12th Australian Tunnelling Conference
21 – 22 November 2013
![Page 2: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/2.jpg)
The partners
• Perth City Link Rail Alliance project supported by Local, State and
Federal governments:
• $360 million project
• PTA will deliver the project’s first stages:
• Stage 1 (2011- 2014): sink 600 metre section of the Fremantle Line; build
a pedestrian underpass to connect Perth and Perth Underground stations;
and major upgrades to Perth Station
• Stage 2 (2014 - 2016): sink the Wellington Street Bus Station
underground
• MRA will manage the area’s planning and subdivision works, create the
new public spaces and facilitate private sector investment for the overall
Perth City Link project
![Page 3: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/3.jpg)
Rail project overview
• Sinking the Fremantle Line (William Street to Lake/King Street)
• New covered section of the Fremantle Line almost 600metres long
• Total work site exceeds 1.2km in length
• Improving connections between Perth Station and Perth Underground via a new pedestrian underpass
• By 2031, 22,600 people a day will use the new underpass
• Major upgrades to Perth Station, to meet Perth’s future public transport needs and special events.
• A new platform and track is being constructed, involving the extension of Barrack St Bridge
![Page 4: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/4.jpg)
January 2012
July 2011
![Page 5: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/5.jpg)
October 2013
![Page 6: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/6.jpg)
The vision - beyond 2016
![Page 7: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/7.jpg)
The facts
• 83,000 cubic metres of earth moved
• 53,000 cubic metres of concrete poured
• 3,400 metres of track laid
• 200km of cable installed (signals / communications and
power)
![Page 8: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/8.jpg)
BARRACK STREET
HORSESHOE BRIDGE
TUNNEL & DECLINES
PEDESTRIAN
UNDERPASS
CHILD CARE CENTRE
PERTH STATION
Key site areas
![Page 9: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/9.jpg)
Engineering and design challenges
![Page 10: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/10.jpg)
Building a tunnel over two existing tunnels
![Page 11: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/11.jpg)
Eastern Dive
Main Tunnel
Western Dive
Pedestrian Underpass
PUG LINK
Fremantle tunnel
![Page 12: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/12.jpg)
Fremantle and Joondalup Line tunnels
Fremantle
Line tunnel
Joondalup Line
bored tunnels
![Page 13: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/13.jpg)
Staged construction to maintain operating train
station
![Page 14: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/14.jpg)
Operating in a live rail environment
![Page 15: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/15.jpg)
Heritage-listed structures and nearby buildings
![Page 16: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/16.jpg)
Relocating Horseshoe Bridge Pier
![Page 17: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/17.jpg)
Piling in Childcare Centre playground
![Page 18: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/18.jpg)
Dewatering tanks
![Page 19: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/19.jpg)
Instrumentation and monitoring
![Page 20: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/20.jpg)
Located on old Lake Kingsford
![Page 21: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/21.jpg)
Site location - logistics
![Page 22: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/22.jpg)
Proactive approach to community relations
![Page 23: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/23.jpg)
WESTERN DECLINE
MAIN TUNNEL
EASTERN DECLINE
Perth-Fremantle tunnel
![Page 24: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/24.jpg)
Main tunnel
![Page 25: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/25.jpg)
D-wall excavation
![Page 26: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/26.jpg)
Pre-cast roof planks
![Page 27: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/27.jpg)
Topping slab
![Page 28: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/28.jpg)
Insitu base slab
![Page 29: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/29.jpg)
Western decline
![Page 30: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/30.jpg)
Eastern decline
![Page 31: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/31.jpg)
Tunnel excavation
![Page 32: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/32.jpg)
Fremantle Line tunnel – rail track
![Page 33: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/33.jpg)
Construct Diaphragm
Walls
Initial Bulk Excavation Construct Roof Slab
Partial Excavation
Complete Bulk Excavation
/ Dewatering
Construct Base Slab
Lateral Earth Pressures
RL 8.9 (Nom.)
Construction sequence
![Page 34: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/34.jpg)
3D plaxis modeling
![Page 35: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/35.jpg)
Joondalup and Fremantle Line tunnel interface
![Page 36: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/36.jpg)
MAIN TUNNEL
![Page 37: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/37.jpg)
Key design considerations
Proximity to existing tunnels
• current state of tunnel
• cracking of segment linings
• leaks at segment joints and bolt pockets
• Effects of construction on existing defects
![Page 38: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/38.jpg)
Key design considerations
Groundwater control
• Tunnel heave
• Release of overburden pressure
• Buoyancy due to high groundwater level
![Page 39: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/39.jpg)
Key design considerations
Stabilisation of diaphragm wall
toe
Primary support
Diaphragm wall panels
Prestressed Hanger
Beam
![Page 40: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/40.jpg)
CSM – grouted base
![Page 41: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/41.jpg)
Key design considerations
Soil movement minimisation
• Minimisation of soil pressure relief
• Increased diaphragm wall
stiffness
• Grout-mix base restraint to
diaphragm walls
• Staging of base slab excavation /
construction
![Page 42: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/42.jpg)
![Page 43: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/43.jpg)
Advantages of adopted solution
Simplicity of construction
Staged construction
• Facilitates progressive monitoring
• Allows ongoing benchmarking of theoretical results
• Allowed continuous assessment of impact
• Provided avenue for continuous input from design
![Page 44: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/44.jpg)
Tunnel – western decline
![Page 45: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/45.jpg)
![Page 46: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/46.jpg)
Key design issues
Future above-ground developments
• Magnitude of applied loads
• Restrictions on allowable tunnel movements
![Page 47: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/47.jpg)
5.1 MN 12.6 MN 15.2 MN 12.6 MN
Continuous 600
Diaphragm Wall 1200 / 1050 Dia.
Piles
Existing Sheet piling
40 / 30kPa 40 / 30kPa 40 / 30kPa
![Page 48: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/48.jpg)
Staged construction
• Screening to existing decline structure
![Page 49: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/49.jpg)
Construction sequence – stage 1
600 Continuous
Diaphragm Wall
1200 / 1050
Dia. Piles
Piles
![Page 50: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/50.jpg)
Construction sequence – stage 2
Construct Base
Slab
Excavate to a
maximum of 4.2m
Full depth
excavation within
Dive Structure
Construct Buttress
& Infill Walls
![Page 51: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/51.jpg)
Construction sequence – stage 3
Construct Roof Slab
![Page 52: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/52.jpg)
Construction sequence – stage 4
Complete Bulk
Excavation
Pour Bus Ramp
Base Slab
![Page 53: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/53.jpg)
Construction sequence – stage 5
Commission Tunnel &
Dive Structures
![Page 54: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/54.jpg)
Construction sequence – stage 6
Install Piles
adjacent existing
Decline Structure
![Page 55: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/55.jpg)
Construction sequence – stage 7 Construct Roof
Slab over Perth-
Butler Decline
![Page 56: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/56.jpg)
Pedestrian underpass
![Page 57: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/57.jpg)
Pedestrian underpass layout
![Page 58: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/58.jpg)
Pedestrian underpass
![Page 59: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/59.jpg)
Key design considerations
• Distance to operating train
station
• Maintain pedestrian movements
![Page 60: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/60.jpg)
Key design considerations
Top down construction
• Minimise required number of
shutdowns
• Delayed commencement of
stage 1 tunnel works
• Temporary strutting of contiguous
piled walls
![Page 61: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/61.jpg)
Underpass structure
![Page 62: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/62.jpg)
Underpass structure
![Page 63: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/63.jpg)
Underpass structure
![Page 64: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/64.jpg)
Perth Station underpinning
![Page 65: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/65.jpg)
Micro-piling underneath Perth Station
![Page 66: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/66.jpg)
Underpinning beams
![Page 67: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/67.jpg)
Perth Station underpinning
![Page 68: Will Freelander, John Holland: Perth City Link](https://reader033.fdocuments.net/reader033/viewer/2022042714/555b7a95d8b42aae678b56aa/html5/thumbnails/68.jpg)