Cellular Specialties, Inc.
ClearLink™ UDIT™
Installation Manual
www.cellularspecialties.com
1.877.844.4CSI (4274)
CSI ClearLink™ UDIT™ Installation Manual
Page 2 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
DISCLAIMER
All information and statements contained herein are accurate to the best of Cellular Specialties, Inc. (CSI) knowledge. CSI makes no warranty with respect there to, including without limitation any results that may be obtained from the products described herein or the infringement by such products of any property rights of any persons. Use or application of such information or statements is at the users’ sole risk, without any liability on the part of CSI. Nothing herein shall be construed as license or recommendation for use, which
infringes upon any propriety rights of any person. Product material and specifications are subject to change without notice. CSI standard terms of sale and the specific terms of any particular sale apply.
NOTE
Please check to make sure the software for your UDIT is the latest. On the UDIT the software revision is provide on the Home page under Device Information. To see if there is a newer version please login in to the CSI Portal http://portal.cellularspecialties.com and look under User Documentation>Active Products>ClearLink™ Universal DAS Interface Tray (UDIT™).
The CSI ClearLink UDIT Users Guide may be updated from time to time to reflect new software or additional features. To see if there is a new revision please login in to the CSI portal http://portal.cellularspecialties.com
and look under User Documentation>Active Products>ClearLink™ Universal DAS Interface Tray
(UDIT™).
CSI ClearLink™ UDIT™ Installation Manual
Page 3 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
TABLE OF CONTENTS
Preface ...........................................................................................................................................6
Purpose ........................................................................................................................................ 7
Scope ........................................................................................................................................... 7
Audience ....................................................................................................................................... 7
Document Organization .................................................................................................................. 7
References .................................................................................................................................... 7
Document Conventions ................................................................................................................... 8
Safety Notices ............................................................................................................................... 8
Technical Support .......................................................................................................................... 9
Warranty ...................................................................................................................................... 9
RMA Request ................................................................................................................................. 9
Acronyms and Abbreviations ........................................................................................................... 9
Copyright and Trademark Acknowledgements .................................................................................... 9
1 Overview ...............................................................................................................................10
1.1 Customer Furnished Equipment ........................................................................................... 10
1.2 Prepare the Site................................................................................................................. 10
1.2.1 High Heat Loading Considerations ................................................................................. 11
1.3 Unpacking and Physical Inspection of Components ................................................................. 12
1.4 ClearLink UDIT Chassis Box Unpacking and Physical Inspection ............................................... 12
1.5 Control/PSU Module Unpacking and Physical Inspection .......................................................... 14
1.6 POI Module Unpacking and Physical Inspection ...................................................................... 15
1.7 Combiner Module Unpacking and Physical Inspection .............................................................. 16
1.8 Cable Management Unit Unpacking and Physical Inspection .................................................... 16
2 UDIT Chassis Installation ......................................................................................................17
2.1 Two (2) Post Rack Chassis Installation .................................................................................. 17
2.2 Four (4) Post Rack Chassis Installation ................................................................................. 19
2.3 Ground and Bond the UDIT Chassis ...................................................................................... 21
3 Control/PSU Module ..............................................................................................................23
3.1 Control/PSU Module Indicators, Controls, and Connectors ....................................................... 23
3.2 Control/PSU Module Installation ........................................................................................... 25
4 POI Module ............................................................................................................................27
4.1 POI Module Indicators, Controls, and Connectors ................................................................... 27
4.2 POI Module Installation ....................................................................................................... 28
5 Combiner Module ...................................................................................................................30
5.1 Combiner Module Indicators, Controls, and Connectors ........................................................... 30
5.2 Combiner Module Installation .............................................................................................. 31
6 Blank Panel Installation ........................................................................................................33
7 Connecting the Power Source ................................................................................................34
7.1 Power Consumption Calculations .......................................................................................... 34
CSI ClearLink™ UDIT™ Installation Manual
Page 4 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
7.2 Power Installation .............................................................................................................. 35
8 Cabling and Cable Management .............................................................................................38
8.1 Cable Manager Installation .................................................................................................. 38
8.2 BTS Connections ................................................................................................................ 39
8.3 DAS Connections ............................................................................................................... 39
8.4 Combiner Connections ........................................................................................................ 40
9 Preventive Maintenance ........................................................................................................41
9.1 POI and Combiner Modules Hot Swapping ............................................................................. 41
9.2 Fan Hot Swapping .............................................................................................................. 41
9.3 Control/PSU Module Replacement ........................................................................................ 43
9.4 Control/PSU Module Battery Replacement ............................................................................. 43
Appendix A Product Registration Information .........................................................................47
Appendix B Glossary................................................................................................................48
TABLE OF FIGURES
Figure 3-1: Control/PSU Module Front Panel ....................................................................................... 23
Figure 4-1: POI Module Front Panel ................................................................................................... 27
Figure 5-1: Combiner Module Front Panel ........................................................................................... 30
LIST OF TABLES
Table P-1: Document Conventions ....................................................................................................... 8
Table 1-1: Tools and Supplies Required .............................................................................................. 10
Table 1-2: Heat Calculation Example.................................................................................................. 11
Table 1-3: ClearLink UDIT Chassis Box Unpacking ............................................................................... 13
Table 1-4: Control/PSU Module Unpacking and Physical Inspection ........................................................ 14
Table 1-5: POI Module Unpacking and Physical Inspection .................................................................... 15
Table 1-6: Combiner Module Unpacking and Physical Inspection ............................................................ 16
Table 1-7: Cable Management Unit Unpacking and Physical Inspection ................................................... 16
Table 2-1: Two (2) Post Rack Chassis Installation Procedures ............................................................... 17
Table 2-2: Four (4) Post Rack Chassis Installation Procedures ............................................................... 19
Table 2-3: Grounding and Bonding the Chassis Procedures ................................................................... 21
Table 3-1: Control/PSU Module Indicators, Controls, and Connectors ..................................................... 23
Table 3-2: Control/PSU Module Installation ......................................................................................... 25
Table 4-1: POI Module Indicators, Controls, and Connectors ................................................................. 27
Table 4-2: POI Module Installation ..................................................................................................... 28
Table 5-1: Controller Module Indicators, Controls, and Connectors ........................................................ 30
Table 5-2: Combiner Module Installation ............................................................................................ 31
CSI ClearLink™ UDIT™ Installation Manual
Page 5 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Table 6-1: Blank Panel Installation .................................................................................................... 33
Table 7-1: Typical Component Power Consumptions ............................................................................ 34
Table 7-2: Power Installation ............................................................................................................ 35
Table 8-1: Cable Manager Installation ................................................................................................ 38
Table 9-1: Fan Hot Swapping Procedure ............................................................................................. 41
Table 9-2: Control/PSU Module Battery Replacement Procedures ........................................................... 43
Table A-1: Product Registration Information ....................................................................................... 47
Table B-1: Acronyms and Abbreviations ............................................................................................. 48
CSI ClearLink™ UDIT™ Installation Manual
Page 6 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Preface
This Preface includes the following:
Purpose
Scope
Audience
Document Organization
References
Document Conventions
Safety Notices
Technical Support
Warranty
RMA Request
Acronyms and Abbreviations
Copyright and Trademark Acknowledgements
CSI ClearLink™ UDIT™ Installation Manual
Page 7 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Purpose
The purpose of this manual is to provide information required to prepare, install and maintain the CSI ClearLink™ Universal DAS Interface Tray (UDIT™) system.
Scope
This manual provides the steps needed for the installer of the CSI ClearLink™ Universal DAS Interface Tray (UDIT™) to install, connect and maintain this system.
Audience
This manual is intended for the operators and technicians (installers) of the CSI ClearLink™ Universal DAS
Interface Tray (UDIT™) system.
Document Organization
This manual is organized as follows:
Chapter 1: Overview – Provides an overview of the ClearLink UDIT system, the customer furnished equipment that is needed for supporting the system and preparing the site for the installation of the
system
Chapter 2: Unpacking and Physical Inspection – Provides the information needed for unpacking and physically inspecting all of the system components
Chapter 3: UDIT Chassis Installation – Provides the information needed to install the UDIT chassis
Chapter 4: Control/PSU Module – Provides the information about the indicators, controls and connectors on the Control/PSU plus the information required to install the module
Chapter 5: POI Module - Provides the information about the indicators, controls and connectors on
the POI plus the information required to install the module
Chapter 6: Combiner Module - Provides the information required to install the module
Chapter 7: Blank Panel Installation – Provides the installer information for installing the blank panels into to the chassis
Chapter 8: Connecting the Power Source – Provides the information on how to connect the power supply to the Control/PSU module
Chapter 9: Cable Management – Provides the information for the cable management of the system
Chapter 10: Preventive Maintenance – Provides the information that is needed to maintain the system
Appendix A: Product Registration Information - Retain the serial information, model numbers or CSI Part Numbers and proof of purchase to serve as your record of purchase
Appendix B: Glossary – Provides a list of acronyms used in this manual
References
GR-3028-CORE, Thermal Management in Telecommunication Central Offices: Thermal GR-3028
Telcordia GR-1089-CORE 9.5.3
TIA-607-B Network Bonding and Grounding
CSI UDIT Users Guide
CSI UDIT Quick Reference Users Guide
CSI UDIT Quick Reference Hardware Install Guide
CSI ClearLink™ UDIT™ Installation Manual
Page 8 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Document Conventions
Table P-1 lists the conventions used throughout this document.
Table P-1: Document Conventions
Convention Description
WARNING! Indicates conditions or practices that could cause personal injury or death
CAUTION! Indicates conditions or practices that could cause damage to equipment or property, for information that is crucial to preventing loss of data or damage to hardware or software, and actions that could result in catastrophic equipment failure.
NOTE Indicates additional information or comments that may be useful
to the user.
Bold Bold typeface indicates equipment labels and provides emphasis.
Safety Notices
The general safety information in this manual applies to both operating and service personnel. Failure to comply with these precautions or specific warnings elsewhere in the manual violates safety standards of design, manufacture, and intended use of equipment. Cellular Specialties, Inc. assumes no liability for the customer’s failure to comply with these requirements:
Grounding - This system is designed to operate from -36 to - 60 VDC (-48VDC nominal) and should always be operated with the ground wire properly connected. Do not remove or otherwise alter the grounding lug on the power cord.
Explosive Atmospheres - To avoid explosion or fire, do not operate this product in the presence of flammable gases or fumes.
No Serviceable Parts Inside Modules - Opening the modules will void your warranty except for replacing the battery in the Control/PSU Module.
IMPORTANT Safety Information
WARNING!
Hazardous moving parts. Keep away from moving fan blades. Service Personal are the only personal that can hot swap the fan.
This is NOT a CONSUMER device. It is designed for installation by FCC LICENSEES and QUALIFIED INSTALLERS. You MUST have an FCC LICENSE or express consent of an FCC License to operate this device. Unauthorized user may result in significant forfeiture penalties, including penalties in excess of $100,000 for each continuing offense.
CAUTION!
Do not force the module in to place, if resistance is encountered or the module
is difficult to seat, check the module alignment in the guide rails and alignment of the backplane connector.
POI’s and Combiner Modules may be HOT. Care should be taken to avoid direct contact with unprotected parts of the body.
Risk of explosion if the internal battery is replaced by an incorrect type. Dispose of the used battery in accordance to local regulations
CSI ClearLink™ UDIT™ Installation Manual
Page 9 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Technical Support
If you have technical questions regarding a CSI product or require troubleshooting assistance, please contact a member of our technical support team. Support is available business days Monday - Friday 9:00 AM – 5:00
PM EST. It is helpful to have product part numbers and serial numbers available when calling or e-mailing regarding an existing product. These can be found on the product and through the GUI. Chassis serial number is located on label affixed to the rear of the chassis. Module serial and part numbers are on labels affixed to the side of the modules.
P: 877.844.4CSI (4274) - press option 2 and then option 1 E: [email protected]
Request Information - Click here. http://www.cellularspecialties.com/request-information.aspx.
Warranty
The UDIT™ is covered by a full two-year warranty. Extended warranties are available upon request. An RMA number must be obtained prior to the return of all products.
RMA Request
To request an RMA - click here. [email protected]
Acronyms and Abbreviations
Refer to the Glossary at the end of this manual for definitions of the acronyms and abbreviations used in this manual.
Copyright and Trademark Acknowledgements
The following products are referred to in this manual:
ClearLink™ is a trademark of CSI, a division of Westell Technologies
UDIT™ is a trademark of CSI, a division of Westell Technologies
CSI ClearLink™ UDIT™ Installation Manual
Page 10 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
1 Overview
The ClearLink UDIT is a modular, scalable sub-system which provides RF conditioning between the BTS and the DAS for single carrier or neutral host multicarrier/operator systems. The ClearLink UDIT chassis is capable of supporting 13 modules; a controller/power supply and up to 12 UDIT POIs or UDIT Combiner modules. The chassis and all UDIT modules are designed with their cabling interfaces accessible on the front panel. This arrangement provides the system maximum flexibility to meet the specific installation needs.
1.1 Customer Furnished Equipment
The UDIT chassis can be rack mounted in a 19” two (2) post rack using center mounted hardware or flush mounted in a four (4) post rack. Table 1-1 list the tools and supplies that you will need to have for the installation and maintenance of the UDIT system.
Table 1-1: Tools and Supplies Required
Item Name/Description Size
19” rack 2 post or 4 post
Ground Wire No. 6 AWG
Flat tip screwdrivers #1, #2, #3
Phillips screwdrivers #1, #2, #3, #4
Torx Screwdriver T10
Side Cutters N/A
Wire/Cable Strippers N/A
Razor Knife N/A
Torque Wrench 7/16 DIN
Crimper for Ground Lug
Electrical Tape N/A
Velcro 0.75” width
Hook and Loop Cable Tie ¾” width
1.2 Prepare the Site
Select an appropriate location within your rack for mounting the UDIT chassis. Please consider the high heat load of the unit and its requirements as well as the availability of the required power. Some acceptable locations include; telecom closets, MDF rooms, and climate control enclosures. The area must also be capable
of providing at least a 10” unobstructed area behind the unit to avoid cooling fan airflow restriction.
Local Code Requirements should be followed. Always review the local code requirements with the local Authority Having Jurisdiction (AHJ) before proceeding with the installation. This includes reviewing what codes and edition is adopted, and what, if any exceptions to the code are adopted by the governing authority. Most of the code requirements for the job should be included in the scope of work documents. The installer should never take this information for granted since the telecommunications contractor is fully responsible for all work
done on the project.
If no code has been adopted locally, consult with the fire marshal’s office to determine what agency is responsible for that geographic area and what codes are in effect. Do not depend on other installers, contractors, or even company personnel in making these determinations.
CSI ClearLink™ UDIT™ Installation Manual
Page 11 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Local DAS Requirements
In 2010 the National Fire Protection Association (NFPA) adopted an updated version of their code NFPA-72, the National Fire Alarm Code, which includes a requirement for DAS or other In Building Wireless (IBW)
systems in certain commercial buildings to provide coverage for public safety radio systems. A growing number of cities and states are adopting this or a similar code, making such coverage mandatory. The specifics of these ordinances and codes vary, but most include: A minimum signal strength, application of the limit over a specified percentage of each floor, a specific level of reliability, a specific frequency band or bands for public safety coverage, testing requirements and procedures, provisions for penalties, provisions for waivers of the requirements.
1.2.1 High Heat Loading Considerations
Due to the high density construction of the chassis and ability to handle up to 100W of RF power per POI, care needs to be taken to accommodate for the potentially high heat loading of the area in which it will be installed.
Table 1-2 shows an example of the heat calculation for a single chassis with 12 POI units.
In cases where a large number of units are installed in a limited area, additional cooling may be required to avoid hot spots and excessive temperature gradients in the room. For additional information on equipment and room cooling methods, refer to GR-3028-CORE, Thermal Management in Telecommunication Central
Offices: Thermal GR-3028.
Table 1-2: Heat Calculation Example
POWER
Consumption Typ. at -48VDC
(Watts)
# of Units POIs
HEAT DISSIPATION Per Unit
(Watts)
HEAT DISSIPATION Total
(Watts)
BTU/HR (1W=3.14B
TU/HR)
Maximum
Dissipation/Part Number
A:
Maximum Modules per Sub-Rack
C: Maximum
Design (100W RF
input power)
D:
Typical Design
(40W RF input
power)
E: Maximum (A) X (C)
F:
Typical (A) X (D)
G:
(E) X 3.14
Chassis & Controller Module 75 1 75 75 75 75 235.5
POI Modules 7 12 107 47 1284 564 4031.76
1359 639 4267.26
Note above calculations assume:
(C) Maximum RF input power of 100 Watts into each POI
(D) RF input power of 40 Watts input each POI (if your input power is different you will need to do your own calculation)
CSI ClearLink™ UDIT™ Installation Manual
Page 12 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
1.3 Unpacking and Physical Inspection of Components
The unpacking of your components includes: taking an inventory of the contents of the packing container, and physically unpacking and inspecting the components for any noticeable damage that might have occurred
during shipping.
The components of your ClearLink UDIT depend on the configuration that you purchased.
ClearLink UDIT Chassis Box
Control/PSU Module
Power Supply - The UDIT system requires -36 to -60 VDC at 4.0A maximum and a bay mounted fuse panel in accordance with AT&T TP-76450, section 2.6.1. If -48 VDC is unavailable on site call CSI to
order a rack mount power supply.
POI (at least one of these)
Combiner
Cable Management
Blank Panels
When you are unpacking the equipment locate and document the serial number for each serialized UDIT item in Table A-1. Retain the serial information, model numbers or CSI Part Numbers and proof of purchase to
serve as your record of purchase.
The Chassis serial number can be found on a label affixed to the rear of the chassis.
The POI and Combiner serial numbers can be found on a label affixed to the side of the module
The Control Module serial number can be found on a label affixed to the side of the module
1.4 ClearLink UDIT Chassis Box Unpacking and Physical Inspection
Refer to Table 1-3 for the steps on unpacking and physical inspection of the ClearLink UDIT Chassis box. Once
the box is unpacked make sure the following items where included in the box:
ClearLink UDIT Chassis in one of the following configurations:
o CS18-115-100 - UDIT Chassis
o CS18-115-127 - UDIT Chassis with Control/PSU module installed in slot 13
o CS18-115-128 – UDIT Chassis with Control/PSU module installed in slot 13 and blank panels installed in slots 1 – 12
Two (2) Large black brackets for the two (2) post rack
Bag with Accessories which includes:
Description Quantity
Rear Chassis Supports, small for four (4) post rack install 2
Screw 10-32 x ½”, PHP w square cone spring washer 8
Screw 12-24 x ½”, PHP w tooth washer 8
Washer Lock Spring M4 2
Screw SPHC-TORX M4X8, SS NYLON Patch 2
Screw machine tress head, Phillips #4 10
Ground Lug, Two Hole, 90 Degree, window barrel, NON-INS, 6AWG 1
Washer, Flat, M4, SS, DIN 125, ROHs COMP 4
USB Thumb Drive with UDIT Installation Manual and UDIT Users Guide 1
CSI ClearLink™ UDIT™ Installation Manual
Page 13 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Ethernet Crossover cable 7 foot
ClearLink UDIT Quick Install Installation Guide
ClearLink UDIT Quick Install Users Guide
NOTE
It is recommended that you keep the shipping containers until the UDIT is configured, however, it is not required. If you find any items that have been damaged during shipping or are defective upon receipt you should call Technical Support for an RMA and use the same box for the return unless the
box is damaged. If during maintenance you need to replace an item, call for an RMA. A new item will be sent out then you could use that same packaging to ship the old item back.
Table 1-3: ClearLink UDIT Chassis Box Unpacking
Step Procedure Illustration
1 Open the box and remove the documentation
2 Remove the packing material protecting the top of the chassis
3 Lift the chassis out of the box
CSI ClearLink™ UDIT™ Installation Manual
Page 14 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
4 In the Chassis box there is a section which is separated by a cardboard divider, the accessary kit bag and the two (2) large mounting brackets for the two (2) post rack are be located in this section.
5 Inspect the handles and chassis to verify no damage occurred in shipping
6 Inspect fans to verify no damage occurred in shipping
1.5 Control/PSU Module Unpacking and Physical Inspection
Refer to Table 1-4 for the steps on unpacking and physical inspection of the Control/PSU Module if it is not already installed in the UDIT Chassis.
Table 1-4: Control/PSU Module Unpacking and Physical Inspection
Step Procedure Illustration
1 Locate the box that has the Control/PSU module in it
2 Open the box
3 Remove the packing container with the Control/PSU Module
4 Carefully open the packing container that the Control/PSU module is in so as not to damage the module
5 Verify that the Control/PSU Module has not been damaged in shipping
NOTE: Caution should be taken with the Control/PSU Module to prevent damage
to the rear connector
6 Leave the Control/PSU Module in the packing container until it is ready to install
CSI ClearLink™ UDIT™ Installation Manual
Page 15 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
1.6 POI Module Unpacking and Physical Inspection
Refer to Table 1-5 for the steps on unpacking and physical inspection of the POI Module. If you have more than one (1) POI Module follow these steps for each one.
Table 1-5: POI Module Unpacking and Physical Inspection
Step Procedure Illustration
1 Locate the box that has the POI module in it
2 Open the box
3 Remove the packing container with the POI Module
4 Carefully open the packing container that the POI
module is in so as not to damage the module
5 Verify that the POI Module has not been damaged in shipping
NOTE: Caution should be taken with the POI Module to prevent damage to the rear connector
6 Leave the POI Module in the packing container until it
is ready to install
NOTE: The POI Module ships with the QMA-QMA Jumpers installed in High Power Mode
CSI ClearLink™ UDIT™ Installation Manual
Page 16 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
1.7 Combiner Module Unpacking and Physical Inspection
Refer to Table 1-6 for the steps on unpacking and physical inspection of the Combiner Module. If you have more than one (1) Combiner Module follow these steps for each one.
Table 1-6: Combiner Module Unpacking and Physical Inspection
Step Procedure Illustration
1 Locate the box that has the Combiner module in it
2 Open the box
3 Remove the packing container with the Combiner Module
4 Carefully open the packing container that the Combiner module is in so as not
to damage the module
5 Verify that the Combiner Module has not been damaged in shipping
NOTE: Caution should be taken with the Combiner Module to prevent damage to the rear connector
6 Leave the Combiner Module in the packing container until it is ready to install
1.8 Cable Management Unit Unpacking and Physical Inspection
Refer to Table 1-7 for the steps on unpacking and physical inspection of the Cable Management Units.
Table 1-7: Cable Management Unit Unpacking and Physical Inspection
Step Procedure Illustration
1 Locate the box that has the Cable Management Unit in it
2 Open the box
3 Remove the packing material with the Cable Management Unit
4 Verify that the Cable Management Unit has not been damaged in shipping
5 Verify that the grommet material is in place
6 Verify that there are four (4) mounting screws
7 Leave the Cable Management Unit on the packing container until it is ready to install
CSI ClearLink™ UDIT™ Installation Manual
Page 17 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
2 UDIT Chassis Installation
Installation of the chassis includes installing the UDIT chassis into the rack and grounding the chassis to the rack. Installation of a UDIT chassis varies depending on what type of rack is utilized. See procedures as follows for a two (2) post rack or a four (4) post rack mounting:
Section 2.1 for mounting to a two (2) post rack
Section 2.2 for mounting to a four (4) post rack
2.1 Two (2) Post Rack Chassis Installation
To mount the UDIT to a two (2) post rack you will need the following:
Two (2) mounting brackets
Eight (8) Philips Truss head screws for mounting the brackets to the chassis
Four (4) Philips screws with washers for mounting the brackets to the posts
#2 and #4 Philips screwdrivers (CFE)
Follow the steps in Table 2-1 for installing the chassis in a two (2) post rack.
Table 2-1: Two (2) Post Rack Chassis Installation Procedures
Step Procedure Illustration
1 Remove the eight (8) screws from the accessory kit bag
2 Place a bracket next to one side of the UDIT chassis, aligning the screw holes of the bracket
with the screw holes on the front side of the chassis
NOTE: Bracket placement and orientation are designed to support the chassis at the center of its loaded weight distribution
CSI ClearLink™ UDIT™ Installation Manual
Page 18 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
3 Fasten the bracket to the side of the chassis using four (4) of the Philips screws that were supplied
4 Repeat steps 2 and 3 for fastening the second bracket to the other side of the chassis
5 Place a screw partially into each rail in the hole below where you want the UDIT to be aligned. This helps the user hold the chassis and align it to the desired rack height while installing the chassis and securing the UDIT
NOTE: There needs to be a minimum of a 1U
space empty above and a 1U space empty below the UDIT chassis for room for the Cable Management Unit and routing of the cables
6 Position the UDIT chassis (4U high) in the two
(2) post rack approximately as shown
NOTE: The actual position in the rack will vary according to venue or design requirements
CSI ClearLink™ UDIT™ Installation Manual
Page 19 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
7 Screw the mounting bracket to the two (2) post rails with at least two (2) screws for each mounting bracket
NOTE: Use screws designed to work with the hole size and thread of the mounting rails
2.2 Four (4) Post Rack Chassis Installation
To mount the UDIT to a four (4) post rack you will need the following:
Two (2) small mounting brackets
Four (4) Philips screws for mounting the brackets to the rear posts
Four (4) Philips screws for mounting the UDIT chassis to the front posts
#2 Philips screwdrivers (CFE)
Follows the steps in Table 2-2 for installing the chassis in a four (4) post rack.
Table 2-2: Four (4) Post Rack Chassis Installation Procedures
Step Procedure Illustration
1 Remove the brackets and screws from the accessory kit bag
2 Screw the bracket on to one (1) of the rear posts using two (2) of the screws that were
supplied
888
CSI ClearLink™ UDIT™ Installation Manual
Page 20 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
3 Repeat step two for the other rear post making sure that you get both brackets at the same level
4 Locate the mounting slots at the rear sides of the chassis
5 Slide the mounting slots on the rear of the UDIT chassis onto the pre-installed brackets
6 Continue to slide the chassis on to the rear post brackets until the chassis stops
CSI ClearLink™ UDIT™ Installation Manual
Page 21 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
7 Fasten the front of the UDIT chassis to the front posts using the mounting holes provided in the front panel
2.3 Ground and Bond the UDIT Chassis
The UDIT is suitable for installation as part of either the Common Bonding Network (CBN) or an Isolated Bonding Network (IBN).
To ground and bond the UDIT chassis you will need the following:
No. 6 AWG copper bonding wire
Two (2) Phillips Truss Head Screws
One (1) 6 AWG right angle dual hole lug with cable window
Crimper for 6 AWG dual lug
#4 Phillips screwdriver
Follows the steps in Table 2-3 for installing the grounding wire to the chassis and grounding strip.
Table 2-3: Grounding and Bonding the Chassis Procedures
Step Procedure Illustration
1 Locate the dual hole ground lug and
choose which dual grounding lug position on the chassis is closest to the grounding bus bar
NOTE: The UDIT chassis has three ground
mounting positions that can be used for installation
CSI ClearLink™ UDIT™ Installation Manual
Page 22 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
2 Make the grounding wire by crimping the right angle dual lug onto 6 AWG wire (Customer provided and cut to length). Install a second dual hole ground lug on the other end of the ground wire (customer provided)
Make sure the cable is properly seated in the lug and visible thru the lug window
Make sure the ground cable jacket is flush with the ground lug
Refer to the TIA-607-B Network Bonding
and Grounding requirements for
information on the grounding wire
NOTE: Be sure to follow any local code requirements
3 Screw one end of the dual ground lug terminated ground cable to either the front or one of the rear grounding locations of the chassis
4 Secure the other end of the dual ground lug terminated cable to the ground bus bar or rack
NOTE: If grounding to the rack, be sure there is no paint on that area of the rack where the ground lug will be attached to assure that a solid ground between the lug and rack is made
Follow local grounding procedures regarding scraping the paint from the rack, use of metal piercing washers etc.
CSI ClearLink™ UDIT™ Installation Manual
Page 23 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
3 Control/PSU Module
The UDIT Control/PSU Module provides power to all the modules installed in the UDIT Chassis. It also provides a Graphical User Interface (GUI) for configuration, status and alarm information over an Internet Protocol (IP) network. Alarms generated in the UDIT system can be monitored locally or remotely through Simple Network Management Protocol (SNMP).
3.1 Control/PSU Module Indicators, Controls, and Connectors
Figure 3-1 shows the Control/PSU Module front panel. Table 3-1 provides a description of the Control Module indicators, controls and connectors.
Figure 3-1: Control/PSU Module Front Panel
Table 3-1: Control/PSU Module Indicators, Controls, and Connectors
Item Label Description
1 ETH1 Ethernet cross over Cable hookup for Site LAN port, used for connecting a MODEM or network connection using a RJ45 CAT5 or greater cross over cable
2 ETH2 Ethernet cross over cable hookup for Local LAN connection port, used for initial setup with
your PC using a RJ45 CAT5 or greater cross over cable
3 Power Power LED indicator
Green – Power is connected to the Control Module and it not in alarm
OFF- no power provided to the Control Module
CSI ClearLink™ UDIT™ Installation Manual
Page 24 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Item Label Description
4 Status Status LED indicator
Green
During power up
Everything in the Sub-Rack works as expected without any alarm condition
Orange
Any POI/Backplane module indicated major alarm condition but not critical such as
but not limited to:
o DL input power has exceeded the clamp down level by 1dB
o DL RF input power cable is not connected/RF input power is not fed
o DL temperature exceeds threshold temperature
o UL input power has exceeded the threshold noise input power by 1dB
o UL RF input power cable is not connected/RF input power is not supplied
o UL temperature exceeds threshold temperature o Control Module temperature exceeds threshold of 80oC
Red
Any Fan, Control Module/PSU, POI module indicated a critical alarm condition
DL input power has exceeded the configured maximum input power by at least 1 dB and POI has increased DL attenuation setting to keep DL output power within the configured maximum
Troubleshooting tip: Check the configuration values for this POI and verify network input levels with WSP
POI/Combiner module is missing
Troubleshooting tip: Communication lost with DL module or module has been removed
DC power failure
Troubleshooting tip: Reseat the POI or Combiner Modules and/or change module locations to verify proper connection to the Back-plane. If this does not resolve call Technical Support
FAN alarm
Controller Software Failure
Troubleshooting tip: Power cycle the FAN module or upgrade the FAN software
Communication with the fan lost should not occur unless someone has removed the
fan
Module temperature exceeds maximum temperature value
Troubleshooting tip: Make sure the fan is working and not obstructed, lower the temperature of the room where the UDIT is located.
5 RTN
-48V
Phoenix Style 1829345 Power Connector or BlockMaster OTB-351 two-position terminal block
RTN- connected to ground (RED wire)
-48V- connected to -48VDC (BLACK wire)
For information on logging into the UDIT for commissioning and maintenance please see the ClearLink UDIT Users Guide. Information on logging in, accessing the UDIT for configuration between the BTS and DAS and
for daisy chaining two (2) or more UDIT chassis together. ETH1 and ETH2 ports are used in Daisy Chaining the UDIT together.
CSI ClearLink™ UDIT™ Installation Manual
Page 25 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
3.2 Control/PSU Module Installation
Follow the steps in Table 3-2 for the installation of the Control/PSU module in to the UDIT chassis if it is not already installed.
Table 3-2: Control/PSU Module Installation
Step Procedure Illustration
1 Remove the Control/PSU Module from its packing material
2 Locate the CNTRL/PSU slot on the far right of the UDIT chassis
3 Properly align the tabs of the Control/PSU Module with the top and bottom guide rails in the chassis
4 Gently slide the Control/PSU Module in the guide rails
CAUTION!: Do not force the module into place, if resistance is encountered or the module is difficult
to seat, check the module alignment in the guide rails and alignment of the backplane connector
CSI ClearLink™ UDIT™ Installation Manual
Page 26 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
5 The connector on the Control/PSU Module should be seated properly in the back plane connector at the rear of the chassis
6 Tighten the thumb screws on the top and bottom on the front of the Control/PSU Module securing
the module to the front of the chassis
CSI ClearLink™ UDIT™ Installation Manual
Page 27 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
4 POI Module
Each Point of Interface (POI) Module is plug-and-play and automatically detected by the system, plus is hot swappable. Each POI module consists of an RF Duplexer, and Up and Down stream conditioning paths. The design maximizes the dynamic range realized by the overall system to support maximum throughput. This increases the number of customers supported and Return on Investment (ROI).
4.1 POI Module Indicators, Controls, and Connectors
Figure 4-1 shows the POI Module front panel. Table 4-1 provides a description of the POI indicators, controls and connectors.
Figure 4-1: POI Module Front Panel
Table 4-1: POI Module Indicators, Controls, and Connectors
Item Label Description
1 DAS DL QMA simplex connection for DL cable connection to the DAS or a Combiner
2 HI Lo High/Low Power Jumper Ports
3 E911 QMA connection to support E911 LMU
4 Status Status LED indicator –Controlled by the Control Module
Green – No alarm condition for that POI UL and DL
Red – Any alarm condition in either the UL and/or DL of this POI
UL/DL Input Power Alarms, UL/DL RF Cable not connected Alarm, UL/DL Temperature Alarms, DL Maximum Attenuation Alarm, UL/DL DC Power Failure Alarms, UL/DL SW/HW Failure Alarms
5 BTS RF DL/UL 7/16 DIN duplex connection for cable connection to the BTS or Small Cell
6 DAS UL QMA simplex connection for UL cable connection to the DAS or a Combiner
CSI ClearLink™ UDIT™ Installation Manual
Page 28 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
4.2 POI Module Installation
The POI Modules can be installed in slots 1 thru 12 in the UDIT chassis. Slots may be skipped, however the odd numbered slots require that the POI Module DIN connector be oriented below the center line and even
number slots require the POI Module DIN connector to be above the center line.
Follow the steps in Table 4-2 for the installation of the POI module in to the UDIT chassis.
Table 4-2: POI Module Installation
Step Procedure Illustration
1 Remove a POI Module from its packing material
2 When using the POI Module in a Low Power
configuration the jumpers need to be changed before installation
Low Power: 10 – 40 dBm
High Power: 20 – 50 dBm
3 Choose the slot you are going to mount the POI Module into
NOTE:
Odd numbered slot make sure the POI Module DIN is oriented below the center line
Even numbered slot make sure the POI Module
DIN is oriented above the center line
4 Properly align the tabs of the POI Module with the top and bottom guide rails in the chassis
NOTE: Double check the orientation of DIN to the
center line
5 Gently slide the POI Module in the guide rails
CAUTION!: Do not force the module into place, if resistance is encountered or the module is difficult to seat, check the module alignment in the guide rails
and alignment of the backplane connector
CSI ClearLink™ UDIT™ Installation Manual
Page 29 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
6 The connector on the POI Module should be seated properly into the back plane connector at the rear of the chassis
7 Tighten the thumb screws on the top and bottom on the front of the POI Module securing the module to
the front of the chassis
CSI ClearLink™ UDIT™ Installation Manual
Page 30 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
5 Combiner Module
The Combiner module divides or sums signals going between the BTS-POI and POI-DAS. The Combiner allows the system to resolve spectral density issues by allowing disparate frequency bands to be grouped together and passed to the DAS. The reduction of hardware allows the system engineers to allocate resources where there will be a greater Return on Investment (ROI) without sacrificing usable throughput bandwidth.
5.1 Combiner Module Indicators, Controls, and Connectors
Figure 5-1 shows the Combiner Module front panel. Table 5-1 provides a description of the Combiner indicators, controls and connectors.
Figure 5-1: Combiner Module Front Panel
Table 5-1: Controller Module Indicators, Controls, and Connectors
Item Label Description
1 & 3 DL IN DL In, Ports 1 – 4, QMA connections to DAS DL port on a POI
2 DL OUT QMA connection for simplex cable to the DAS
4 & 6 UL Out UL Out, Ports 1 – 4, QMA connections to DAS UL port on a POI
5 UL In QMA connection for simplex cable to the DAS
7 Status Status LED Indicator - Controlled by Control Module
GREEN No alarm condition for that Combiner
RED Any alarm condition for that Combiner
CSI ClearLink™ UDIT™ Installation Manual
Page 31 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
5.2 Combiner Module Installation
The Combiner Module can be installed in slots 1 thru 12 in the UDIT chassis. Odd numbered slots require that the Combiner Module be oriented with the LED on the top and even number slots require the Combiner Module
be oriented with the LED on the bottom.
Follow the steps in Table 5-2 for the installation of the Combiner module in to the UDIT chassis.
Table 5-2: Combiner Module Installation
Step Procedure Illustration
1 Remove a Combiner Module from its packing material
2 Choose the slot into which the Combiner Module
will be mounted.
3 Properly align the tabs of the Combiner Module with the top and bottom guide rails in the chassis
NOTE: Make sure the orientation of the Combiner
has the LED at the bottom of the Chassis for even number slots and the LED at the top of the Chassis
for odd numbered slots.
4 Gently slide the Combiner Module in the guide rails
CAUTION!: Do not force the module into place, if resistance is encountered or the module is difficult
to seat, check the module alignment in the guide rails and alignment of the backplane connector
5 The connector on the Combiner Module should be seated properly in the back plane connector at the
rear of the chassis
CSI ClearLink™ UDIT™ Installation Manual
Page 32 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
6 Tighten the screws on the top and bottom on the front of the Combiner Module securing the module to the front of the chassis
CSI ClearLink™ UDIT™ Installation Manual
Page 33 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
6 Blank Panel Installation
Unpopulated slots require the installation of a slot blank panel.
CAUTION!
If the unpopulated slots do not have blank covers on them the UDIT Chassis will not have the proper ventilation for the unit to cool effectively which could cause damage to the unit.
Follow the steps in Table 6-1 for the installation of the Bank Panels on to all of the blank slots of the UDIT chassis if they are not already installed.
Table 6-1: Blank Panel Installation
Step Procedure Illustration
1 Remove the Blank Panels from the packing material
2 Place the Blank Panel over an empty slot
3 Continue until all of the empty slots are covered
4 Tighten the screws on the top and bottom of the front of the Blank Panel in to the front of the chassis
CSI ClearLink™ UDIT™ Installation Manual
Page 34 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
7 Connecting the Power Source
Each UDIT Sub-Rack requires an NRTL approved DC power supply to provide the required range of -36 to -60VDC (-48VDC nominal), 3.6 - 6.1A (4.0A nominal, 220w maximum). The UDIT Control/Power Supply Module ships with 20 AWG wire. The user should use a wire size between 16 and 22 AWG.
7.1 Power Consumption Calculations
Table 7-1 lists the typical power consumption for each component in the UDIT family. This data should be used to determine the total current draw for the -48VDC power supply and associated backup power system.
Table 7-1: Typical Component Power Consumptions
Component Power Consumption Watts
(Typical at -48VDC)
Chassis with Controller Module 10 – 75.0 (temperature dependent)
Controller Module 9.6
POI Module 7.0
Combiner Module 1.0
NOTE
The -48VDC supply is fully isolated from chassis ground. DC Power is classified as DC-I per GR-1089.
CSI ClearLink™ UDIT™ Installation Manual
Page 35 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
7.2 Power Installation
Follow the steps in Table 7-2 for the installation of the power to the UDIT chassis.
Table 7-2: Power Installation
Step Procedure Illustration
1 Make sure power supply is off or fuse is removed on fuse panel as appropriate.
2 Connect open end of power cable to -48VDC power supply or fuse panel, if
required
Depending on which style Control/PSU module you have you will have a two wire cable open on one end and terminated with either a green Phoenix connector or ring connectors
NOTE: The Return and -48VDC positions of the connector as labeled on the UDIT Control/PSU module
Red: RTN (RED wire)
Black: -48VDC (Black wire)
3 Turn on power supply and check with multi meter to be sure -48VDC is supplied properly
CSI ClearLink™ UDIT™ Installation Manual
Page 36 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
4 If the Control Module has a Green Phoenix Power Connector, UDIT has shipped with a 20 AWG cable terminated with a Phoenix connector on one end. Plug the green power connector into the Control/PSU module mounted in the UDIT
chassis and secure using the screws in the connector.
If the Control Module has the Terminal block, UDIT has shipped with a 20 AWG
wire with ring lugs. Attach each ring terminal to its respective post and secure
with the included hardware, making sure to maintain proper power orientation.
Properly terminate the open end of the wires and secure to your power supply or fuse panel.
Do not use spade lug connectors or bare wire to make these connections.
5 Turn on the power or insert fuse in fuse panel as appropriate
CSI ClearLink™ UDIT™ Installation Manual
Page 37 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
6 When power is first applied the LED’s on the POI’s will light green during boot up
The POI’s then turn red until the cabling between the BTS through the UDIT to the DAS are properly cabled
and RF is applied
At this point the POI LED’s will again turn green
The Control/PSU Power LED will turn Green
The Control/PSU Status LED will start Orange while the system performs
diagnostics and then will be Red if there is an alarm or green if there are no alarms
LED on Combiner will turn Red if there is any alarm for the Combiner
NOTE: If the LED on the POI does not turn on during power up check to make sure the module is seated correctly. If the LEDS do not turn green check the cabling to make sure that it is connected correctly.
CSI ClearLink™ UDIT™ Installation Manual
Page 38 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
8 Cabling and Cable Management
The slots in the Cable Manager allow flexibility in securing BTS and DAS cables. Cables can be routed from the front of the UDIT Chassis to the rear of the rack or up/down the front of the UDIT Chassis and across Cable Managers mounted above and below the UDIT. The UDIT is designed such that a cable connected to a lower position DIN connector routes up and a cable connected to an upper position DIN routes down.
NOTE
Cables should be installed such that they will not interfere with the installation
or removal of a POI into any slot, nor block the rear fans.
NOTE
When installing cables it is important to maintain the bend radius of the cables. Refer to the manufactures specifications for specific cable bend radius.
NOTE
QMA jumpers should be of a flexible cable such as RG142 or equivalent. Users should not use an N to QMA adapter on an inflexible cable such as LMR400, or LDF4 as this could damage the QMA connectors on the UDIT modules.
8.1 Cable Manager Installation
Follow the steps in Table 8-1 for the installation of the Cable Managers above and below the UDIT chassis.
Table 8-1: Cable Manager Installation
Step Procedure Illustration
1 Use four (4) Phillips screws to mount the upper Cable Manager above the UDIT chassis such that there is 1U space between the top of the UDIT and
the bottom of the Cable Manager, with the CSI logo in an upright position
NOTE: This will allow the 7/16 DIN connectors to fit between the UDIT chassis located above or below the cable managers
2 Use four (4) Phillips screws to mount the lower Cable Manager below the UDIT chassis such that the
top of the Cable Manager bracket is right under the UDIT chassis, with the CSI logo should be in an upright position
3 Remove the dust caps from the front of the POI and Combiner modules
CSI ClearLink™ UDIT™ Installation Manual
Page 39 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
4 Refer to Sections 8.2 and 8.3 for connecting and routing the cables properly
8.2 BTS Connections
To enable the BTS cables to meet bend radius requirements and allow access to adjacent POIs, the BTS cables can be routed from the back and fed:
Over the UDIT chassis and under the upper Cable Manager and connected to a lower DIN connector
Under the UDIT chassis and over the lower Cable Manager and connected to an upper DIN connector
Secure the BTS cables to the Cable Manager using a Velcro strap fed through two slots parallel to the cable run.
NOTE
The UDIT POI Modules are designed to fit in the chassis in alternating directions to allow the installer to be able to use a 7/16” DIN torque wrench to
properly tighten the DIN connector.
8.3 DAS Connections
QMA cables that feed the DAS can be routed along and secured to the BTS cables with Velcro straps. These cables may connect to a DAS whose connections may be on the front or rear of the rack.
NOTE
The UDIT requires QMA cables, the DAS may use a different connector. Be sure to have the proper type and length cables and adapters as required for the installation.
For front DAS connections route the QMA cables from the UDIT, along the BTS cables and across the
Cable Manager
o Secure the cables using the front slots and Velcro straps
o The cables then can route up or down using installer provided vertical managers to the DAS
CSI ClearLink™ UDIT™ Installation Manual
Page 40 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
For rear DAS connections route cables along the BTS cables from the front to the rear of the UDIT
chassis
o At the rear of the chassis be sure BTS and DAS cables sweep to the right or the left and route
along the rack rails or in the installer provided vertical cable manager
o Cables should not block fans to allow for proper cooling and replacement
8.4 Combiner Connections
QMA to QMA cables are used to connect POI UL and DL ports to Combiner UL and DL ports
Use the color coded port labels to assist in making connections to combine up to 4 POIs
o UL – Blue
o DL - Green
Up to four (4) POIs can be connected to a Combiner
Not all ports need be connected on a Combiner
Unused ports should be terminated with a 50Ω termination
The middle UL and DL ports connect to the DAS
CSI ClearLink™ UDIT™ Installation Manual
Page 41 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
9 Preventive Maintenance
The overall preventive maintenance is based on checking the LEDs on the front of the modules and components, as well as regularly checking to make sure everything is in working order. The Software Graphical User Interface (GUI) can also be connected to remote alarming. CSI has Management Information Base (MIB) for integration into the customers Network Operations Center (NOC). More information on this can be found in the ClearLink UDIT Users Guide. For a copy of the MIBs file contact CSI Technical Support.
9.1 POI and Combiner Modules Hot Swapping
Combiner and POI’s Modules may be “Hot Swapped”. To do so, loosen thumb screws and slide the module to be swapped out of the chassis. The thumb screws will be hot and the user should be careful to avoid possible injury. The replacement module can then be installed as explained in the installation section.
NOTE
The settings for all swapped modules are retained by the Control Module and are restored into the replacement component after installation.
CAUTION!
POI’s and Combiner Modules may be HOT. Care should be taken to avoid direct contact with unprotected parts of the body.
9.2 Fan Hot Swapping
All fans can be “Hot Swapped by following the steps in Table 9-1.
WARNING!
Hazardous moving parts. Keep away from moving fan blades. Service Personal are the only personal that can hot swap the fan.
Table 9-1: Fan Hot Swapping Procedure
Step Procedure Illustration
1 Loosen the four snap pins on the back of the fan that you want to replace
NOTE: The UDIT chassis can stay running when you replace a
fan
WARNING!
Hazardous moving parts. Keep away from moving fan blades.
Service Personnel are the only personnel that can hot swap the fan.
22
66
CSI ClearLink™ UDIT™ Installation Manual
Page 42 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
2 Remove the fan from the back of the chassis for the wires to be removed
WARNING!
Hazardous moving parts. Keep away from moving fan blades. Service Personnel are the only personnel that can hot swap the
fan.
3 Find the white cable routing clamp mounted to the bottom of the chassis and lift up to release the fan wires
4 Depress the latch on the on the top of the black fan connector and pull the connector out of the receptacle
5 Obtain new fan, connect the fan cable with the latch oriented to the top
6 Snap the connector in place
WARNING!
Be aware that the fan may start any time that the power connector is attached.
7 Make sure to secure the fan wires under the white clip to prevent them from getting in the way of the fan blades
CSI ClearLink™ UDIT™ Installation Manual
Page 43 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
8 Orient the fan in to the portrait view slide and press each of the four snaps to secure the fan in place
9.3 Control/PSU Module Replacement
The Control/PSU Module cannot be “Hot Swapped”. To change it, the system must be powered down. Power off the power supply or remove the fuse feeding the Control/PSU module, remove the green power connector from the module or disconnect the ring terminals from the terminal block, then remove the Control/PSU Module. The Control/PSU Module can then be replaced in accordance with the installation instructions detailed in Section 3.2.
9.4 Control/PSU Module Battery Replacement
To replace the battery in the Control/PSU Module the system must be powered down to remove the Control/PSU module to replace the battery. The Control/PSU Module can then be removed in accordance with the installation instructions detailed in Section 3.2 of this document. Follow the steps in Table 9-2 for replacing the battery in the Control/PSU Module.
CAUTION!
Risk of explosion if the internal battery is replaced by an incorrect type. Dispose of the used battery in accordance to local regulations.
Call CSI to order a replacement battery.
PN: 453-1025-001
Phone#: 877.844.4CSI (4274) - press option 2 and then option 1
Table 9-2: Control/PSU Module Battery Replacement Procedures
Step Procedure Illustration
1 Power down the UDIT chassis by Powering off the power supply feeding the Control/PSU module or removing its fuse from the fuse panel,
2 Once the UDIT chassis is fully powered down, disconnect the ring connectors from the terminal block, or remove the green
power connector from the module.
CSI ClearLink™ UDIT™ Installation Manual
Page 44 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
Remove the Control/PSU module from the UDIT chassis in accordance with the installation instructions detailed in Section 3.2 of this document
3 Unscrew the eleven (11) Torx screws on the right side of the Control/PSU module using the T10 torx driver
4 Remove the cover
CSI ClearLink™ UDIT™ Installation Manual
Page 45 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
5 Replace with new battery as follows:
NOTE: The battery only fits on the socket in one direction. See notch on battery (circled) and align with slot on socket (arrow indicates)
CAUTION!: Risk of explosion if the internal battery is replaced by an incorrect type. Dispose of the used battery in accordance to local regulations
ORDERING INFO:
Call: 877.844.4CSI (4274) - press option 2 and then option 1
PN: 453-1025-001
6 Seat the battery on the chip
7 Carefully press down on the chip making sure it is fully seated on the socket
8 Replace the cover on the Control/PSU module
9 Screw the eleven (11) screws on the side of the Control/PSU module to refasten the cover
CSI ClearLink™ UDIT™ Installation Manual
Page 46 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Step Procedure Illustration
10 Mount the Control/PSU Module into the UDIT chassis in accordance with the installation instructions detailed in Section 3.2 of this document
11 Reattach the ring connectors on the terminal block observing correct polarity, or reconnect the green power connector. Then reinstall the fuse or turn on the -48VDC power supply.
CSI ClearLink™ UDIT™ Installation Manual
Page 47 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Appendix A Product Registration Information
Locate and document the serial number for each serialized UDIT item in Table A-1. Retain the serial information, model numbers or CSI Part Numbers and proof of purchase to serve as your record of purchase.
The Chassis serial number can be found on a label affixed to the rear of the chassis.
The POI and Combiner serial numbers can be found on a label affixed to the side of the module
The Control Module serial number can be found on a label affixed to the side of the module
Table A-1: Product Registration Information
Point of Sale Company:
CSI Part Number Serial Number Date of Purchase
CSI ClearLink™ UDIT™ Installation Manual
Page 48 of 49 1.877.844.4CSI (4274) © 2014 Cellular Specialties Inc. www.cellularspecialties.com 24 October 2014 Doc. No. 960-1150-001 Rev. D
Appendix B Glossary
Table B-1 is a list of the acronyms and abbreviations used in this manual.
Table B-1: Acronyms and Abbreviations
Acronym/Abbreviation Meaning
AHJ Authority Having Jurisdiction
BTS Base Transceiver Station
CBN Common Bonding Network
CFE Customer Furnished Equipment
DAS Distributed Antenna System
DC Direct Current
DL Downlink
GUI Graphical User Interface
HW Hardware
IBN Isolated Bonding Network
IP Internet Protocol
LED Light Emitting Diode
MIB Management Information Base
NOC Network Operations Center
NRTL National Recognized Testing Laboratory
POI Point of Interface
PSU Power Supply Unit
RF Radio Frequency
SNMP Simple Network Management Protocol
SW Software
UDIT Universal DAS Interface Tray
UL Uplink
www.cellularspecialties.com
1.877.844.4CSI (4274)
© 2014 Cellular Specialties Inc.
24 October 2014 Doc. No. 960-1150-001 Rev. D