Workshop - Challenges in Offshore Geotechnics - Gulin T ...

25
Geotechnical considerations throughout the entire project life cycle : from perception to execution Gülin Yetginer, Equinor Leading Advisor Geotechnics

Transcript of Workshop - Challenges in Offshore Geotechnics - Gulin T ...

Geotechnica l considera tions throughout the entire project lifecycle : from perception to executionGülin Yetginer, Equinor Leading Advisor Geotechnics

Open 25 September 20 19

Equinor: sha ping the future of energy«We a im to be the world's most ca rbon-efficient oil a nd ga s producer, a nd a re investing a ctive ly in renewa bles.»

Turning na tura l resources into energy for people a nd progress for society

3 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Explora tionDevelopment a nd productionRefining a nd processingMa rketing a nd tra ding

Ca na da

Mexico

Colombia

Argentina

USA

Nica ra gua

Ba ha ma s

Surina meVenezue la

Bra zil

Russia

China

Austra lia

Algeria

UKIre la nd

Greenla nd

Norwa y

Denma rk

Belgium

Netherla ndsGerma ny

Turkey Azerba ija n

UAE

Nigeria

Ta nza niaAngola

South AfricaUrugua y

Libya

South Korea

Indonesia

New Zea la nd

Singa pore

Opera tor of a sse tsJ oint venturePresence

Open 25 September 20 19

How ca n we ensure tha t considera tions do not become cha llenges?

cha llenge = unidentified risk

4 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 195 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 196 | Geotechnica l considera tions throughout the entire project lifecycle: from perception to execution

Open 25 September 20 19

Project Lifecycle : «The Ca pita l Va lue Process»

7 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

EngineeringEa rly Pha se

Prospect

Open 25 September 20 19

• “Memory”: the soil response depends on the geologica l a nd ma n-ma de pa st (ha s it been loa ded before? decrea sed porosity a nd wa ter content)

• “Mood”: the soil response depends on how we trea t it a nd loa d it (how much dra ina ge is expected)

• “Temper”: it is possible to trigger a n unexpected fa ilure if the bigger picture is not well understood (regiona l geology)

• Importa nt to perform a good qua lity soil investiga tion to a ssess the a bove a nd construct a ground model tha t presents the comple te picture

Ea rly Pha se : Understa nding the Soil

8 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Ea rly Pha se : Geoha za rds

• Pore pressure modelling• Slope sta bility• Sha llow ga s a nd other drilling ha za rds• Ea rthqua kes

9 | Geotechnica l considera tions throughout the entire project lifecycle: from perception to execution

Open 25 September 20 19

Desktop Study

• Informa tion sourcestypica lly a va ila ble during the desktop study pha sefor a new projectdevelopment in a ma turea rea (e .g. North Sea ):

• Geologica l se tting• Prelimina ry

geophysica linforma tion

• Geotechnica linforma tion from thela rger developmenta rea

• Insta lla tion experience

10 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Desktop Study

• Informa tion sourcestypica lly a va ila ble during the desktop study pha sefor a new projectdevelopment in a newa rea (e .g. Ta nza nia ):

• Geologica l se tting• Prelimina ry

geophysica linforma tion

11 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Ea rly Pha se : Soil Investiga tion Scope of Work Definition

12 | Geotechnica l considera tions throughout the entire project lifecycle: from perception to execution

“The scope of work for the ABC Development Area soil investigation consists of:• A detailed soil investigation at TEMPLATE X where geotechnical

information is required for foundation design purposes• Optional soil investigation at an additional template location • Optional soil investigation for an UnMannedWellhead Platform• Pipeline routes between the new template locations and existing

infrastructure to determine pipe soil interaction properties and to assess trenchability”

Open 25 September 20 19

Ea rly Pha se (a nd beyond): Opera tions

• Selection of geotechnica l drilling equipment: • Remoteness• Wa ter depth• Expected soil conditions• Potentia l geoha za rds

• Design a nd se lection of founda tion concept• All of the a bove• Insta lla tion / penetra tion

13 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Ea rly Pha se : Soil Investiga tion Cha llenges / La b Testing Considera tions

Tjelta , T.I. & Yetginer, A.G. 20 10 . Luva deepwater site investigation programme and findings. Proc. 2nd ISFOG.

14 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Ea rly Pha se : La b Testing

Worldwide Offshore Database Dogger Bank

15 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Loss of memory

Open 25 September 20 19

Engineering: Na tura l Va ria bility

10 0 9-1 10 0 9-1A Dista nce: 3m

16 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Engineering: Na tura l Va ria bility

• Da ta from boreholes kilometers a pa rt in a comple te ly different geologica l se tting

17 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Pla nned scope of work for the development a rea

A Moving Ta rge t?

18 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Fa cilities la yout upda ted oncethe subsurfa ce informa tion is further ma tured

Open 25 September 20 19

Execution: Wha t you see is not wha t you get!

19 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Wha t you see is not wha t you get!

• Na tura l e rosion of the sea bed due to scour

20 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 1921 | Geotechnica l considera tions throughout the entire project lifecycle: from perception to execution

Open 25 September 20 19

Wha t you see is not wha t you get!

• Ma nma de erosion of the sea bed due to drilling

22 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

Wha t you see is not wha t you get!

• Ma nma de erosion of the sea bed due to drilling

23 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

ISO 13628-15:20 11 Subsea Structures a nd Ma nifolds

24 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

Open 25 September 20 19

There is however one considera tion which will a lwa ys rema in a cha llenge…

25 | Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution

© Equinor ASAThis presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, is owned by Equinor. Copyright to a ll ma teria l including, but not limited to, written ma teria l, photogra phs, dra wings, ima ges, ta bles a nd da ta rema ins the property of Equinor. All rights reserved. Any other use , reproduction, tra nsla tion, a da ption, a rra ngement, a ltera tion, distribution or stora ge of this presenta tion, in whole or in pa rt, without the prior written permission of Equinor is prohibited. The informa tion conta ined in this presenta tion ma y not be a ccura te , up to da te or a pplica ble to the circumsta nces of a ny pa rticula r ca se , despite our efforts. Equinor ca nnot a ccept a ny lia bility for a ny ina ccura cies or omissions.

Gülin Yetginer, Equinor Lea ding Advisor Geotechnics

Geotechnica l considera tions throughout the entire project lifecycle : from perception to execution