8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
1/46
WPCA Capital Improvements Referendum Public Hearing
City of Derby
Water Pollution Control Authority
Referendum Public Hearing
September 3, 2014
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
2/46
WPCA Capital Improvements Referendum Public Hearing
Presentation Outline
Opening Statement by WPCA Purpose of Referendum How The City Got Here? Wastewater System Understanding
Capital Improvement Projects Capital Recovery Referendum Approach Capital Recovery Non Referendum Approach
Why Have A Referendum? Closing Statement by WPCA Questions and Answers
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
3/46
WPCA Capital Improvements Referendum Public Hearing
Presentation OutlinePUBLIC VOTE TO AUTHORIZE FUNDING
TO ADDRESS AND UPGRADEAGING INFRASTRUCTURE INCLUDING:
South Division Street Wastewater Pumping Station
Burtville Avenue Wastewater Pumping StationRoosevelt Drive Wastewater Pumping Station
Roosevelt Drive Forcemain Replacement
Route 34 Downtown Sanitary Sewers
Water Pollution Control Facility Phase I UpgradesWater Pollution Control Facility Solids Handling System Upgrades
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
4/46
WPCA Capital Improvements Referendum Public Hearing
Few capital improvements over the last 30 years
Rapidly deteriorating infrastructure (50 plus years old) Recurring overflows to the Housatonic River Skyrocketing operational costs Skyrocketing sewer use fees
Enhancement of economic development opportunities
Due to these issues, in 2010 the WPCA began a 20-yearWastewater Facilities Planning Project, which was recently
completed. The plan identified the immediate capitalneeds which are included in this referendum
How The City Got Here
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
5/46
WPCA Capital Improvements Referendum Public Hearing
Water Pollution
Control Facility
PumpingStations
CollectionSystem
Wastewater System Understanding
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
6/46
WPCA Capital Improvements Referendum Public Hearing
4 Municipally Owned and Operated South Division Street (1966)
Burtville Avenue (1965)
Roosevelt Drive (1965) last upgrade 1972
Patty Ann Terrace (1971) replaced in 2014
Three Pumping Stations are in FAILURE MODE
and Need Major Overhauls
Wastewater Pumping Stations
PumpingStations
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
7/46
WPCA Capital Improvements Referendum Public Hearing
INSERT TYPICAL WWPS SECTION HERE
Wastewater Pumping Station Diagram
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
8/46
WPCA Capital Improvements Referendum Public Hearing
South Division St. Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
9/46
WPCA Capital Improvements Referendum Public Hearing
South Division St. Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
10/46
WPCA Capital Improvements Referendum Public Hearing
Constructed in 1966 No Upgrades Since
Significant corrosion of underground steel structure
Safety Concerns:
30-ft deep without fall protection
Recurring electrical failures
Frequent station flooding
Costly Routine Maintenance
Monthly station failures
Weekly operational issues
Beyond its useful life
South Division St. Pumping Station
PumpingStations
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
11/46
WPCA Capital Improvements Referendum Public Hearing
Submersible Non Clog Pumps
Piping and valves
Modern electrical & control system
Site paving, fencing and security
Concrete structures
Concrete utility building to house:
Electrical System
Control System
Emergency Generator
New South Division St. PSProject Cost $830,000
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
12/46
WPCA Capital Improvements Referendum Public Hearing
Burtville Avenue Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
13/46
WPCA Capital Improvements Referendum Public Hearing
Burtville Avenue Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
14/46
WPCA Capital Improvements Referendum Public Hearing
Constructed in 1965 No Upgrades Since
Safety Concerns: 20-ft deep without fall protection
Recurring electrical failures
Dangerous conditions for routine maintenance
Frequent station flooding
Insufficient: Wetwell volume
Operations space New site needed
Beyond its useful life
Burtville Avenue Pumping Station
PumpingStations
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
15/46
WPCA Capital Improvements Referendum Public Hearing
Relocated Site
Submersible Non Clog Pumps Piping and valves
Modern electrical & control systems
Site paving, fencing and security Concrete structures
Concrete utility building to house:Electrical System
Control System
Emergency Generator
New Burtville Avenue PSProject Cost $1,070,000
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
16/46
WPCA Capital Improvements Referendum Public Hearing
Overflow toHousatonic River
2011 OSHAViolation and Fines
Current DEEPEnforcement Action
Roosevelt Drive Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
17/46
WPCA Capital Improvements Referendum Public Hearing
Roosevelt Drive Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
18/46
WPCA Capital Improvements Referendum Public Hearing
Roosevelt Drive Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
19/46
WPCA Capital Improvements Referendum Public Hearing
Make Aerial Show Floodway
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
20/46
WPCA Capital Improvements Referendum Public Hearing
Constructed in 1966 Last Upgrade 1972
Pumps 40-50% of all flow in Derby
Major Impacts on Economic Development
Located in Regulated River Floodway
Numerous overflows and fines
Daily operational issues
Weekly Failures
Significant operational costs
Beyond its useful life
New site neededOverflow to
Housatonic River
Roosevelt Drive Pumping Station
PumpingStations
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
21/46
WPCA Capital Improvements Referendum Public Hearing
Significant corrosion of underground steel structure Steel Failures River Water Intrusion
Insufficient wetwell volume
Insufficient operations space
Cannot handle current flows (Overflows)
Constant Pump Clogging (Rags) Safety Concerns
30-ft deep without fall protection
Recurring electrical failures Dangerous conditions for routine maintenance
Regulated confined space entryOverflow to
Housatonic River
Roosevelt Drive Pumping Station
PumpingStations
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
22/46
WPCA Capital Improvements Referendum Public Hearing
Energy Efficient Pumps sized for planned economic development
Screening System for rag removal and pump longevity Relocated Site out of Floodway
Piping and valves
Modern electrical & control systems
Site paving, fencing and security Concrete structures
Concrete utility building to house:
Electrical System
Control System
Emergency Generator
New Roosevelt Drive PSProject Cost $7,460,000
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
23/46
WPCA Capital Improvements Referendum Public Hearing
Piped from new Pumping Station to WPCF
Increase Roosevelt Drive Pumping Station capacityfrom 2,000 gallons per minute to 4,000 gallons perminute
Pipe sized for planned economic development increased from 12-inch diameter to 16-inch diameter
Improved long term maintenance access
Staged with Route 34 ConnDOT Widening projectfor cost savings
New Roosevelt Drive ForcemainProject Cost $3,780,000
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
24/46
WPCA Capital Improvements Referendum Public Hearing
Current downtown sewers are undersized and limit
the ability for economic development, refurbishmentof defunct downtown properties and downtown re-development
Pipe sized for planned economic development and
downtown re-development Improved long term maintenance access
Project construction coordinated with ConnDOT
Route 34 Improvements/Widening project. WPCApays for pipe installation DOT pays for Paving,Traffic Control, etc. resulting in significant costsavings($3,000,000 to $6,000,000 savings)
Downtown/Route 34 Sewer ReplacementProject Cost $3,660,000
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
25/46
WPCA Capital Improvements Referendum Public Hearing
Manual Rag Removal System
Ineffective Rag Removal (noprotection of WPCF equipment)
Labor Intensive/Costly Process
Structural Deterioration
Safety Issues
Permit Compliance Issues Flooding
Water Pollution Control FacilityPreliminary Treatment System - Screening
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
26/46
WPCA Capital Improvements Referendum Public Hearing
Automatic Screening System
1/4 Bar Spacing for maximum ragremoval
Screenings washer compactor
Reduced long term maintenance
Reduced Flooding
Stabilize normal WPCF flow
Maintaining Permit Compliance
Modern Technology
Water Pollution Control FacilityPreliminary Treatment System - Screening
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
27/46
WPCA Capital Improvements Referendum Public Hearing
Influent Pumping System Deficient Bearings
Inefficient Pumping System
Total of Three pumps
Daily Pump Clogging Frequent Maintenance
Overheating Motors
Structural Concerns
Water Pollution Control FacilityPreliminary Treatment System Influent Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
28/46
WPCA Capital Improvements Referendum Public Hearing
Influent Pumping System Four energy efficient pumps
Piping and valves
Modern electrical & controls
Concrete repairs to structure Brick repairs to building
Water Pollution Control FacilityPreliminary Treatment System Influent Pumping Station
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
29/46
WPCA Capital Improvements Referendum Public Hearing
Grit Removal System
Does not meet current standards Insufficient Capacity resulting in
inefficient grit capture
Flooding during high flowconditions
Odor concerns
Water Pollution Control FacilityPreliminary Treatment System Grit Removal
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
30/46
WPCA Capital Improvements Referendum Public Hearing
Grit Removal System
Multiple Grit Trays in existing tank for95% grit capture
Grit Processing/Cleaning System toReduce Odors
Piping and valves
Modern electrical & control system
Eliminate Safety Issues & Flooding
Water Pollution Control FacilityPreliminary Treatment System Grit Removal
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
31/46
WPCA Capital Improvements Referendum Public Hearing
Anaerobic Digestion System
All equipment is original (1966) Tank covers and building roof leak
Structural deterioration to roofs, tanksand building
Equipment when operationalconstantly clogged
System reduced sludge volume andassociated disposal costs by 50%
when operational ($60,000 per year) All equipment is currently not
operational and is offline
Water Pollution Control FacilityAnaerobic Digestion System
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
32/46
WPCA Capital Improvements Referendum Public Hearing
Anaerobic Digestion System
Fixed digester covers w/ gas collection system Energy efficient digester mixing and heating
systems
Piping and valves
Modern electrical & control system
Structural repairs to building components
Gas turbine for digester heating and energyproduction to reduce WPCF electrical costs
Renewable Green Energy Source
Reduce sludge volume and associated disposalcosts by up to 50% ($75,000 per year)
Allow for sludge processing from othercommunities to offset user costs (regionalapproach)
Water Pollution Control FacilityAnaerobic Digestion System
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
33/46
WPCA Capital Improvements Referendum Public Hearing
Water Pollution Control FacilitySolids Handling System
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
34/46
WPCA Capital Improvements Referendum Public Hearing
Solids Handling Facilities Heart of the WPCF operations
Major impacts to WPCF permit compliance andannual operating costs ($400,000 per year)
No Process Redundancy system runs 7 days aweek and operators are paid overtime or WPCF
would fail Permit Requirements!!! Belt Filter Press (1980)
Constant Failures 2010, 2011, 2012, 2013, 2014!!
Rotary Thickener (1972)
Constant Failures 2010, 2011, 2012, 2013, 2014!! All systems well beyond useful life and were
recommended for replacement in 2000!!
Water Pollution Control FacilitySolids Handling System
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
35/46
WPCA Capital Improvements Referendum Public Hearing
Solids Handling Facilities
Consolidated Processing System 2 Belt Filter
Presses operating during normal WPCF hours Dry Bulk Polymer Processing System
Odor Control Chemical Feed System
Modern Non-Clog Primary Sludge Pumping
Modern Non-Clog Secondary Sludge Pumping Piping and valves
Modern electrical & control system
New external WPCF main electrical system sized for
future considerations Structural repairs to building components
Allow for sludge processing from other communitiesto offset user costs (regional approach)
Water Pollution Control FacilitySolids Handling System
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
36/46
WPCA Capital Improvements Referendum Public Hearing
WPCF Phase I Upgrades - $8,940,000
Fine Screening System w/ Washer Compactor
Influent Pumping Station Upgrades
Grit Removal System Upgrades
Anaerobic Digestion System Upgrades
Possible Revenue Generation through Digestion System
Possible Renewable Energy through Green Digestion System
WPCF Solids Handling System Upgrades - $5,000,000
Fine Screening System w/ Washer Compactor
Influent Pumping Station Upgrades
Grit Removal System Upgrades
Possible Revenue Generation through Regional Sludge Processing
Water Pollution Control FacilityProject Summary
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
37/46
WPCA Capital Improvements Referendum Public Hearing
Roosevelt Drive Pumping Station - $7.46 M
Roosevelt Drive Forcemain - $3.78 M
South Division Street Pump Station - $0.83 M
Burtville Avenue Pump Station - $1.07 M
WPCF Solids Handling System Upgrades - $5.00 M
Bid April 2014 - Project is Construction Ready WPCF Phase I Upgrades - $8.94 M
Route 34 Sewer Improvements - $3.66 M
Total $30.74 M
All Projects include a contingency and an escalation to theyear of construction
Referendum Cost Summary
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
38/46
WPCA Capital Improvements Referendum Public Hearing
Bar Chart Here
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
39/46
WPCA Capital Improvements Referendum Public Hearing
6,831 Citywide Blended Residential and CommercialUnits
Single Family = 1 Unit Two Family = 2 Unit
Three Family = 3 Unit
Condo Unit = 1 Unit
Mixed Use/Commercial Units based on Flow Conversion toResidential Equivalent (153 gpd)
Units Breakdown Residential 5,358
Mixed Use 193 Commercial 1,280
Total 6,831
Capital RecoveryReferendum Approach
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
40/46
WPCA Capital Improvements Referendum Public Hearing
Current Typical Single Family Bill Flat Fee = $250.00
Consumption Fee = $115.00Total $365.00
After Referendum Typical Single Family Bill
Flat Fee = $250.00 Consumption Fee = $115.00
Capital Recovery Fee = $257.00
Total $622.00
WPCA to Implement Multiple Payments for entire bill whichwill avoid other City Taxes (July/Property Tax Season)
Capital RecoveryReferendum Approach
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
41/46
WPCA Capital Improvements Referendum Public Hearing
Current Typical Two Family Bill Flat Fee = $500.00
Consumption Fee = $230.00Total $730.00
After Referendum Typical Single Family Bill
Flat Fee = $500.00 Consumption Fee = $230.00
Capital Recovery Fee = $514.00
Total $1,244.00
WPCA to Implement Multiple Payments for entire bill whichwill avoid other City Taxes (July/Property Tax Season)
Capital RecoveryReferendum Approach
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
42/46
WPCA Capital Improvements Referendum Public Hearing
Division St Pumping Station - $830,000 $61 per unit capital recovery fee per year for 2 years
Burtville Avenue Pumping Station - $1,070,000 $80 per unit capital recovery fee per year for 2 years
Roosevelt Drive Pumping Station - $7,460,000 $365 per unit capital recovery fee per year for 3 years
Roosevelt Drive Pumping Station Forcemain - $3,780,000
$280 per unit capital recovery fee per year for 2 years Route 34 / Downtown Sewer Replacement - $3,660,000
$270 per unit capital recovery fee per year for 2 years
WPCF Solids Handling System Replacement - $5,000,000 $370 per unit capital recovery fee per year for 2 years
WPCF Phase I Upgrades - $8,940,000 $437 per unit capital recovery fee per year for 3 years
Significant Variations in Capital Recovery Cost Per Unit per Year
Capital RecoveryNon-Referendum Approach
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
43/46
WPCA Capital Improvements Referendum Public Hearing
Capital Recovery fees would be a special assessment assessedby the WPCA. Special assessments would be due in full in 30days.
Assessments could be issued at any time due to the condition ofthe equipment, making it difficult for household budgeting
Project assessments may not be staggered resulting in multipleassessments per year (i.e. $370 for WPCF solids handling and$365 for Roosevelt Drive Pumping Station or $735 assessed inone year)
Unpredictability of assessments can result in significantfluctuations in annual costs per year (i.e. $365 one year to $1,100the next year)
NOTE:The capital recovery fees are for project capital costs only. Additionalcosts for emergency operations until projects are completed could berequired and are not included
Capital RecoveryNon-Referendum Approach
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
44/46
WPCA Capital Improvements Referendum Public Hearing
You are voting on How the capital projects arepaid for not whether the capital projects need tobe completed.
Gives you the choice of How to pay for these
projects.
Why Have a Referendum?
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
45/46
WPCA Capital Improvements Referendum Public Hearing
Citywide benefit
Address Administrative Enforcement Actionsfrom CT DEEP
Stabilizes annual WPCA budget
Stabilizes financial impacts to system users Addresses Environmental Concerns
Limits cities risk related to emergency
replacement and associated costs /environmental impacts
Allows for Economic Development and Growth
WPCA Closing Statement
8/11/2019 Derby WPCA - Referendum Public Hearing Presentation - Sept 3 2014
46/46
WPCA Capital Improvements Referendum Public Hearing
QUESTIONS?
City of Derby
Water Pollution Control Authority