Winter project 2013

29
Grounds Department Off Season Review February 27, 2013

Transcript of Winter project 2013

Page 1: Winter project 2013

Grounds DepartmentOff Season Review

February 27, 2013

Page 2: Winter project 2013

New forward tee boxes on # 2

Page 3: Winter project 2013

Deep tine aeration alleviating soil compactions of the fairway.

Page 4: Winter project 2013

4 green – reclaimed putting areas

Page 5: Winter project 2013

5 green – reclaimed putting areas

Page 6: Winter project 2013

6 green 7 greenReclaimed putting areas

Page 7: Winter project 2013

8 green – reclaimed putting areas

Page 8: Winter project 2013

Original design for # 8 green

Page 9: Winter project 2013
Page 10: Winter project 2013

Logs from hole # 8

Page 11: Winter project 2013

Left side of 8 green – Brush clearing and grade tweaks

Page 12: Winter project 2013

Tree roots growing through bunker drainage gravel

Page 13: Winter project 2013

Tree roots compromising drainage pipe and gravel of our bunkers

Page 14: Winter project 2013

Old bunker drainage lines

Page 15: Winter project 2013

Green side bunker work # 10

Page 16: Winter project 2013

Worn bridge decking on # 4 bridge

Page 17: Winter project 2013

Gary Derickson and Garrett Lewis installing new decking on # 4 bridge

Page 18: Winter project 2013

New decking for # 4 bridge

Page 19: Winter project 2013

Tree removals for new 50 ft netting along one tee

Page 20: Winter project 2013
Page 21: Winter project 2013

Storm Damage left of 15 fairway

Page 22: Winter project 2013

Storm damage to left of 15 fairway

Page 23: Winter project 2013

Storm Damage to left of 15 fairway

Page 24: Winter project 2013

Storm Damage behind 3 tee

Page 25: Winter project 2013

Storm damage 12 tee

Page 26: Winter project 2013

New drain basin on # 9 rough

Page 27: Winter project 2013

Toro Golf Decoder Control System(GDC)Update

Page 28: Winter project 2013

Continuing education opportunities