ZPC – Power and Energy Projects
description
Transcript of ZPC – Power and Energy Projects
ZPC – POWER AND ENERGY PROJECTS
PRESENTED BY: DOUGLAS CHINGOKAZIMBABWE POWER COMPANY
OverviewElectricity is a crucial input into the industry’s production
cycle.Zimbabwe is plagued by a shortage of power.Reliable capacity is of the order of 1320 MW against a
demand of about 2200 MW.There is need for investments to be made in order to increase
the amount of reliable capacity.The increase in reliable capacity should be made available at a
competitive price.
Current Electricity Industry Structure
Ministry of Energy and Power Development
(MOEPD)
Zimbabwe Energy Regulatory Authority
(ZERA)
ZESA HoldingsRural
Electrification Agency (REA)
Zimbabwe Power Company
(ZPC)
Zimbabwe Electricity
Transmission and Distribution
Company (ZETDC)
POWERTELZESA
Enterprises (ZENT)
Proposed Electricity Industry StructureZERA
REGULATION
COMPACT MINISTRY OF ENERGY POLICY & PLANNING
National Grid
Services Company
ZPC
Licenses
IPPs
Bulk Supply Customers
ZEDCDistributor
1
Distributor 2
Distributor N
ZEDCRetailer 1
Retailer 2
Retailer 3
Retailer N
Power Supply Balance: Jan – Aug, 2013
Hwange28.67%
Kariba37.28%
Harare0.46%
Munyati1.44%
Bulawayo1.24%Imports
13.22%Shortfall17.69%
Power Supply Balance: Jan - Aug, 2013
Daily Load Profile
6
Jan Feb Mar Apr May Jun Jul Aug0
500
1000
1500
2000
2500
Strategy and Performance, Jan - Aug, 2013
Maximum Demand
Installed Capacity
Average Capacity
Pow
er (M
W) Gap A
Gap B
Gap C
Zimbabwe has vast energy sources at its disposal to increase the generation capacity. The increase in capacity has to be done at an affordable price. These include:
Coal – thermal power stations
Coal bed methane – thermal power stations
Hydropower
Solar energy
Action Plans
8
Power Generation Projects PROJECT DESCRIPTION COST (in
USD millions)STATUS ESTIMATED
CONSTRUCTION PERIOD
Kariba South Extension
2 x 150 MW generating units, adding to existing Kariba South Power Station.
400 Design review in progress in parallel with financial close processes.
40 months
Hwange Expansion Construction of 2 x 300 MW generating units at Hwange.
1,300 Technical and Funding negotiations with CMEC.
42 months
Gairezi Hydro-Power 2 x 15 MW generating units, on the Gairezi River.
105 Geotechnical investigations in progress.
30 months
Power Generation Projects PROJECT DESCRIPTION COST (in
USD millions)STATUS ESTIMATED
CONSTRUCTION PERIOD
Hwange Life Extension
Investigations of the plant and implementation of the project.
500 Completed phase 1 of stage 1 ECORAM study.
5 years
Deka Pipeline Upgrade
Upgradation of the existing infrastructure and construction of a second pipeline.
28.6 Appointment of project consultant in tendering stage.
18 months
Harare Repowering
Boiler replacement with CFBC equipment.
85 Going through the tendering process for an EPC contractor.
24 months
Munyati Repowering
Boiler replacement with CFBC equipment.
90 Draft Request For Quotation stage.
24 months
Power Generation Projects PROJECT DESCRIPTION COST (in USD
millions)STATUS ESTIMATED
CONSTRUCTION PERIOD
Bulawayo Repowering
Boiler replacement with CFBC equipment.
90 Draft RFQ stage. 24 months
Solar 3 x 100 MW (Gwanda, Plumtree, Munyati), 2 MW (Zvishavane).
400 Tendering for partner to develop 100 MW in progress.
9 months
Coal Bed Methane CBM gas fired power plant projects.
580 Application for special grants in progress.
36 months
Batoka Gorge 4 x 200 MW generating units, along the Zambezi River.
2200 Bids for review of ESIA and Engineering feasibility studies. received,
6 years
Projects Supply / Demand Curve
201020122014201620182020202220242026202820302032203420362038204020422044204620482050
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
TOTAL
Forecast MD
Ene
rgy
(GW
h)
THANK YOU!