Yang Mao TSSR
-
Upload
vu-thai-chi -
Category
Documents
-
view
247 -
download
1
Transcript of Yang Mao TSSR
-
8/3/2019 Yang Mao TSSR
1/10
Site ID / M s trm:
Site Name/Tn trm Yang MaoSite Type/Cu hnh Indoor
Longitude / Kinh :Latitude / V :
Region / Vng: Krong Bng
Province / Tnh: c LcSite Address / a ch:
Site manager / Q.L trm: A.Cng
Tel: 0913411487
Accepted byZTE Coporation Qun l Mng Tnh Phng K thut Khai thc, VMS3
Name: Name: Name:
Date: Date: Date:
TECHNICAL SITE SURVEY REPORT/BIN BN KHO ST TRM
VMS Uni-RAN Project
Split Site
BVH x Yang Mao, Krong Bng, c Lc
108.568411
12.453199
-
8/3/2019 Yang Mao TSSR
2/10
CONTENT
A. SITE & EQUIPMENT INFORMATION
1. SITE LOCATION / A IM TRM
2. SURVEYORS INFORMATION / THNG TIN V NHM KHO ST
3. SITE INFORMATION / THNG TIN V TRM
4. SITE ACCESS INFORMATION / THNG TIN VO TRM
5. SITE EXISTING INFORMATION
B. NEW EQUIPMENT
NEW EQUIPMENT INFORMATION / THNG TIN V THIT B MI
C. PHOTOS
Existing Site View (Attachment "A") - nh chp a im (Ph lc "A")
Panoramic View (Attachment "B") - nh chp ton cnh (Ph lc "B")
Photoes for Power and Equipment room (Attachment "C") - nh chp ca ngun v phng thit b ( Ph lc "C")
Photoes for Other Survey Details (Attachment "D") - nh chp cc chi tit kho st khc (Ph lc "D")
D. Survey Memorandum
-
8/3/2019 Yang Mao TSSR
3/10
A. SITE & EQUIPMENT INFORMATION
1. SITE LOCATION / A IM TRM
Site ID/ M s trm: 0 Longitude / Kinh :
Region/ Vng: Krong Bng Latitude / V :
Province/ Tnh: c Lc Altitude /Cao so mc n
Site Address/ a ch:
Site manager/ Q.L trm: A.Cng Tel: 0913411487
2. SURVEYORS INFORMATION / THNG TIN V NHM KHO ST
3. SITE INFORMATION / THNG TIN V TRM
Inbuiding
VMSLocal
Rooftop / Mi nh
Equip.room floor no/ Tng th
Greenfield / Mt t
Rooftop / Mi nh
Tower.location floor no/ Tng th
Greenfield / Mt t
Tower foundation column above Grounding Level. /Cao mng thp so vi
Tower height /Chiu cao thp
Total structure height /Tng chiu cao (From ground to top of the tower /T
From /T 0m To /n 42 m From /T
From /T To /n From /T
Note /Ghi ch: From bottom of tower leg /T y chn thp
4. SITE ACCESS INFORMATION / THNG TIN VO TRM
How to entry to the site by Car
Need Key /Cn cha kha vo phng XHH
Parking space available /Khng gian trng
Equipment delivery method /Cch thc nhn thit b
5. SITE EXISTING INFORMATION
2G Transmission cable Optical fiber HDSL cable
Total E1 Qty / Tng s lng E1 : Enough Spare E1 port (Y/
Participant Name / Tn thnh vin
Site Access Information /
Thng tin vo trm
Comments / Ghi ch
V Thi Ch
Company/ Cng ty Cell Phone
Mobitechs
Property type / c imt t trm
Structure Height / Chiucao cng trnh
Equipment room location
and type / V tr phngthit b v loi
BVH x Yang Mao, Krong Bng, c Lc
Nhn vin k thut 91674
Function / Chc nng
Tower type / Loi thp
Site Key / Cha kha votrm
Space availability on the
tower / Khong trng trnthp
Other / Vn khc
Transmission / Truyndn
Comments / Ghi ch
-
8/3/2019 Yang Mao TSSR
4/10
B. NEW EQUIPMENT
NEW EQUIPMENT INFORMATION / THNG TIN V THIT B MI
Ericsson
Alcatel
GSM900: DCS1800:
Power
Votage
type:
-48V
Jum
conn
type
2G BTS Installation Position Indoor outd
Need Install swap site power Yes No Remark:
Old BAT New Power in
Alarm cable length: 6 m diameter: 16 mm^2
AC cable / Chiu di cp AC
New DC cable BTS-Rectifier(2 cables) / Chiu di cp cho BTS/NodeB-Retifier (2 ca
New power groud cable
New battery groud cable
New Indoor Grounding Bar (I.G.B.) Qty. / S lng bng ng mi
GND cable length from new I.G.B. to existing outdoor G.B. /Cp tip a t bng n
New Tower Grounding Bar (O.G.B.) Qty. / S lng bng ng mi
GND cable length from new Tower G.B. to existing outdoor G.B. /Cp tip a t b
GND cable length from BTS to G.B. :
Qty : 1 Type : 35mm2 Len
Transmission cable type /Loi cp cho truyn dn : E1
Transmission cable length /Chiu di cp truyn dn : 6m
Transmission cable connector /Lin kt truyn dn : DDF
BTS installation feeder length (BTS to Antenna) /Chiu di lp t cp Feeder (BTS Cell1 52 m Feeder type: 1/2"
Cell2 52 m Feeder type: 1/2"
Cell3 52 m Feeder type: 1/2"
installation Jumper length (BTS-Feeder) installation Jumper
Cell1 3.5m Jumper type: 1/2" Cell1
Cell2 3.5m Jumper type: 1/2" Cell2
Cell3 3.5m Jumper type: 1/2" Cell3
connector type:_______ connector type:____
indoor: 9 m width: 400 mm ou
New feeder window 1 set PVC
New 7/8 feeder connectors: 12 pcs
Ohters new add materiral :
New 2G
Ant.Pole length Frequency Ant. Height An
B
Cell1 3m 900 34Cell2 3m 900 34
Cell3 3m 900 34
Power supply New Battery position New positon
NSN_Flex
BTS&ConfigMain device
Site Type
Huawei 3900
Band 900
m for indo
Jumper cable
Grounding / Tip a
Transmission
Feeder cable / Cpfeeder
Comments
Power Cable/ CpNgun in
ZTE suggestion /xut ZTE
Ant. Model
Single band
Single band
Single band
Installation Material
New Cable ladder
-
8/3/2019 Yang Mao TSSR
5/10
C. PHOTOS
Site ID
M TrmPicture Site Location A (Front View)
V tr trm A (mt trc)Tower View A
T
Existing Site View (Attachment "A") - nh chp a im (Ph lc "A")
Site ID
M TrmPicture Site Location A (Front View)
V tr trm A (mt trc)Tower View A
Picture Tower View A (Antennas on tower)
Cc ng ten treo trn thpCable Ladder on Tower (Show feeder line)
Thang cp trn thpCable Bridge to
Cu c
Cable Ladder on Tower (Show feeder line)
Thang cp trn thp
Cable Bridge to B
Cu cp
Feeder entry (Show Feeder entry position)
V tr l cu cpCable Bridge to BTS Room (Show Feeder line)
ng cp chyPicture Propose
Feeder entry (Show Feeder entry position)
V tr l cu cpPicture Propose p
xut v tr
Anttena direction sugesstion - Hng xut anten
Picture Propose position for Antenna Sector 1
V tr xut ng ten 1Picture Propose position for Antenna Sector 2
V tr xut ng ten 2Picture Propose
V tr
Yang Mao
-
8/3/2019 Yang Mao TSSR
6/10
Hng pht anten 1Hng pht do i kho st xut
Hng pht anten 2Hng pht do i kho st xut
HngHng pht do
-
8/3/2019 Yang Mao TSSR
7/10
View of 3300 View of 00
Panorama View (Attachment "B") - nh chp ton cnh (Ph lc "B")
View of 3300 View of 00
View of 3000
View of 3000
0
View of 2700
View of 2700
View of 2400
View of 2100 View of 1800
View of 2100 View of 1800
-
8/3/2019 Yang Mao TSSR
8/10
Photoes for Power and Equipment room (Attachment "C") -nh chp ca ngun v phng thit b ( Ph lc "C")
External View of BTS Room or shelter location
Bn ngoi phng thit bInternal View of BTS Room (Photo 1)
Bn trong phng BTS (nh 1)Internal V
Bn tr
External View of BTS Room or shelter location
Bn ngoi phng thit bInternal View of BTS Room (Photo 1)
Bn trong phng BTS (nh 1)Internal
Bn
Picture indoor ladder (Photo 1)
Cu cp trong phng thit b (nh 1)Picture indoor ladder (Photo 2)
Cu cp trong phng thit b (nh 2)Pictu
Cu c
Picture indoor ladder (Photo 1)
Cu cp trong phng thit b (nh 1)Picture indoor ladder (Photo 2)
Cu cp trong phng thit b (nh 2)Picture
Cu cp t
Internal View of BTS Room
(Grounding Bar)
Bn trong phng BTS (nh 3)
Internal View of BTS Room
(DC breaker)
Bn trong phng BTS (nh 4)
Int
Bn
Internal View of BTS Room
(Grounding Bar)
Bn trong phng BTS (nh 3)
Picture Propose position for FEPIf need Picture Propose position for DDF Picture P
Picture Propose position for FEP If needHnh chp xut l feeder (nu c)
Picture Pro
Hnh v
-
8/3/2019 Yang Mao TSSR
9/10
View earthing bar TOP View earthing bar Middle View e
Picture Propose position for BTS/BBU Picture Propose position for Rectifier Picture Propose
Picture Propose position for BS8800/BBU
xut v tr cho t BS8800/ BBUPicture Propose position for Rectifier
xut v tr cho t ngunPicture Propose
xut v tr
Photoes for Other Survey Details (Attachment "D") -nh chp cc chi tit kho st khc (Ph lc "D")
View earthing bar TOP
Hnh chp tip a trn ctView earthing bar Middle
Hnh chp tip a im un/ gia ctView ea
Hnh chp tip a
Existing Feeder Window Hole Existing rectifier Ex
Existing rectifier
H thng t ngun hin hu
Exis
Hnh t phn Chp chi ti
Existing battery System ( Face ) View BTS equipmentInternal View
Bn trong
Existing battery System ( Face )
Hnh h thng t/ gin Bnh,chp thm chi tit 1 nhn
View BTS equipment
Mt trc t BTS hin huExistin
-
8/3/2019 Yang Mao TSSR
10/10
Survey Memorandum
Date:
Date:
Date:
VMS4 comments
Note: This survey report provides the basic data for equipment commissioning, and shall
not be modified once confirmed by 3 parties. If the user needs to modify the data due to
special reasons, contact the local office of ZTE in time. ZTE shall not be responsible for the
delay in project implementation due to the modification of the survey results required by the
user/ Bn kho st ny bao gm nhng thng tin c bn gip ch cho vic bt trm, khng
th thay i khi khng c s thng nht ca 3 bn. Khi cn thay i hoc chnh sa, vuilng lin h ZTE. Trng hp thay i, nu c nh hng lm chm tr trong vic trinkhai d n, ZTE s khng chu trch nhim.
ZTEs comments
Local VMS comments