…While Investing To Achieve Excellence In Reliability
247
315 320
30%
Transmission capital investment03-06; $ millions
296
335 330
Distribution capital investment03-06; $ millions
13%
SAIDI1 benchmarks (non-storm)98-06E; Minutes
03 topquartile
TXU 04E per-formance
TXU 06Etarget
TXU 05Etarget
11%
77 78 6874
1 System Average Interruption Duration Index
TXU Electric Delivery
TXU Electric Delivery Has A Strong Competitive Position…
Large customer base03; Millions of customers
Large infrastructure03; Thousands of miles of primary distribution lines
High growth03-12E; Percent annual demand growth
TXU TXU
ERCOTFRCC
SERCECAR
WECCMAPP
MAACSPP
MAINNPCC
2.5 2.52.3 2.2 2.1
1.9 1.8 1.8 1.81.4
5.2 5.2
4.1 4.1
3.1 2.9 2.8 2.62.2 2.2
86 8573 69 67 62 57 53
39
Source: FERC
EXCPCG SO PGN ETR D DUKEDFPL
Source: NERC Source: PA Consulting
Source: Proprietary benchmarking study
143
Top quartile safety record03; Lost time incidents per 200,000 hours
0.12
0.21
0.14
0.25
0.43
0.28
0.40
0.27
0.12
TXU
…Focused On Providing The Lowest Cost…
T&D O&M expense/distribution customer03-04; $ per customer
TXU 03 performance
03 top quartile
03 top
decile
TXU 04E performance
2.71 2.46 2.19 2.19
TXU 03 performance
03 top quartile
03 top
decile
85
77 77 76
TXU 04E performance
T&D O&M expense per MWh delivered03-04; $/MWh delivered
$24.01
$24.27
$34.03
$25.89
TXU
Center-point
AEPCentral
AEP North
TNMP
$27.97
Monthly wires charges04; Dollars1
1 Assumes 1000 KWH monthly customer; Electric Delivery’s average residential consumption for 2003 was about 1300 kWh. Other non-operating charges,including system benefit fund, nuclear decommissioning charge, excess mitigation credit, retail clawback credit, transition charge on securitized regulatoryassets and merger savings/rate reduction riders have not been included.
03 05E 06E03 05E 06E
OKLAHOMA
TITUS
FRA NKLINCO LLINDEN TO N
G R AYSO N
CO O KE
M O NTA G UE
YO UNG
ARC HER
STE PHE NS PALO P INTO
PAR K ER
TAR RANT DALLAS
RO CKW ALL
HUN T
HO PKINS
RAINSW ISE
JACK
CLAY
FAN NIN
CHE RO KE E
RED R IV ER
CAM P
LAM AR
W O O DUPS HUR
SM ITH
HEN DERSO N
AND ERSO N
FRE ESTO NE
LIM ESTO NE
NAV A RRO
JO HNS O N
BO SQ U E
HILL
M cLE NNAN
FALLS
RO BERTS O N M ADISO NLEO N
HO USTO N
TRINITY
W ALKE R
G R IM ES
HO O D
CO M A NCHE
HAM ILTON
M ILLS
BRO W N
ERA TH
EAS TLAN D
CO RYELL
LAM PAS A S
BELL
M ILAM
BUR LESO N
BRA ZO STRA VIS
BUR NET
FO ARD
W ILBARG ER
BAY LO R
KNO X
CHILDRE SS
CO TTLE
KING
STO NEW A LL HAS K ELL
THR O CKM OR TO N
HAR DEM ANM O TLEYFLO YDHALELAM BBAILEY
CO CHRAN HO CKLEY LUBB O CK CRO SBY DICKE NS
KEN TG A RZALYNNTER RYYO AKUM
SHA CK E LF O RD
JO NE S
FISHE R
TAY LO R
CALLAH AN
NO LAN
G A IN ES DAW S O N BO RDEN SCU RRY
AND REW S M ARTIN
HO W ARD M ITC HELL
CO LEM ANRUN NELS
CO KE
STE RLING
IRIO N
TO M G R EEN
CO NCHO
M cC ULLO CH
G LA SSCO CK
M IDLAND
ECT O R
CRA NE UPT O N REA G AN
TER RELL
CRO CKET T
SAN S A BA
LLANOM ASO N
M ENAR DSCH LEICHER
SUT TO N
KIM BLE
BLAN CO
W ICHITA
W ILLIAM SO N
ELLIS
KAU FM AN
SO M E RVELL
VAN Z ANDT
CAS TRO
LEEW ASH IN G TO N
W ALLER
M O NTG O M ERY
HAY S
DELT A
G ILLES PIE
Previously planned projects New projects
Transmission Grid Enhancements Will Reduce Grid Congestion And Support Grid Reliability
99-03: DFW area increased imports by 2600 MW
00-03: 25GW of new generation capacity in ERCOT
Increased demand in DFW is being served by new generation located outside the Metroplex causing ~$100 million in congestion costs…
…TXU is undertaking an aggressive plan to enhance the grid and relieve the congestion…
TXU plans to spend $400 million in 04 and 05 on transmission systemupgrades across North Texas
TXU plans to spend $400 million in 04 and 05 on transmission systemupgrades across North Texas
1 2
3 4
Storm Restoration: Our Commitment to Customer Service
June 1, 2004 storm Worst storm in 100 year history of TXU (Category 1 hurricane winds) 500,000 lightning strikes across TXU Electric Delivery system More than 11,000 device outages affecting approximately 1.3 million
customers 90% of customer power restored within 60 hours
Enhanced customer service through remote and on demand meter reading without accessing premise
Technology will allow for automatic outage notification, power quality monitoring and real time customer access to consumption data
Enhanced customer service through remote and on demand meter reading without accessing premise
Technology will allow for automatic outage notification, power quality monitoring and real time customer access to consumption data
Automated Meter Reading Will Improve ProductivityAnd Safety
Load Control Transponder
DistributionSubstation
Voice Grade Communication
PowerLines
Substation Control Equipment
ServiceTo Home
Gas MeterWater Meter
Automated electric Meter
Client Workstation (PC)Mainframe
Communication FrontEnd Processors (FEPs)
Network Client Workstations (PCs)
IT Network Platform
Oracle
Billing/CIS Mainframe
SCADA, EMS, OMS,
etc
UTILITY ENTERPRISE NETWORK (WAN/LAN)
Distribution Automation Will Enhance Customer Service And Increase Operational Efficiency
Disruption occurs on delivery system causing an outage…
1 2
Operations Center gets notified of outage
DOC
Cell Tower
Switch & CellularModem
3 Dispatcher notifies field technician who has to inspect entire feeder; average restoration time of 30-45 minutes
3 Distribution automation technology immediately identifies location of disruption and reconfigures system to restore service to majority of customers, typically within minutes.
Old
Way
New Way
Where deployed, automation technology enhances customer serviceby reducing restoration time up to 80%
Where deployed, automation technology enhances customer serviceby reducing restoration time up to 80%
TXU Electric Delivery
5 6
7 8
These Initiatives Are Improving Electric Delivery’sFinancial Performance
9301,005
1,160
0.68
0.80
1.29
Operational EPS03-05; $ per share
EBITDA1
03-05; $ millions
25%25%
04E 05E03
90%90%
04E 05E03