2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template -...

27
Supporting European Aviation 2019 LSSIP Event New in the 2019 LSSIP cycle Martou Véronique – NMD/INF/PAS

Transcript of 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template -...

Page 1: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

Supporting European

Aviation

2019 LSSIP EventNew in the 2019 LSSIP cycle

Martou Véronique – NMD/INF/PAS

Page 2: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

The 2019 LSSIP Process

The LSSIP Webinar for New Comers

What is new in the 2019 LSSIP Working Instructions?

What is new in the 2019 LSSIP Template?

Outline of this presentation

2019 LSSIP Event 2

Conclusions

Page 3: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

What is new in the 2019 LSSIP Template (1)

2019 LSSIP Event 3

• Updated version of cover with flag

Page 4: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

What is new in the 2019 LSSIP Template (2)

2019 LSSIP Event 4

• Updated Table of Contents• Master Plan Level 3 Implementation Report conclusions (previous chapter 3) removed• Numbering all pages from Executive Summary to Full list of Annexes • Key Features and ICAO ASBU visibility in Chapter 5 – Implementation Objectives Progress

Page 5: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

Main deadlines listed on the first page

What is new in the 2019 LSSIP Template (3)

2019 LSSIP Event

Page 6: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

• Executive Summary: more visual and concise (with new icons and logos).

• CP to update the icons when the Traffic and Capacity NM data are available in Chapter 2

What is new in the 2019 LSSIP Template (4)

2019 LSSIP Event

Page 7: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

• FAB logos & name

• CP to delete non applicable logo for the initial draft

What is new in the 2019 LSSIP Template (5)

2019 LSSIP Event

Page 8: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

Chapter 1: National ATM Environment - Static Description of U-space services data to be included in the Annex D.

What is new in the 2019 LSSIP Template (6)

2019 LSSIP Event

Page 9: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

• Renaming of regional projects with Multinational projects and regional cooperation initiatives with Multinational of cooperation initiatives

• Adding New U-space demonstration projects

What is new in the 2019 LSSIP Template (7)

2019 LSSIP Event

Page 10: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

What is new in the 2019 LSSIP Template (8)

Chapter 5 : Implementation Objectives Progress:

• Charts:• State View: Overall Objective Implementation Progress,

National Progress Pie is showing all objectives not only the applicable ones.

• Chart Bars on progression per KF will be only showing applicable and main objectives (not the not applicable or the local ones without FOC). For the full list of objectives, all may refer to the Annex C: Implementation Objectives’ links with SESAR KF, ASBU block or the MPL3

• Separate Sub - Chapters added for Key Feature and ICAO ASBU Implementation Progress, to be more visible (reflected in the Table of Contents).

2019 LSSIP Event

Page 11: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

Full list of Annexes always included, adding a standard text for the empty annexes, not printed and/or not applicable.

A. Specialists involved in the ATM implementation reporting for <State> - LSSIP FPsB. National stakeholders organisation chartsC. Implementation Objectives’ links with SESAR, ICAO and DP D. SESAR Solutions implemented in a voluntary way E. Implementation of U-Space Services F. Questionnaire for States Military Organisations on infrastructureG. Glossary of abbreviations

What is new in the 2019 LSSIP Template (9)

Voluntary publishing EU, + CH, NO

New

not published Every 2 years, not in 2019

2019 LSSIP Event

Page 12: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

What is new in the 2019 LSSIP Template (10)2019 LSSIP Template - Deadlines

2019 LSSIP Event 12

• The pre-filled LSSIP documents (Word) will be delivered to States via LSSIP SharePoint by 5 November 2019

• The Executive summary graphs, Chapter 3 Implementation Projects, Chapter 5 Implementation Objectives Progress (graphs and Objectives) require freezing of the DB on 14 February 2020 and will be updated by CPs ASAP after that date

• The WLA should be reached by 1 March 2020

• The signed document by 31 March 2020 – publication in European ATM Portal (working)

Page 13: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

What is new in the 2019 LSSIPWorking Instructions?

Already available on the LSSIP SharePoint website

2019 LSSIP Event 13

Page 14: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Working Instructions (2)

2019 LSSIP Event 14

2019

LSS

IP W

orki

ng In

stru

ctio

nsLSSIP roles and responsibilities

Production of LSSIP document

Determination of Implementation Progress

LSSIP Database User Guide

LSSIP SharePoint User Guide

Gen

eric

intro

duct

ion

for a

ll ch

apte

rs

Page 15: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Working Instructions (3)

2019 LSSIP Event 15

2019

LSS

IP W

orki

ng In

stru

ctio

nsLSSIP roles and responsibilities

• Developed in cooperation with LSSIP EG on request of the States.

• Describes in details roles and responsibilities of the States, LSSIP FPs and CPs.

• To support the organization of the national LSSIP process in case of new States/ problems within the State.

Page 16: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Working Instructions (4)

2019 LSSIP Event 16

2019

LSS

IP W

orki

ng In

stru

ctio

ns

Production of LSSIP document

• Who does what and when to produce the LSSIP document.• New definitions: Initial draft, In-cycle review, WLA• Modified deadlines:

• 14 February (freezing of DB), 31 March (publication of data).• Cooperation with external organizations

Annex on SESAR Solution implemented on a voluntary way (formerly called “ Orphan SESAR Solutions”) – 14 February

Questionnaire for States Military Organisations on infrastructure – not requested in 2019 (to be updated in next cycle)

• Simplified presentation of the workflow

Page 17: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

European ATM Master Plan Level 3 + the LSSIP reporting

2019

LSS

IP W

orki

ng In

stru

ctio

ns2019 LSSIP Working Instructions (5)

Page 18: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Working Instructions (6)

2019 LSSIP Event 18

2019

LSS

IP W

orki

ng In

stru

ctio

ns

Determination of Implementation Progress

• How to establish progress for Objectives at all levels (Checkpoint, SLoA, Stakeholder, State)

• Better explanation of Overwritten %• Rewording of the low-key stakeholder and SLoA parts• New in process: Applicability Area determination

Page 19: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Working Instructions (7)

2019 LSSIP Event 19

2019

LSS

IP W

orki

ng In

stru

ctio

ns

LSSIP Database User Guide

• Introduction to LSSIP DB• Regular update, better clarification of

certain functionalities

Page 20: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Working Instructions (8)

2019 LSSIP Event 20

2019

LSS

IP W

orki

ng In

stru

ctio

ns

LSSIP SharePoint User Guide

• Introduction to LSSIP SharePoint• Regular update

Page 21: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 LSSIP Process

2019 LSSIP Event 21

Ways of cooperation

• LSSIP Support Team: [email protected]

• Your CP(s)

• LSSIP Expert Group representatives

Page 22: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

European ATM Master Plan Level 3 + the LSSIP reporting 22

Tools – EUROCONTROL Internet Websitehttps://www.eurocontrol.int/

Page 23: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

DeliverablesLSSIP Documents (4)

European ATM Master Plan Level 3 + the LSSIP reporting 23

Link: https://www.eurocontrol.int/service/local-single-sky-implementation-monitoring

Level 1 – Implementation Overview – publicly available, printedLevel 2 – Detailed Implementation Status –restricted, not printed, ask FP

Page 24: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

European ATM Master Plan Level 3 + the LSSIP reporting 24

Tools – EUROCONTROL Internet Websitehttps://www.eurocontrol.int/master-plan-architecture-and-monitoring

Page 25: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

2019 Webinar for NewComers

2019 LSSIP Event 25

It took place on 24 September 2019

Slides with notes are available here: https://ost.eurocontrol.int/sites/lssip/SitePages/Home.aspx?RootFolder=%2Fsites%2Flssip%2FShared%20Documents%2FLSSIP%202019%20Event&FolderCTID=0x0120000FEE2D1D593BA24F83B771DF5D7E6686&View={76214223-BCAB-4718-AA0D-DC62312B6789}

Recorded session with voices (about 1 hour) will be made available during the course of October

Page 26: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

Conclusions – 2019 LSSIP cycleWhat’s in it for you?

• The requests of our stakeholders are the driving force for changes,• Improvements in the Template + new U-Space sections,• No change in the methodology,• The burden for the States is reduced to minimal – full support of EUROCONTROL

NM/INF/PAS Team.

26

More during your bilateral meetings with your EUROCONTROL Contact Person

2019 LSSIP Event

Page 27: 2019 LSSIP Event - Eurocontrol · What is new in the 2019 LSSIP Template (10) 2019 LSSIP Template - Deadlines. 2019 LSSIP Event 12 • The pre-filled LSSIP documents (Word) will be

Do you have any questions?

Thank you for your attention

272019 LSSIP Event