ZPC – Power and Energy Projects

13
ZPC – POWER AND ENERGY PROJECTS PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY

description

ZPC – Power and Energy Projects. PRESENTED BY: DOUGLAS CHINGOKA ZIMBABWE POWER COMPANY. Overview. Electricity is a crucial input into the industry’s production cycle. Zimbabwe is plagued by a shortage of power. Reliable capacity is of the order of 1320 MW against a demand of about 2200 MW. - PowerPoint PPT Presentation

Transcript of ZPC – Power and Energy Projects

Page 1: ZPC – Power and Energy Projects

ZPC – POWER AND ENERGY PROJECTS

PRESENTED BY: DOUGLAS CHINGOKAZIMBABWE POWER COMPANY

Page 2: ZPC – Power and Energy Projects

OverviewElectricity is a crucial input into the industry’s production

cycle.Zimbabwe is plagued by a shortage of power.Reliable capacity is of the order of 1320 MW against a

demand of about 2200 MW.There is need for investments to be made in order to increase

the amount of reliable capacity.The increase in reliable capacity should be made available at a

competitive price.

Page 3: ZPC – Power and Energy Projects

Current Electricity Industry Structure

Ministry of Energy and Power Development

(MOEPD)

Zimbabwe Energy Regulatory Authority

(ZERA)

ZESA HoldingsRural

Electrification Agency (REA)

Zimbabwe Power Company

(ZPC)

Zimbabwe Electricity

Transmission and Distribution

Company (ZETDC)

POWERTELZESA

Enterprises (ZENT)

Page 4: ZPC – Power and Energy Projects

Proposed Electricity Industry StructureZERA

REGULATION

COMPACT MINISTRY OF ENERGY POLICY & PLANNING

National Grid

Services Company

ZPC

Licenses

IPPs

Bulk Supply Customers

ZEDCDistributor

1

Distributor 2

Distributor N

ZEDCRetailer 1

Retailer 2

Retailer 3

Retailer N

Page 5: ZPC – Power and Energy Projects

Power Supply Balance: Jan – Aug, 2013

Hwange28.67%

Kariba37.28%

Harare0.46%

Munyati1.44%

Bulawayo1.24%Imports

13.22%Shortfall17.69%

Power Supply Balance: Jan - Aug, 2013

Page 6: ZPC – Power and Energy Projects

Daily Load Profile

6

Page 7: ZPC – Power and Energy Projects

Jan Feb Mar Apr May Jun Jul Aug0

500

1000

1500

2000

2500

Strategy and Performance, Jan - Aug, 2013

Maximum Demand

Installed Capacity

Average Capacity

Pow

er (M

W) Gap A

Gap B

Gap C

Page 8: ZPC – Power and Energy Projects

Zimbabwe has vast energy sources at its disposal to increase the generation capacity. The increase in capacity has to be done at an affordable price. These include:

Coal – thermal power stations

Coal bed methane – thermal power stations

Hydropower

Solar energy

Action Plans

8

Page 9: ZPC – Power and Energy Projects

Power Generation Projects PROJECT DESCRIPTION COST (in

USD millions)STATUS ESTIMATED

CONSTRUCTION PERIOD

Kariba South Extension

2 x 150 MW generating units, adding to existing Kariba South Power Station. 

400 Design review in progress in parallel with financial close processes.

40 months

Hwange Expansion Construction of 2 x 300 MW generating units at Hwange.

1,300 Technical and Funding negotiations with CMEC.

42 months

Gairezi Hydro-Power 2 x 15 MW generating units, on the Gairezi River.

105 Geotechnical investigations in progress.

30 months

Page 10: ZPC – Power and Energy Projects

Power Generation Projects PROJECT DESCRIPTION COST (in

USD millions)STATUS ESTIMATED

CONSTRUCTION PERIOD

Hwange Life Extension

Investigations of the plant and implementation of the project.

500 Completed phase 1 of stage 1 ECORAM study.

5 years

Deka Pipeline Upgrade

Upgradation of the existing infrastructure and construction of a second pipeline.

28.6 Appointment of project consultant in tendering stage.

18 months

Harare Repowering

Boiler replacement with CFBC equipment.

85  Going through the tendering process for an EPC contractor.

24 months

Munyati Repowering

Boiler replacement with CFBC equipment.

90  Draft Request For Quotation stage.

24 months

Page 11: ZPC – Power and Energy Projects

Power Generation Projects PROJECT DESCRIPTION COST (in USD

millions)STATUS ESTIMATED

CONSTRUCTION PERIOD

Bulawayo Repowering

 Boiler replacement with CFBC equipment.

90  Draft RFQ stage. 24 months

Solar 3 x 100 MW (Gwanda, Plumtree, Munyati), 2 MW (Zvishavane).

400 Tendering for partner to develop 100 MW in progress.

9 months

Coal Bed Methane  CBM gas fired power plant projects.

580  Application for special grants in progress.

36 months

Batoka Gorge 4 x 200 MW generating units, along the Zambezi River.

2200  Bids for review of ESIA and Engineering feasibility studies. received,

6 years

Page 12: ZPC – Power and Energy Projects

Projects Supply / Demand Curve

201020122014201620182020202220242026202820302032203420362038204020422044204620482050

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

TOTAL

Forecast MD

Ene

rgy

(GW

h)

Page 13: ZPC – Power and Energy Projects

THANK YOU!