariablerelationships(if necessary)
Transfer function:
Proposed Solution: Optimal Settings
Confirmation runs capability:
I-step 10:Establish
OperatingTolerances(if necessary)
ImproveImproved performance
8/2/2019 Equable DMAIC Template July 2004
21/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting21
Project nameControlGage R&R on Xs
C-step 11:Define and
ValidateMeasurementSystem on Xs(if necessary)
Control on one X (yes/no):
If yes, X measurement systemanalysis:
Data Collection plan for Repeatability & Reproductibility study:Data sample size =Date of data collection:Where data have been collected?How data have been collected?How many operators? How many repeats per operator?
Gage R&R study Continuous data:
-Tolerance (USL-LSL):
-Short method (yes/no):
-Gage R&R as %contribution: Gage R&R as %tolerance: Nb of distinct categories:
Gage R&R study discrete data:If we have a Known sample (a reference), then how was built the known sample?
Conclusion/decision taken (evidence that the measurement of our X is reliable):
8/2/2019 Equable DMAIC Template July 2004
22/23
Equabletous droits rservs. Copyrights Equable. Six Sigma Consulting22
Project name
C-step 12:Determine new
ProcessCapability
Process or Product new capability:
Continuous CTQ:
NORMAL DistributionObserved DPMO=Potential DPMO=ZLT=ZST (ZLT+1.5)=
Discrete CTQ:Sample size:=Short term data or Long term data?
Process capabilityYield (%)=%defects=DPMO=Opportunities per unit=DPU=Equivalent ZLT=Equivalent ZST (ZLT+1.5)=95% confidence interval on DPMO
Statistical Confirmation of Improvement (by statistical test):
Confirmation of improved performanceControl
Non NORMAL DistributionObserved DPMO=Equivalent ZLT=Equivalent ZST (ZLT+1.5)=
8/2/2019 Equable DMAIC Template July 2004
23/23
E bl t d it C i ht E bl Si Si C lti
Project name
C-step 13:Implement
ProcessControl
Control Charts (SPC) in place/review mechanisms:
Mistake Proofing action taken:
FMEA control actions in place:
Process controlsControl