    1/35

    SpECThis Technology report is an insight into the latest technologies availableand which could be further explored and adopted for the prestigiousWorld Outlet Mall concept being planned by TIME Machine Group

    Technology Report - MEP

  • 8/13/2019 WOM Technology Report - Rev1 290813

    2/35

    Specialised Engineering Consultants WOM !

    Client

    Consultants:

    Technology Report - MEP 2

    B.E.S.T

  • 8/13/2019 WOM Technology Report - Rev1 290813

    3/35

    Specialised Engineering Consultants WOM "

    INDEX

    1.INTRODUCTION:................................................................................................................4

    THEFOLLOWINGAREASARECOVEREDASPARTOFTHISREPORT:.......................................4

    2.SOLARPOWERANDBUILDINGINTEGRATEDPHOTOVOLTAICCELLS(BIPV) ..................42.1PROPOSED SOLUTIONS.................................................................................................7

    2.2ESTIMATED ECONOMIC ASSESSMENT....................................................................8

    3.WASTETOENERG:...............................................................................................................8

    11

    3.LIGHTINGDESIGNCONCEPT.................................................................................................11

    A.LATESTTECHNOLOGANDSTANDARDSUSEDFOROFFICELIGHTING:............................14

    B. INTERIORLIGHTINGPOWERALLOWANCE(ILPA)..........................................................1!

    C.LIGHTINGCONTROLSSTEM..............................................................................................1!

    I.CONTROLPHILOSOPH:.......................................................................................................1!

    4.IT SSTEMFORVOICE"DATA"INTERNET............................................................................17

    A.FO CHARACTERISTICS:........................................................................................................17

    B.CHARACTERISTICS OFCAT#7A CABLEISASFOLLOWS:.....................................................17C.PERFORMANCECOMPARISONCHARTFORCOPPERCABLES:.............................................18

    D.PAIRBASEDDISTRIBUTION...................................................................................................1$

    E.TRENDSINDATACENTERANDIT.........................................................................................2%

    21

    F.WIRELESSACCESSPOINTS# WAP......................................................................................22

    &.E'TRALOWVOLTAGE(ELV) SSTEM..............................................................................22

    THEFOLLOWINGELV SSTEMSAREPROPOSEDFORTHEPROECT:..................................24

    WIDEAREANETWORSCHEMATICTOE'PLAINCONNECTIONBETWEENBUILDINGS:.....2&

    A.PUBLICADDRESSSSTEM(PAS)"BGM SSTEM...............................................................2&

    B.SECURITSSTEM................................................................................................................27

    I.REMOTESURVEILLANCE(CCTV) SSTEM.........................................................................27

    II.INTEGRATEDCCTV * ACCESSCONTROLSSTEM...........................................................28

    III.REMOTESURVEILLANCE(CCTV) SSTEM.......................................................................2$

    C.BUILDINGMANAGEMENTSSTEM......................................................................................2$

    D.SMATV SSTEM...................................................................................................................3%

    !.UNINTERRUPTEDPOWERSUPPL(UPS)............................................................................31

    7.LOADANALSIS# POWER....................................................................................................32

    8.LOADANALSIS# HVAC.....................................................................................................33

    $.HVAC SSTEMS...................................................................................................................34

    1%.PLUMBINGANDDRAINAGESSTEMS.................................................................................3&

    Technology Report - MEP 3

  • 8/13/2019 WOM Technology Report - Rev1 290813

    4/35

    Specialised Engineering Consultants WOM #

    $ INTRODUCTION%

    This Technology report is an insight into the latest technologies available and whichcould be further explored and adopted for the prestigious World Outlet Mall concept

    being planned by TIME Machine Group

    The following areas are covered as part of this report%

    $ &olar power and 'I()* 'uilding Integrated photo voltaic cells

    ! (ower Generation fro+ waste fro+ the Mall ,ood Outlets

    " -E. -ighting

    # Media Interactive fa/ade

    0 IT Technologies $1Gigabit connectivity to des2top3 4onverged technology for building services including 'M&* +etering* lighting

    control* 44T) and access control* I(T) etc

    5 Interior lighting load allowance as per 6&786E

    9 -atest technologies used in chilled water generation

    : -atest technologies used for drainage syste+s

    . Solar po!er and Building Integrated p"oto #oltaic cells $BI%&'

    This report briefly explains the 'I() syste+* which could be used for the

    pro;ect in line with client

  • 8/13/2019 WOM Technology Report - Rev1 290813

    5/35

    Specialised Engineering Consultants WOM 0

    The integration of the photovoltaic technology could ta2e place in the shading roof or

    a broad way to wal2 fro+ one building to others* creating an open co++on space

    6rea &tate+ents%

    Technology Report - MEP 5

  • 8/13/2019 WOM Technology Report - Rev1 290813

    6/35

    Specialised Engineering Consultants WOM 3

    The pro;ect is supposed to be built on a total '>6 of !!1111+! area excluding the

    par2ing ?one in base+ents &uch a high +agnitude of develop+ent re=uires green

    building concepts i+ple+ented as part of the architecture itself to reduce

    energy consu+ption of buildings and to provide inhabitant

  • 8/13/2019 WOM Technology Report - Rev1 290813

    7/35

    Specialised Engineering Consultants WOM 5

    The 'I() syste+ can be $11A custo+i?ed in order to co+ply with the pro;ect

    re=uire+ents* 2eeping the initial aesthetical and functional architect

  • 8/13/2019 WOM Technology Report - Rev1 290813

    8/35

    Specialised Engineering Consultants WOM 9

    0degree tilt option:

    Coplanar S 1) lig "t option:

    . ESTIM2TED ECONOMIC 2SSESSMENT

    The cost of 'I() integration was not a feasible scenario 3 years ago Over the

    period of ti+e there has been substantial reduction in cost and the prices have

    co+e down drastically .own the line the trend is further reduction* which will

    put together the invest+ent attractive

    3. Waste to Energ):

    Technology Report - MEP 8

  • 8/13/2019 WOM Technology Report - Rev1 290813

    9/35

    Specialised Engineering Consultants WOM :

    Technology Report - MEP 9

  • 8/13/2019 WOM Technology Report - Rev1 290813

    10/35

    Specialised Engineering Consultants WOM $1

    Technology Report - MEP 10

  • 8/13/2019 WOM Technology Report - Rev1 290813

    11/35

    Specialised Engineering Consultants WOM $$

    3. ig"ting design concept

    The -E. technology has i+proved a lot and there are lots of products available now

    which could be used in areas li2e corridors* external areas* landscaping* par2ing and

    for decorative purposes &o+e of the pictures are shown below for

    illustration@exa+ples%

    Technology Report - MEP 11

  • 8/13/2019 WOM Technology Report - Rev1 290813

    12/35

    Specialised Engineering Consultants WOM $!

    -E. -ighting

    -E. 4ove -ighting

    Technology Report - MEP 12

  • 8/13/2019 WOM Technology Report - Rev1 290813

    13/35

    Specialised Engineering Consultants WOM $"

    4ar (ar2ing with .ischarged -a+p 4ar (ar2ing with -E. -a+p

    #1A -ess (ower

    Technology Report - MEP 13

  • 8/13/2019 WOM Technology Report - Rev1 290813

    14/35

    Specialised Engineering Consultants WOM $#

    a. atest tec"nolog) and standards used ,or o,,ice lig"ting:

    In,or+ation purpose:

    The latest technology used for office lighting is based on the re=uire+ent as per

    4I'&E -G5 type 6s per the new standards ceiling shall have $01 lux* walls shall

    have !11 to !01 lux and wor2top shall have "01 to 011 lux

    Technology Report - MEP 14

  • 8/13/2019 WOM Technology Report - Rev1 290813

    15/35

    Specialised Engineering Consultants WOM $0

    Technology Report - MEP 15

  • 8/13/2019 WOM Technology Report - Rev1 290813

    16/35

    Specialised Engineering Consultants WOM $3

    b Interior ig"ting %o!er 2llo!ance $I%2'

    The lighting power allowance is based on 6&786E :1$ B-EE. re=uire+entsC* using

    building area +ethods as follows%

    Office D $$9 W@+! 011-ux

    (ar2ing garage D !$ W@+! 01-ux* .rive way $11-ux,ood preparation D $!:1 W@+! 011 to $111-ux

    Electrical roo+s D $3$# W@+! "11-ux

    Mechanical roo+s D $3$# W@+! !11-ux

    &hopping Mall D $! W@+! 011-ux

    &tairs D 3#3 W@+!

    &torage D "!" W@+!to 93 W@+!

    ,ood 4ourt D $#11 W@+!

    &ervice area D $011 W@+!

    -obby D $!11 W@+!

    c. ig"ting Control S)ste+

    Intelligent -ighting 4ontrol &yste+ BEi'@-OFC based on +otion and day light sensors*

    ti+ers* light level sensors and override switches shall be provided to control all public

    area lights 4o+plete syste+ shall be controlled and progra++ed through a (4

    &tandalone sensors can also be considered for certain areas to achieve energy

    efficient lighting control 2eeping the installation cost reasonable

    i. Control %"ilosop"):

    -ift lobbies* circulation areas and corridors* bac2 of house@front of house and

    car par2ing%

    01 01A light control by lighting control syste+* +otion sensors If solar

    syste+ is used the lights can be operated using solar power during dayti+e

    and hence saving in power

    4ar par2ing lighting control is based on ti+e* +otion sensors

    -andscape areas lighting control is based on ti+e and external lighting level

    Elevation lighting control is based on ti+e and external lighting level

    -ighting control syste+ shall be integrated with 'M& for central control

    Technology Report - MEP 16

  • 8/13/2019 WOM Technology Report - Rev1 290813

    17/35

    Specialised Engineering Consultants WOM $5

    4. IT s)ste+ ,or &oice5Data5Internet

    T"e latest tec"nolog) of -06iga(it connecti#it) to des2 top will be provided by

    using 4atD56 hori?ontal cabling and 01@$!0 +icron OM3 -0 6iga(it 7i(re opticca(les 0005800as bac2 bone to each #!> cabinet within the office space 4atD56

    cables shall be ,D>T( to avoid alienDcross tal2* which nor+ally happen above

    $Gigabit

    a. 7O C"aracteristics:

    (. C"aracteristics o, cat/92 ca(le is as ,ollo!s:

    The table below su++ari?es cabling types capable of supporting co++only specified

    applications over $11D+eter* fourDconnector topologies%

    Ta(le -: 2pplications C"art

    Categor) 8e

    Class D

    Categor)

    Class E

    Categor) 2

    Class E2Class 7 Class 72

    #@$3 M'(&

    To2en 8ing x x x x x$1'6&EDT x x x x x

    Technology Report - MEP 17

  • 8/13/2019 WOM Technology Report - Rev1 290813

    18/35

    Specialised Engineering Consultants WOM $9

    $11'6&EDT# x x x x x

    $00 M'(&

    6TMx x x x x

    $111'6&EDT x x x x x

    TI6@EI6D90# x x x x

    $1G'6&EDT x x x

    I&O@IE4

    $#$30D$## x x

    'roadband

    46T) x

    ,ro+ the above table 4lass ,6 B4atD56C cable is the latest and best suited for the

    pro;ect It can run all types of application including 4able T) and can even support

    applications above $1Gigabit to the extent of #1Gigabit

    The proposed bac2bone ,ibre optic B,OC cable is +ultiD+ode $1G'aseD&* which is

    the latest available for distribution

    c. %er,or+ance co+parison c"art ,or copper ca(les:

    The table below provides co+parative channel perfor+ance data at $11 M7? for

    category 0e@class .* category 3@classE* category 36@class E6* class ,* and class ,6

    channels Where there is a slight difference between TI6 and I&O perfor+ance li+its*

    I&O perfor+ance li+its are indicated in parenthesis%

    T2BE : Industr) Standards %er,or+ance Co+parison at -00 M;* ,or

    C"annels

    Categor) 8e

    Class D

    Categor)

    Class E

    Categor) 2

    Class E2

    Cat/9I also

    view the video against each transaction

    iii. Re+ote sur#eillance $CCT&' S)ste+

    44T) syste+ shall be operational !# x 5* "30 days and will have >(& power bac2up

    &yste+ will be expandable to cater for future re=uire+ents 4a+eras are provided in

    general to +onitor the following areas%

    4ar par2 ra+ps and entrances and exits* Fu+ber plate recognition

    6ll lift -obby areas Bground floorC

    Entrance to staircase

    6ll Main Entrances to each building

    8ecreational facilities

    (ublic areas

    4ar par2ing areasExternal areas

    8oof

    7otel areas and Mall areas as per .ubai police

    4a+era recording shall be based on +otion and will be interfaced with access control

    syste+ to record the entry@exit

    The 4.4@control roo+ shall be provided with -4. +onitors in addition to the video

    walls for +onitoring and playbac2

    c. Building Manage+ent S)ste+

    'M& will be provided to control and +onitor various +echanical e=uip+ents*

    syste+s etc 'M& will reduce the high cost of +aintenance cost and reduce the staff

    re=uire+ents to +anage the co+plete facility Through 'M&* the operator can ad;ust

    e=uip+ent properties as per actual re=uire+ents at site* trending* scheduling the

    +aintenance etc &o+e of the data points +onitored and controlled through 'M& are

    as follows%

    'T> +eters for each food outlet D Monitoring only

    Water +eters for each outlet D Monitoring only

    -(G +eters for each outlet D Monitoring only

    Water cooled chillers D Monitoring only 4hilled water pu+ps D Monitoring only

    Grey water syste+ D Monitoring only

    4o++ercial Hitchen exhaust ,ans D Monitoring and control

    6ll 67>

  • 8/13/2019 WOM Technology Report - Rev1 290813

    30/35

    Specialised Engineering Consultants WOM "1

    &tatus of Irrigation syste+ D Monitoring only

    Water treat+ent syste+@pu+p sets D Monitoring and control

    &tatus of water tan2s levels D Monitoring only

    Water feature syste+ D Monitoring only

    .o+estic water filtration syste+ D Monitoring only .rainage pu+ps D Monitoring and control

    Environ+ental control syste+* if any D Monitoring only

    -ifts D Monitoring only

    Grey water treat+ent syste+s D Monitoring only

    &T( D Monitoring only

    &tor+ water syste+ D Monitoring only

    Interface with ,acility +anage+ent D Monitoring only

    -ighting 4ontrol &yste+ and &ignage D Monitoring and control

    G@r +etering using 2Whr transducer D Monitoring .iesel generator set D Monitoring only

    -) panels for +eteringDModbus D Monitoring only

    >(& Modbus D Monitoring only

    .iesel generator set D Monitoring only

    ,ire alar+ syste+ D Monitoring only

    Interface with ,acility +anage+ent syste+s

    d. SM2T& s)ste+

    -atest &atellite T) distribution technology is considered for the facility

    The distribution can be carried out as per the following%

    Using Disec s!itc"es: .istribution shall be carried out using .isec switches to

    distribute various satellite channels through the I, networ2 This will also help various

    service providers to distribute their channels through co++on dishes and the tenants

    can subscribe to various channels fro+ various service providers

    I% T& distri(ution: I( based &atellite Master 6ntenna Television &yste+ is also

    considered as an option The dishes shall be placed in a co++on area fro+ where

    the signals are trans+itted through the structured cabling networ2 for the entire

    facility &ubscription to pay channels shall be as per tenants re=uire+ent

    Technology Report - MEP 30

  • 8/13/2019 WOM Technology Report - Rev1 290813

    31/35

    Specialised Engineering Consultants WOM "$

    ,or public area display -4.

  • 8/13/2019 WOM Technology Report - Rev1 290813

    32/35

    Specialised Engineering Consultants WOM "!

    &ince the >(& is provided with diesel power bac2 up in addition to +ains power* the

    bac2up battery shall be rated for $0 +inutes autono+y to save the capital cost >(&

    shall feed following loads in general%

    44T) ca+era .igital )ideo 8ecorders

    6ccess 4ontrol 8eaders

    44T) ca+eras

    &erver E=uip+ents* I., and M.,

    4ontrol roo+ e=uip+ents

    (-4s

    The >(& will be using latest I6BT tec"nolog)to reduce the har+onic level The

    output power factor of >(& shall be 1: +ini+u+

    Each office shall have provision to install their own >(& according to their individual

    needs

    9. oad 2nal)sis / %o!er

    Descrition S?,t S?.+

    w@

    s=+ T4- D 2W ., M. D 2W

    Net etta(le 2rea

    $Non "ospitalit)'

    6round ,loor

    Ground floor retail $3315$ $0#"# $11 $0#" :1A $"9:

    Ground floor hyper "9$91 "0#9 $01 0"! :1A #5:

    8efrigeration (lant #01 "11 $11A "11

    Ground , ' $0:$1 $#5: $11 $#9 :1A $""

    8efrigeration (lant #01 !11 $11A #01

    'ase+ent (ar2ing 331#9" 3$"9" 9 #:$ 01A !#3

    7irst ,loor

    ,irst floor retail !#"009 !!3"3 $11 !!3# :1A !1"5

    Second ,loor

    &econd floor retail !#"009 !!3"3 $11 !!3# :1A !1"5

    T"ird ,loor

    Third floor retail !!### !193 $11 !1: :1A $99

    4ine+a 9"""# 55#0 50 09$ 51A #15

    Govoffice $#1111 $"1$$ 51 :$$ :1A 9!1

    "rd floor food court "0111 "!0" 50 !## :1A !!1

    HitchenD"1A #01 #": :1A ":0

    Exhibition@

    Entertain+ent #0111 #$9! $01 3!5 91A 01!

    Technology Report - MEP 32

  • 8/13/2019 WOM Technology Report - Rev1 290813

    33/35

    Specialised Engineering Consultants WOM ""

    7ourt" ,loor

    #th floor , ' :"11 93# $11 93 :1A 59

    Hitchen D !1A #01 59 :1A 51

    Indoor sports doo+ $"99## $!:1# $01 $:"3 91A $0#9

    ;ospitalit)

    $No.1e)s'

    Heys@

    unit

    &=ft@

    unit

    Total

    S?,t

    Total

    S?.+

    w@

    s=+

    T4-D

    2W .,

    M. D

    2W

    4 star

    7otel standard

    roo+s !9# 93$ !##0!# !!5!0 $!1 !5!5 :1A !#0#

    3 star

    7otel standard

    roo+s !!5 0:! $"#"9# $!#9: $11 $!#: :1A $$!#

    7otel apart+ents

    B#JC $01 $01 $111 $01111 $":#$ $01 !1:$ :1A $99!

    Total 2eys

    @apart+ents 331 0!9:19 #:$00

    Mechanical -oadD

    2W $!"$5 :1A $$193

    Other Electrical

    -oadsD2W !011 91A !111

    Total -oadD2W ""5"5

    4ontingencyK$1A ""5# 91A !3::

    Total 4onnected

    -oad in 2WT4- "5$$1 "!!:"

    Total (ower in

    M)6L1:pf #$!M)6 "3M)6

    @. oad anal)sis / ;&2C

    Descrition S?,t

    Total

    2rea

    $+'

    Cooling

    load

    $!5s?.+'

    Total

    Cooling

    oad $1W'

    Total Cooling

    oad $TR'

    Net etta(le 2rea$Non "ospitalit)'

    6round ,loor

    Ground floor retail $33*15$ $0*#"# !11 "*195 959

    Ground floor hyper "9*$91 "*0#9 !11 5$1 !1!

    Ground , ' $0*:$1 $*#5: #01 330 $9:

    7irst ,loor

    ,irst floor retail !#"*009 !!*3"3 !11 #*0!5 $*!99

    Second ,loor

    Technology Report - MEP 33

  • 8/13/2019 WOM Technology Report - Rev1 290813

    34/35

    Specialised Engineering Consultants WOM "#

    &cond floor retail !#"*009 !!*3"3 !11 #*0!5 $*!99

    T"ird ,loor

    Third floor retail !!*### !*193 !11 #$5 $$:

    4ine+a 9"*""# 5*5#0 $50 $*"00 "93

    Govoffice $#1*111 $"*1$$ $31 !*19! 0:!

    "rd floor food court "0*111 "*!0" #01 $*#3# #$5

    Exhibition@Entertain

    +ent #0*111 #*$9! !01 $*1#3 !:9

    7out" ,loor

    #th floor , ' :*"11 93# #01 "9: $$$

    Indoor sports doo+ $"9*9## $!*:1# !11 !*09$ 5"#

    Total 4ooling -oad

    for shopping center with desiccant coated ther+al

    wheel* which re+oves the latent heat in addition to the sensible With this the overall

    64 cooling load is reduced by at least $0A

    The chilled water generation shall be hybrid chillers* if air cooled with 4,4 free

    refrigerant which has +uch i+proved 2w@T8 of cooling in co+parison withconventional chillers If the chillers are water cooled* the reco++endation would be

    Technology Report - MEP 34

  • 8/13/2019 WOM Technology Report - Rev1 290813

    35/35

    Specialised Engineering Consultants WOM "0

    to go for centrifugal with ),.* which is a latest technology introduced only and

    +astered by or2 International

    $ .epending on the type of area space utili?ation the space internal

    cooling could be by central 67> with ),. B)ariable ,re=uency

    .rivesC instead of ,4> in the ceiling voids Though there are +anyadvantages li2e low noise* no condensation dripping* reduction in

    power consu+ption* +aintenance personal out of wor2ing areas* no

    access panels in ceilings* +eets the sustainable design re=uire+ents*

    etc* this depends on the area of each occupant and availability of

    space for 67>

    -0. %lu+(ing and drainage s)ste+s

    $ We would li2e to introduce (E piping for do+estic water distribution

    for toilets instead of conventional piping This will allow forreplace+ent of piping without having to brea2 the tiles

    ! The >rinals and W4 flushing can be with duel flushing cisterns*

    though we would reco++end flush valve syste+ for toilets for

    auditoriu+ and co+plexes due to higher utili?ation

    " We reco++end providing water +etering at each floor levels with

    central riser fro+ roof These +eters could be connected to 'M& for

    +etering and billing purpose

    # We reco++end solar water heaters if space per+its with the drain

    bac2 facility to eli+inate bleed of@overflow of hot water during non

    consu+ption period

    0 We co++end providing separate piping and treat+ent for &oil and

    grey water

    3 We would propose the grey water treat+ent with the Me+brane

    'ioreactor technology by which suspended solids can be eli+inated

    up to ::5A and in addition >) filters can be installed to 2ill all

    bacterial and reusing treated grey water for W4 flushing or cooling

    tower or irrigation syste+