Supporting European
Aviation
2019 LSSIP EventNew in the 2019 LSSIP cycle
Martou Véronique – NMD/INF/PAS
The 2019 LSSIP Process
The LSSIP Webinar for New Comers
What is new in the 2019 LSSIP Working Instructions?
What is new in the 2019 LSSIP Template?
Outline of this presentation
2019 LSSIP Event 2
Conclusions
What is new in the 2019 LSSIP Template (1)
2019 LSSIP Event 3
• Updated version of cover with flag
What is new in the 2019 LSSIP Template (2)
2019 LSSIP Event 4
• Updated Table of Contents• Master Plan Level 3 Implementation Report conclusions (previous chapter 3) removed• Numbering all pages from Executive Summary to Full list of Annexes • Key Features and ICAO ASBU visibility in Chapter 5 – Implementation Objectives Progress
Main deadlines listed on the first page
What is new in the 2019 LSSIP Template (3)
2019 LSSIP Event
• Executive Summary: more visual and concise (with new icons and logos).
• CP to update the icons when the Traffic and Capacity NM data are available in Chapter 2
What is new in the 2019 LSSIP Template (4)
2019 LSSIP Event
• FAB logos & name
• CP to delete non applicable logo for the initial draft
What is new in the 2019 LSSIP Template (5)
2019 LSSIP Event
Chapter 1: National ATM Environment - Static Description of U-space services data to be included in the Annex D.
What is new in the 2019 LSSIP Template (6)
2019 LSSIP Event
• Renaming of regional projects with Multinational projects and regional cooperation initiatives with Multinational of cooperation initiatives
• Adding New U-space demonstration projects
What is new in the 2019 LSSIP Template (7)
2019 LSSIP Event
What is new in the 2019 LSSIP Template (8)
Chapter 5 : Implementation Objectives Progress:
• Charts:• State View: Overall Objective Implementation Progress,
National Progress Pie is showing all objectives not only the applicable ones.
• Chart Bars on progression per KF will be only showing applicable and main objectives (not the not applicable or the local ones without FOC). For the full list of objectives, all may refer to the Annex C: Implementation Objectives’ links with SESAR KF, ASBU block or the MPL3
• Separate Sub - Chapters added for Key Feature and ICAO ASBU Implementation Progress, to be more visible (reflected in the Table of Contents).
2019 LSSIP Event
Full list of Annexes always included, adding a standard text for the empty annexes, not printed and/or not applicable.
A. Specialists involved in the ATM implementation reporting for <State> - LSSIP FPsB. National stakeholders organisation chartsC. Implementation Objectives’ links with SESAR, ICAO and DP D. SESAR Solutions implemented in a voluntary way E. Implementation of U-Space Services F. Questionnaire for States Military Organisations on infrastructureG. Glossary of abbreviations
What is new in the 2019 LSSIP Template (9)
Voluntary publishing EU, + CH, NO
New
not published Every 2 years, not in 2019
2019 LSSIP Event
What is new in the 2019 LSSIP Template (10)2019 LSSIP Template - Deadlines
2019 LSSIP Event 12
• The pre-filled LSSIP documents (Word) will be delivered to States via LSSIP SharePoint by 5 November 2019
• The Executive summary graphs, Chapter 3 Implementation Projects, Chapter 5 Implementation Objectives Progress (graphs and Objectives) require freezing of the DB on 14 February 2020 and will be updated by CPs ASAP after that date
• The WLA should be reached by 1 March 2020
• The signed document by 31 March 2020 – publication in European ATM Portal (working)
What is new in the 2019 LSSIPWorking Instructions?
Already available on the LSSIP SharePoint website
2019 LSSIP Event 13
2019 LSSIP Working Instructions (2)
2019 LSSIP Event 14
2019
LSS
IP W
orki
ng In
stru
ctio
nsLSSIP roles and responsibilities
Production of LSSIP document
Determination of Implementation Progress
LSSIP Database User Guide
LSSIP SharePoint User Guide
Gen
eric
intro
duct
ion
for a
ll ch
apte
rs
2019 LSSIP Working Instructions (3)
2019 LSSIP Event 15
2019
LSS
IP W
orki
ng In
stru
ctio
nsLSSIP roles and responsibilities
• Developed in cooperation with LSSIP EG on request of the States.
• Describes in details roles and responsibilities of the States, LSSIP FPs and CPs.
• To support the organization of the national LSSIP process in case of new States/ problems within the State.
2019 LSSIP Working Instructions (4)
2019 LSSIP Event 16
2019
LSS
IP W
orki
ng In
stru
ctio
ns
Production of LSSIP document
• Who does what and when to produce the LSSIP document.• New definitions: Initial draft, In-cycle review, WLA• Modified deadlines:
• 14 February (freezing of DB), 31 March (publication of data).• Cooperation with external organizations
Annex on SESAR Solution implemented on a voluntary way (formerly called “ Orphan SESAR Solutions”) – 14 February
Questionnaire for States Military Organisations on infrastructure – not requested in 2019 (to be updated in next cycle)
• Simplified presentation of the workflow
European ATM Master Plan Level 3 + the LSSIP reporting
2019
LSS
IP W
orki
ng In
stru
ctio
ns2019 LSSIP Working Instructions (5)
2019 LSSIP Working Instructions (6)
2019 LSSIP Event 18
2019
LSS
IP W
orki
ng In
stru
ctio
ns
Determination of Implementation Progress
• How to establish progress for Objectives at all levels (Checkpoint, SLoA, Stakeholder, State)
• Better explanation of Overwritten %• Rewording of the low-key stakeholder and SLoA parts• New in process: Applicability Area determination
2019 LSSIP Working Instructions (7)
2019 LSSIP Event 19
2019
LSS
IP W
orki
ng In
stru
ctio
ns
LSSIP Database User Guide
• Introduction to LSSIP DB• Regular update, better clarification of
certain functionalities
2019 LSSIP Working Instructions (8)
2019 LSSIP Event 20
2019
LSS
IP W
orki
ng In
stru
ctio
ns
LSSIP SharePoint User Guide
• Introduction to LSSIP SharePoint• Regular update
2019 LSSIP Process
2019 LSSIP Event 21
Ways of cooperation
• LSSIP Support Team: [email protected]
• Your CP(s)
• LSSIP Expert Group representatives
European ATM Master Plan Level 3 + the LSSIP reporting 22
Tools – EUROCONTROL Internet Websitehttps://www.eurocontrol.int/
DeliverablesLSSIP Documents (4)
European ATM Master Plan Level 3 + the LSSIP reporting 23
Link: https://www.eurocontrol.int/service/local-single-sky-implementation-monitoring
Level 1 – Implementation Overview – publicly available, printedLevel 2 – Detailed Implementation Status –restricted, not printed, ask FP
European ATM Master Plan Level 3 + the LSSIP reporting 24
Tools – EUROCONTROL Internet Websitehttps://www.eurocontrol.int/master-plan-architecture-and-monitoring
2019 Webinar for NewComers
2019 LSSIP Event 25
It took place on 24 September 2019
Slides with notes are available here: https://ost.eurocontrol.int/sites/lssip/SitePages/Home.aspx?RootFolder=%2Fsites%2Flssip%2FShared%20Documents%2FLSSIP%202019%20Event&FolderCTID=0x0120000FEE2D1D593BA24F83B771DF5D7E6686&View={76214223-BCAB-4718-AA0D-DC62312B6789}
Recorded session with voices (about 1 hour) will be made available during the course of October
Conclusions – 2019 LSSIP cycleWhat’s in it for you?
• The requests of our stakeholders are the driving force for changes,• Improvements in the Template + new U-Space sections,• No change in the methodology,• The burden for the States is reduced to minimal – full support of EUROCONTROL
NM/INF/PAS Team.
26
More during your bilateral meetings with your EUROCONTROL Contact Person
2019 LSSIP Event
Do you have any questions?
Thank you for your attention
272019 LSSIP Event
Top Related